Professional Documents
Culture Documents
net/Flowcrete/flowcrete-india-presents-industrial-flooring-installation-the-problems-causes-
and-solutions
https://www.slideshare.net/AkisApostolopoulos/how-does-the-working-temperature
https://www.slideshare.net/deepakdha/epoxy-epoxy-floorings
1. Preparation:
2. At the time of installation of the Napfloor EP-200 SL system , the substrate
concrete must have a minimum tensile strength of >1.5 MPa, be more than
7 days old and the surface should be dry.