You are on page 1of 5

BP VIETNAM NAM CON SON GAS PROJECT

SUPPLIERS FRONT SHEET (FOR A4/A3 DOCUMENTS ONLY)

DOCUMENT Procedure for Positioning of Rod-Drop Probes, Calibration and Setting of Monitoring Equip.t

TITLE

TOTAL No. OF PAGES


(INCLUDING FRONT SHEETS)

SUPPLIER ORDER No.

SUPPLIERS APPROVAL NAME


SUPPLIERS OWN DOCUMENT No. REV. DATE
AND SIGNATURE

SOP 24932/4 . . .

SUBMITTED FOR :
BP VIETNAM NAM CON SON GAS PROJECT
INFO REVIEW

REVIEW DOES NOT CONSTITUTE SUPPLIER NAME : Nuovo Pignone S.P.A


ACCEPTANCE OF DESIGN DETAILS,
CALCULATIONS,TEST METHODS OR
MATERIALS DEVELOPD OR SELECTED PACKAGE DESCRIPTION :
BY SUPPLIER, NOR DOES IT RELIEVE
CONSTRUCTUAL OR OTHER OBLIGATIONS. Stabiliser Overhead Compressor

1. REVIEWED AND ACCEPTED.


WORK MAY PROCEED.

2. PLEASE RESUBMIT DOCUMENT TAG NOS : MODEL


AFTER RESOLVING OUR COMMENTS. TYPE NOS:
WORK MAY PROCEED ON BASIS OF
REVIEW COMMENTS.

3. NOT ACCEPTABLE. WORK MAY NOT


PROCEED.

LIFE CYCLE CODE : B SDRL PRIME CODE : G04


NAME: DATE:
PURCHASE ORDER NO. SDRL CAT. SEQUENCE NO. ISSUE

SIGNATURE:
8382-3201-PM115A G 002 01

You might also like