Field Dry Density Test(BS 1377-9:

Project Title 1.2 MTPA MINI MILL (ROLLING MILL ZONE) PROJECT AT
Owner Moon Iron & Steel.Co.S.A.O.C
Owner Consultant R.Singh & Associates
Client SHRIRAM EPC
Consultant SEMAC & PARTNERS LLC
Contractor SMC INFRA
Location:Rolling mill H/19
Layer level: +88.2 TO +88.8

Bulk Density of sand: 1.49

back
Description Unit
calculation

Wt.of wet material from hole (Ww) gm 7315

Weight of Sand + Cylinder before pouring (W1) gm 8000

Weight of Sand + Cylinder after pouring (W2) gm 1769

Weight of Sand in Cone (W3) gm 1566

SMC/IMS/LAB/007 REV00 Page 1 of 1 ISSUED DATE 01/09/2014


Weight of Sand in hole (Wb = W1-W2-W3) gm 4665

Unit Weight of Sand (Gs) gm/cc 1.490

Volume of the hole (v)=Wb/Gs cc 3131

Bulk Density of Soil Ύ = (Ww /Wb)* Gs gm/cc 2.336

Wt.of Wet soil W4 gm 704

Wt.of Dry soil W5 gm 674

Moisture content W=(W4-W5/W5)*100 % 4.5

Dry density of soil Ύd = {Ύ /( 1 + w / 100 )} gm/cc 2.235

Relative Compaction % 96.48

SMC INFRA SEPC


NAME
SIGN
DATE

SMC/IMS/LAB/007 REV00 Page 1 of 1 ISSUED DATE 01/09/2014


BS 1377-9:90/ASTM D1556)
E) PROJECT AT SOHAR

Date 7/2/2017
MDD(gm/cc) 2.317

OMC(%) : 4.5

Original
calculation

7315

8000

1769

1566

SMC/IMS/LAB/007 REV00 Page 1 of 1 ISSUED DATE 01/09/2014


4665

1.490

3131

2.336

704

674

4.5

2.235

96.48

SEPC MISCO

SMC/IMS/LAB/007 REV00 Page 1 of 1 ISSUED DATE 01/09/2014