Sl no Date Equipment Nature of breakdowm Required action Expected Actual time Remark

time taken

1 24/06 500T LK Auto ladle metal variation Chain tightness adjust 40 min 85 min Three times attend

Shaft remove 180 Min

2 24/06 120TSS Die close shaft broken Machining 120 min 11 Hr No crane for handling

Assemble 240 min

400T LK FOLLOW THROUGH PROBLEM N2 FILL 30 MIN 1 HR

3 25/06
350 T
OIL LEVEL LOW OIL FILL 20 20
TOSHIBA

4 26/06 500T LK DIE COAT MIXING UNIT PROBLEM DIE COAT MIX BY HAND 30 30