LINE UP / CLEANING INSPECTION REPORT

Line Up / Cleaning

Report No: GM552-55219-104-PL-RP-0010 Location / Area:


Progress No: 0001 Description:
Design Drawing No:

Inspection
No. Activity Date
Result

1 Ensure the pipe size is correct before lining up.

Internal surface of pipes shall be free of any mud, sand, etc. The
2 external and internal of pipes near the groove shall be free of any
rust and oil, etc. before lining up.
Damaged and unsatisfied pipe ends shall be repaired as per the
3
specifications.
Pipes shall be lifted and assembled with the approved special
4
lifting equipment.
Spiral and straight welds between two adjacent pipes shall be
5
staggered according to relative standards.

6 High-low of the pipes shall be within the allowed range.

Inspection Conclusion:

Proceeding Work: YES: NO: Date:


SALPME GPNME

Name: Name:

Date: Date:

Sign: Sign: