DOC. NO: ASEBR4-AEL-643-TOR-0108-R0 Page 22
TERMS OF REFERENCE FOR THE AWARD OF TURNKEY OFFER
FOR 220KV SC TRANSMISSION LINE FROM M/s AEPL 320MW
SOLAR POWER PLANT TO PGCIL’s BHADLA II SUBSTATION
i) Maximum 17
ii) Minimum 10
Second Layer
i) Maximum 16
ii) Minimum 10
Third Layer
i) Maximum 15
ii) Minimum 10
Fourth Layer
i) Maximum 14
ii) Minimum 10
15. Standard length of conductor in Km 2.0 ± 5%
16. Drum Details Steel 1850x650x1000
Material IS: 15976 & Approved
Size in mm (F x B x T) drum drawing
Standard confirming will be followed