RITL /QAQC/F03
Project Name : Construction of Civil and Structural Works of Single track Rail Bridges for ( Bridge no.
REV. NO R0
13 14 15 16 17 ) Five Bridge between Chainages: KM 28+000 to 42+000 in Connection with Sivok (West
DATE OF REV. 01.01.2022
bangal) to Rangpo (Sikkim)new single line BG Railway Line Project (PKG -II)
PAGE 1 OF 1
CLIENT : IRCON INTERNATIONAL LIMITED
Cumulative
Weight Retained Cum. Wt Retained Percentage of
IS Sieve Size (mm) Percentage Specification Limit (IS:383 )
(gms) (gms) Passing
Retained
12.5 100
10 85-100
4.75 0-20
2.36 0-05