PROJECT: LIGHT RAIL TRANSIT LINE 3 (LRT3) PROJECT FROM BANDAR UTAMA TO
JOHAN SETIA|
PACKAGE G506: CONSTRUCTION AND COMPLETION OF GUIDEWAY, STATIONS,
ANCILLARY BUILDINGS AND OTHER ASSOCIATED WORKS FOR COMPLETION OF
LIGHT RAIL TRANSIT LINE 3(LRT3) FROM BANDAR UTAMA TO JOHAN SETIA
NoTIFICA “TERMINATION OF WP‘
417 BEREAU GROUP (Ml) SDN, BHD.
Reference is made tothe above mater
SUBCONTRACTOR = CHINA Ri
We would ike to notity MRCAGK that we have terminated our major subcontractor, China
Railway 17° Bureau Group M) Sdn. Bhd. to take effec as at §* November 2020 following
their breech of cur Subcontract Agreement
Due to this circumstances, tis estimated that we require a cooling off period for about two
|woeks in order for us to reorganize all the necessaries 1o resume the work at site, Please be
sured that we wll endeaver to minimize work csrupton at st,
‘The decision is deemed necessary to remedy the present work gaps. We are commited to
diver the Project successfully and we shall update you from time to time the development
ofthis process.