You are on page 1of 60

CONSTRUCTION OF ACCESS CONTROLLED NAGPUR- MUMBAI SUPER COMMUNICATION

EXPRESSWAY (MAHARASHTRA SAMRUDDHI MAHAMARG) IN THE STATE OF


MAHARASHTRA ON EPC MODE FOR PACKAGE 10, FROM KM. 444+845 TO KM. 502+752

Format No.:T/F 6 Rev no: 0 Rev. Date : 14.01.2019


Client MAHARASHTRA STATE ROAD DEVELOPMENT CORPORATION
SPV NAGPUR MUMBAI SUPER COMMUNICATION EXPRESSWAY LIMITED
Authority Engineer FP Project Management
Construction Contractor Larsen & Toubro Limited - TIIC(RR&EC)

FREE SWELL INDEX


[As per IS 2720 (Part - 40)
Laboratory Job No. Date Sampled 27.09.19
Type of Material Soil Sampled By Jointly
Source BA-57 @ PIT 01 Date Tested 28.09.19
Location 488+700 LHS @ 6 KM Tested By Jointly
Proposed Use EMB/SUB

Sample level in Sample level in Free Swell in Free Swell Index


Average
Water (Vw) kerosene (Vk) Water (Vw-Vk) 100x(Vw-Vk)/Vk
S.No. Free Swell Index
(%)
(ml) (ml) (ml) (%)

1
13 10 3 30

3 30

Note : 1. Test sample shall be passing 425 micron sieve


2. Take 10gm of each sample.

Remarks : ……………………………………………………………………………………………..

Specification Limits as per MoRTH Clause 305.2, Free Swell Index shall not be more than 50%

For L&T, TIIC For FPPM For NMSCEL/MSRDC


MUMBAI NAGPUR EXPRESSWAYCONSTRUCTION OF ACCESS CONTROLLED NAGPUR- MUMBAI SUPER COMMUNICATION
EXPRESSWAY (MAHARASHTRA SAMRUDDHI MAHAMARG) IN THE STATE OF
MAHARASHTRA ON EPC MODE FOR PACKAGE 10, FROM KM. 444+845 TO KM. 502+752

Format No.:T/F 8 Rev no: 0 Rev. Date : 14.01.2019

Client MAHARASHTRA STATE ROAD DEVELOPMENT CORPORATION

SPV NAGPUR MUMBAI SUPER COMMUNICATION EXPRESSWAY LIMITED

Authority Engineer FP Project Management

Construction Contractor Larsen & Toubro Limited - TIIC(RR&EC)

SIEVE ANALYSIS OF SOILS


[As per IS : 2720, (Part 4)]
Laboratory Job No. Date Sampled 27.09.19

Type of Material Soil Sampled by Jointly

Source BA-57 @ PIT 01 Date Tested 28.09.19

Location 488+700 LHS @ 6 KM Tested by Jointly

Proposed Use EMB/SUB

Weight of sample taken(gm): 1000


Cumulative
S Weight Cumulative Cumulative
Sieve Size Weight Remarks
no Retained Retained Passing
Retained
(mm) (gms) (gms) (%) (%)

GRAVEL CONTENT
A 100.0 0 0 0 100 38.26
(B-D):%

B 75.0 0 0 0 100

SAND CONTENT
C 19.0 189.5 18.95 18.95 81.05 33.67
(D-G):%

D 4.75 193.1 19.31 38.26 61.74

SILT&CLAY CONTENT
E 2.00 102.6 10.26 48.52 51.48 28.07
(G):%

F 0.425 90.6 9.06 57.58 42.42

G 0.075 143.5 14.35 71.93 28.07

For L&T, TIIC For FPPM For NMSCEL/MSRDC


CONSTRUCTION OF ACCESS CONTROLLED NAGPUR- MUMBAI SUPER COMMUNICATION
EXPRESSWAY (MAHARASHTRA SAMRUDDHI MAHAMARG) IN THE STATE OF
MAHARASHTRA ON EPC MODE FOR PACKAGE 10, FROM KM. 444+845 TO KM. 502+752
(From village Fatiyabad to village surala in aurangabad district)

Format No.:T/F 5 Rev no: 0 Rev. Date : 14.01.2019


Client MAHARASHTRA STATE ROAD DEVELOPMENT CORPORATION
SPV NAGPUR MUMBAI SUPER COMMUNICATION EXPRESSWAY LIMITED
Authority Engineer FP Project Management
Construction Contractor Larsen & Toubro Limited - TIIC(RR&EC)
ATTERBERG'S LIMITS
[As per IS 2720, (Part-5)]
Laboratory Job no Date Sampled 27.09.19
Type of material Soil Sampled by Jointly
Source BA-57 @ PIT 01 Date Tested 28.09.19
Location 488+700 LHS @ 6 KM Tested by Jointly
Proposed Use EMB/SUB
Liquid Limit Plastic Limit
Determination No. 1 2 3 4 5 6
Container No. 165 166 167 168 169 170
Empty Wt.of Container (W1) gm 15.87 15.33 15.16 15.55 14.82 14.49
Wt.of Container and Wet material (W2) gm 41.79 43.98 43.61 37.61 18.19 17.95
Wt.of Container and Dry material (W3) gm 35.59 36.96 36.44 31.86 17.41 17.15
Wt.of Moisture (W4=W2-W3) gm 6.20 7.02 7.17 5.75 0.78 0.80
Wt.of dry material (W5=W3-W1) gm 19.72 21.63 21.28 16.31 2.59 2.66
Moisture Content w = 100 x W4/W5 % 31.44 32.45 33.69 35.25 30.12 30.08
No. of Blows / Penetration 34 30 22 17 Average= 30.10
LIQUID LIMIT CHART
50.00

45.00 25 25
20 40

40.00
6.20 7.02 7.17 5.75 0.78 0.80
% Moisture content

19.72 21.63 21.28 16.31 2.59 2.66


35.00
31.45 32.46 33.69 35.22 30.16 30.04

30.00 30.1

25.00

20.00
10 25 No. of blows 100

Calculation for PI shall made as follows:-


1. The Plasticity index is calculated as the difference between its Liquid limit & Plastic limit
2. In case of sandy soil PL should be determined first, When PL can not be determined, The
PI should be reported as Non-Plastic (NP)
3. When the plastic limit is equal to or greater than the liquid limit, The PI shall be reported as zero
RESULTS:-
Liquid Limit(%)LL = Plastic Limit(%)PL = Plasticity Index PI =

For L&T, TIIC For FPPM For NMSCEL/MSRDC


CONSTRUCTION OF ACCESS CONTROLLED NAGPUR- MUMBAI SUPER COMMUNICATION
EXPRESSWAY (MAHARASHTRA SAMRUDDHI MAHAMARG) IN THE STATE OF
MAHARASHTRA ON EPC MODE FOR PACKAGE 10, FROM KM. 444+845 TO KM. 502+752

Format No.:T/F 4 Rev no: 0 Rev. Date : 14.01.2019


Client MAHARASHTRA STATE ROAD DEVELOPMENT CORPORATION
SPV NAGPUR MUMBAI SUPER COMMUNICATION EXPRESSWAY LIMITED
Authority Engineer FP Project Management
Construction Contractor Larsen & Toubro Limited - TIIC(RR&EC)
MODIFIED PROCTOR'S DENSITY TEST
[As per IS 2720, (Part-8)]
Laboratory Job no Date Sampled 27.09.19
Type of material Soil Sampled by Jointly
Source BA-57 @ PIT 01 Date Tested 28.09.19
Location 488+700 LHS @ 6 KM Tested by Jointly
Proposed Use EMB/SUB

B Mould No. :- 4 Wt.of mould (A) = 5730 gm


gm Volume of mould (V)= 2250 cc
C Trial No. 1 2 3 4 5 6 7
D Wt.of wet sample + mould gm 9133 9868 10313 10565 10397 10024
E Wt.of wet sample (E = D-A) gm 3403 4138 4583 4835 4667 4294
F Wet density of sample (F = E/V) gm/cc 1.512 1.839 2.037 2.149 2.074 1.908
G Container No. 61 62 63 64 65 66
H Wt.of Empty container gm 21.48 21.50 21.52 21.70 21.30 22.20
J Wt.of wet sample+Cont. gm 136.40 136.37 135.61 133.13 134.18 138.93
K Wt.of dry sample+Cont. gm 132.99 130.35 127.31 122.81 121.12 123.19
L Wt.of water(L=J-K) gm 3.41 6.02 8.30 10.31 13.06 15.74
M Wt.of dry sample(M=K-H) gm 111.51 108.85 105.79 101.11 99.82 100.99
N Water content [N = 100X(L/M)]% 3.06 5.53 7.85 10.20 13.08 15.59
P Dry density[P=100x(F/(100+N))] gm/cc 1.468 1.743 1.889 1.950 1.834 1.651

2.05
2
1.95
1.9 10.20 10.171
1.85 1.3 1.931
1.8
1.950 1.95
1.75
Dry Density (gm/cc)

0 10.2
1.7
1.65
1.6
1.55
1.5
1.45
1.4
1.35
1.3
0 1 2 3 4 5 6 7 8 Moisture
9 10 11 12 13Content
14 15(%)16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

Method used:- Modified Rammer Wt.:- 4.89 kg No. of blows/layer :- 25 / 55 No. of layer :- 5

MDD= 1.950 OMC= 10.2 %


Specification Limits as per MoRTH Clause 305.2, Maximum Dry unit required for
Embankment upto 3m hieght :15.2 kN/cu.m
Embankment exceeding 3m hieght :16 kN/cu.m
Subgrade and Earthen shoulders,verges, backfill :17.5 kN/cu.m

For L&T, TIIC For FPPM For NMSCEL/MSRDC


CONSTRUCTION OF ACCESS CONTROLLED NAGPUR- MUMBAI SUPER COMMUNICATION
EXPRESSWAY (MAHARASHTRA SAMRUDDHI MAHAMARG) IN THE STATE OF
MAHARASHTRA ON EPC MODE FOR PACKAGE 10, FROM KM. 444+845 TO KM. 502+752
(From Village Fatiyabad to Village Surala in Aurangabad District)
Format No.:T/F 7-1 Rev no: 0 Rev. Date : 14.01.2019
Client MAHARASHTRA STATE ROAD DEVELOPMENT CORPORATION
SPV NAGPUR MUMBAI SUPER COMMUNICATION EXPRESSWAY LIMITED
Authority Engineer FP Project Management
Construction Contractor Larsen & Toubro Limited - TIIC(RR&EC)
CALIFORNIA BEARING RATIO TEST
[As per IS 2720(Part-16)]
Laboratory job no. Date sampled 27.09.19
Type of material Soil Sampled by Jointly

Source/Location BA-57 @ PIT 01&02 Date casted 05-10-2019

MDD of Sample (gm/cc) 1.963 Date tested 09-10-2019


OMC of Sample (%) 10.00 Tested by Jointly
Proposed use EMB/SUB
MOISTURE CONTENT AND UNIT WEIGHT OF TEST SAMPLES
S.No Description Specimen 1 Specimen 2 Specimen 3

A. Mould No. 10 11 12
B. No.Of blows per layer 55 55 55
C. Condition of sample while SOAKING Before After Before After Before After
D. Wt.of mould(gm) 6326 6079 6431
E. Wt.of wet sample+mould(gm) 10973 11030 10783 10866 11129 11104
F. Wt.of wet sample(E-D)(gm) 4647 4704 4704 4787 4698 4673
G. Volume of mould/sample (cc) 2250 2250 2250 2250 2250 2250
H. Wet density (F/G)(gm/cc) 2.065 2.091 2.091 2.127 2.088 2.077
J. Moisture determination
K. Container no. 31 32 33 34 35 36
L. Wt.of container(gm) 34.89 32.82 33.64 33.44 31.49 28.86
M. Wt.of wet sample+cont.(gm) 148.86 144.52 145.69 144.22 143.37 142.68
N. Wt.of dry sample+cont.(gm) 139.57 133.96 136.54 133.07 134.04 131.10
P. Wt.of water(M-N)(gm) 9.29 10.56 9.15 11.15 9.33 11.58
Q. Wt.of dry sample(N-L)(gm) 104.68 101.14 102.90 99.63 102.55 102.24
R. Water content[(P/Q)x100](%) 8.87 10.44 8.89 11.19 9.1 11.33
S. Dry density{H/[1+(R/100)]}(gm/cc) 1.897 1.893 1.920 1.913 1.914 1.865
LOAD PENETRATION TEST DATA

Penetrati Proving ring Proving ring Proving ring


GENERAL INFORMATION Load(kgf) Load(kgf) Load(kgf)
on (mm) reading reading reading

0.0 0 0 0 0 0 0
Type of compaction used: Static/ Dynamic
0.5 7 30.6 6 26.2 7 30.6
1.0 15 65.5 14 61.1 14 61.1
Period of soaking: 4 days
1.5 21 91.7 20 87.3 20 87.3
2.0 29 126.6 27 117.9 27 117.9
Wt.of surcharge used (kg): 5
2.5 35 152.8 33 144.1 33 144.1
Proving ring Number & capacity: 4.0 53 231.5 50 218.4 50 218.4
13527 - 50kN 5.0 64 279.5 61 266.4 61 266.4
7.5 88 384.3 82 358.1 83 362.5
Proving Ring Load Factor 4.367
10.0 99 432.3 93 406.1 94 410.5
12.5 103 449.8 97 423.6 98 428.0
Corrected unit load from graph(kg) for 2.5mm 152.8 144.1 144.1
Corrected unit load from graph(kg) for 5.0mm 279.5 266.4 266.4
CBR at 2.5mm (%) 11.2 10.5 10.5
CBR at 5.0mm(%) 13.6 13.0 13.0
CBR reported (%) 13.2

For L&T TIIC For FPPM For MMSCEL/ MSRDC


CONSTRUCTION OF ACCESS CONTROLLED NAGPUR- MUMBAI SUPER COMMUNICATION
EXPRESSWAY (MAHARASHTRA SAMRUDDHI MAHAMARG) IN THE STATE OF
MAHARASHTRA ON EPC MODE FOR PACKAGE 10, FROM KM. 444+845 TO KM. 502+752
(From Village Fatiyabad to Village Surala in Aurangabad District)
Format No.:T/F 7-2 Rev no: 0 Rev. Date : 14.01.2019
Client MAHARASHTRA STATE ROAD DEVELOPMENT CORPORATION
SPV NAGPUR MUMBAI SUPER COMMUNICATION EXPRESSWAY LIMITED
Authority Engineer FP Project Management
Construction Contractor Larsen & Toubro Limited - TIIC(RR&EC)
C B R TEST
Laboratory job no. Date sampled 27.09.19
Type of material Soil Sampled by Jointly
Source BA-57 @ PIT 01&02 Date tested 09-10-2019
Location 488+700 LHS @ 6 KM Tested by Jointly
Proposed use EMB/SUB

LOAD Vs PENETRATION GRAPH


600

500

### ###
0 8
400
Load (kg)

### ###
0 8
300

200

100

0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 11.0 12.0 13.0 14.0 15.0 16.0 17.0 18.0 19.0 20.0
1

Penetration (mm)
Results:-
Mould no. 10
Load at 2.5mm Penetration 152.8
Load at 5.0mm Penetration 279.5
CBR at 2.5mm Penetration 11.2
CBR at 5.0mm Penetration 13.6
CBR reported as (%)= 13.6

For L&T, TIIC For FPPM For NMSCEL/MSRDC


CONSTRUCTION OF ACCESS CONTROLLED NAGPUR- MUMBAI SUPER COMMUNICATION
EXPRESSWAY (MAHARASHTRA SAMRUDDHI MAHAMARG) IN THE STATE OF
MAHARASHTRA ON EPC MODE FOR PACKAGE 10, FROM KM. 444+845 TO KM. 502+752
(From Village Fatiyabad to Village Surala in Aurangabad District)
Format No.:T/F 7-2 Rev no: 0 Rev. Date : 14.01.2019
Client MAHARASHTRA STATE ROAD DEVELOPMENT CORPORATION
SPV NAGPUR MUMBAI SUPER COMMUNICATION EXPRESSWAY LIMITED
Authority Engineer FP Project Management
Construction Contractor Larsen & Toubro Limited - TIIC(RR&EC)
C B R TEST
Laboratory job no. Date sampled 27.09.19
Type of material Soil Sampled by Jointly
Source BA-57 @ PIT 01&02 Date tested 09-10-2019
Location 488+700 LHS @ 6 KM Tested by Jointly
Proposed use EMB/SUB

LOAD Vs PENETRATION GRAPH

600

500

### ###
0 8
400
Load (kg)

### ###
0 8
300

200

100

0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 11.0 12.0 13.0 14.0 15.0 16.0 17.0 18.0 19.0 20.0
1

Penetration (mm)
Results:-
Mould no. 11
Load at 2.5mm Penetration 144.1
Load at 5.0mm Penetration 266.4
CBR at 2.5mm Penetration 10.5
CBR at 5.0mm Penetration 13.0
CBR reported as (%)= 13.0

For L&T, TIIC For FPPM For NMSCEL/MSRDC


CONSTRUCTION OF ACCESS CONTROLLED NAGPUR- MUMBAI SUPER COMMUNICATION
EXPRESSWAY (MAHARASHTRA SAMRUDDHI MAHAMARG) IN THE STATE OF
MAHARASHTRA ON EPC MODE FOR PACKAGE 10, FROM KM. 444+845 TO KM. 502+752
(From Village Fatiyabad to Village Surala in Aurangabad District)
Format No.:T/F 7-2 Rev no: 0 Rev. Date : 14.01.2019
Client MAHARASHTRA STATE ROAD DEVELOPMENT CORPORATION
SPV NAGPUR MUMBAI SUPER COMMUNICATION EXPRESSWAY LIMITED
Authority Engineer FP Project Management
Construction Contractor Larsen & Toubro Limited - TIIC(RR&EC)
C B R TEST
Laboratory job no. Date sampled 27.09.19
Type of material Soil Sampled by Jointly
Source BA-57 @ PIT 01&02 Date tested 09-10-2019
Location 488+700 LHS @ 6 KM Tested by Jointly
Proposed use EMB/SUB

LOAD Vs PENETRATION GRAPH

600

500

### ###
0 8
400
Load (kg)

### ###
0 8
300

200

100

0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 11.0 12.0 13.0 14.0 15.0 16.0 17.0 18.0 19.0 20.0

Penetration (mm)
Results:-
Mould no. 12
Load at 2.5mm Penetration 144.1
Load at 5.0mm Penetration 266.4
CBR at 2.5mm Penetration 10.5
CBR at 5.0mm Penetration 13.0
CBR reported as (%)= 13.0

For L&T, TIIC For FPPM For NMSCEL/MSRDC


CONSTRUCTION OF ACCESS CONTROLLED NAGPUR- MUMBAI SUPER COMMUNICATION
EXPRESSWAY (MAHARASHTRA SAMRUDDHI MAHAMARG) IN THE STATE OF
MAHARASHTRA ON EPC MODE FOR PACKAGE 10, FROM KM. 444+845 TO KM. 502+752

Format No.:T/F 4 Rev no: 0 Rev. Date : 14.01.2019


Client MAHARASHTRA STATE ROAD DEVELOPMENT CORPORATION
SPV NAGPUR MUMBAI SUPER COMMUNICATION EXPRESSWAY LIMITED
Authority Engineer FP Project Management
Construction Contractor Larsen & Toubro Limited - TIIC(RR&EC)
MODIFIED PROCTOR'S DENSITY TEST
[As per IS 2720, (Part-8)]
Laboratory Job no Date Sampled 27.09.19
Type of material Soil Sampled by Jointly
Source BA-57 @ PIT 02 Date Tested 28.09.19
Location 488+700 LHS @ 6 KM Tested by Jointly
Proposed Use EMB/SUB

B Mould No. :- 4 Wt.of mould (A) = 5730 gmgm Volume of mould (V)= 2250 cc
C Trial No. 1 2 3 4 5 6 7
D Wt.of wet sample + mould gm 9192 9937 10385 10609 10463 10082
E Wt.of wet sample (E = D-A) gm 3462 4207 4655 4879 4733 4352
F Wet density of sample (F = E/V) gm/cc 1.539 1.870 2.069 2.169 2.104 1.934
G Container No. 67 68 69 70 71 72
H Wt.of Empty container gm 21.93 21.27 22.29 21.34 21.83 21.75
J Wt.of wet sample+Cont. gm 138.75 133.22 135.35 136.66 141.04 139.12
K Wt.of dry sample+Cont. gm 135.42 127.57 127.42 126.36 127.72 123.81
L Wt.of water(L=J-K) gm 3.34 5.65 7.94 10.29 13.32 15.31
M Wt.of dry sample(M=K-H) gm 113.49 106.30 105.13 105.02 105.89 102.06
N Water content [N = 100X(L/M)]% 2.94 5.32 7.55 9.80 12.58 15.00
P Dry density[P=100x(F/(100+N))] gm/cc 1.495 1.775 1.924 1.975 1.869 1.682

2.05
2
1.95
1.9 9.80 9.7911
1.85 1.3 1.967
1.8
1.975 1.975
1.75
Dry Density (gm/cc)

0 9.8
1.7
1.65
1.6
1.55
1.5
1.45
1.4
1.35
1.3
0 1 2 3 4 5 6 7 8 Moisture
9 10 11 12 13Content
14 15(%)
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

Method used:- Modified Rammer Wt.:- 4.89 kg No. of blows/layer :- 25 / 55 No. of layer :- 5

MDD= 1.975 OMC= 9.8 %


Specification Limits as per MoRTH Clause 305.2, Maximum Dry unit required for
Embankment upto 3m hieght :15.2 kN/cu.m
Embankment exceeding 3m hieght :16 kN/cu.m
Subgrade and Earthen shoulders,verges, backfill :17.5 kN/cu.m

For L&T, TIIC For FPPM For NMSCEL/MSRDC


CONSTRUCTION OF ACCESS CONTROLLED NAGPUR- MUMBAI SUPER COMMUNICATION
EXPRESSWAY (MAHARASHTRA SAMRUDDHI MAHAMARG) IN THE STATE OF
MAHARASHTRA ON EPC MODE FOR PACKAGE 10, FROM KM. 444+845 TO KM. 502+752

Format No.:T/F 6 Rev no: 0 Rev. Date : 14.01.2019


Client MAHARASHTRA STATE ROAD DEVELOPMENT CORPORATION
SPV NAGPUR MUMBAI SUPER COMMUNICATION EXPRESSWAY LIMITED
Authority Engineer FP Project Management
Construction Contractor Larsen & Toubro Limited - TIIC(RR&EC)

FREE SWELL INDEX


[As per IS 2720 (Part - 40)
Laboratory Job No. Date Sampled 27.09.19
Type of Material Soil Sampled By Jointly
Source BA-57 @ PIT 02 Date Tested 28.09.19
Location 488+700 LHS @ 6 KM Tested By Jointly
Proposed Use EMB/SUB

Sample level in Sample level in Free Swell in Free Swell Index


Average
Water (Vw) kerosene (Vk) Water (Vw-Vk) 100x(Vw-Vk)/Vk
S.No. Free Swell Index
(%)
(ml) (ml) (ml) (%)

1
11 10 1 10

3 10

Note : 1. Test sample shall be passing 425 micron sieve


2. Take 10gm of each sample.

Remarks : ……………………………………………………………………………………………..

Specification Limits as per MoRTH Clause 305.2, Free Swell Index shall not be more than 50%

For L&T, TIIC For FPPM For NMSCEL/MSRDC


MUMBAI NAGPUR EXPRESSWAYCONSTRUCTION OF ACCESS CONTROLLED NAGPUR- MUMBAI SUPER COMMUNICATION
EXPRESSWAY (MAHARASHTRA SAMRUDDHI MAHAMARG) IN THE STATE OF
MAHARASHTRA ON EPC MODE FOR PACKAGE 10, FROM KM. 444+845 TO KM. 502+752

Format No.:T/F 8 Rev no: 0 Rev. Date : 14.01.2019

Client MAHARASHTRA STATE ROAD DEVELOPMENT CORPORATION

SPV NAGPUR MUMBAI SUPER COMMUNICATION EXPRESSWAY LIMITED

Authority Engineer FP Project Management

Construction Contractor Larsen & Toubro Limited - TIIC(RR&EC)

SIEVE ANALYSIS OF SOILS


[As per IS : 2720, (Part 4)]
Laboratory Job No. Date Sampled 27.09.19

Type of Material Soil Sampled by Jointly

Source BA-57 @ PIT 02 Date Tested 28.09.19

Location 488+700 LHS @ 6 KM Tested by Jointly

Proposed Use EMB/SUB

Weight of sample taken(gm): 1000


Cumulative
S Weight Cumulative Cumulative
Sieve Size Weight Remarks
no Retained Retained Passing
Retained
(mm) (gms) (gms) (%) (%)

GRAVEL CONTENT
A 100.0 0 0 0 100 38.88
(B-D):%

B 75.0 0 0 0 100

SAND CONTENT
C 19.0 168.9 16.89 16.89 83.11 42.97
(D-G):%

D 4.75 219.9 21.99 38.88 61.12

SILT&CLAY CONTENT
E 2.00 123.7 12.37 51.25 48.75 18.15
(G):%

F 0.425 162.7 16.27 67.52 32.48

G 0.075 143.3 14.33 81.85 18.15

For L&T, TIIC For FPPM For NMSCEL/MSRDC


CONSTRUCTION OF ACCESS CONTROLLED NAGPUR- MUMBAI SUPER COMMUNICATION
EXPRESSWAY (MAHARASHTRA SAMRUDDHI MAHAMARG) IN THE STATE OF
MAHARASHTRA ON EPC MODE FOR PACKAGE 10, FROM KM. 444+845 TO KM. 502+752
(From village Fatiyabad to village surala in aurangabad district)

Format No.:T/F 5 Rev no: 0 Rev. Date : 14.01.2019


Client MAHARASHTRA STATE ROAD DEVELOPMENT CORPORATION
SPV NAGPUR MUMBAI SUPER COMMUNICATION EXPRESSWAY LIMITED
Authority Engineer FP Project Management
Construction Contractor Larsen & Toubro Limited - TIIC(RR&EC)
ATTERBERG'S LIMITS
[As per IS 2720, (Part-5)]
Laboratory Job no Date Sampled 27.09.19
Type of material Soil Sampled by Jointly
Source BA-57 @ PIT 02 Date Tested 28.09.19
Location 488+700 LHS @ 6 KM Tested by Jointly
Proposed Use EMB/SUB
Liquid Limit Plastic Limit
Determination No. 1 2 3 4 5 6
Container No. 171 172 173 174 175 176
Empty Wt.of Container (W1) gm 14.68 14.42 14.98 15.73 14.68 14.75
Wt.of Container and Wet material (W2) gm 38.34 41.92 44.24 42.86 17.93 17.81
Wt.of Container and Dry material (W3) gm 32.79 35.29 36.97 35.92 17.21 17.13
Wt.of Moisture (W4=W2-W3) gm 5.55 6.63 7.27 6.94 0.72 0.68
Wt.of dry material (W5=W3-W1) gm 18.11 20.87 21.99 20.19 2.53 2.38
Moisture Content w = 100 x W4/W5 % 30.65 31.77 33.06 34.37 28.46 28.57
No. of Blows / Penetration 34 29 23 19 Average= 28.51
LIQUID LIMIT CHART
50.00

45.00 25 25
20 40

40.00
5.55 6.63 7.27 6.94 0.72 0.68
% Moisture content

18.11 20.87 21.99 20.19 2.53 2.38


35.00
30.65 31.78 33.07 34.36 28.51 28.39

30.00 28.45

25.00

20.00
10 25 No. of blows 100

Calculation for PI shall made as follows:-


1. The Plasticity index is calculated as the difference between its Liquid limit & Plastic limit
2. In case of sandy soil PL should be determined first, When PL can not be determined, The
PI should be reported as Non-Plastic (NP)
3. When the plastic limit is equal to or greater than the liquid limit, The PI shall be reported as zero
RESULTS:-
Liquid Limit(%)LL = Plastic Limit(%)PL = Plasticity Index PI =

For L&T, TIIC For FPPM For NMSCEL/MSRDC


CONSTRUCTION OF ACCESS CONTROLLED NAGPUR- MUMBAI SUPER COMMUNICATION
EXPRESSWAY (MAHARASHTRA SAMRUDDHI MAHAMARG) IN THE STATE OF
MAHARASHTRA ON EPC MODE FOR PACKAGE 10, FROM KM. 444+845 TO KM. 502+752

Format No.:T/F 6 Rev no: 0 Rev. Date : 14.01.2019


Client MAHARASHTRA STATE ROAD DEVELOPMENT CORPORATION
SPV NAGPUR MUMBAI SUPER COMMUNICATION EXPRESSWAY LIMITED
Authority Engineer FP Project Management
Construction Contractor Larsen & Toubro Limited - TIIC(RR&EC)

FREE SWELL INDEX


[As per IS 2720 (Part - 40)
Laboratory Job No. Date Sampled 27.09.19
Type of Material Soil Sampled By Jointly
Source BA-57 @ PIT 03 Date Tested 28.09.19
Location 488+700 LHS @ 6 KM Tested By Jointly
Proposed Use EMB/SUB

Sample level in Sample level in Free Swell in Free Swell Index


Average
Water (Vw) kerosene (Vk) Water (Vw-Vk) 100x(Vw-Vk)/Vk
S.No. Free Swell Index
(%)
(ml) (ml) (ml) (%)

1
13 10 3 30

3 30

Note : 1. Test sample shall be passing 425 micron sieve


2. Take 10gm of each sample.

Remarks : ……………………………………………………………………………………………..

Specification Limits as per MoRTH Clause 305.2, Free Swell Index shall not be more than 50%

For L&T, TIIC For FPPM For NMSCEL/MSRDC


MUMBAI NAGPUR EXPRESSWAYCONSTRUCTION OF ACCESS CONTROLLED NAGPUR- MUMBAI SUPER COMMUNICATION
EXPRESSWAY (MAHARASHTRA SAMRUDDHI MAHAMARG) IN THE STATE OF
MAHARASHTRA ON EPC MODE FOR PACKAGE 10, FROM KM. 444+845 TO KM. 502+752

Format No.:T/F 8 Rev no: 0 Rev. Date : 14.01.2019

Client MAHARASHTRA STATE ROAD DEVELOPMENT CORPORATION

SPV NAGPUR MUMBAI SUPER COMMUNICATION EXPRESSWAY LIMITED

Authority Engineer FP Project Management

Construction Contractor Larsen & Toubro Limited - TIIC(RR&EC)

SIEVE ANALYSIS OF SOILS


[As per IS : 2720, (Part 4)]
Laboratory Job No. Date Sampled 27.09.19

Type of Material Soil Sampled by Jointly

Source BA-57 @ PIT 03 Date Tested 28.09.19

Location 488+700 LHS @ 6 KM Tested by Jointly

Proposed Use EMB/SUB

Weight of sample taken(gm): 1000


Cumulative
S Weight Cumulative Cumulative
Sieve Size Weight Remarks
no Retained Retained Passing
Retained
(mm) (gms) (gms) (%) (%)

GRAVEL CONTENT
A 100.0 0 0 0 100 33.17
(B-D):%

B 75.0 0 0 0 100

SAND CONTENT
C 19.0 178.6 17.86 17.86 82.14 36.19
(D-G):%

D 4.75 153.1 15.31 33.17 66.83

SILT&CLAY CONTENT
E 2.00 103.6 10.36 43.53 56.47 30.64
(G):%

F 0.425 112.1 11.21 54.74 45.26

G 0.075 146.2 14.62 69.36 30.64

For L&T, TIIC For FPPM For NMSCEL/MSRDC


CONSTRUCTION OF ACCESS CONTROLLED NAGPUR- MUMBAI SUPER COMMUNICATION
EXPRESSWAY (MAHARASHTRA SAMRUDDHI MAHAMARG) IN THE STATE OF
MAHARASHTRA ON EPC MODE FOR PACKAGE 10, FROM KM. 444+845 TO KM. 502+752
(From village Fatiyabad to village surala in aurangabad district)

Format No.:T/F 5 Rev no: 0 Rev. Date : 14.01.2019


Client MAHARASHTRA STATE ROAD DEVELOPMENT CORPORATION
SPV NAGPUR MUMBAI SUPER COMMUNICATION EXPRESSWAY LIMITED
Authority Engineer FP Project Management
Construction Contractor Larsen & Toubro Limited - TIIC(RR&EC)
ATTERBERG'S LIMITS
[As per IS 2720, (Part-5)]
Laboratory Job no Date Sampled 27.09.19
Type of material Soil Sampled by Jointly
Source BA-57 @ PIT 03 Date Tested 28.09.19
Location 488+700 LHS @ 6 KM Tested by Jointly
Proposed Use EMB/SUB
Liquid Limit Plastic Limit
Determination No. 1 2 3 4 5 6
Container No. 177 178 179 180 181 182
Empty Wt.of Container (W1) gm 14.96 14.62 16.15 14.96 15.38 15.85
Wt.of Container and Wet material (W2) gm 40.53 39.53 38.97 41.26 19.10 18.78
Wt.of Container and Dry material (W3) gm 34.16 33.18 32.97 34.15 18.24 18.10
Wt.of Moisture (W4=W2-W3) gm 6.37 6.35 6.00 7.11 0.86 0.68
Wt.of dry material (W5=W3-W1) gm 19.20 18.56 16.82 19.19 2.86 2.25
Moisture Content w = 100 x W4/W5 % 33.18 34.21 35.67 37.05 30.07 30.22
No. of Blows / Penetration 35 30 21 16 Average= 30.15
LIQUID LIMIT CHART
50.00

45.00 25 25
20 40

40.00
6.37 6.35 6.00 7.11 0.86 0.68
% Moisture content

19.20 18.56 16.82 19.19 2.86 2.25


35.00
33.19 34.23 35.65 37.04 30.18 30.02

30.00 30.1

25.00

20.00
10 25 No. of blows 100

Calculation for PI shall made as follows:-


1. The Plasticity index is calculated as the difference between its Liquid limit & Plastic limit
2. In case of sandy soil PL should be determined first, When PL can not be determined, The
PI should be reported as Non-Plastic (NP)
3. When the plastic limit is equal to or greater than the liquid limit, The PI shall be reported as zero
RESULTS:-
Liquid Limit(%)LL = Plastic Limit(%)PL = Plasticity Index PI =

For L&T, TIIC For FPPM For NMSCEL/MSRDC


CONSTRUCTION OF ACCESS CONTROLLED NAGPUR- MUMBAI SUPER COMMUNICATION
EXPRESSWAY (MAHARASHTRA SAMRUDDHI MAHAMARG) IN THE STATE OF
MAHARASHTRA ON EPC MODE FOR PACKAGE 10, FROM KM. 444+845 TO KM. 502+752

Format No.:T/F 4 Rev no: 0 Rev. Date : 14.01.2019


Client MAHARASHTRA STATE ROAD DEVELOPMENT CORPORATION
SPV NAGPUR MUMBAI SUPER COMMUNICATION EXPRESSWAY LIMITED
Authority Engineer FP Project Management
Construction Contractor Larsen & Toubro Limited - TIIC(RR&EC)
MODIFIED PROCTOR'S DENSITY TEST
[As per IS 2720, (Part-8)]
Laboratory Job no Date Sampled 27.09.19
Type of material Soil Sampled by Jointly
Source BA-57 @ PIT 03 Date Tested 28.09.19
Location 488+700 LHS @ 6 KM Tested by Jointly
Proposed Use EMB/SUB

B Mould No. :- 4 Wt.of mould (A) = 5730 gm


gm Volume of mould (V)= 2250 cc
C Trial No. 1 2 3 4 5 6 7
D Wt.of wet sample + mould gm 9222 9972 10422 10637 10497 10111
E Wt.of wet sample (E = D-A) gm 3492 4242 4692 4907 4767 4381
F Wet density of sample (F = E/V) gm/cc 1.552 1.885 2.085 2.181 2.119 1.947
G Container No. 73 74 75 76 77 78
H Wt.of Empty container gm 21.56 22.51 21.96 21.53 21.92 22.30
J Wt.of wet sample+Cont. gm 134.98 132.79 140.38 132.16 141.57 137.88
K Wt.of dry sample+Cont. gm 131.80 127.31 132.21 122.47 128.42 123.04
L Wt.of water(L=J-K) gm 3.17 5.48 8.17 9.69 13.15 14.84
M Wt.of dry sample(M=K-H) gm 110.24 104.80 110.25 100.94 106.50 100.74
N Water content [N = 100X(L/M)]% 2.88 5.23 7.41 9.60 12.35 14.73
P Dry density[P=100x(F/(100+N))] gm/cc 1.509 1.791 1.941 1.990 1.886 1.697

2.05
2
1.95
1.9 9.60 9.6111
1.85 1.3 1.985
1.8
1.990 1.99
1.75
Dry Density (gm/cc)

0 9.6
1.7
1.65
1.6
1.55
1.5
1.45
1.4
1.35
1.3
0 1 2 3 4 5 6 7 8 Moisture
9 10 11 12 13Content
14 15(%)16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

Method used:- Modified Rammer Wt.:- 4.89 kg No. of blows/layer :- 25 / 55 No. of layer :- 5

MDD= 1.990 OMC= 9.6 %


Specification Limits as per MoRTH Clause 305.2, Maximum Dry unit required for
Embankment upto 3m hieght :15.2 kN/cu.m
Embankment exceeding 3m hieght :16 kN/cu.m
Subgrade and Earthen shoulders,verges, backfill :17.5 kN/cu.m

For L&T, TIIC For FPPM For NMSCEL/MSRDC


CONSTRUCTION OF ACCESS CONTROLLED NAGPUR- MUMBAI SUPER COMMUNICATION
EXPRESSWAY (MAHARASHTRA SAMRUDDHI MAHAMARG) IN THE STATE OF
MAHARASHTRA ON EPC MODE FOR PACKAGE 10, FROM KM. 444+845 TO KM. 502+752
(From Village Fatiyabad to Village Surala in Aurangabad District)
Format No.:T/F 7-1 Rev no: 0 Rev. Date : 14.01.2019
Client MAHARASHTRA STATE ROAD DEVELOPMENT CORPORATION
SPV NAGPUR MUMBAI SUPER COMMUNICATION EXPRESSWAY LIMITED
Authority Engineer FP Project Management
Construction Contractor Larsen & Toubro Limited - TIIC(RR&EC)
CALIFORNIA BEARING RATIO TEST
[As per IS 2720(Part-16)]
Laboratory job no. Date sampled 27.09.19
Type of material Soil Sampled by Jointly

Source/Location BA-57 @ PIT 03&04 Date casted 05-10-2019

MDD of Sample (gm/cc) 1.960 Date tested 09-10-2019


OMC of Sample (%) 10.30 Tested by Jointly
Proposed use EMB/SUB
MOISTURE CONTENT AND UNIT WEIGHT OF TEST SAMPLES
S.No Description Specimen 1 Specimen 2 Specimen 3

A. Mould No. 13 14 15
B. No.Of blows per layer 55 55 55
C. Condition of sample while SOAKING Before After Before After Before After
D. Wt.of mould(gm) 6283 6387 6193
E. Wt.of wet sample+mould(gm) 10954 10933 11058 11119 10891 10957
F. Wt.of wet sample(E-D)(gm) 4671 4650 4671 4732 4698 4764
G. Volume of mould/sample (cc) 2250 2250 2250 2250 2250 2250
H. Wet density (F/G)(gm/cc) 2.076 2.067 2.076 2.103 2.088 2.117
J. Moisture determination
K. Container no. 37 38 39 40 41 42
L. Wt.of container(gm) 32.04 33.09 33.23 30.62 31.61 34.73
M. Wt.of wet sample+cont.(gm) 144.4 143.84 146.55 140.8 145.36 146.74
N. Wt.of dry sample+cont.(gm) 134.83 132.67 137.26 130.00 135.83 135.56
P. Wt.of water(M-N)(gm) 9.57 11.17 9.29 10.80 9.53 11.18
Q. Wt.of dry sample(N-L)(gm) 102.79 99.58 104.03 99.38 104.22 100.83
R. Water content[(P/Q)x100](%) 9.31 11.22 8.93 10.87 9.14 11.08
S. Dry density{H/[1+(R/100)]}(gm/cc) 1.899 1.858 1.906 1.897 1.913 1.906
LOAD PENETRATION TEST DATA

Penetrati Proving ring Proving ring Proving ring


GENERAL INFORMATION Load(kgf) Load(kgf) Load(kgf)
on (mm) reading reading reading

0.0 0 0 0 0 0 0
Type of compaction used: Static/ Dynamic
0.5 8 34.9 8 34.9 8 34.9
1.0 18 78.6 18 78.6 17 74.2
Period of soaking: 4 days
1.5 25 109.2 26 113.5 25 109.2
2.0 34 148.5 34 148.5 33 144.1
Wt.of surcharge used (kg): 5
2.5 41 179.0 42 183.4 40 174.7
Proving ring Number & capacity: 4.0 63 275.1 64 279.5 62 270.8
13527 - 50kN 5.0 75 327.5 76 331.9 73 318.8
7.5 104 454.2 105 458.5 101 441.1
Proving Ring Load Factor 4.367
10.0 119 519.7 121 528.4 116 506.6
12.5 125 545.9 126 550.2 122 532.8
Corrected unit load from graph(kg) for 2.5mm 179.0 183.4 174.7
Corrected unit load from graph(kg) for 5.0mm 327.5 331.9 318.8
CBR at 2.5mm (%) 13.1 13.4 12.8
CBR at 5.0mm(%) 15.9 16.2 15.5
CBR reported (%) 15.9

For L&T TIIC For FPPM For MMSCEL/ MSRDC


CONSTRUCTION OF ACCESS CONTROLLED NAGPUR- MUMBAI SUPER COMMUNICATION
EXPRESSWAY (MAHARASHTRA SAMRUDDHI MAHAMARG) IN THE STATE OF
MAHARASHTRA ON EPC MODE FOR PACKAGE 10, FROM KM. 444+845 TO KM. 502+752
(From Village Fatiyabad to Village Surala in Aurangabad District)
Format No.:T/F 7-2 Rev no: 0 Rev. Date : 14.01.2019
Client MAHARASHTRA STATE ROAD DEVELOPMENT CORPORATION
SPV NAGPUR MUMBAI SUPER COMMUNICATION EXPRESSWAY LIMITED
Authority Engineer FP Project Management
Construction Contractor Larsen & Toubro Limited - TIIC(RR&EC)
C B R TEST
Laboratory job no. Date sampled 27.09.19
Type of material Soil Sampled by Jointly
Source BA-57 @ PIT 03&04 Date tested 09-10-2019
Location 488+700 LHS @ 6 KM Tested by Jointly
Proposed use EMB/SUB

LOAD Vs PENETRATION GRAPH


600

500

### ###
0 8
400
Load (kg)

### ###
0 8
300

200

100

0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 11.0 12.0 13.0 14.0 15.0 16.0 17.0 18.0 19.0 20.0
1

Penetration (mm)
Results:-
Mould no. 13
Load at 2.5mm Penetration 179.0
Load at 5.0mm Penetration 327.5
CBR at 2.5mm Penetration 13.1
CBR at 5.0mm Penetration 15.9
CBR reported as (%)= 15.9

For L&T, TIIC For FPPM For NMSCEL/MSRDC


CONSTRUCTION OF ACCESS CONTROLLED NAGPUR- MUMBAI SUPER COMMUNICATION
EXPRESSWAY (MAHARASHTRA SAMRUDDHI MAHAMARG) IN THE STATE OF
MAHARASHTRA ON EPC MODE FOR PACKAGE 10, FROM KM. 444+845 TO KM. 502+752
(From Village Fatiyabad to Village Surala in Aurangabad District)
Format No.:T/F 7-2 Rev no: 0 Rev. Date : 14.01.2019
Client MAHARASHTRA STATE ROAD DEVELOPMENT CORPORATION
SPV NAGPUR MUMBAI SUPER COMMUNICATION EXPRESSWAY LIMITED
Authority Engineer FP Project Management
Construction Contractor Larsen & Toubro Limited - TIIC(RR&EC)
C B R TEST
Laboratory job no. Date sampled 27.09.19
Type of material Soil Sampled by Jointly
Source BA-57 @ PIT 03&04 Date tested 09-10-2019
Location 488+700 LHS @ 6 KM Tested by Jointly
Proposed use EMB/SUB

LOAD Vs PENETRATION GRAPH

600

500

### ###
0 8
400
Load (kg)

### ###
0 8
300

200

100

0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 11.0 12.0 13.0 14.0 15.0 16.0 17.0 18.0 19.0 20.0
1

Penetration (mm)
Results:-
Mould no. 14
Load at 2.5mm Penetration 183.4
Load at 5.0mm Penetration 331.9
CBR at 2.5mm Penetration 13.4
CBR at 5.0mm Penetration 16.2
CBR reported as (%)= 16.2

For L&T, TIIC For FPPM For NMSCEL/MSRDC


CONSTRUCTION OF ACCESS CONTROLLED NAGPUR- MUMBAI SUPER COMMUNICATION
EXPRESSWAY (MAHARASHTRA SAMRUDDHI MAHAMARG) IN THE STATE OF
MAHARASHTRA ON EPC MODE FOR PACKAGE 10, FROM KM. 444+845 TO KM. 502+752
(From Village Fatiyabad to Village Surala in Aurangabad District)
Format No.:T/F 7-2 Rev no: 0 Rev. Date : 14.01.2019
Client MAHARASHTRA STATE ROAD DEVELOPMENT CORPORATION
SPV NAGPUR MUMBAI SUPER COMMUNICATION EXPRESSWAY LIMITED
Authority Engineer FP Project Management
Construction Contractor Larsen & Toubro Limited - TIIC(RR&EC)
C B R TEST
Laboratory job no. Date sampled 27.09.19
Type of material Soil Sampled by Jointly
Source BA-57 @ PIT 03&04 Date tested 09-10-2019
Location 488+700 LHS @ 6 KM Tested by Jointly
Proposed use EMB/SUB

LOAD Vs PENETRATION GRAPH

600

500

### ###
0 8
400
Load (kg)

### ###
0 8
300

200

100

0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 11.0 12.0 13.0 14.0 15.0 16.0 17.0 18.0 19.0 20.0

Penetration (mm)
Results:-
Mould no. 15
Load at 2.5mm Penetration 174.7
Load at 5.0mm Penetration 318.8
CBR at 2.5mm Penetration 12.8
CBR at 5.0mm Penetration 15.5
CBR reported as (%)= 15.5

For L&T, TIIC For FPPM For NMSCEL/MSRDC


CONSTRUCTION OF ACCESS CONTROLLED NAGPUR- MUMBAI SUPER COMMUNICATION
EXPRESSWAY (MAHARASHTRA SAMRUDDHI MAHAMARG) IN THE STATE OF
MAHARASHTRA ON EPC MODE FOR PACKAGE 10, FROM KM. 444+845 TO KM. 502+752

Format No.:T/F 6 Rev no: 0 Rev. Date : 14.01.2019


Client MAHARASHTRA STATE ROAD DEVELOPMENT CORPORATION
SPV NAGPUR MUMBAI SUPER COMMUNICATION EXPRESSWAY LIMITED
Authority Engineer FP Project Management
Construction Contractor Larsen & Toubro Limited - TIIC(RR&EC)

FREE SWELL INDEX


[As per IS 2720 (Part - 40)
Laboratory Job No. Date Sampled 27.09.19
Type of Material Soil Sampled By Jointly
Source BA-57 @ PIT 04 Date Tested 28.09.19
Location 488+700 LHS @ 6 KM Tested By Jointly
Proposed Use EMB/SUB

Sample level in Sample level in Free Swell in Free Swell Index


Average
Water (Vw) kerosene (Vk) Water (Vw-Vk) 100x(Vw-Vk)/Vk
S.No. Free Swell Index
(%)
(ml) (ml) (ml) (%)

1
12 10 2 20

3 20

Note : 1. Test sample shall be passing 425 micron sieve


2. Take 10gm of each sample.

Remarks : ……………………………………………………………………………………………..

Specification Limits as per MoRTH Clause 305.2, Free Swell Index shall not be more than 50%

For L&T, TIIC For FPPM For NMSCEL/MSRDC


MUMBAI NAGPUR EXPRESSWAYCONSTRUCTION OF ACCESS CONTROLLED NAGPUR- MUMBAI SUPER COMMUNICATION
EXPRESSWAY (MAHARASHTRA SAMRUDDHI MAHAMARG) IN THE STATE OF
MAHARASHTRA ON EPC MODE FOR PACKAGE 10, FROM KM. 444+845 TO KM. 502+752

Format No.:T/F 8 Rev no: 0 Rev. Date : 14.01.2019

Client MAHARASHTRA STATE ROAD DEVELOPMENT CORPORATION

SPV NAGPUR MUMBAI SUPER COMMUNICATION EXPRESSWAY LIMITED

Authority Engineer FP Project Management

Construction Contractor Larsen & Toubro Limited - TIIC(RR&EC)

SIEVE ANALYSIS OF SOILS


[As per IS : 2720, (Part 4)]
Laboratory Job No. Date Sampled 27.09.19

Type of Material Soil Sampled by Jointly

Source BA-57 @ PIT 04 Date Tested 28.09.19

Location 488+700 LHS @ 6 KM Tested by Jointly

Proposed Use EMB/SUB

Weight of sample taken(gm): 1000


Cumulative
S Weight Cumulative Cumulative
Sieve Size Weight Remarks
no Retained Retained Passing
Retained
(mm) (gms) (gms) (%) (%)

GRAVEL CONTENT
A 100.0 0 0 0 100 35.50
(B-D):%

B 75.0 0 0 0 100

SAND CONTENT
C 19.0 168.7 16.87 16.87 83.13 33.40
(D-G):%

D 4.75 186.3 18.63 35.50 64.50

SILT&CLAY CONTENT
E 2.00 101.3 10.13 45.63 54.37 31.10
(G):%

F 0.425 85.7 8.57 54.20 45.80

G 0.075 147.0 14.70 68.90 31.10

For L&T, TIIC For FPPM For NMSCEL/MSRDC


CONSTRUCTION OF ACCESS CONTROLLED NAGPUR- MUMBAI SUPER COMMUNICATION
EXPRESSWAY (MAHARASHTRA SAMRUDDHI MAHAMARG) IN THE STATE OF
MAHARASHTRA ON EPC MODE FOR PACKAGE 10, FROM KM. 444+845 TO KM. 502+752
(From village Fatiyabad to village surala in aurangabad district)

Format No.:T/F 5 Rev no: 0 Rev. Date : 14.01.2019


Client MAHARASHTRA STATE ROAD DEVELOPMENT CORPORATION
SPV NAGPUR MUMBAI SUPER COMMUNICATION EXPRESSWAY LIMITED
Authority Engineer FP Project Management
Construction Contractor Larsen & Toubro Limited - TIIC(RR&EC)
ATTERBERG'S LIMITS
[As per IS 2720, (Part-5)]
Laboratory Job no Date Sampled 27.09.19
Type of material Soil Sampled by Jointly
Source BA-57 @ PIT 04 Date Tested 28.09.19
Location 488+700 LHS @ 6 KM Tested by Jointly
Proposed Use EMB/SUB
Liquid Limit Plastic Limit
Determination No. 1 2 3 4 5 6
Container No. 183 184 185 186 187 188
Empty Wt.of Container (W1) gm 16.26 14.99 14.57 14.85 14.37 14.62
Wt.of Container and Wet material (W2) gm 42.00 39.23 41.78 37.17 18.07 17.82
Wt.of Container and Dry material (W3) gm 36.05 33.42 35.03 31.50 17.29 17.15
Wt.of Moisture (W4=W2-W3) gm 5.95 5.81 6.75 5.67 0.78 0.67
Wt.of dry material (W5=W3-W1) gm 19.79 18.43 20.46 16.65 2.92 2.53
Moisture Content w = 100 x W4/W5 % 30.07 31.52 32.99 34.05 26.71 26.48
No. of Blows / Penetration 33 29 20 16 Average= 26.60
LIQUID LIMIT CHART
50.00

45.00 25 25
20 40

40.00
5.95 5.81 6.75 5.67 0.78 0.67
% Moisture content

19.79 18.43 20.46 16.65 2.92 2.53


35.00
30.08 31.51 32.97 34.04 26.59 26.45

30.00 26.52

25.00

20.00
10 25 No. of blows 100

Calculation for PI shall made as follows:-


1. The Plasticity index is calculated as the difference between its Liquid limit & Plastic limit
2. In case of sandy soil PL should be determined first, When PL can not be determined, The
PI should be reported as Non-Plastic (NP)
3. When the plastic limit is equal to or greater than the liquid limit, The PI shall be reported as zero
RESULTS:-
Liquid Limit(%)LL = Plastic Limit(%)PL = Plasticity Index PI =

For L&T, TIIC For FPPM For NMSCEL/MSRDC


CONSTRUCTION OF ACCESS CONTROLLED NAGPUR- MUMBAI SUPER COMMUNICATION
EXPRESSWAY (MAHARASHTRA SAMRUDDHI MAHAMARG) IN THE STATE OF
MAHARASHTRA ON EPC MODE FOR PACKAGE 10, FROM KM. 444+845 TO KM. 502+752

Format No.:T/F 4 Rev no: 0 Rev. Date : 14.01.2019


Client MAHARASHTRA STATE ROAD DEVELOPMENT CORPORATION
SPV NAGPUR MUMBAI SUPER COMMUNICATION EXPRESSWAY LIMITED
Authority Engineer FP Project Management
Construction Contractor Larsen & Toubro Limited - TIIC(RR&EC)
MODIFIED PROCTOR'S DENSITY TEST
[As per IS 2720, (Part-8)]
Laboratory Job no Date Sampled 27.09.19
Type of material Soil Sampled by Jointly
Source BA-57 @ PIT 04 Date Tested 28.09.19
Location 488+700 LHS @ 6 KM Tested by Jointly
Proposed Use EMB/SUB

B Mould No. :- 4 Wt.of mould (A) = 5730 gm


gm Volume of mould (V)= 2250 cc
C Trial No. 1 2 3 4 5 6 7
D Wt.of wet sample + mould gm 9134 9877 10330 10550 10431 10062
E Wt.of wet sample (E = D-A) gm 3404 4147 4600 4820 4701 4332
F Wet density of sample (F = E/V) gm/cc 1.513 1.843 2.045 2.142 2.090 1.925
G Container No. 79 80 81 82 83 84
H Wt.of Empty container gm 22.81 21.62 21.46 22.46 22.14 21.47
J Wt.of wet sample+Cont. gm 137.82 138.85 133.94 133.19 141.03 134.34
K Wt.of dry sample+Cont. gm 134.15 132.24 125.14 122.22 126.30 118.06
L Wt.of water(L=J-K) gm 3.67 6.61 8.80 10.97 14.73 16.28
M Wt.of dry sample(M=K-H) gm 111.34 110.62 103.68 99.76 104.16 96.59
N Water content [N = 100X(L/M)]% 3.30 5.98 8.49 11.00 14.14 16.86
P Dry density[P=100x(F/(100+N))] gm/cc 1.465 1.739 1.885 1.930 1.831 1.648

2.05
2
1.95
1.9 11.00 10.991
1.85 1.3 1.927
1.8
1.930 1.93
1.75
Dry Density (gm/cc)

0 11
1.7
1.65
1.6
1.55
1.5
1.45
1.4
1.35
1.3
0 1 2 3 4 5 6 7 8 Moisture
9 10 11 12 13Content
14 15(%)16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

Method used:- Modified Rammer Wt.:- 4.89 kg No. of blows/layer :- 25 / 55 No. of layer :- 5

MDD= 1.930 OMC= 11 %


Specification Limits as per MoRTH Clause 305.2, Maximum Dry unit required for
Embankment upto 3m hieght :15.2 kN/cu.m
Embankment exceeding 3m hieght :16 kN/cu.m
Subgrade and Earthen shoulders,verges, backfill :17.5 kN/cu.m

For L&T, TIIC For FPPM For NMSCEL/MSRDC


CONSTRUCTION OF ACCESS CONTROLLED NAGPUR- MUMBAI SUPER COMMUNICATION
EXPRESSWAY (MAHARASHTRA SAMRUDDHI MAHAMARG) IN THE STATE OF
MAHARASHTRA ON EPC MODE FOR PACKAGE 10, FROM KM. 444+845 TO KM. 502+752

Format No.:T/F 6 Rev no: 0 Rev. Date : 14.01.2019


Client MAHARASHTRA STATE ROAD DEVELOPMENT CORPORATION
SPV NAGPUR MUMBAI SUPER COMMUNICATION EXPRESSWAY LIMITED
Authority Engineer FP Project Management
Construction Contractor Larsen & Toubro Limited - TIIC(RR&EC)

FREE SWELL INDEX


[As per IS 2720 (Part - 40)
Laboratory Job No. Date Sampled 27.09.19
Type of Material Soil Sampled By Jointly
Source BA-57 @ PIT 05 Date Tested 28.09.19
Location 488+700 LHS @ 6 KM Tested By Jointly
Proposed Use EMB/SUB

Sample level in Sample level in Free Swell in Free Swell Index


Average
Water (Vw) kerosene (Vk) Water (Vw-Vk) 100x(Vw-Vk)/Vk
S.No. Free Swell Index
(%)
(ml) (ml) (ml) (%)

1
12 10 2 20

3 20

Note : 1. Test sample shall be passing 425 micron sieve


2. Take 10gm of each sample.

Remarks : ……………………………………………………………………………………………..

Specification Limits as per MoRTH Clause 305.2, Free Swell Index shall not be more than 50%

For L&T, TIIC For FPPM For NMSCEL/MSRDC


MUMBAI NAGPUR EXPRESSWAYCONSTRUCTION OF ACCESS CONTROLLED NAGPUR- MUMBAI SUPER COMMUNICATION
EXPRESSWAY (MAHARASHTRA SAMRUDDHI MAHAMARG) IN THE STATE OF
MAHARASHTRA ON EPC MODE FOR PACKAGE 10, FROM KM. 444+845 TO KM. 502+752

Format No.:T/F 8 Rev no: 0 Rev. Date : 14.01.2019

Client MAHARASHTRA STATE ROAD DEVELOPMENT CORPORATION

SPV NAGPUR MUMBAI SUPER COMMUNICATION EXPRESSWAY LIMITED

Authority Engineer FP Project Management

Construction Contractor Larsen & Toubro Limited - TIIC(RR&EC)

SIEVE ANALYSIS OF SOILS


[As per IS : 2720, (Part 4)]
Laboratory Job No. Date Sampled 27.09.19

Type of Material Soil Sampled by Jointly

Source BA-57 @ PIT 05 Date Tested 28.09.19

Location 488+700 LHS @ 6 KM Tested by Jointly

Proposed Use EMB/SUB

Weight of sample taken(gm): 1000


Cumulative
S Weight Cumulative Cumulative
Sieve Size Weight Remarks
no Retained Retained Passing
Retained
(mm) (gms) (gms) (%) (%)

GRAVEL CONTENT
A 100.0 0 0 0 100 38.82
(B-D):%

B 75.0 0 0 0 100

SAND CONTENT
C 19.0 156.3 15.63 15.63 84.37 32.68
(D-G):%

D 4.75 231.9 23.19 38.82 61.18

SILT&CLAY CONTENT
E 2.00 88.4 8.84 47.66 52.34 28.50
(G):%

F 0.425 85.1 8.51 56.17 43.83

G 0.075 153.3 15.33 71.50 28.50

For L&T, TIIC For FPPM For NMSCEL/MSRDC


CONSTRUCTION OF ACCESS CONTROLLED NAGPUR- MUMBAI SUPER COMMUNICATION
EXPRESSWAY (MAHARASHTRA SAMRUDDHI MAHAMARG) IN THE STATE OF
MAHARASHTRA ON EPC MODE FOR PACKAGE 10, FROM KM. 444+845 TO KM. 502+752
(From village Fatiyabad to village surala in aurangabad district)

Format No.:T/F 5 Rev no: 0 Rev. Date : 14.01.2019


Client MAHARASHTRA STATE ROAD DEVELOPMENT CORPORATION
SPV NAGPUR MUMBAI SUPER COMMUNICATION EXPRESSWAY LIMITED
Authority Engineer FP Project Management
Construction Contractor Larsen & Toubro Limited - TIIC(RR&EC)
ATTERBERG'S LIMITS
[As per IS 2720, (Part-5)]
Laboratory Job no Date Sampled 27.09.19
Type of material Soil Sampled by Jointly
Source BA-57 @ PIT 05 Date Tested 28.09.19
Location 488+700 LHS @ 6 KM Tested by Jointly
Proposed Use EMB/SUB
Liquid Limit Plastic Limit
Determination No. 1 2 3 4 5 6
Container No. 189 190 191 192 193 194
Empty Wt.of Container (W1) gm 16.15 15.55 16.84 17.54 14.68 14.84
Wt.of Container and Wet material (W2) gm 41.15 40.42 38.25 42.81 17.37 18.42
Wt.of Container and Dry material (W3) gm 35.53 34.68 33.16 36.65 16.81 17.67
Wt.of Moisture (W4=W2-W3) gm 5.62 5.74 5.09 6.16 0.56 0.75
Wt.of dry material (W5=W3-W1) gm 19.38 19.13 16.32 19.11 2.13 2.83
Moisture Content w = 100 x W4/W5 % 29.00 30.01 31.19 32.23 26.29 26.50
No. of Blows / Penetration 34 29 21 17 Average= 26.40
LIQUID LIMIT CHART
50.00

45.00 25 25
20 40

40.00
5.62 5.74 5.09 6.16 0.56 0.75
% Moisture content

19.38 19.13 16.32 19.11 2.13 2.83


35.00
28.97 29.98 31.17 32.25 26.51 26.39

30.00 26.45

25.00

20.00
10 25 No. of blows 100

Calculation for PI shall made as follows:-


1. The Plasticity index is calculated as the difference between its Liquid limit & Plastic limit
2. In case of sandy soil PL should be determined first, When PL can not be determined, The
PI should be reported as Non-Plastic (NP)
3. When the plastic limit is equal to or greater than the liquid limit, The PI shall be reported as zero
RESULTS:-
Liquid Limit(%)LL = Plastic Limit(%)PL = Plasticity Index PI =

For L&T, TIIC For FPPM For NMSCEL/MSRDC


CONSTRUCTION OF ACCESS CONTROLLED NAGPUR- MUMBAI SUPER COMMUNICATION
EXPRESSWAY (MAHARASHTRA SAMRUDDHI MAHAMARG) IN THE STATE OF
MAHARASHTRA ON EPC MODE FOR PACKAGE 10, FROM KM. 444+845 TO KM. 502+752

Format No.:T/F 4 Rev no: 0 Rev. Date : 14.01.2019


Client MAHARASHTRA STATE ROAD DEVELOPMENT CORPORATION
SPV NAGPUR MUMBAI SUPER COMMUNICATION EXPRESSWAY LIMITED
Authority Engineer FP Project Management
Construction Contractor Larsen & Toubro Limited - TIIC(RR&EC)
MODIFIED PROCTOR'S DENSITY TEST
[As per IS 2720, (Part-8)]
Laboratory Job no Date Sampled 27.09.19
Type of material Soil Sampled by Jointly
Source BA-57 @ PIT 05 Date Tested 28.09.19
Location 488+700 LHS @ 6 KM Tested by Jointly
Proposed Use EMB/SUB

B Mould No. :- 4 Wt.of mould (A) = 5730 gm


gm Volume of mould (V)= 2250 cc
C Trial No. 1 2 3 4 5 6 7
D Wt.of wet sample + mould gm 9232 9979 10426 10644 10493 10103
E Wt.of wet sample (E = D-A) gm 3502 4249 4696 4914 4763 4373
F Wet density of sample (F = E/V) gm/cc 1.556 1.888 2.087 2.184 2.117 1.944
G Container No. 85 86 87 88 89 90
H Wt.of Empty container gm 21.95 21.94 21.51 21.32 21.87 21.65
J Wt.of wet sample+Cont. gm 139.14 133.15 138.04 133.67 133.11 140.31
K Wt.of dry sample+Cont. gm 135.99 127.86 130.34 124.20 121.37 125.67
L Wt.of water(L=J-K) gm 3.15 5.29 7.70 9.47 11.74 14.64
M Wt.of dry sample(M=K-H) gm 114.04 105.92 108.83 102.88 99.50 104.02
N Water content [N = 100X(L/M)]% 2.76 4.99 7.08 9.20 11.80 14.07
P Dry density[P=100x(F/(100+N))] gm/cc 1.515 1.799 1.949 2.000 1.893 1.704

2.05
2
1.95
1.9 9.20 9.1911
1.85 1.3 1.993
1.8
2.000 2
1.75
Dry Density (gm/cc)

0 9.2
1.7
1.65
1.6
1.55
1.5
1.45
1.4
1.35
1.3
0 1 2 3 4 5 6 7 8 Moisture
9 10 11 12 13Content
14 15(%)16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

Method used:- Modified Rammer Wt.:- 4.89 kg No. of blows/layer :- 25 / 55 No. of layer :- 5

MDD= 2.000 OMC= 9.2 %


Specification Limits as per MoRTH Clause 305.2, Maximum Dry unit required for
Embankment upto 3m hieght :15.2 kN/cu.m
Embankment exceeding 3m hieght :16 kN/cu.m
Subgrade and Earthen shoulders,verges, backfill :17.5 kN/cu.m

For L&T, TIIC For FPPM For NMSCEL/MSRDC


CONSTRUCTION OF ACCESS CONTROLLED NAGPUR- MUMBAI SUPER COMMUNICATION
EXPRESSWAY (MAHARASHTRA SAMRUDDHI MAHAMARG) IN THE STATE OF
MAHARASHTRA ON EPC MODE FOR PACKAGE 10, FROM KM. 444+845 TO KM. 502+752
(From Village Fatiyabad to Village Surala in Aurangabad District)
Format No.:T/F 7-1 Rev no: 0 Rev. Date : 14.01.2019
Client MAHARASHTRA STATE ROAD DEVELOPMENT CORPORATION
SPV NAGPUR MUMBAI SUPER COMMUNICATION EXPRESSWAY LIMITED
Authority Engineer FP Project Management
Construction Contractor Larsen & Toubro Limited - TIIC(RR&EC)
CALIFORNIA BEARING RATIO TEST
[As per IS 2720(Part-16)]
Laboratory job no. Date sampled 27.09.19
Type of material Soil Sampled by Jointly

Source/Location BA-57 @ PIT 05&06 Date casted 05-10-2019

MDD of Sample (gm/cc) 1.973 Date tested 09-10-2019


OMC of Sample (%) 9.60 Tested by Jointly
Proposed use EMB/SUB
MOISTURE CONTENT AND UNIT WEIGHT OF TEST SAMPLES
S.No Description Specimen 1 Specimen 2 Specimen 3

A. Mould No. 16 17 18
B. No.Of blows per layer 55 55 55
C. Condition of sample while SOAKING Before After Before After Before After
D. Wt.of mould(gm) 6372 6263 5916
E. Wt.of wet sample+mould(gm) 11046 11020 10956 10938 10659 10738
F. Wt.of wet sample(E-D)(gm) 4674 4648 4693 4675 4743 4822
G. Volume of mould/sample (cc) 2250 2250 2250 2250 2250 2250
H. Wet density (F/G)(gm/cc) 2.077 2.066 2.086 2.078 2.108 2.143
J. Moisture determination
K. Container no. 43 44 45 46 47 48
L. Wt.of container(gm) 31.77 29.19 31.11 30.63 31.31 29
M. Wt.of wet sample+cont.(gm) 142.78 140.71 143.1 144.49 143 140.71
N. Wt.of dry sample+cont.(gm) 134.33 130.92 134.09 133.13 133.82 129.37
P. Wt.of water(M-N)(gm) 8.45 9.79 9.01 11.36 9.18 11.34
Q. Wt.of dry sample(N-L)(gm) 102.56 101.73 102.98 102.50 102.51 100.37
R. Water content[(P/Q)x100](%) 8.24 9.63 8.75 11.08 8.95 11.29
S. Dry density{H/[1+(R/100)]}(gm/cc) 1.919 1.884 1.918 1.870 1.935 1.925
LOAD PENETRATION TEST DATA

Penetrati Proving ring Proving ring Proving ring


GENERAL INFORMATION Load(kgf) Load(kgf) Load(kgf)
on (mm) reading reading reading

0.0 0 0 0 0 0 0
Type of compaction used: Static/ Dynamic
0.5 8 34.9 7 30.6 7 30.6
1.0 17 74.2 16 69.9 15 65.5
Period of soaking: 4 days
1.5 24 104.8 22 96.1 22 96.1
2.0 32 139.7 30 131.0 29 126.6
Wt.of surcharge used (kg): 5
2.5 39 170.3 37 161.6 36 157.2
Proving ring Number & capacity: 4.0 60 262.0 57 248.9 55 240.2
13527 - 50kN 5.0 71 310.1 68 297.0 66 288.2
7.5 99 432.3 94 410.5 91 397.4
Proving Ring Load Factor 4.367
10.0 111 484.7 106 462.9 103 449.8
12.5 115 502.2 109 476.0 106 462.9
Corrected unit load from graph(kg) for 2.5mm 170.3 161.6 157.2
Corrected unit load from graph(kg) for 5.0mm 310.1 297.0 288.2
CBR at 2.5mm (%) 12.4 11.8 11.5
CBR at 5.0mm(%) 15.1 14.5 14.0
CBR reported (%) 14.5

For L&T TIIC For FPPM For MMSCEL/ MSRDC


CONSTRUCTION OF ACCESS CONTROLLED NAGPUR- MUMBAI SUPER COMMUNICATION
EXPRESSWAY (MAHARASHTRA SAMRUDDHI MAHAMARG) IN THE STATE OF
MAHARASHTRA ON EPC MODE FOR PACKAGE 10, FROM KM. 444+845 TO KM. 502+752
(From Village Fatiyabad to Village Surala in Aurangabad District)
Format No.:T/F 7-2 Rev no: 0 Rev. Date : 14.01.2019
Client MAHARASHTRA STATE ROAD DEVELOPMENT CORPORATION
SPV NAGPUR MUMBAI SUPER COMMUNICATION EXPRESSWAY LIMITED
Authority Engineer FP Project Management
Construction Contractor Larsen & Toubro Limited - TIIC(RR&EC)
C B R TEST
Laboratory job no. Date sampled 27.09.19
Type of material Soil Sampled by Jointly
Source BA-57 @ PIT 05&06 Date tested 09-10-2019
Location 488+700 LHS @ 6 KM Tested by Jointly
Proposed use EMB/SUB

LOAD Vs PENETRATION GRAPH


600

500

### ###
0 8
400
Load (kg)

### ###
0 8
300

200

100

0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 11.0 12.0 13.0 14.0 15.0 16.0 17.0 18.0 19.0 20.0
1

Penetration (mm)
Results:-
Mould no. 16
Load at 2.5mm Penetration 170.3
Load at 5.0mm Penetration 310.1
CBR at 2.5mm Penetration 12.4
CBR at 5.0mm Penetration 15.1
CBR reported as (%)= 15.1

For L&T, TIIC For FPPM For NMSCEL/MSRDC


CONSTRUCTION OF ACCESS CONTROLLED NAGPUR- MUMBAI SUPER COMMUNICATION
EXPRESSWAY (MAHARASHTRA SAMRUDDHI MAHAMARG) IN THE STATE OF
MAHARASHTRA ON EPC MODE FOR PACKAGE 10, FROM KM. 444+845 TO KM. 502+752
(From Village Fatiyabad to Village Surala in Aurangabad District)
Format No.:T/F 7-2 Rev no: 0 Rev. Date : 14.01.2019
Client MAHARASHTRA STATE ROAD DEVELOPMENT CORPORATION
SPV NAGPUR MUMBAI SUPER COMMUNICATION EXPRESSWAY LIMITED
Authority Engineer FP Project Management
Construction Contractor Larsen & Toubro Limited - TIIC(RR&EC)
C B R TEST
Laboratory job no. Date sampled 27.09.19
Type of material Soil Sampled by Jointly
Source BA-57 @ PIT 05&06 Date tested 09-10-2019
Location 488+700 LHS @ 6 KM Tested by Jointly
Proposed use EMB/SUB

LOAD Vs PENETRATION GRAPH

600

500

### ###
0 8
400
Load (kg)

### ###
0 8
300

200

100

0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 11.0 12.0 13.0 14.0 15.0 16.0 17.0 18.0 19.0 20.0
1

Penetration (mm)
Results:-
Mould no. 17
Load at 2.5mm Penetration 161.6
Load at 5.0mm Penetration 297.0
CBR at 2.5mm Penetration 11.8
CBR at 5.0mm Penetration 14.5
CBR reported as (%)= 14.5

For L&T, TIIC For FPPM For NMSCEL/MSRDC


CONSTRUCTION OF ACCESS CONTROLLED NAGPUR- MUMBAI SUPER COMMUNICATION
EXPRESSWAY (MAHARASHTRA SAMRUDDHI MAHAMARG) IN THE STATE OF
MAHARASHTRA ON EPC MODE FOR PACKAGE 10, FROM KM. 444+845 TO KM. 502+752
(From Village Fatiyabad to Village Surala in Aurangabad District)
Format No.:T/F 7-2 Rev no: 0 Rev. Date : 14.01.2019
Client MAHARASHTRA STATE ROAD DEVELOPMENT CORPORATION
SPV NAGPUR MUMBAI SUPER COMMUNICATION EXPRESSWAY LIMITED
Authority Engineer FP Project Management
Construction Contractor Larsen & Toubro Limited - TIIC(RR&EC)
C B R TEST
Laboratory job no. Date sampled 27.09.19
Type of material Soil Sampled by Jointly
Source BA-57 @ PIT 05&06 Date tested 09-10-2019
Location 488+700 LHS @ 6 KM Tested by Jointly
Proposed use EMB/SUB

LOAD Vs PENETRATION GRAPH

600

500

### ###
0 8
400
Load (kg)

### ###
0 8
300

200

100

0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 11.0 12.0 13.0 14.0 15.0 16.0 17.0 18.0 19.0 20.0

Penetration (mm)
Results:-
Mould no. 18
Load at 2.5mm Penetration 157.2
Load at 5.0mm Penetration 288.2
CBR at 2.5mm Penetration 11.5
CBR at 5.0mm Penetration 14.0
CBR reported as (%)= 14.0

For L&T, TIIC For FPPM For NMSCEL/MSRDC


CONSTRUCTION OF ACCESS CONTROLLED NAGPUR- MUMBAI SUPER COMMUNICATION
EXPRESSWAY (MAHARASHTRA SAMRUDDHI MAHAMARG) IN THE STATE OF
MAHARASHTRA ON EPC MODE FOR PACKAGE 10, FROM KM. 444+845 TO KM. 502+752

Format No.:T/F 6 Rev no: 0 Rev. Date : 14.01.2019


Client MAHARASHTRA STATE ROAD DEVELOPMENT CORPORATION
SPV NAGPUR MUMBAI SUPER COMMUNICATION EXPRESSWAY LIMITED
Authority Engineer FP Project Management
Construction Contractor Larsen & Toubro Limited - TIIC(RR&EC)

FREE SWELL INDEX


[As per IS 2720 (Part - 40)
Laboratory Job No. Date Sampled 27.09.19
Type of Material Soil Sampled By Jointly
Source BA-57 @ PIT 06 Date Tested 28.09.19
Location 488+700 LHS @ 6 KM Tested By Jointly
Proposed Use EMB/SUB

Sample level in Sample level in Free Swell in Free Swell Index


Average
Water (Vw) kerosene (Vk) Water (Vw-Vk) 100x(Vw-Vk)/Vk
S.No. Free Swell Index
(%)
(ml) (ml) (ml) (%)

1
13 11 2 18

3 18

Note : 1. Test sample shall be passing 425 micron sieve


2. Take 10gm of each sample.

Remarks : ……………………………………………………………………………………………..

Specification Limits as per MoRTH Clause 305.2, Free Swell Index shall not be more than 50%

For L&T, TIIC For FPPM For NMSCEL/MSRDC


MUMBAI NAGPUR EXPRESSWAYCONSTRUCTION OF ACCESS CONTROLLED NAGPUR- MUMBAI SUPER COMMUNICATION
EXPRESSWAY (MAHARASHTRA SAMRUDDHI MAHAMARG) IN THE STATE OF
MAHARASHTRA ON EPC MODE FOR PACKAGE 10, FROM KM. 444+845 TO KM. 502+752

Format No.:T/F 8 Rev no: 0 Rev. Date : 14.01.2019

Client MAHARASHTRA STATE ROAD DEVELOPMENT CORPORATION

SPV NAGPUR MUMBAI SUPER COMMUNICATION EXPRESSWAY LIMITED

Authority Engineer FP Project Management

Construction Contractor Larsen & Toubro Limited - TIIC(RR&EC)

SIEVE ANALYSIS OF SOILS


[As per IS : 2720, (Part 4)]
Laboratory Job No. Date Sampled 27.09.19

Type of Material Soil Sampled by Jointly

Source BA-57 @ PIT 06 Date Tested 28.09.19

Location 488+700 LHS @ 6 KM Tested by Jointly

Proposed Use EMB/SUB

Weight of sample taken(gm): 1000


Cumulative
S Weight Cumulative Cumulative
Sieve Size Weight Remarks
no Retained Retained Passing
Retained
(mm) (gms) (gms) (%) (%)

GRAVEL CONTENT
A 100.0 0 0 0 100 40.10
(B-D):%

B 75.0 0 0 0 100

SAND CONTENT
C 19.0 169.8 16.98 16.98 83.02 33.40
(D-G):%

D 4.75 231.2 23.12 40.10 59.90

SILT&CLAY CONTENT
E 2.00 95.7 9.57 49.67 50.33 26.50
(G):%

F 0.425 89.5 8.95 58.62 41.38

G 0.075 148.8 14.88 73.50 26.50

For L&T, TIIC For FPPM For NMSCEL/MSRDC


CONSTRUCTION OF ACCESS CONTROLLED NAGPUR- MUMBAI SUPER COMMUNICATION
EXPRESSWAY (MAHARASHTRA SAMRUDDHI MAHAMARG) IN THE STATE OF
MAHARASHTRA ON EPC MODE FOR PACKAGE 10, FROM KM. 444+845 TO KM. 502+752
(From village Fatiyabad to village surala in aurangabad district)

Format No.:T/F 5 Rev no: 0 Rev. Date : 14.01.2019


Client MAHARASHTRA STATE ROAD DEVELOPMENT CORPORATION
SPV NAGPUR MUMBAI SUPER COMMUNICATION EXPRESSWAY LIMITED
Authority Engineer FP Project Management
Construction Contractor Larsen & Toubro Limited - TIIC(RR&EC)
ATTERBERG'S LIMITS
[As per IS 2720, (Part-5)]
Laboratory Job no Date Sampled 27.09.19
Type of material Soil Sampled by Jointly
Source BA-57 @ PIT 06 Date Tested 28.09.19
Location 488+700 LHS @ 6 KM Tested by Jointly
Proposed Use EMB/SUB
Liquid Limit Plastic Limit
Determination No. 1 2 3 4 5 6
Container No. 195 196 197 198 199 200
Empty Wt.of Container (W1) gm 15.31 14.58 15.07 15.07 15.24 14.43
Wt.of Container and Wet material (W2) gm 40.32 43.70 40.66 37.25 18.24 17.06
Wt.of Container and Dry material (W3) gm 33.97 36.05 33.78 31.12 17.53 16.44
Wt.of Moisture (W4=W2-W3) gm 6.35 7.65 6.88 6.13 0.71 0.62
Wt.of dry material (W5=W3-W1) gm 18.66 21.47 18.71 16.05 2.29 2.01
Moisture Content w = 100 x W4/W5 % 34.03 35.63 36.77 38.19 31.00 30.85
No. of Blows / Penetration 32 27 23 17 Average= 30.93
LIQUID LIMIT CHART
50.00

45.00 25 25
20 40

40.00
6.35 7.65 6.88 6.13 0.71 0.62
% Moisture content

18.66 21.47 18.71 16.05 2.29 2.01


35.00
34.05 35.65 36.76 38.16 31.15 31.05

30.00 31.1

25.00

20.00
10 25 No. of blows 100

Calculation for PI shall made as follows:-


1. The Plasticity index is calculated as the difference between its Liquid limit & Plastic limit
2. In case of sandy soil PL should be determined first, When PL can not be determined, The
PI should be reported as Non-Plastic (NP)
3. When the plastic limit is equal to or greater than the liquid limit, The PI shall be reported as zero
RESULTS:-
Liquid Limit(%)LL = Plastic Limit(%)PL = Plasticity Index PI =

For L&T, TIIC For FPPM For NMSCEL/MSRDC


CONSTRUCTION OF ACCESS CONTROLLED NAGPUR- MUMBAI SUPER COMMUNICATION
EXPRESSWAY (MAHARASHTRA SAMRUDDHI MAHAMARG) IN THE STATE OF
MAHARASHTRA ON EPC MODE FOR PACKAGE 10, FROM KM. 444+845 TO KM. 502+752

Format No.:T/F 4 Rev no: 0 Rev. Date : 14.01.2019


Client MAHARASHTRA STATE ROAD DEVELOPMENT CORPORATION
SPV NAGPUR MUMBAI SUPER COMMUNICATION EXPRESSWAY LIMITED
Authority Engineer FP Project Management
Construction Contractor Larsen & Toubro Limited - TIIC(RR&EC)
MODIFIED PROCTOR'S DENSITY TEST
[As per IS 2720, (Part-8)]
Laboratory Job no Date Sampled 27.09.19
Type of material Soil Sampled by Jointly
Source BA-57 @ PIT 06 Date Tested 28.09.19
Location 488+700 LHS @ 6 KM Tested by Jointly
Proposed Use EMB/SUB

B Mould No. :- 4 Wt.of mould (A) = 5730 gm


gm Volume of mould (V)= 2250 cc
C Trial No. 1 2 3 4 5 6 7
D Wt.of wet sample + mould gm 9131 9864 10307 10544 10388 10014
E Wt.of wet sample (E = D-A) gm 3401 4134 4577 4814 4658 4284
F Wet density of sample (F = E/V) gm/cc 1.512 1.838 2.034 2.140 2.070 1.904
G Container No. 91 92 93 94 95 96
H Wt.of Empty container gm 21.75 21.62 21.70 21.19 21.56 21.72
J Wt.of wet sample+Cont. gm 132.60 133.61 137.22 140.27 137.60 132.46
K Wt.of dry sample+Cont. gm 129.37 127.83 128.95 129.45 124.38 117.74
L Wt.of water(L=J-K) gm 3.23 5.78 8.27 10.83 13.22 14.72
M Wt.of dry sample(M=K-H) gm 107.62 106.21 107.25 108.26 102.82 96.02
N Water content [N = 100X(L/M)]% 3.00 5.44 7.71 10.00 12.86 15.33
P Dry density[P=100x(F/(100+N))] gm/cc 1.468 1.743 1.889 1.945 1.834 1.651

2.05
2
1.95
1.9 10.00 10.001
1.85 1.3 1.931
1.8
1.945 1.945
1.75
Dry Density (gm/cc)

0 10
1.7
1.65
1.6
1.55
1.5
1.45
1.4
1.35
1.3
0 1 2 3 4 5 6 7 8 Moisture
9 10 11 12 13Content
14 15(%)16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

Method used:- Modified Rammer Wt.:- 4.89 kg No. of blows/layer :- 25 / 55 No. of layer :- 5

MDD= 1.945 OMC= 10 %


Specification Limits as per MoRTH Clause 305.2, Maximum Dry unit required for
Embankment upto 3m hieght :15.2 kN/cu.m
Embankment exceeding 3m hieght :16 kN/cu.m
Subgrade and Earthen shoulders,verges, backfill :17.5 kN/cu.m

For L&T, TIIC For FPPM For NMSCEL/MSRDC


CONSTRUCTION OF ACCESS CONTROLLED NAGPUR- MUMBAI SUPER COMMUNICATION
EXPRESSWAY (MAHARASHTRA SAMRUDDHI MAHAMARG) IN THE STATE OF
MAHARASHTRA ON EPC MODE FOR PACKAGE 10, FROM KM. 444+845 TO KM. 502+752

Format No.:T/F 6 Rev no: 0 Rev. Date : 14.01.2019


Client MAHARASHTRA STATE ROAD DEVELOPMENT CORPORATION
SPV NAGPUR MUMBAI SUPER COMMUNICATION EXPRESSWAY LIMITED
Authority Engineer FP Project Management
Construction Contractor Larsen & Toubro Limited - TIIC(RR&EC)

FREE SWELL INDEX


[As per IS 2720 (Part - 40)
Laboratory Job No. Date Sampled 27.09.19
Type of Material Soil Sampled By Jointly
Source BA-57 @ PIT 07 Date Tested 28.09.19
Location 488+700 LHS @ 6 KM Tested By Jointly
Proposed Use EMB/SUB

Sample level in Sample level in Free Swell in Free Swell Index


Average
Water (Vw) kerosene (Vk) Water (Vw-Vk) 100x(Vw-Vk)/Vk
S.No. Free Swell Index
(%)
(ml) (ml) (ml) (%)

1
12 10 2 20

3 20

Note : 1. Test sample shall be passing 425 micron sieve


2. Take 10gm of each sample.

Remarks : ……………………………………………………………………………………………..

Specification Limits as per MoRTH Clause 305.2, Free Swell Index shall not be more than 50%

For L&T, TIIC For FPPM For NMSCEL/MSRDC


MUMBAI NAGPUR EXPRESSWAYCONSTRUCTION OF ACCESS CONTROLLED NAGPUR- MUMBAI SUPER COMMUNICATION
EXPRESSWAY (MAHARASHTRA SAMRUDDHI MAHAMARG) IN THE STATE OF
MAHARASHTRA ON EPC MODE FOR PACKAGE 10, FROM KM. 444+845 TO KM. 502+752

Format No.:T/F 8 Rev no: 0 Rev. Date : 14.01.2019

Client MAHARASHTRA STATE ROAD DEVELOPMENT CORPORATION

SPV NAGPUR MUMBAI SUPER COMMUNICATION EXPRESSWAY LIMITED

Authority Engineer FP Project Management

Construction Contractor Larsen & Toubro Limited - TIIC(RR&EC)

SIEVE ANALYSIS OF SOILS


[As per IS : 2720, (Part 4)]
Laboratory Job No. Date Sampled 27.09.19

Type of Material Soil Sampled by Jointly

Source BA-57 @ PIT 07 Date Tested 28.09.19

Location 488+700 LHS @ 6 KM Tested by Jointly

Proposed Use EMB/SUB

Weight of sample taken(gm): 1000


Cumulative
S Weight Cumulative Cumulative
Sieve Size Weight Remarks
no Retained Retained Passing
Retained
(mm) (gms) (gms) (%) (%)

GRAVEL CONTENT
A 100.0 0 0 0 100 32.26
(B-D):%

B 75.0 0 0 0 100

SAND CONTENT
C 19.0 178.9 17.89 17.89 82.11 47.59
(D-G):%

D 4.75 143.7 14.37 32.26 67.74

SILT&CLAY CONTENT
E 2.00 123.4 12.34 44.60 55.40 20.15
(G):%

F 0.425 210.7 21.07 65.67 34.33

G 0.075 141.8 14.18 79.85 20.15

For L&T, TIIC For FPPM For NMSCEL/MSRDC


CONSTRUCTION OF ACCESS CONTROLLED NAGPUR- MUMBAI SUPER COMMUNICATION
EXPRESSWAY (MAHARASHTRA SAMRUDDHI MAHAMARG) IN THE STATE OF
MAHARASHTRA ON EPC MODE FOR PACKAGE 10, FROM KM. 444+845 TO KM. 502+752
(From village Fatiyabad to village surala in aurangabad district)

Format No.:T/F 5 Rev no: 0 Rev. Date : 14.01.2019


Client MAHARASHTRA STATE ROAD DEVELOPMENT CORPORATION
SPV NAGPUR MUMBAI SUPER COMMUNICATION EXPRESSWAY LIMITED
Authority Engineer FP Project Management
Construction Contractor Larsen & Toubro Limited - TIIC(RR&EC)
ATTERBERG'S LIMITS
[As per IS 2720, (Part-5)]
Laboratory Job no Date Sampled 27.09.19
Type of material Soil Sampled by Jointly
Source BA-57 @ PIT 07 Date Tested 28.09.19
Location 488+700 LHS @ 6 KM Tested by Jointly
Proposed Use EMB/SUB
Liquid Limit Plastic Limit
Determination No. 1 2 3 4 5 6
Container No. 201 202 203 204 205 206
Empty Wt.of Container (W1) gm 16.59 15.78 15.79 15.13 15.76 14.31
Wt.of Container and Wet material (W2) gm 40.45 44.94 45.23 40.03 18.38 17.29
Wt.of Container and Dry material (W3) gm 34.55 37.54 37.59 33.38 17.77 16.60
Wt.of Moisture (W4=W2-W3) gm 5.90 7.40 7.64 6.65 0.61 0.69
Wt.of dry material (W5=W3-W1) gm 17.96 21.76 21.80 18.25 2.01 2.29
Moisture Content w = 100 x W4/W5 % 32.85 34.01 35.05 36.44 30.35 30.13
No. of Blows / Penetration 31 27 21 16 Average= 30.24
LIQUID LIMIT CHART
50.00

45.00 25 25
20 40

40.00
5.90 7.40 7.64 6.65 0.61 0.69
% Moisture content

17.96 21.76 21.80 18.25 2.01 2.29


35.00
32.84 34.02 35.06 36.42 30.19 30.31

30.00 30.25

25.00

20.00
10 25 No. of blows 100

Calculation for PI shall made as follows:-


1. The Plasticity index is calculated as the difference between its Liquid limit & Plastic limit
2. In case of sandy soil PL should be determined first, When PL can not be determined, The
PI should be reported as Non-Plastic (NP)
3. When the plastic limit is equal to or greater than the liquid limit, The PI shall be reported as zero
RESULTS:-
Liquid Limit(%)LL = Plastic Limit(%)PL = Plasticity Index PI =

For L&T, TIIC For FPPM For NMSCEL/MSRDC


CONSTRUCTION OF ACCESS CONTROLLED NAGPUR- MUMBAI SUPER COMMUNICATION
EXPRESSWAY (MAHARASHTRA SAMRUDDHI MAHAMARG) IN THE STATE OF
MAHARASHTRA ON EPC MODE FOR PACKAGE 10, FROM KM. 444+845 TO KM. 502+752

Format No.:T/F 4 Rev no: 0 Rev. Date : 14.01.2019


Client MAHARASHTRA STATE ROAD DEVELOPMENT CORPORATION
SPV NAGPUR MUMBAI SUPER COMMUNICATION EXPRESSWAY LIMITED
Authority Engineer FP Project Management
Construction Contractor Larsen & Toubro Limited - TIIC(RR&EC)
MODIFIED PROCTOR'S DENSITY TEST
[As per IS 2720, (Part-8)]
Laboratory Job no Date Sampled 27.09.19
Type of material Soil Sampled by Jointly
Source BA-57 @ PIT 07 Date Tested 28.09.19
Location 488+700 LHS @ 6 KM Tested by Jointly
Proposed Use EMB/SUB

B Mould No. :- 4 Wt.of mould (A) = 5730 gm


gm Volume of mould (V)= 2250 cc
C Trial No. 1 2 3 4 5 6 7
D Wt.of wet sample + mould gm 9269 10026 10479 10727 10551 10158
E Wt.of wet sample (E = D-A) gm 3539 4296 4749 4997 4821 4428
F Wet density of sample (F = E/V) gm/cc 1.573 1.909 2.111 2.221 2.143 1.968
G Container No. 97 98 99 100 130 132
H Wt.of Empty container gm 22.51 21.88 22.61 22.18 21.73 21.54
J Wt.of wet sample+Cont. gm 134.84 137.04 138.30 137.71 138.53 138.28
K Wt.of dry sample+Cont. gm 131.76 131.46 130.51 127.78 125.98 123.63
L Wt.of water(L=J-K) gm 3.08 5.58 7.79 9.93 12.55 14.65
M Wt.of dry sample(M=K-H) gm 109.25 109.58 107.90 105.60 104.25 102.09
N Water content [N = 100X(L/M)]% 2.82 5.09 7.22 9.40 12.04 14.35
P Dry density[P=100x(F/(100+N))] gm/cc 1.530 1.817 1.969 2.030 1.912 1.721

2.05
2
1.95
1.9 9.40 9.3711
1.85 1.3 2.013
1.8
2.030 2.03
1.75
Dry Density (gm/cc)

0 9.4
1.7
1.65
1.6
1.55
1.5
1.45
1.4
1.35
1.3
0 1 2 3 4 5 6 7 8 Moisture
9 10 11 12 13Content
14 15(%)16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

Method used:- Modified Rammer Wt.:- 4.89 kg No. of blows/layer :- 25 / 55 No. of layer :- 5

MDD= 2.030 OMC= 9.4 %


Specification Limits as per MoRTH Clause 305.2, Maximum Dry unit required for
Embankment upto 3m hieght :15.2 kN/cu.m
Embankment exceeding 3m hieght :16 kN/cu.m
Subgrade and Earthen shoulders,verges, backfill :17.5 kN/cu.m

For L&T, TIIC For FPPM For NMSCEL/MSRDC


CONSTRUCTION OF ACCESS CONTROLLED NAGPUR- MUMBAI SUPER COMMUNICATION
EXPRESSWAY (MAHARASHTRA SAMRUDDHI MAHAMARG) IN THE STATE OF
MAHARASHTRA ON EPC MODE FOR PACKAGE 10, FROM KM. 444+845 TO KM. 502+752
(From Village Fatiyabad to Village Surala in Aurangabad District)
Format No.:T/F 7-1 Rev no: 0 Rev. Date : 14.01.2019
Client MAHARASHTRA STATE ROAD DEVELOPMENT CORPORATION
SPV NAGPUR MUMBAI SUPER COMMUNICATION EXPRESSWAY LIMITED
Authority Engineer FP Project Management
Construction Contractor Larsen & Toubro Limited - TIIC(RR&EC)
CALIFORNIA BEARING RATIO TEST
[As per IS 2720(Part-16)]
Laboratory job no. Date sampled 27.09.19
Type of material Soil Sampled by Jointly

Source/Location BA-57 @ PIT 07&08 Date casted 05-10-2019

MDD of Sample (gm/cc) 1.965 Date tested 09-10-2019


OMC of Sample (%) 10.50 Tested by Jointly
Proposed use EMB/SUB
MOISTURE CONTENT AND UNIT WEIGHT OF TEST SAMPLES
S.No Description Specimen 1 Specimen 2 Specimen 3

A. Mould No. 19 20 21
B. No.Of blows per layer 55 55 55
C. Condition of sample while SOAKING Before After Before After Before After
D. Wt.of mould(gm) 5778 6457 6196
E. Wt.of wet sample+mould(gm) 10533 10520 11121 11156 10914 10952
F. Wt.of wet sample(E-D)(gm) 4755 4742 4664 4699 4718 4756
G. Volume of mould/sample (cc) 2250 2250 2250 2250 2250 2250
H. Wet density (F/G)(gm/cc) 2.113 2.107 2.073 2.089 2.097 2.114
J. Moisture determination
K. Container no. 49 50 167 169 171 172
L. Wt.of container(gm) 30.98 31.42 20.92 21.73 22.56 20.24
M. Wt.of wet sample+cont.(gm) 142.32 143.86 131.1 134.33 133.43 133.12
N. Wt.of dry sample+cont.(gm) 132.35 132.12 121.86 122.91 124.23 121.52
P. Wt.of water(M-N)(gm) 9.97 11.74 9.24 11.42 9.20 11.60
Q. Wt.of dry sample(N-L)(gm) 101.37 100.70 100.94 101.18 101.67 101.28
R. Water content[(P/Q)x100](%) 9.83 11.66 9.15 11.28 9.05 11.45
S. Dry density{H/[1+(R/100)]}(gm/cc) 1.924 1.887 1.899 1.877 1.923 1.897
LOAD PENETRATION TEST DATA

Penetrati Proving ring Proving ring Proving ring


GENERAL INFORMATION Load(kgf) Load(kgf) Load(kgf)
on (mm) reading reading reading

0.0 0 0 0 0 0 0
Type of compaction used: Static/ Dynamic
0.5 8 34.9 7 30.6 7 30.6
1.0 17 74.2 16 69.9 16 69.9
Period of soaking: 4 days
1.5 24 104.8 22 96.1 22 96.1
2.0 32 139.7 30 131.0 29 126.6
Wt.of surcharge used (kg): 5
2.5 39 170.3 37 161.6 36 157.2
Proving ring Number & capacity: 4.0 60 262.0 57 248.9 55 240.2
13527 - 50kN 5.0 72 314.4 68 297.0 67 292.6
7.5 99 432.3 94 410.5 92 401.8
Proving Ring Load Factor 4.367
10.0 110 480.4 105 458.5 102 445.4
12.5 118 515.3 112 489.1 109 476.0
Corrected unit load from graph(kg) for 2.5mm 170.3 161.6 157.2
Corrected unit load from graph(kg) for 5.0mm 314.4 297.0 292.6
CBR at 2.5mm (%) 12.4 11.8 11.5
CBR at 5.0mm(%) 15.3 14.5 14.2
CBR reported (%) 14.7

For L&T TIIC For FPPM For MMSCEL/ MSRDC


CONSTRUCTION OF ACCESS CONTROLLED NAGPUR- MUMBAI SUPER COMMUNICATION
EXPRESSWAY (MAHARASHTRA SAMRUDDHI MAHAMARG) IN THE STATE OF
MAHARASHTRA ON EPC MODE FOR PACKAGE 10, FROM KM. 444+845 TO KM. 502+752
(From Village Fatiyabad to Village Surala in Aurangabad District)
Format No.:T/F 7-2 Rev no: 0 Rev. Date : 14.01.2019
Client MAHARASHTRA STATE ROAD DEVELOPMENT CORPORATION
SPV NAGPUR MUMBAI SUPER COMMUNICATION EXPRESSWAY LIMITED
Authority Engineer FP Project Management
Construction Contractor Larsen & Toubro Limited - TIIC(RR&EC)
C B R TEST
Laboratory job no. Date sampled 27.09.19
Type of material Soil Sampled by Jointly
Source BA-57 @ PIT 07&08 Date tested 09-10-2019
Location 488+700 LHS @ 6 KM Tested by Jointly
Proposed use EMB/SUB

LOAD Vs PENETRATION GRAPH


600

500

### ###
0 8
400
Load (kg)

### ###
0 8
300

200

100

0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 11.0 12.0 13.0 14.0 15.0 16.0 17.0 18.0 19.0 20.0
1

Penetration (mm)
Results:-
Mould no. 19
Load at 2.5mm Penetration 170.3
Load at 5.0mm Penetration 314.4
CBR at 2.5mm Penetration 12.4
CBR at 5.0mm Penetration 15.3
CBR reported as (%)= 15.3

For L&T, TIIC For FPPM For NMSCEL/MSRDC


CONSTRUCTION OF ACCESS CONTROLLED NAGPUR- MUMBAI SUPER COMMUNICATION
EXPRESSWAY (MAHARASHTRA SAMRUDDHI MAHAMARG) IN THE STATE OF
MAHARASHTRA ON EPC MODE FOR PACKAGE 10, FROM KM. 444+845 TO KM. 502+752
(From Village Fatiyabad to Village Surala in Aurangabad District)
Format No.:T/F 7-2 Rev no: 0 Rev. Date : 14.01.2019
Client MAHARASHTRA STATE ROAD DEVELOPMENT CORPORATION
SPV NAGPUR MUMBAI SUPER COMMUNICATION EXPRESSWAY LIMITED
Authority Engineer FP Project Management
Construction Contractor Larsen & Toubro Limited - TIIC(RR&EC)
C B R TEST
Laboratory job no. Date sampled 27.09.19
Type of material Soil Sampled by Jointly
Source BA-57 @ PIT 07&08 Date tested 09-10-2019
Location 488+700 LHS @ 6 KM Tested by Jointly
Proposed use EMB/SUB

LOAD Vs PENETRATION GRAPH

600

500

### ###
0 8
400
Load (kg)

### ###
0 8
300

200

100

0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 11.0 12.0 13.0 14.0 15.0 16.0 17.0 18.0 19.0 20.0
1

Penetration (mm)
Results:-
Mould no. 20
Load at 2.5mm Penetration 161.6
Load at 5.0mm Penetration 297.0
CBR at 2.5mm Penetration 11.8
CBR at 5.0mm Penetration 14.5
CBR reported as (%)= 14.5

For L&T, TIIC For FPPM For NMSCEL/MSRDC


CONSTRUCTION OF ACCESS CONTROLLED NAGPUR- MUMBAI SUPER COMMUNICATION
EXPRESSWAY (MAHARASHTRA SAMRUDDHI MAHAMARG) IN THE STATE OF
MAHARASHTRA ON EPC MODE FOR PACKAGE 10, FROM KM. 444+845 TO KM. 502+752
(From Village Fatiyabad to Village Surala in Aurangabad District)
Format No.:T/F 7-2 Rev no: 0 Rev. Date : 14.01.2019
Client MAHARASHTRA STATE ROAD DEVELOPMENT CORPORATION
SPV NAGPUR MUMBAI SUPER COMMUNICATION EXPRESSWAY LIMITED
Authority Engineer FP Project Management
Construction Contractor Larsen & Toubro Limited - TIIC(RR&EC)
C B R TEST
Laboratory job no. Date sampled 27.09.19
Type of material Soil Sampled by Jointly
Source BA-57 @ PIT 07&08 Date tested 09-10-2019
Location 488+700 LHS @ 6 KM Tested by Jointly
Proposed use EMB/SUB

LOAD Vs PENETRATION GRAPH

600

500

### ###
0 8
400
Load (kg)

### ###
0 8
300

200

100

0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 11.0 12.0 13.0 14.0 15.0 16.0 17.0 18.0 19.0 20.0

Penetration (mm)
Results:-
Mould no. 21
Load at 2.5mm Penetration 157.2
Load at 5.0mm Penetration 292.6
CBR at 2.5mm Penetration 11.5
CBR at 5.0mm Penetration 14.2
CBR reported as (%)= 14.2

For L&T, TIIC For FPPM For NMSCEL/MSRDC


CONSTRUCTION OF ACCESS CONTROLLED NAGPUR- MUMBAI SUPER COMMUNICATION
EXPRESSWAY (MAHARASHTRA SAMRUDDHI MAHAMARG) IN THE STATE OF
MAHARASHTRA ON EPC MODE FOR PACKAGE 10, FROM KM. 444+845 TO KM. 502+752

Format No.:T/F 6 Rev no: 0 Rev. Date : 14.01.2019


Client MAHARASHTRA STATE ROAD DEVELOPMENT CORPORATION
SPV NAGPUR MUMBAI SUPER COMMUNICATION EXPRESSWAY LIMITED
Authority Engineer FP Project Management
Construction Contractor Larsen & Toubro Limited - TIIC(RR&EC)

FREE SWELL INDEX


[As per IS 2720 (Part - 40)
Laboratory Job No. Date Sampled 27.09.19
Type of Material Soil Sampled By Jointly
Source BA-57 @ PIT-08 Date Tested 28.09.19
Location 488+700 LHS @ 6 KM Tested By Jointly
Proposed Use EMB/SUB

Sample level in Sample level in Free Swell in Free Swell Index


Average
Water (Vw) kerosene (Vk) Water (Vw-Vk) 100x(Vw-Vk)/Vk
S.No. Free Swell Index
(%)
(ml) (ml) (ml) (%)

1
13 11 2 18

3 18

Note : 1. Test sample shall be passing 425 micron sieve


2. Take 10gm of each sample.

Remarks : ……………………………………………………………………………………………..

Specification Limits as per MoRTH Clause 305.2, Free Swell Index shall not be more than 50%

For L&T, TIIC For FPPM For NMSCEL/MSRDC


MUMBAI NAGPUR EXPRESSWAYCONSTRUCTION OF ACCESS CONTROLLED NAGPUR- MUMBAI SUPER COMMUNICATION
EXPRESSWAY (MAHARASHTRA SAMRUDDHI MAHAMARG) IN THE STATE OF
MAHARASHTRA ON EPC MODE FOR PACKAGE 10, FROM KM. 444+845 TO KM. 502+752

Format No.:T/F 8 Rev no: 0 Rev. Date : 14.01.2019

Client MAHARASHTRA STATE ROAD DEVELOPMENT CORPORATION

SPV NAGPUR MUMBAI SUPER COMMUNICATION EXPRESSWAY LIMITED

Authority Engineer FP Project Management

Construction Contractor Larsen & Toubro Limited - TIIC(RR&EC)

SIEVE ANALYSIS OF SOILS


[As per IS : 2720, (Part 4)]
Laboratory Job No. Date Sampled 27.09.19

Type of Material Soil Sampled by Jointly

Source BA-57 @ PIT-08 Date Tested 28.09.19

Location 488+700 LHS @ 6 KM Tested by Jointly

Proposed Use EMB/SUB

Weight of sample taken(gm): 1000


Cumulative
S Weight Cumulative Cumulative
Sieve Size Weight Remarks
no Retained Retained Passing
Retained
(mm) (gms) (gms) (%) (%)

GRAVEL CONTENT
A 100.0 0 0 0 100 34.58
(B-D):%

B 75.0 0 0 0 100

SAND CONTENT
C 19.0 162.4 16.24 16.24 83.76 35.57
(D-G):%

D 4.75 183.4 18.34 34.58 65.42

SILT&CLAY CONTENT
E 2.00 97.8 9.78 44.36 55.64 29.85
(G):%

F 0.425 108.8 10.88 55.24 44.76

G 0.075 149.1 14.91 70.15 29.85

For L&T, TIIC For FPPM For NMSCEL/MSRDC


CONSTRUCTION OF ACCESS CONTROLLED NAGPUR- MUMBAI SUPER COMMUNICATION
EXPRESSWAY (MAHARASHTRA SAMRUDDHI MAHAMARG) IN THE STATE OF
MAHARASHTRA ON EPC MODE FOR PACKAGE 10, FROM KM. 444+845 TO KM. 502+752
(From village Fatiyabad to village surala in aurangabad district)

Format No.:T/F 5 Rev no: 0 Rev. Date : 14.01.2019


Client MAHARASHTRA STATE ROAD DEVELOPMENT CORPORATION
SPV NAGPUR MUMBAI SUPER COMMUNICATION EXPRESSWAY LIMITED
Authority Engineer FP Project Management
Construction Contractor Larsen & Toubro Limited - TIIC(RR&EC)
ATTERBERG'S LIMITS
[As per IS 2720, (Part-5)]
Laboratory Job no Date Sampled 27.09.19
Type of material Soil Sampled by Jointly
Source BA-57 @ PIT-08 Date Tested 28.09.19
Location 488+700 LHS @ 6 KM Tested by Jointly
Proposed Use EMB/SUB
Liquid Limit Plastic Limit
Determination No. 1 2 3 4 5 6
Container No. 207 208 209 226 228 231
Empty Wt.of Container (W1) gm 14.77 15.74 14.97 21.68 21.21 21.1
Wt.of Container and Wet material (W2) gm 39.49 39.76 42.13 49.71 24.86 23.64
Wt.of Container and Dry material (W3) gm 33.56 33.81 35.24 42.36 24.09 23.11
Wt.of Moisture (W4=W2-W3) gm 5.93 5.95 6.89 7.35 0.77 0.53
Wt.of dry material (W5=W3-W1) gm 18.79 18.07 20.27 20.68 2.88 2.01
Moisture Content w = 100 x W4/W5 % 31.56 32.93 33.99 35.54 26.74 26.37
No. of Blows / Penetration 33 28 23 18 Average= 26.55
LIQUID LIMIT CHART
50.00

45.00 25 25
20 40

40.00
5.93 5.95 6.89 7.35 0.77 0.53
% Moisture content

18.79 18.07 20.27 20.68 2.88 2.01


35.00
31.57 32.91 33.99 35.53 26.57 26.43

30.00 26.5

25.00

20.00
10 25 No. of blows 100

Calculation for PI shall made as follows:-


1. The Plasticity index is calculated as the difference between its Liquid limit & Plastic limit
2. In case of sandy soil PL should be determined first, When PL can not be determined, The
PI should be reported as Non-Plastic (NP)
3. When the plastic limit is equal to or greater than the liquid limit, The PI shall be reported as zero
RESULTS:-
Liquid Limit(%)LL = Plastic Limit(%)PL = Plasticity Index PI =

For L&T, TIIC For FPPM For NMSCEL/MSRDC


CONSTRUCTION OF ACCESS CONTROLLED NAGPUR- MUMBAI SUPER COMMUNICATION
EXPRESSWAY (MAHARASHTRA SAMRUDDHI MAHAMARG) IN THE STATE OF
MAHARASHTRA ON EPC MODE FOR PACKAGE 10, FROM KM. 444+845 TO KM. 502+752

Format No.:T/F 4 Rev no: 0 Rev. Date : 14.01.2019


Client MAHARASHTRA STATE ROAD DEVELOPMENT CORPORATION
SPV NAGPUR MUMBAI SUPER COMMUNICATION EXPRESSWAY LIMITED
Authority Engineer FP Project Management
Construction Contractor Larsen & Toubro Limited - TIIC(RR&EC)
MODIFIED PROCTOR'S DENSITY TEST
[As per IS 2720, (Part-8)]
Laboratory Job no Date Sampled 27.09.19
Type of material Soil Sampled by Jointly
Source BA-57 @ PIT-08 Date Tested 28.09.19
Location 488+700 LHS @ 6 KM Tested by Jointly
Proposed Use EMB/SUB

B Mould No. :- 4 Wt.of mould (A) = 5730 gm


gm Volume of mould (V)= 2250 cc
C Trial No. 1 2 3 4 5 6 7
D Wt.of wet sample + mould gm 9089 9827 10279 10501 10390 10029
E Wt.of wet sample (E = D-A) gm 3359 4097 4549 4771 4660 4299
F Wet density of sample (F = E/V) gm/cc 1.493 1.821 2.022 2.120 2.071 1.911
G Container No. 134 135 137 138 141 143
H Wt.of Empty container gm 21.72 22.30 21.21 22.84 22.38 21.58
J Wt.of wet sample+Cont. gm 135.92 138.00 135.87 140.70 136.50 137.60
K Wt.of dry sample+Cont. gm 132.08 131.16 126.48 128.45 121.73 120.13
L Wt.of water(L=J-K) gm 3.84 6.85 9.39 12.25 14.77 17.47
M Wt.of dry sample(M=K-H) gm 110.36 108.86 105.27 105.61 99.35 98.55
N Water content [N = 100X(L/M)]% 3.48 6.29 8.92 11.60 14.87 17.73
P Dry density[P=100x(F/(100+N))] gm/cc 1.442 1.713 1.856 1.900 1.803 1.623

2.05
2
1.95
1.9 11.60 11.551
1.85 1.3 1.898
1.8
1.900 1.9
1.75
Dry Density (gm/cc)

0 11.6
1.7
1.65
1.6
1.55
1.5
1.45
1.4
1.35
1.3
0 1 2 3 4 5 6 7 8 Moisture
9 10 11 12 13Content
14 15(%)16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

Method used:- Modified Rammer Wt.:- 4.89 kg No. of blows/layer :- 25 / 55 No. of layer :- 5

MDD= 1.900 OMC= 11.6 %


Specification Limits as per MoRTH Clause 305.2, Maximum Dry unit required for
Embankment upto 3m hieght :15.2 kN/cu.m
Embankment exceeding 3m hieght :16 kN/cu.m
Subgrade and Earthen shoulders,verges, backfill :17.5 kN/cu.m

For L&T, TIIC For FPPM For NMSCEL/MSRDC


CONSTRUCTION OF ACCESS CONTROLLED NAGPUR- MUMBAI SUPER COMMUNICATION
EXPRESSWAY (MAHARASHTRA SAMRUDDHI MAHAMARG) IN THE STATE OF
MAHARASHTRA ON EPC MODE FOR PACKAGE 10, FROM KM. 444+845 TO KM. 502+752

Format No.:T/F 6 Rev no: 0 Rev. Date : 14.01.2019


Client MAHARASHTRA STATE ROAD DEVELOPMENT CORPORATION
SPV NAGPUR MUMBAI SUPER COMMUNICATION EXPRESSWAY LIMITED
Authority Engineer FP Project Management
Construction Contractor Larsen & Toubro Limited - TIIC(RR&EC)

FREE SWELL INDEX


[As per IS 2720 (Part - 40)
Laboratory Job No. Date Sampled 27.09.19
Type of Material Soil Sampled By Jointly
Source BA-57 @ PIT 09 Date Tested 28.09.19
Location 488+700 LHS @ 6 KM Tested By Jointly
Proposed Use EMB/SUB

Sample level in Sample level in Free Swell in Free Swell Index


Average
Water (Vw) kerosene (Vk) Water (Vw-Vk) 100x(Vw-Vk)/Vk
S.No. Free Swell Index
(%)
(ml) (ml) (ml) (%)

1
13 10 3 30

3 30

Note : 1. Test sample shall be passing 425 micron sieve


2. Take 10gm of each sample.

Remarks : ……………………………………………………………………………………………..

Specification Limits as per MoRTH Clause 305.2, Free Swell Index shall not be more than 50%

For L&T, TIIC For FPPM For NMSCEL/MSRDC


MUMBAI NAGPUR EXPRESSWAYCONSTRUCTION OF ACCESS CONTROLLED NAGPUR- MUMBAI SUPER COMMUNICATION
EXPRESSWAY (MAHARASHTRA SAMRUDDHI MAHAMARG) IN THE STATE OF
MAHARASHTRA ON EPC MODE FOR PACKAGE 10, FROM KM. 444+845 TO KM. 502+752

Format No.:T/F 8 Rev no: 0 Rev. Date : 14.01.2019

Client MAHARASHTRA STATE ROAD DEVELOPMENT CORPORATION

SPV NAGPUR MUMBAI SUPER COMMUNICATION EXPRESSWAY LIMITED

Authority Engineer FP Project Management

Construction Contractor Larsen & Toubro Limited - TIIC(RR&EC)

SIEVE ANALYSIS OF SOILS


[As per IS : 2720, (Part 4)]
Laboratory Job No. Date Sampled 27.09.19

Type of Material Soil Sampled by Jointly

Source BA-57 @ PIT 09 Date Tested 28.09.19

Location 488+700 LHS @ 6 KM Tested by Jointly

Proposed Use EMB/SUB

Weight of sample taken(gm): 1000


Cumulative
S Weight Cumulative Cumulative
Sieve Size Weight Remarks
no Retained Retained Passing
Retained
(mm) (gms) (gms) (%) (%)

GRAVEL CONTENT
A 100.0 0 0 0 100 37.50
(B-D):%

B 75.0 0 0 0 100

SAND CONTENT
C 19.0 168.9 16.89 16.89 83.11 32.30
(D-G):%

D 4.75 206.1 20.61 37.50 62.50

SILT&CLAY CONTENT
E 2.00 98.6 9.86 47.36 52.64 30.20
(G):%

F 0.425 81.0 8.10 55.46 44.54

G 0.075 143.4 14.34 69.80 30.20

For L&T, TIIC For FPPM For NMSCEL/MSRDC


CONSTRUCTION OF ACCESS CONTROLLED NAGPUR- MUMBAI SUPER COMMUNICATION
EXPRESSWAY (MAHARASHTRA SAMRUDDHI MAHAMARG) IN THE STATE OF
MAHARASHTRA ON EPC MODE FOR PACKAGE 10, FROM KM. 444+845 TO KM. 502+752
(From village Fatiyabad to village surala in aurangabad district)

Format No.:T/F 5 Rev no: 0 Rev. Date : 14.01.2019


Client MAHARASHTRA STATE ROAD DEVELOPMENT CORPORATION
SPV NAGPUR MUMBAI SUPER COMMUNICATION EXPRESSWAY LIMITED
Authority Engineer FP Project Management
Construction Contractor Larsen & Toubro Limited - TIIC(RR&EC)
ATTERBERG'S LIMITS
[As per IS 2720, (Part-5)]
Laboratory Job no Date Sampled 27.09.19
Type of material Soil Sampled by Jointly
Source BA-57 @ PIT 09 Date Tested 28.09.19
Location 488+700 LHS @ 6 KM Tested by Jointly
Proposed Use EMB/SUB
Liquid Limit Plastic Limit
Determination No. 1 2 3 4 5 6
Container No. 235 239 240 241 242 244
Empty Wt.of Container (W1) gm 22.31 21.32 22.08 21.37 21.84 21.74
Wt.of Container and Wet material (W2) gm 50.81 47.91 47.80 46.46 24.92 25.39
Wt.of Container and Dry material (W3) gm 44.09 41.43 41.36 40.02 24.23 24.57
Wt.of Moisture (W4=W2-W3) gm 6.72 6.48 6.44 6.44 0.69 0.82
Wt.of dry material (W5=W3-W1) gm 21.78 20.11 19.28 18.65 2.39 2.83
Moisture Content w = 100 x W4/W5 % 30.85 32.22 33.40 34.53 28.87 28.98
No. of Blows / Penetration 31 27 22 16 Average= 28.92
LIQUID LIMIT CHART
50.00

45.00 25 25
20 40

40.00
6.72 6.48 6.44 6.44 0.69 0.82
% Moisture content

21.78 20.11 19.28 18.65 2.39 2.83


35.00
30.87 32.24 33.39 34.51 28.76 28.94

30.00 28.85

25.00

20.00
10 25 No. of blows 100

Calculation for PI shall made as follows:-


1. The Plasticity index is calculated as the difference between its Liquid limit & Plastic limit
2. In case of sandy soil PL should be determined first, When PL can not be determined, The
PI should be reported as Non-Plastic (NP)
3. When the plastic limit is equal to or greater than the liquid limit, The PI shall be reported as zero
RESULTS:-
Liquid Limit(%)LL = Plastic Limit(%)PL = Plasticity Index PI =

For L&T, TIIC For FPPM For NMSCEL/MSRDC


CONSTRUCTION OF ACCESS CONTROLLED NAGPUR- MUMBAI SUPER COMMUNICATION
EXPRESSWAY (MAHARASHTRA SAMRUDDHI MAHAMARG) IN THE STATE OF
MAHARASHTRA ON EPC MODE FOR PACKAGE 10, FROM KM. 444+845 TO KM. 502+752

Format No.:T/F 4 Rev no: 0 Rev. Date : 14.01.2019


Client MAHARASHTRA STATE ROAD DEVELOPMENT CORPORATION
SPV NAGPUR MUMBAI SUPER COMMUNICATION EXPRESSWAY LIMITED
Authority Engineer FP Project Management
Construction Contractor Larsen & Toubro Limited - TIIC(RR&EC)
MODIFIED PROCTOR'S DENSITY TEST
[As per IS 2720, (Part-8)]
Laboratory Job no Date Sampled 27.09.19
Type of material Soil Sampled by Jointly
Source BA-57 @ PIT 09 Date Tested 28.09.19
Location 488+700 LHS @ 6 KM Tested by Jointly
Proposed Use EMB/SUB

B Mould No. :- 4 Wt.of mould (A) = 5730 gm


gm Volume of mould (V)= 2250 cc
C Trial No. 1 2 3 4 5 6 7
D Wt.of wet sample + mould gm 9246 10006 10465 10677 10553 10167
E Wt.of wet sample (E = D-A) gm 3516 4276 4735 4947 4823 4437
F Wet density of sample (F = E/V) gm/cc 1.563 1.900 2.104 2.198 2.143 1.972
G Container No. 146 147 148 152 154 155
H Wt.of Empty container gm 21.85 21.56 21.45 21.59 22.19 21.72
J Wt.of wet sample+Cont. gm 137.14 136.45 131.98 131.93 137.14 133.90
K Wt.of dry sample+Cont. gm 133.71 130.42 123.94 121.72 123.84 118.75
L Wt.of water(L=J-K) gm 3.42 6.03 8.05 10.21 13.31 15.15
M Wt.of dry sample(M=K-H) gm 111.86 108.86 102.49 100.13 101.65 97.03
N Water content [N = 100X(L/M)]% 3.06 5.54 7.85 10.20 13.09 15.61
P Dry density[P=100x(F/(100+N))] gm/cc 1.516 1.800 1.951 1.995 1.895 1.706

2.05
2
1.95
1.9 10.20 10.181
1.85 1.3 1.995
1.8
1.995 1.995
1.75
Dry Density (gm/cc)

0 10.2
1.7
1.65
1.6
1.55
1.5
1.45
1.4
1.35
1.3
0 1 2 3 4 5 6 7 8 Moisture
9 10 11 12 13Content
14 15(%)16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

Method used:- Modified Rammer Wt.:- 4.89 kg No. of blows/layer :- 25 / 55 No. of layer :- 5

MDD= 1.995 OMC= 10.2 %


Specification Limits as per MoRTH Clause 305.2, Maximum Dry unit required for
Embankment upto 3m hieght :15.2 kN/cu.m
Embankment exceeding 3m hieght :16 kN/cu.m
Subgrade and Earthen shoulders,verges, backfill :17.5 kN/cu.m

For L&T, TIIC For FPPM For NMSCEL/MSRDC


CONSTRUCTION OF ACCESS CONTROLLED NAGPUR- MUMBAI SUPER COMMUNICATION
EXPRESSWAY (MAHARASHTRA SAMRUDDHI MAHAMARG) IN THE STATE OF
MAHARASHTRA ON EPC MODE FOR PACKAGE 10, FROM KM. 444+845 TO KM. 502+752
(From Village Fatiyabad to Village Surala in Aurangabad District)
Format No.:T/F 7-1 Rev no: 0 Rev. Date : 14.01.2019
Client MAHARASHTRA STATE ROAD DEVELOPMENT CORPORATION
SPV NAGPUR MUMBAI SUPER COMMUNICATION EXPRESSWAY LIMITED
Authority Engineer FP Project Management
Construction Contractor Larsen & Toubro Limited - TIIC(RR&EC)
CALIFORNIA BEARING RATIO TEST
[As per IS 2720(Part-16)]
Laboratory job no. Date sampled 27.09.19
Type of material Soil Sampled by Jointly

Source/Location BA-57 @ PIT 09&10 Date casted 05-10-2019

MDD of Sample (gm/cc) 1.998 Date tested 09-10-2019


OMC of Sample (%) 10.00 Tested by Jointly
Proposed use EMB/SUB
MOISTURE CONTENT AND UNIT WEIGHT OF TEST SAMPLES
S.No Description Specimen 1 Specimen 2 Specimen 3

A. Mould No. 22 23 24
B. No.Of blows per layer 55 55 55
C. Condition of sample while SOAKING Before After Before After Before After
D. Wt.of mould(gm) 6388 6366 6642
E. Wt.of wet sample+mould(gm) 11177 11147 11143 11115 11364 11446
F. Wt.of wet sample(E-D)(gm) 4789 4759 4777 4749 4722 4804
G. Volume of mould/sample (cc) 2250 2250 2250 2250 2250 2250
H. Wet density (F/G)(gm/cc) 2.128 2.115 2.123 2.111 2.099 2.135
J. Moisture determination
K. Container no. 173 174 175 176 177 181
L. Wt.of container(gm) 21.77 22.06 22.43 21.52 21.84 22.01
M. Wt.of wet sample+cont.(gm) 131.99 134.08 135.96 134.09 135.6 133.9
N. Wt.of dry sample+cont.(gm) 122.96 123.01 126.21 122.53 126.62 123.12
P. Wt.of water(M-N)(gm) 9.03 11.07 9.75 11.56 8.98 10.78
Q. Wt.of dry sample(N-L)(gm) 101.19 100.95 103.78 101.01 104.78 101.11
R. Water content[(P/Q)x100](%) 8.92 10.97 9.39 11.45 8.57 10.67
S. Dry density{H/[1+(R/100)]}(gm/cc) 1.954 1.906 1.941 1.894 1.933 1.929
LOAD PENETRATION TEST DATA

Penetrati Proving ring Proving ring Proving ring


GENERAL INFORMATION Load(kgf) Load(kgf) Load(kgf)
on (mm) reading reading reading

0.0 0 0 0 0 0 0
Type of compaction used: Static/ Dynamic
0.5 8 34.9 8 34.9 8 34.9
1.0 18 78.6 18 78.6 17 74.2
Period of soaking: 4 days
1.5 25 109.2 25 109.2 24 104.8
2.0 35 152.8 34 148.5 32 139.7
Wt.of surcharge used (kg): 5
2.5 41 179.0 41 179.0 39 170.3
Proving ring Number & capacity: 4.0 64 279.5 63 275.1 60 262.0
13527 - 50kN 5.0 76 331.9 75 327.5 71 310.1
7.5 107 467.3 105 458.5 101 441.1
Proving Ring Load Factor 4.367
10.0 120 524.0 117 510.9 112 489.1
12.5 126 550.2 124 541.5 118 515.3
Corrected unit load from graph(kg) for 2.5mm 179.0 179.0 170.3
Corrected unit load from graph(kg) for 5.0mm 331.9 327.5 310.1
CBR at 2.5mm (%) 13.1 13.1 12.4
CBR at 5.0mm(%) 16.2 15.9 15.1
CBR reported (%) 15.7

For L&T TIIC For FPPM For MMSCEL/ MSRDC


CONSTRUCTION OF ACCESS CONTROLLED NAGPUR- MUMBAI SUPER COMMUNICATION
EXPRESSWAY (MAHARASHTRA SAMRUDDHI MAHAMARG) IN THE STATE OF
MAHARASHTRA ON EPC MODE FOR PACKAGE 10, FROM KM. 444+845 TO KM. 502+752
(From Village Fatiyabad to Village Surala in Aurangabad District)
Format No.:T/F 7-2 Rev no: 0 Rev. Date : 14.01.2019
Client MAHARASHTRA STATE ROAD DEVELOPMENT CORPORATION
SPV NAGPUR MUMBAI SUPER COMMUNICATION EXPRESSWAY LIMITED
Authority Engineer FP Project Management
Construction Contractor Larsen & Toubro Limited - TIIC(RR&EC)
C B R TEST
Laboratory job no. Date sampled 27.09.19
Type of material Soil Sampled by Jointly
Source BA-57 @ PIT 09&10 Date tested 09-10-2019
Location 488+700 LHS @ 6 KM Tested by Jointly
Proposed use EMB/SUB

LOAD Vs PENETRATION GRAPH


600

500

### ###
0 8
400
Load (kg)

### ###
0 8
300

200

100

0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 11.0 12.0 13.0 14.0 15.0 16.0 17.0 18.0 19.0 20.0
1

Penetration (mm)
Results:-
Mould no. 22
Load at 2.5mm Penetration 179.0
Load at 5.0mm Penetration 331.9
CBR at 2.5mm Penetration 13.1
CBR at 5.0mm Penetration 16.2
CBR reported as (%)= 16.2

For L&T, TIIC For FPPM For NMSCEL/MSRDC


CONSTRUCTION OF ACCESS CONTROLLED NAGPUR- MUMBAI SUPER COMMUNICATION
EXPRESSWAY (MAHARASHTRA SAMRUDDHI MAHAMARG) IN THE STATE OF
MAHARASHTRA ON EPC MODE FOR PACKAGE 10, FROM KM. 444+845 TO KM. 502+752
(From Village Fatiyabad to Village Surala in Aurangabad District)
Format No.:T/F 7-2 Rev no: 0 Rev. Date : 14.01.2019
Client MAHARASHTRA STATE ROAD DEVELOPMENT CORPORATION
SPV NAGPUR MUMBAI SUPER COMMUNICATION EXPRESSWAY LIMITED
Authority Engineer FP Project Management
Construction Contractor Larsen & Toubro Limited - TIIC(RR&EC)
C B R TEST
Laboratory job no. Date sampled 27.09.19
Type of material Soil Sampled by Jointly
Source BA-57 @ PIT 09&10 Date tested 09-10-2019
Location 488+700 LHS @ 6 KM Tested by Jointly
Proposed use EMB/SUB

LOAD Vs PENETRATION GRAPH

600

500

### ###
0 8
400
Load (kg)

### ###
0 8
300

200

100

0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 11.0 12.0 13.0 14.0 15.0 16.0 17.0 18.0 19.0 20.0
1

Penetration (mm)
Results:-
Mould no. 23
Load at 2.5mm Penetration 179.0
Load at 5.0mm Penetration 327.5
CBR at 2.5mm Penetration 13.1
CBR at 5.0mm Penetration 15.9
CBR reported as (%)= 15.9

For L&T, TIIC For FPPM For NMSCEL/MSRDC


CONSTRUCTION OF ACCESS CONTROLLED NAGPUR- MUMBAI SUPER COMMUNICATION
EXPRESSWAY (MAHARASHTRA SAMRUDDHI MAHAMARG) IN THE STATE OF
MAHARASHTRA ON EPC MODE FOR PACKAGE 10, FROM KM. 444+845 TO KM. 502+752
(From Village Fatiyabad to Village Surala in Aurangabad District)
Format No.:T/F 7-2 Rev no: 0 Rev. Date : 14.01.2019
Client MAHARASHTRA STATE ROAD DEVELOPMENT CORPORATION
SPV NAGPUR MUMBAI SUPER COMMUNICATION EXPRESSWAY LIMITED
Authority Engineer FP Project Management
Construction Contractor Larsen & Toubro Limited - TIIC(RR&EC)
C B R TEST
Laboratory job no. Date sampled 27.09.19
Type of material Soil Sampled by Jointly
Source BA-57 @ PIT 09&10 Date tested 09-10-2019
Location 488+700 LHS @ 6 KM Tested by Jointly
Proposed use EMB/SUB

LOAD Vs PENETRATION GRAPH

600

500

### ###
0 8
400
Load (kg)

### ###
0 8
300

200

100

0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 11.0 12.0 13.0 14.0 15.0 16.0 17.0 18.0 19.0 20.0

Penetration (mm)
Results:-
Mould no. 24
Load at 2.5mm Penetration 170.3
Load at 5.0mm Penetration 310.1
CBR at 2.5mm Penetration 12.4
CBR at 5.0mm Penetration 15.1
CBR reported as (%)= 15.1

For L&T, TIIC For FPPM For NMSCEL/MSRDC


CONSTRUCTION OF ACCESS CONTROLLED NAGPUR- MUMBAI SUPER COMMUNICATION
EXPRESSWAY (MAHARASHTRA SAMRUDDHI MAHAMARG) IN THE STATE OF
MAHARASHTRA ON EPC MODE FOR PACKAGE 10, FROM KM. 444+845 TO KM. 502+752

Format No.:T/F 6 Rev no: 0 Rev. Date : 14.01.2019


Client MAHARASHTRA STATE ROAD DEVELOPMENT CORPORATION
SPV NAGPUR MUMBAI SUPER COMMUNICATION EXPRESSWAY LIMITED
Authority Engineer FP Project Management
Construction Contractor Larsen & Toubro Limited - TIIC(RR&EC)

FREE SWELL INDEX


[As per IS 2720 (Part - 40)
Laboratory Job No. Date Sampled 27.09.19
Type of Material Soil Sampled By Jointly
Source BA-57 @ PIT 10 Date Tested 28.09.19
Location 488+700 LHS @ 6 KM Tested By Jointly
Proposed Use EMB/SUB

Sample level in Sample level in Free Swell in Free Swell Index


Average
Water (Vw) kerosene (Vk) Water (Vw-Vk) 100x(Vw-Vk)/Vk
S.No. Free Swell Index
(%)
(ml) (ml) (ml) (%)

1
12 11 1 9

3 9

Note : 1. Test sample shall be passing 425 micron sieve


2. Take 10gm of each sample.

Remarks : ……………………………………………………………………………………………..

Specification Limits as per MoRTH Clause 305.2, Free Swell Index shall not be more than 50%

For L&T, TIIC For FPPM For NMSCEL/MSRDC


MUMBAI NAGPUR EXPRESSWAYCONSTRUCTION OF ACCESS CONTROLLED NAGPUR- MUMBAI SUPER COMMUNICATION
EXPRESSWAY (MAHARASHTRA SAMRUDDHI MAHAMARG) IN THE STATE OF
MAHARASHTRA ON EPC MODE FOR PACKAGE 10, FROM KM. 444+845 TO KM. 502+752

Format No.:T/F 8 Rev no: 0 Rev. Date : 14.01.2019

Client MAHARASHTRA STATE ROAD DEVELOPMENT CORPORATION

SPV NAGPUR MUMBAI SUPER COMMUNICATION EXPRESSWAY LIMITED

Authority Engineer FP Project Management

Construction Contractor Larsen & Toubro Limited - TIIC(RR&EC)

SIEVE ANALYSIS OF SOILS


[As per IS : 2720, (Part 4)]
Laboratory Job No. Date Sampled 27.09.19

Type of Material Soil Sampled by Jointly

Source BA-57 @ PIT 10 Date Tested 28.09.19

Location 488+700 LHS @ 6 KM Tested by Jointly

Proposed Use EMB/SUB

Weight of sample taken(gm): 1339


Cumulative
S Weight Cumulative Cumulative
Sieve Size Weight Remarks
no Retained Retained Passing
Retained
(mm) (gms) (gms) (%) (%)

GRAVEL CONTENT
A 100.0 0 0 0 100 37.98
(B-D):%

B 75.0 0 0 0 100

SAND CONTENT
C 19.0 122.1 9.12 9.12 90.88 29.03
(D-G):%

D 4.75 386.5 28.87 37.98 62.02

SILT&CLAY CONTENT
E 2.00 83.0 6.20 44.18 55.82 32.98
(G):%

F 0.425 156.5 11.69 55.87 44.13

G 0.075 149.3 11.15 67.02 32.98

For L&T, TIIC For FPPM For NMSCEL/MSRDC


CONSTRUCTION OF ACCESS CONTROLLED NAGPUR- MUMBAI SUPER COMMUNICATION
EXPRESSWAY (MAHARASHTRA SAMRUDDHI MAHAMARG) IN THE STATE OF
MAHARASHTRA ON EPC MODE FOR PACKAGE 10, FROM KM. 444+845 TO KM. 502+752
(From village Fatiyabad to village surala in aurangabad district)

Format No.:T/F 5 Rev no: 0 Rev. Date : 14.01.2019


Client MAHARASHTRA STATE ROAD DEVELOPMENT CORPORATION
SPV NAGPUR MUMBAI SUPER COMMUNICATION EXPRESSWAY LIMITED
Authority Engineer FP Project Management
Construction Contractor Larsen & Toubro Limited - TIIC(RR&EC)
ATTERBERG'S LIMITS
[As per IS 2720, (Part-5)]
Laboratory Job no Date Sampled 27.09.19
Type of material Soil Sampled by Jointly
Source BA-57 @ PIT 10 Date Tested 28.09.19
Location 488+700 LHS @ 6 KM Tested by Jointly
Proposed Use EMB/SUB
3 4 5 6 7 8
Determination No. 1 2 3 4 5 6
Container No. 7 9 10 12 13 14
Empty Wt.of Container (W1) gm 13.06 12.56 12.61 12.58 13.28 12.33
Wt.of Container and Wet material (W2) gm 37.66 38.20 40.75 35.34 16.01 15.87
Wt.of Container and Dry material (W3) gm 31.59 31.68 33.42 29.22 15.42 15.10
Wt.of Moisture (W4=W2-W3) gm 6.07 6.52 7.33 6.12 0.59 0.77
Wt.of dry material (W5=W3-W1) gm 18.53 19.12 20.81 16.64 2.14 2.77
Moisture Content w = 100 x W4/W5 % 32.76 34.10 35.22 36.78 27.57 27.80
No. of Blows / Penetration 34 30 24 18 Average= 27.68
LIQUID LIMIT CHART
50.00

45.00 25 25
20 40

40.00
6.07 6.52 7.33 6.12 0.59 0.77
% Moisture content

18.53 19.12 20.81 16.64 2.14 2.77


35.00
32.78 34.11 35.21 36.77 27.58 27.62

30.00 27.6

25.00

20.00
10 25 No. of blows 100

Calculation for PI shall made as follows:-


1. The Plasticity index is calculated as the difference between its Liquid limit & Plastic limit
2. In case of sandy soil PL should be determined first, When PL can not be determined, The
PI should be reported as Non-Plastic (NP)
3. When the plastic limit is equal to or greater than the liquid limit, The PI shall be reported as zero
RESULTS:-
Liquid Limit(%)LL = Plastic Limit(%)PL = Plasticity Index PI =

For L&T, TIIC For FPPM For NMSCEL/MSRDC


CONSTRUCTION OF ACCESS CONTROLLED NAGPUR- MUMBAI SUPER COMMUNICATION
EXPRESSWAY (MAHARASHTRA SAMRUDDHI MAHAMARG) IN THE STATE OF
MAHARASHTRA ON EPC MODE FOR PACKAGE 10, FROM KM. 444+845 TO KM. 502+752

Format No.:T/F 4 Rev no: 0 Rev. Date : 14.01.2019


Client MAHARASHTRA STATE ROAD DEVELOPMENT CORPORATION
SPV NAGPUR MUMBAI SUPER COMMUNICATION EXPRESSWAY LIMITED
Authority Engineer FP Project Management
Construction Contractor Larsen & Toubro Limited - TIIC(RR&EC)
MODIFIED PROCTOR'S DENSITY TEST
[As per IS 2720, (Part-8)]
Laboratory Job no Date Sampled 27.09.19
Type of material Soil Sampled by Jointly
Source BA-57 @ PIT 10 Date Tested 28.09.19
Location 488+700 LHS @ 6 KM Tested by Jointly
Proposed Use EMB/SUB

B Mould No. :- 4 Wt.of mould (A) = 5730 gm


gm Volume of mould (V)= 2250 cc
C Trial No. 1 2 3 4 5 6 7
D Wt.of wet sample + mould gm 9258 10016 10473 10671 10553 10164
E Wt.of wet sample (E = D-A) gm 3528 4286 4743 4941 4823 4434
F Wet density of sample (F = E/V) gm/cc 1.568 1.905 2.108 2.196 2.144 1.971
G Container No. 158 159 160 161 163 166
H Wt.of Empty container gm 22.28 22.90 21.89 22.69 22.41 21.44
J Wt.of wet sample+Cont. gm 136.55 141.91 134.08 140.21 134.65 133.82
K Wt.of dry sample+Cont. gm 133.28 135.89 126.19 129.72 122.09 119.14
L Wt.of water(L=J-K) gm 3.26 6.02 7.89 10.49 12.56 14.68
M Wt.of dry sample(M=K-H) gm 111.00 112.99 104.30 107.03 99.68 97.70
N Water content [N = 100X(L/M)]% 2.94 5.33 7.56 9.80 12.60 15.02
P Dry density[P=100x(F/(100+N))] gm/cc 1.523 1.809 1.960 2.000 1.904 1.713

2.05
2
1.95
1.9 9.80 9.8011
1.85 1.3 2.004
1.8
2.000 2
1.75
Dry Density (gm/cc)

0 9.8
1.7
1.65
1.6
1.55
1.5
1.45
1.4
1.35
1.3
0 1 2 3 4 5 6 7 8 Moisture
9 10 11 12 13Content
14 15(%)16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

Method used:- Modified Rammer Wt.:- 4.89 kg No. of blows/layer :- 25 / 55 No. of layer :- 5

MDD= 2.000 OMC= 9.8 %


Specification Limits as per MoRTH Clause 305.2, Maximum Dry unit required for
Embankment upto 3m hieght :15.2 kN/cu.m
Embankment exceeding 3m hieght :16 kN/cu.m
Subgrade and Earthen shoulders,verges, backfill :17.5 kN/cu.m

For L&T, TIIC For FPPM For NMSCEL/MSRDC