40 old NH-4
between Hubli-Dharwad from Hosur at Hubli to Jubilee Circle at Dharwad
CHAINGE
TYPE OF SPAN TYPE OF SPAN U/S D/S From To
STRUCTURE STRUCTURE
7+080 Rcc Slab 1x0.6x0.5M RCC Box 1x1.5x1.5M 7+048 150.229 156.184 148.509 148.44 RHS LHS
7+585 Rcc Slab 1x0.7x0.4M Discarded - 7+560 159.376 160.141 158.336 158.226 LHS RHS
7+720 Rcc Slab 2x0.75x0.8M + 1x0.9x0.8M RCC Box 2x1.5X1.5M 7+694 158.291 158.975 156.761 156.351 LHS RHS
7+920 Rcc Slab 2x0.8x0.6M RCC Box 1x1.5x1.5M 7+890 159.356 160.139 Not visible 157.451 LHS RHS
8+160 Rcc Slab 1x0.6x0.5M Discarded - 8+130 161.073 162.764 159.863 159.733 LHS RHS
8+280 Rcc Slab 1x0.9x0.8M RCC Box 1x1.5x1.5M 8+255 162.318 162.718 160.543 159.943 LHS RHS
8+565 Rcc Slab 1x0.9x0.8M RCC Box 1x1.5x1.5M 8+530 162.676 163.628 160.316 160.243 LHS RHS
Construction of 4-laning of Mangsuli-Lakshmeshwar (SH-73) between Km 229.00 to Km 248.40 old NH-4 between Hubli-Dharwad
from Hosur at Hubli to Jubilee Circle at Dharwad
CH:7+048 ( 1 X 1.5 X 1.5 M BOX )
BS IS FS HI RL REMARKS
0.965 151.409 150.444 TBM V 8 on culvert HW. L/S 7+100
1.180 150.229 Rd Center
1.250 150.159 5 L BT Edge
1.295 150.114 6 L HW Edge
2.910 148.499 8L
2.694 148.715 10L
2.865 148.544 12L
2.900 148.509 14L
2.915 148.494 16L
2.965 148.444 Invert Level D/S (LHS)
2.125 149.284 Vent Slab soffit
1.410 149.999 5R
1.490 149.919 6R
2.900 148.509 Invert Level U/S(RHS)
2.890 148.519 8R
2.880 148.529 10R
2.870 148.539 12R
2.850 148.559 14R
2.830 148.579 16R
0.965 150.444 Closed on TBM V8
Ch 7+560
BS IS FS HI RL REMARKS
TBM V-9 over layout culvert RHS 20 mtrs from Rd
0.723 159.880 159.157
Centere Line at 7+770
2.15 1.469 160.561 158.411 TBM 22 over culvert HW top R/s 7+700
1.185 159.376 Road Centre
1.43 159.131 6 L BT Edge
1.445 159.116 8 L HW Edge
2.225 158.336 Invert Levels U/S (LHS)
1.825 158.736 Vent Slab Soffit
2.05 158.511 10 L
1.305 159.256 12 L
1.19 159.371 14 L
0.98 159.581 6 R BT edge
0.955 159.606 7 R HW Edge
2.34 158.221 Invert Levels D/S (RHS)
1.94 158.621 Vent Slab Soffit
1.92 158.641 8R
2.21 158.351 10 R
2.41 158.151 12 R
2.36 158.201 14 R
2.325 158.236 16 R
2.15 158.411 Closed TBM on 22
Ch 7+694 ( 2 x 1.5 x 1.5 M BOX)
BS IS FS HI RL REMARKS
TBM V-9 over layout culvert R/S 20 mtr from
0.723 159.880 159.157
Centere Line at 7+770
1.175 1.469 159.586 158.411 TBM 22 over culvert HW Top R/S 7+700
1.295 158.291 Road Centre
1.41 158.176 6 L BT edge
1.48 158.106 8 L HW edge
2.825 156.761 Invert Lever U/S (LHS)
2.025 157.561 Vent Slab Soffit
2.53 157.056 10 L
2.085 157.501 12 L
1.86 157.726 14 L
1.69 157.896 16 L
1.44 158.146 6 R BT edge
1.465 158.121 8 R HW bottom
3.235 156.351 Invert Level D/S (RHS)
2.435 157.151 Vent Slab Soffit
3.31 156.276 10 R
2.89 156.696 12 R
2.87 156.716 14 R
3.105 156.481 16 R
1.175 158.411 Closed on TBM 22