You are on page 1of 1

E-Engineering Limited

95, Khawaja Tower (13th floor), Mohakhali, Dhaka.


Payra Port Project, Patuakhali.

List of Manpower
Date: 06-05-2019
Package No
SL no Name Of Contractors Total
1 2 3 7 11 12 13 14
1 Sprinters corporation 4 8 12
2 Mahin enterprise 14 10 24
3 Myth Village 12 8 12 32
4 T.B.L Enterprise 4 19 23
5 Nokib Corporation 27 2 6 35
6 Bosundia Corporation 20 7 27
7 S.M Construction 9 5 14
8 F.Khan 5 5
9 Sadik Enterprise 4 4
10 Nabil Enterprise 4 4
11 OT. Corporation 11 16 27
12 Digonto Builders 6 9 15
13 Lutfar Enterprise 7 6 13
14 Omega Consurtium 17 17
15 Taj Enterprise 6 14 20
16 Tr. Pilling 0
17 Ariyan Traders 3 11 14
18 DSC& Lina 9 9
Total Manpower = 295

N.B. Manpower reduce due to Cyclone Fani (dYx).

You might also like