NH-216) to two lanes With Paved Shoulder in the State of Andhra Pradesh under NHDP-IV through Engineering ,Procurement &
Construction (EPC) basis.
Wt. of SSD Material Passing through 14mm and Retained on 10mm Sieve
2 3207 3215 3213
[ W3 =(W2-W1 )] in gms
Applied Load ( KN )
4 190 192 180
(X)
Percentage Fines ( % )
5 10.60 10.73 10.68
Y = (W4/W3) X 100
14X / (4+Y) ( KN )
Remarks: 1)X is applied load to produce 10% fine in KN ( 20mm Penetration in 10 Minutes)