FORMAT NO.

RITL /QAQC/F03
Project Name : Construction of Civil and Structural Works of Single track Rail Bridges for ( Bridge no.
REV. NO R0
13 14 15 16 17 ) Five Bridge between Chainages: KM 28+000 to 42+000 in Connection with Sivok (West
DATE OF REV. 01.01.2022
bangal) to Rangpo (Sikkim)new single line BG Railway Line Project (PKG -II)
PAGE 1 OF 1
CLIENT : IRCON INTERNATIONAL LIMITED

CONSULTANT : M/sD2 Consult-PEMS(JV),M/s AMBERG ENGINEERING AG

CONTRACTOR : M/s Royal- ITL(JV)

SIEVE ANALYSIS OF COARSE AGGREGATE (10 mm)


IS: 383 - 1970
Source : Date of Sampling :

Test Location : Date of Testing :

Wt. of Sample (gms) : Sampled by : Jointly

Cumulative
Weight Retained Cum. Wt Retained Percentage of
IS Sieve Size (mm) Percentage Specification Limit (IS:383 )
(gms) (gms) Passing
Retained

12.5 100

10 85-100

4.75 0-20

2.36 0-05

Remarks :

Contractor's Representative Consultant's Representative IRCON's Representative