time taken
1 24/06 500T LK Auto ladle metal variation Chain tightness adjust 40 min 85 min Three times attend
2 24/06 120TSS Die close shaft broken Machining 120 min 11 Hr No crane for handling
3 25/06
350 T
OIL LEVEL LOW OIL FILL 20 20
TOSHIBA
4 26/06 500T LK DIE COAT MIXING UNIT PROBLEM DIE COAT MIX BY HAND 30 30