Project Name (3X245)MW NOKH SOLAR PARK PLOT-03 RAJASTHAN
Client NTPC LIMITED
EPC JAKSON LIMITED FIELD DRY DENSITY TEST BY SAND REPLACEMENT METHOD (As Per IS - 2720 Part - 28)
Location Date of Testing
MDD 2.26 (gm/cc) Tested By
OMC 7.20 (%) Layer No.
Cone Wt. (W4) 362 (gm) Bulk Density (γ1) 1.453 (gm/cc)
Type of Material
Determination 1 2 3
Initial wt.(Sand+Cylinder)gm W1 6720 6720
Final wt.(Sand+Cylinder)gm W2 4773 4773 Wt. of sand in Hole+Cone wt W3=W1-W2 (gm) 1947 1947 Wt. of sand in Hole W5=W3-W4 (gm) 1585 1585 Wt. of excavated material from hole W6 (gm) 2545 2545 Volume of sand in hole V=W5/γ1 (g/cc) 1091 1091 Wet density of ex. material γ2=W6/V (g/cc) 2.333 2.333 RMM Reading (%) 8 8 Field Dry Density [γ2/1+(M/100)]gm/cc 2.160 2.160 Field Compaction (%) 95.58 95.58 Avg. Compaction (%) Remarks :