GAIL/HV4J/Pinal Tariff/352283/2018/ 2246 29.11.2018
To
The Secretary
Petroleum and Natural Gas Regulatory Board
1" Floor, World Trade Centre
Babar Road, New Delhi-110001
Respected Madam,
Sub: Final Tariff Determination of HVJ-GREP-DVPL and. a
Upgradation Natural Gas Pipeline Network of GAIL (India) Li
This has reference to Record Notes of Open House Meeting held at PNGRB on
26.11.2018 in respect of the subject pipeline network,
2. Imaccordance with the Record Notes the following are submitted
(Note on Integrated Tariff of HVJ and HVJ Upgradation pipeline ~ Already
submitted vide letter dated 27.11.2018.
(ii) Updated list of pipelines including spurlines of HVJ / HVJ Upgradation
pipeline network (Annexure-A).
Gi) GAIL views regarding consideration of economic life of Pipeline as 30
years instead of current 25 years (Annexure-B).
(iv) Note on modification for enhancing Operational Lfficicncy and Improving
Flexibility of Operations in the HVJ Natural Gas Pipeline System
(Annexure-C)
Submitted please.
‘Thanking you,
‘Yours sincerely,
0. Keron
(Kumar Shanker)
Chief General Manager (Mktg.-RA)
E-mail: kumarshanker@geAnnexure A
HYJ and HV Upgradation Pipeline Network
Updated List of Pipelines including Spurlines
, Diameter | Length | Year of
SNo. Pipeline Segment Name of Pipeline Section
pene ees el neh) | (km) _| Commissioning
(aaa WAR InAzRATHAGRDIA 36 [a v3
ZAZA VATU IHAGADIA-VAGHODTA oo 137
ST Iazia “via IVAGHODIA-D-RARIA 36 | i387
2 Jax -vnArR pnaRia- ast 3s | na 157
SAA VIATOR TEARUA BARODA 3 [as 157
eNAZIRA“WOAIPOR Re ARODA- KER 3 [sto 1387
3 Juana“ OAT ISHERA- GORAKHPUR 3 [es ier
Saino ORARIPORA VIATOR 3 [ase 137
[DAE WuATPoR-T A. Vea [a 08
1D [DANE WuATPORT [eMan-SiERPURA [meas 07
TI JDARET-VDATPOR-1 ISHERPORA- HARD a [sae Soe
‘2 —JDAIIET-WDAIPUOR=1 TARUA-K-RARODA 2 [aa 2008
TB [DARET-WDAIPUR=1 BARODA-KHTRA [ana 2008
Ta [DATE -VDAUR-1 IEHERA”CORARIPUES eae 2008
15 JOANES=VDATUR=1 IGORARAPORA- DAUR es 2208
ie JOAHES- WUABUR AE VEMAR 76 Bot
TAH: WAPUR=I ReMAR-SiERPORA ap 2a
TE [DABS VAPOR EERPURL HAUS se Sar
1s [pais VAPOR TABU RARODA obser 3B
20 paVes-VOAIrOR-= IE BARODA: RNA ep Eo
31 ARES VOAIPUR- ERA” GORAKHPUR as [26 port
32 palte-VoApuR [GORAKHPUR ATOR sat Soir
55 NAZI RAWAS RADIA AWAS 15 137
Sion Aca oxo siAaIRAT oT 3
25 JoNGe-HAZIA loNGe-HAZIRAT 3} 2000
26_feerau. sue sori) unorRa force. mecune@or.uspera | 16 | s002 2008
3 [WAGHOBIA-RIL VADOBARA IVAGHODIA-RIL VADODARA Zaz oa
28 fiavactiooia.crcr vacnooin —_[ravactioninarervactioninnvi] 20 | 33 193
> frevacnonin-onervacnoor —_[oaer vacnioiaiw2vacnooiaav;] 30 | 33 8
30 |LSv-s VAGHODIA.GREP VaGHODIA—_|ESW'S VAGHODIA-GREP VAGHODIA 36 33 2004
11 fisvsvacnonaansevacnoom_[OREPVAOHODIRISTSVAGHODI: [oy amo
32 fimesanonavironone lmc-sanonavi FORGING < ut 201
sp” IL TERMINAL TO GIRCL TERNAL HTP TERMINAL TOG TERMINAL |, ——] apa oo
runuine hiv son UNE 7
SH POL GPCL TRING peti ENG aps aE
3s fuaveswanitrr -praxwrmate —fsapeswaniter -pieakwrmmare | «| 207 2008
)VAGHODIA RIL DASRATIFTAP OFF) |VAGHODIA RI DASRATIVTAPOFH
se race 2 [08 2003
San [BARSADA GHAR RASTA =
v7 _[oarsaba cua rasta -ruonocnen [PARSADR GH ‘ 5 2005
58 [raciooin comer -arouLoTyRE —_|vaconia cone -arouoryRe | + 7 208
3» [vartoon. lovrur toon. 7 2 me
0 fovmstoosn loveus woos 2 | 00s nove
a1 fruarexen lavarex pa 5 32 ia
Paget
BNDiameter | Length Year of
SINo. Pipeline Segment Name of Pipeline Section
S Ss inch) | Chm) | Commissioning
42 Semana) wre, araRuct }vewanat) THC TERMINAL | ane 2000
: ne lbviL-1 DANE TAP OFF TOGACL
8 [ovnpanertocact pvntoar 6 1 2004
oman Joact TAP ORF ONE NCHTO
“4 foxcu to uspatco exc. Tar orton 4 73 2x08
4s fsanivor-pewas amex -Dewas 2 | 196s 2007
46 fos.,prHawPuRADS2,erAMPUR fips:,rMiaMPuRIOs2,erraampur] 12 fas 2007
Sp ROPROW IE LNENS BRIDGESTONE [FOP FROM TP UNE MS BRIDGE 7 os a
vers tone TyReS
_frormom THEME CPLA TOP FROM 12" [NEMS GRA 5 2
[NE EXTENDED FROM CIPLAS [LINE EXTENDED FROM PEAS
49 Isymaionc [SYMBIOTIC 2 025 2010
TOP FROM 1D" NEMS PRATIANA ror FROM IF UNE WS RATIONS S
50 kywrex’ lsvatex 4 928 =
31 fos2 wis SVANGTSTER, fos-2-ws SIVAN TER Z a SF
52 [TOP ROM #FLNEMS Sr TOP FROM A LINENS SRF z ae 22
53° [TOP FROM 4" LINE-MIS MITTAL CorP.1 [TOP FROM 4° LINE-M/S MITTAL CORP. 4 144 2012
e_ [ENEERTENDED FROM MGI ]UNEEXTENDED ROW NOTTS 7 a coo
IaerrAL conn2 irra cox.
$= _ftorrRow eas aNawri sen. [FOP FEOM # UNEMIS ANANTH + [oan 707
s6_frormomsruneawsKesansteet ror roms" uNeavsxesarstae | a on em
3 (DSE-MS NATIONAL STE [DS-NIS NATIONAL STEEL Zz ie 307
st JeaTiOnaL stews auc stip NATIONAL STEEL.WS RUCHISTRIP | 4 02 2001
Gy [TAPPING FROM NATIONAT STEEL ENE [APNG FROM NATIONAL STEP 7 = con
hws JA1DCEP sear LINE-WS JAIDEEP isPa
Go” TAPPING FROM NATIONAL STEEL UNE TAPPING FROM NATIONAL STEEL 7 oe co
Js wari ikon [Nes Rar RON
Gr [TAPPING FROM NATIONAT STEEL LINE” [TAPPING FROW NATIONAL STEEL 7 va =
his BANSIIALE Lines BANSAL
4g. [PAPPING FROM NATIONAL STEEL LINE. [TAPPING FROM NATIONAL STEEL \ im sow
JMSAHD NDIA SHIREVAM POWER) [LINEAHS MIDINDIA
TAPPING FROM TOS-13-018 PORWAT—[TAPAING FROM IDS-T MOS FORWAT 5 "
8 lauto |AuTO. 4 044 2007
JrAPPING FROM IDS-13 WS FICHER [TAPPING FROM TDS 1S-N0S OEE
$4 Motors: [MOTORS az st =
TOP FROM FICHER LINENS FORCE Tor TRO EICTER NENTS FORCE
2
$5 Motors. IMOTORS | = ow 2007)
Gp [TOP FROM ECHER UNENIS RANATAN [TOP FROM HCHLRTNENS 7 - cor
LOBAL leaiRATAN GLORAL 7
Gp [raPonG FROM DEWASNOS TR TAPPING FROM DE WASMIS TR 7 te =
HONSON Liioxson
&_foerowkionson uns roca [OR OWMRTOSONTRENS |, [9 7
FOP FROM 16 IA nPeL-WS AVANTIKA froP FROM 16" DIA HPL-MiS ;
= iAS. JAVANTIKA GAS ” am -—
wo PAPPRGERTENDED ROW RISARMIS [TAPPING EXTENDED FROM KESAR |, a oe
[ravesa statis IMs TANEIA STEELS 2
Page 2
NEDiameter | Length | Year of
‘S.No. Pipeline Segment Name of Pipeline Section
psec rs Goch) | Gam) | Commissioning
11 hacon-pmiaweun oer.) Lacon raweur ant) | son oor
7a [PSPNGRROM TORT OFTAL-Nas —_TAPPRNG FROMTORTOPIPRL-NIS | —y ms =
ct, UA est
73 fuocsrevan rower) r0 exo ra,_oDestevamroweRTocwowa| 9 | o2e nots
7 ARTA hark ro [a Ta
25 AUR AURA Pakow- RAKSHA ES Tam
7 WAP AURA RAKSHAKER? ss is
7 AU: AAL IER -AURAIA aC To
2 WAPORNIT VOAIpoR co 1a
7» _unipur-cot cxastaTon luaiuR-act exa STATION 4 2s 2o10
[AURA “TACT INURATA- SCENT [as ar
$1 [RuRa-sAcNSTPE SACHENDI- MAURWAT | es7 13
#2 ]AURNA-TAGDSTPUT INAURWAN=TAGDISTOR [98 TSE
19 faurain-sacuenoi van [AURAIA-sacHENDISY.2 a | sais 2o1s
i [OTAPOR-PaTA [DBIVAPURCPATA [as ca
15 Pata BTV APC PATA-DIBIVAPUR [ss ca
$6 [DIaVarURN The DBITAPOR iavaruRnTrC DBTTAPOR [38 7
37 [DIIVAPURGAT- GAS DDuIVAPURSUATL GAS — ort
i [SACHEND RCL IsxcnENDT- cL apo 20
15 SACHENDT-KANPTR EXcHENDT-RANPOR +s 2006
S0_—MAURAWATETOERROW INAUIEAWAWE LUCKNOW oe aot
1 LENE TOLPOR FRULENDEsTOLPU wer Soot
22 pacosnue ime loe.-om 2 | in ams
3_ hese ion =a Pr BE
Sa fAcDISHPUR EME IPE RL TOPTOFARED 1-0 301s
5 JPROLA KS PirnorA esr [05s 195
96 [5-1 CHOURARERRRETLY CoS BV1 CHOURARTDARETEY COS ¢ 2008
97 ]WURTUR- DADRI (GREP) [WOATUR-cnTTaRA VT ir
2 |VUAIPUR-DaDw GRE fora - BORDA ar ir
25 AWPU: DADRICGRER URDIA-SoNF A GERI se 197
100 ]WIATUR: ADH GRE SONFRAGUUA“nAIIERR zee 137
ToT [ATOR DADE a HERA JATAULL oT 1397
Ta [WOAIPOR-DADRT( GREP iRTAUIT- BADR el 1387
T1[WUATPOR DADRT{VDPLt UAWUR-KULVARR ae 2am
Tot VoAIPUR-DADHTVDPLY IRULVARARATARAS ae [an 10
165 WOAIPOR-DADATWDPL} IEATARAS- WATT a] sa9 0
ios |WATPUR= ADRTTVDPLY fata cis apse at
ToT [VORIPUR-DADRTVDRCT eTAINSA = DADRY ae 2210
iOS JEAIARAS- MALANPUR ID) ———KATLARAS- MAL ANDO [mss ioe
Top [BAIR Ac [EAITRA GR [87 ToT
110 foams acra pastrncien wn | as mn
TI [RGR ROEABAD SGRAROAARAD 735 aa
Ta JRGRATROZABAD Inoka razanaD. 7s 1ST
Ta JALSUR MATRA favroR wari es i
Tie RAT DOL POR [aATNPOR DHOLROR i 207
is faanmone-owauior [baNMORE-GwALIOR we [us ot
116 foanworr-owation OR GRMOREGWALION- AGL || 9g oi
1 RCARPOR CAD IMALANSURCCRORURY 7 05
THE NALANFUR-CADBURY IExDAURY TOP TOURER H oF anDiameter | Length | Year of
S.No. Pipeline Segment Name of Pipeline Section
eee a (inch) (km) Commissioning
119_Juatanun-cabauny lcaooury rt ror ro
30 AOR STORED IRARANPUR-KASFUR (RRR) eae 2
a1 bvaa-simreNeRoy MURADABAD —|svata-srrienenay wurapasap | 8 2site 2o12
TE RASTIPUR- RUDRAPOR IRASHPUR-RUDRAPOR 7a Fan
IRASHIPUR RT-SURYA ROSIN
leasine ; 5
213 WURPIPELINE NETWORK [RASHTPUR RTS 2 | 6002 2012
ae pas , ISURYA ROSHINI PLTOFTO 7
JKASIPURMPELINEWETWoRK —__ RURYA ROSHNI PL TOR a 2012
215 |KASHIPUR PIPELINE NETWORK. ————— ae 8 0274 2012
howe
216 |KASHIPUR PIPELINE NETWORK. _—— 2 0817 2012
owen
217 |RUDRAPUR PIPELINE NETWORK Ror UR BAIAI AUTO S'S 5Km & 8 9047 2014
JRUDRAPURPIPELINENETWORK [BAIALAUTOPLTOP ToPRL-puxts| 4 | oa 2018
7 _|RUDRAPUR PPELINE NETWORK [BAJA AUTO METAL MAN i ral if
220 JRUDRAPURIPELINENETWORK [METAL MANTOPPLTOENDURANCE] —¢—o17T 2o1e
721 fRUDRAPURPIPELINENETWORK METAL MAN TOP PL NEEL AUTO + [oon ou
IETAL WAN TOP MANDA
222 [RUDRAPURPIPELINENETWoRK METAL NANT. a | eas er
223 |RUDRAPUR PIPELINE NETWORK eee 4 0.031 2014
ADVE
PUR PIPGLING NETWORK TOF (RT RUDRAPUR-EAIATAUTON” |p 5
“as fauorarun rs roe cer RUDRA 056 018
225 |KOTACHMTTAURGARHINETWORK —[KOTA(IAVANOHIRA)-BUAULIVA | 16 0 2017
5 IRUAULIVA~RANDARGTA
226. |xoracurrraurcaRnNerwonk PAULA. KA v6 8 207
2a7_|eoracuurraunaanu network |kanDA-biLiva cHITTaURGaRty | 12 ® 2017
Page 6Annexure B
Consideration of Economic Life of Natural Gas Pipelines as 30 years from the
current 25 years
At present, under the extant provisions of PNGRB (Determination of Natural Gas
Pipeline Tariff) Regulations, 2008, Economic Life of a Natural Gas Pipeline is being
considered as 25 years from the date of commissioning of the pipeline for
computation of transportation tariffs
However, Schedule II of Companies Act, 2013, provides for considering the Useful
Life of Pipelines as 30 years. In line with the same, GAIL is already following the
depreciation rate considering the usefull life of pipelines as 30 years in the books of
accounts.
There is an emerging view that, for the purpose of computation of tariff also, there are
merits in considering the Economic Life of Natural Gas Pipelines as 30 years, in
alignment with the said Useful Life of Pipelines.
Earlier, in pre-PNGRB period also, Tariff Commission had considered the Economic
Life for the purpose of arriving at net fixed assets of pipelines as 30 years.
In this regard, a wider stakeholder consultation process may be necessary, and
accordingly, if deemed fit to change the economic life as 30 years for the purpose of
tariff computation of all pipelines coming under PNGRB regulatory purview, then
suitable amendments may have to be introduced in the extant PNGRB regulatory
framework.
Till then, in accordance with the extant notified regulatory provisions, let the
transportation tariff be determined for all the natural gas pipelines by considering the
economic life as 25 years, with the provision that, at the end of 25 years, PNGRB may
suitably extend it as the Board may deem it fit at that point in time.
ieee
3Annexure-C
Modification For Enhancing Operational Efficiency _and Improving Flexibility _of
Operations in the HVJ Natural Gas Pipeline System
HVJ Pipeline system transports natural gas from Hazira to Vijaipur, and thereafter, to various
units downstream of Vijaipur, viz., Auraiya, Dadri etc.
In the Hazira to Vijaipur section, the HVJ pipeline system has compressor stations at Hazira,
Vaghodia, Jhabua, Khera and Vijaipur for boosting / re-boosting the gas pressure at various
points to transport the gas up to Vijaipur and beyond. Also, between Haziara and Vijaipur, the
system comprises three trunk lines, i.e., 36” dia Hazira-Vijaipur section and the two DVPL.
pipelines (i.e., 42”DVPL-I and the 48°DVPL-II which run in parallel to the 36”H1VJ from Vemar
to Vijaipur) for carrying the gas available from Hazira, Dahej and Ankot to Vijaipur.
At present, in the normal course of operation, all the compressor stations on 36”HVI pipeline
remain in operation to handle the available volume of natural gas from Hazira to Vajiapur and
DVPL pipelines are not fully utilized and they can handle more gas flows through them up to
Vijaipur. Hence it is found prudent to utilize the higher capacity in these DVPL pipelines so that
the injected gas from Hazira, Dahej and Ankot can be more economically transported up to
\Vijaipur without running some compressors in 36”HVJ pipeline at Shabua and Khera.
‘Therefore necessary modifications are being undertaken under the subject project to enhance
operational flexibility between the HVJ and DVPL pipelines. The said modification project is
undertaken to potentially save up to 0.34 MMSCMD of compressor fuel, by re-routing some gas
through the said DVPL pipelines and by avoiding running of some compressors at Jhabua and
Khera. Thus the subject modification project would lead to optimization of running compressors
in the system. Also, the modification project would help in maintaining uninterrupted gas flow to
customers during occasional downtime of any one of the pipelines.
Extant PNGRB Tariff Regulations also provide for consideration of cost incurred in
improvement/modifications.
Keeping in view, the modification project is being undertaken for the benefit of all the gas
suppliers, shippers and consumers of the HVJ pipeline system, it is submitted that the entailed
capex in this regard may kindly be considered in the tariff determination.