Project Management
It is
• performed by people
• constrained by limited resources
• planned, executed and controlled
PMBOK @ 6th Edition Guide Knowledge Areas :
4. Visual Control
5. Improved Safety
VS
//
22
Tariq Abdelhamid- CMP831- Michigan State University 2008
WASTAGES
CONSTRUCTION INDUSTRY
40 – 60 %
DR.TARIQ ABDEL HAMID, Prof.
Construction Management, Michigan Univ.
INSPIRATION
COSTS
TIME
QUALITY
BEST VALUE
PEACEFUL AMBIENCE
EXAMPLES OF WASTE
in Construction
● Poor Design ● Inefficiency in Machinery
● Poor Constructability working
● Poor Layout ● Wastages of Materials
● Excessive Staff ● Overrun in Time
● Poor Procurement ● Overrun in Cost
● Lack of Flow of Work ● Adversarial Relationships
● Lack of Co-ordination ● Disputes
● Poor Planning ● Arbitration
● Inefficient processes ● And so on……
ACCEPTED GENERAL WASTAGE 40 – 60 %
SOLUTION :
LEAN
CONSTRUCTION
LEAN CONSTRUCTION
Lean construction is a “way to design production
systems to minimize waste of materials, time, and effort
in order to generate the maximum possible amount of
value” (Koskela et al. 2002)
n
Collaboration
Cheering Flow
Lean
No Stress Construction Kaizen
(Fundamentals)
Monitoring
Pull at close
intervals
Team
SKEMA SERTIFIKASI
MANAGEMENT PELAKSANAAN KONSTRUKSI
Management Management
Proyek Konstruksi
Management Management K3
Kualitas