You are on page 1of 1

Fnglneerlng.

Procuromant, Construction and Commiasloning of Projort Roads, Civil & Hydro mothanical works tor 120 MW Lm
Kopill Hydroolectric Projosit, Asam (Packago 2)

ClHent
Assam Power Genoration Corporation
Limited
Lndars ADB
Project EPC
Managemeont
Consultant
AF Consut 8witzorland Limitod
(PE)|.Contractor Larsen & Toubro Limited

Grading Analysis As Per Morth Tablo 600-10 Format No LKHEPPKGZINT/111/G6tA/20006

LKHEP Locatlon: L&T QC Lab Date of Rav 2020-10-19

AGGREGATE /SOL TYPE:

Lsb Rat. No.


Sampling Date :
2n2
Testing Date 3111/92 Samplod By
Toint
Sample source Dohnka Cwsht Sanple Location; Dobaka
Weight of Sample taken: (gm)
ww
3 00 3
Siove Sizo Mass retained %Rotainod % Retainod %Passing JMF limits Spocified inits
Grading 1l as per
(mm) (gm) Accum.
MoRTH, Table 500-10

100
37.5
00
90-100
26.5
100 L00 0 0924
19
92S0 350 19432.0S 1-95

13.2 56-20
1200 S0 24lbT:10| 32-54
4.75
3So 1100 16o331.c
28-42
2.36
13959295 o.15
7--21
0.3
auolFu5 81.6Glo:34 2-&
0.075
350 12695|92.33 C4_|
PAN

Issued by - EPC Contractor: Verified by-PMC: Verified by - APGCL:

Name: oya Sywan Cme Name: |Name |iwuimgoh suknal


Sign Sign Sign haikia
Designation: Designation: . Designation: AGM () ie
Date
H2a Date Date

2 5 70m*
200 %dm NEB

a 1350
LN

CRMT

You might also like