You are on page 1of 11

Copyright © 2016, Georgia Tech Research Corporation

CHAPTER 15

CDFI Brochures

Jean Carlos Hernandez-Mejia & Nigel Hampton

This chapter represents the state of the art at the time of release.
Readers are encouraged to consult the link below for the version of this
chapter with the most recent release date:

http://www.neetrac.gatech.edu/cdfi-publications.html

Users are strongly encouraged to consult the links below for the most
recent releases of Chapter 4, Chapter 6, and Chapter 10.

Chapter 4: How to Start


Chapter 6: Dissipation Factor (Tan Delta)
Chapter 10: Monitored Withstand Techniques
Cable Diagnostic Focused Initiative (CDFI) 15-1
Phase II, Released February 2016
Copyright © 2016, Georgia Tech Research Corporation

DISCLAIMER OF WARRANTIES AND LIMITATION OF LIABILITIES

This document was prepared by Board of Regents of the University System of Georgia by and on
behalf of the Georgia Institute of Technology NEETRAC (NEETRAC) as an account of work
supported by the US Department of Energy and Industrial Sponsors through agreements with the
Georgia Tech Research Institute (GTRC).

Neither NEETRAC, GTRC, any member of NEETRAC or any cosponsor nor any person acting on
behalf of any of them:
a) Makes any warranty or representation whatsoever, express or implied,
i. With respect to the use of any information, apparatus, method, process, or similar
item disclosed in this document, including merchantability and fitness for a
particular purpose, or
ii. That such use does not infringe on or interfere with privately owned rights, including
any party’s intellectual property, or
iii. That this document is suitable to any particular user’s circumstance; or
b) Assumes responsibility for any damages or other liability whatsoever (including any
consequential damages, even if NEETRAC or any NEETRAC representative has been
advised of the possibility of such damages) resulting from your selection or use of this
document or any information, apparatus, method, process or similar item disclosed in this
document.

DOE Disclaimer: This report was prepared as an account of work sponsored by an agency of the
United States Government. Neither the United States Government nor any agency thereof, nor any
of their employees, makes any warranty, express or implied, or assumes any legal liability or
responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product,
or process disclosed, or represents that its use would not infringe privately owned rights. Reference
herein to any specific commercial product, process, or service by trade name, trademark,
manufacturer, or otherwise does not necessarily constitute or imply its endorsement,
recommendation, or favoring by the United States Government or any agency thereof. The views
and opinions of authors expressed herein do not necessarily state or reflect those of the United
States Government or any agency thereof.

NOTICE
Copyright of this report and title to the evaluation data contained herein shall reside with GTRC.

Reference herein to any specific commercial product, process or service by its trade name,
trademark, manufacturer or otherwise does not constitute or imply its endorsement,
recommendation or favoring by NEETRAC.

The information contained herein represents a reasonable research effort and is, to our knowledge,
accurate and reliable at the date of publication.

It is the user's responsibility to conduct the necessary assessments in order to satisfy themselves as
to the suitability of the products or recommendations for the user's particular purpose.

Cable Diagnostic Focused Initiative (CDFI) 15-2


Phase II, Released February 2016
Copyright © 2016, Georgia Tech Research Corporation

15.0 CDFI BROCHURES

The brochures that follow are arranged such that they may be directly printed (front and back) to
make a trifold pamphlet. They are designed to be taken out to the field and used as quick references
for those techniques that the CDFI has developed criteria for.

The following brochures are included:

1. Tan δ Diagnostics of Distribution and Network Cable Using CDFI MV Test Protocl
2. Monitored Withstand Tan δ Using the CDFI MV Test Protocol PE-Based
3. Monitored Withstand Tan δ Using the CDFI MV Test Protocol Filled (i.e. EPR, Kerite, &
Vulkene®
4. Monitored Withstand Tan δ Using the CDFI MV Test Protocol Paper – PILC

Cable Diagnostic Focused Initiative (CDFI) 15-3


Phase II, Released February 2016
INTERPRETATION
Actions following a Further Study diagnosis
might include
 review data for a rogue measurement in the
FURTHER HELP
Rick Hartlein, NEETRAC
CDFI
sequence – most common in the first acquisition rick.hartlein@neetrac.gatech.edu (CABLE DIAGNOSTICS FOCUSED INITIATIVE)
 check insulation type so that correct assessment
table is used


re clean terminations & repeat measurements
compare with previous tests or other results from
NEETRAC TAN δ DIAGNOSTICS OF

other phases of this cable
if Filled insulations are tested check specific
DISTRIBUTION &
www.neetrac.gatech.edu
variety of material; if identified as discharge
resistant or mineral filled XLPE consult CDFI / NETWORK CABLE

NEETRAC for guidance
conduct IEEE400.2 Standard (30 mins) VLF
Diagnostic Tool
SYSTEMS USING THE
Withstand whilst monitoring Tan see
Monitored Withstand Brochure for guidance
http://www.neetrac.gatech.edu/cdfi-publications.html CDFI MV TEST
 place on “watch list”
Final Report available for download at:
http://www.neetrac.gatech.edu/cdfi-publications.html
PROTOCOL
Actions following an Action Required
diagnosis might include Other Useful Documents:

 review data for a rogue measurement in the 1. Perkel, J.; Del Valle, Y.; Hampton, R.N.; Hernandez-mejia, J.C.;
DOE AWARD NO.

sequence – most common in the first acquisition
check insulation type so that correct assessment
Densley, J., “Interpretation of dielectric loss data on service aged
polyethylene based power cable systems using VLF test methods,” DE-FC02-04CH11237
IEEE Transactions on Dielectrics and Electrical Insulation, Year:
table is used 2013, Volume: 20, Issue: 5, pp.1699 - 1711
 re clean terminations & repeat measurements 2. Hernandez-Mejia, J.; Perkel, J.; Harley, R.; Hampton, N.; Hartlein,
R., “Correlation between tan δ diagnostic measurements and FOR FURTHER DETAILED
 compare with previous tests or other results from
other phases of this cable
breakdown performance at VLF for MV XLPE cables,” IEEE
Transactions on Dielectrics and Electrical Insulation, Volume: 16, INFORMATION CONSULT
Issue: 1, Year: 2009, Pp. 162 – 170. http://www.neetrac.gatech.edu/cdfi-publications.html
 if Filled insulations are tested check specific 3. Olearczyk, M.; Hampton, R.N.; Perkel, J.; Weisenfeld, N., “Notes
variety of material; if identified as mineral filled from Underground,” IEEE Power and Energy Magazine, Year:
2010, Volume: 8, Issue: 6, Pages: 75 – 84.
XLPE consult CDFI / NEETRAC for guidance 4. IEEE Std. 400TM – 2012: IEEE Guide for Field Testing and
 conduct IEEE400.2 Standard (60 mins) VLF Evaluation of the Insulation of Shielded Power Cable Systems
Rated 5 kV and Above.
Withstand whilst monitoring Tan see 5. IEEE Std. 400.2TM – 2013: IEEE Guide for Field Testing of
Monitored Withstand Brochure for guidance Shielded Power Cable Systems Using Very Low Frequency (VLF)
 Retest in near future (less than 1 Hz).

 place on “watch list” & consider remedial actions


for the circuit The CDFI data have been incorporated in the
Prepared by NEETRAC under GTRC Project # E-21-RJT
most recent update of IEEE Std. 400.2 - 2013

COPYRIGHT © 2016, GEORGIA TECH RESEARCH CORPORATION


Historical figures of merit within CDFI for Condition No Further is recommended to use the criteria for Unidentified
Action
US utility cable systems over a period of Assessment Action Study Filled data.
Required
[E-3] Required Advised
11 yr. Figures of Merit are based on more Further
Assessment of Unidentified Filled Insulations Condition No Action Action
than 4,000 separate field measurements at 0.1 Assessment Study
VLF. Stability for Required Required
<0.1 to >1.2 [E-3] Advised
TDU0 (standard Assessment of Paper Insulations
1.2
Condition No Further deviation) (i.e. PILC)
Action & or
Assessment Action Study
Required 3.0 Stability for 0.2
[E-3] Required Advised
Tip Up <3.0 to >30.0 <0.2 to >1.5
Assessment of PE-based Insulations TDU0 (standard
(TD1.5U0 – TD0.5U0) 30.0 1.5
(i.e. PE, XLPE, WTRXLPE) deviation)
& or & or
Stability for TDU0 0.1
Tip Up Tip Up 1.0 -30.0 -30 to -60 <-60.0
<0.1 to >1.0
(standard 1.0
{(TD1.5U0–TDU0) - <1.0 to >18.0 Tip Up to or or
deviation) (TDU0–TD0.5U0)} 18.0 (TD1.5U0 – TD0.5U0) 22.0 22 to 220 >220.0
& or
& or & or
6.7
Tip Up <6.7 to >94.0 25.0 Tip Up Tip Up 9.0
Mean TD at U0 {(TD1.5U0–TDU0) - <9.0 to >25.0
(TD1.5U0 – TD0.5U0) 94.0 <25.0 to >150.0
& or 150.0
(TDU0–TD0.5U0)} 25.0
Tip Up Tip Up 2.0 Condition Assessment of Mineral Filled Insulations & or
{(TD1.5U0–TDU0) – <2.0 to >50.0 (i.e. EPR) * 100.0
Mean TD at U0
(TDU0–TD0.5U0)} 50.0 Stability for 0.1 <100.0 to >250.0
& or <0.1 to >0.8 250.0
TDU0 (standard
6.0 0.8
Mean TD at U0 deviation) & or
<6.0 to >70.0 Consult CDFI website for most recent version.
70.0 2.0 Version 1
Tip Up <2.0 to >40.0 http://www.neetrac.gatech.edu/cdfi-publications.html
(TD1.5U0 – TD0.5U0) 40.0
A minimum of 6 measurements should be
& or An excel tool, which simultaneously assesses all
made at each voltage level; to determine the features has been developed to enhance the
Tip Up Tip Up 1.0
parameters detailed above. {(TD1.5U0–TDU0) - <1.0 to >25.0 analyses, especially in the region of Further Study
(TDU0–TD0.5U0)} 25.0 (cable circuits ranked 5 to 15%) & “Action
In these tests (all materials) the “operational & or Required” (the lowest ranked 5% of cable circuits).
U0” is used to determine test voltages. Mean TD at U0 16.0 The tool may be downloaded from the CDFI
<16.0 to >75.0 website
The user may elect to add a measurement at 75.0 http://www.neetrac.gatech.edu/cdfi-publications.html
2U0 of engineering information if this does not * Experience has shown that it is difficult to precisely
identify the type of filled insulation of field-installed
exceed the IEEE Std. 400.2 - 2013 test voltage
cable. The issues encountered include: incorrect
withstand voltages. /missing records, obliterated or obscured markings on
the cable jacket, indistinct coloring etc. In these cases it
DISCLAIMER OF WARRANTIES AND LIMITATION OF LIABILITIES NOTICE privately owned rights. Reference herein to any specific commercial product, process, or service by trade name,
This document was prepared by Board of Regents of the University System of Georgia by and on behalf of the Copyright of this document and title to the evaluation data contained herein shall reside with GTRC. trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or
Georgia Institute of Technology NEETRAC (NEETRAC) as part of work supported by the US Department of Energy favoring by the United States Government or any agency thereof. The views and opinions of authors expressed herein
and Industrial Sponsors through agreements with the Georgia Tech Research Institute (GTRC). Neither NEETRAC, Reference herein to any specific commercial product, process or service by its trade name, trademark, manufacturer or do not necessarily state or reflect those of the United States Government or any agency thereof.
GTRC, any member of NEETRAC or any cosponsor nor any person acting on behalf of any of them: otherwise does not constitute or imply its endorsement, recommendation or favoring by NEETRAC.
a) Makes any warranty or representation whatsoever, express or implied,
i. With respect to the use of any information, apparatus, method, process, or similar item disclosed in The information contained herein represents a reasonable research effort and is, to our knowledge, accurate and
this document, including merchantability and fitness for a particular purpose, or reliable at the date of publication.
ii. That such use does not infringe on or interfere with privately owned rights, including any party’s
intellectual property, or It is the user's responsibility to conduct the necessary assessments in order to satisfy themselves as to the
iii. That this document is suitable to any particular user’s circumstance; or suitability of the recommendations for the user's particular purpose.
iv. Assumes responsibility for any damages or other liability whatsoever (including any consequential DOE Disclaimer: This document was prepared as part of work sponsored by an agency of the United States
damages, even if NEETRAC or any NEETRAC representative has been advised of the possibility of Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any
such damages) resulting from your selection or use of this document or any information, apparatus, warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or
method, process or similar item disclosed in this document. usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe
INTERPRETATION
Cable systems with an evaluation in the
“Ramp-up” Phase resulting in a “Red No”
require remedial actions in the near future
FURTHER HELP
Rick Hartlein, NEETRAC
CDFI
and thus it is assumed that they have not rick.hartlein@neetrac.gatech.edu (CABLE DIAGNOSTICS FOCUSED INITIATIVE)
passed the monitored withstand test; then the
remedial actions following a “Red No” MONITORED
evaluation should be sequentially undertaken NEETRAC
as follows: WITHSTAND TAN δ
 Review data for a rogue measurement in the
sequence – most common in the first voltage cycle,
www.neetrac.gatech.edu USING THE CDFI MV
 Confirm insulation type to ensure that criteria
apply,
TEST PROTOCOL
 Verify the integrity of the terminations and if
compromised replace them and repeat the test,
Final Report available for download at:
http://www.neetrac.gatech.edu/cdfi-publications.html PE-BASED
 Retest in the near future and observe trends (6 Other Useful Documents:
months to a year), or,
 Place on “watch list” and consider system 1. Perkel, J.; Del Valle, Y.; Hampton, R.N.; Hernandez-mejia,
J.C.; Densley, J., “Interpretation of dielectric loss data on
DOE AWARD NO.
replacement in the near future.
service aged polyethylene based power cable systems using
VLF test methods,” IEEE Transactions on Dielectrics and
DE-FC02-04CH11237
Electrical Insulation, Year: 2013, Volume: 20, Issue: 5,
Cable systems with an evaluation of the pp.1699 - 1711
2. First practical utility implementation of monitored withstand
“Hold” Phase resulting in a “Further Study” diagnostics in the USA; CL Fletcher, J Perkel, RN Hampton, FOR FURTHER DETAILED
may require remedial actions in the near JC Hernandez, J Hesse, MG Pearman, CT Wall, W Zenger;
future that should be sequentially undertaken International Conference on Insulated Power Cables
JICABLE11, Versailles France, June 2011; Paper A.10.2
INFORMATION CONSULT
as follows: 3. Hampton, R.N..Perkel. J., Hernandez, J.C., Begovic, M., Hans,
http://www.neetrac.gatech.edu/cdfi-publications.html
J., Riley, R., Tyschenko, P., Doherty, F., Murray, G., Hong, L.,
 Review data for a rogue measurement in the Pearman, M.G., Fletcher, C.L., and Linte, G.C., “Experience of
sequence – most common during the first voltage Withstand Testing of Cable Systems in the USA”; CIGRE
2010, Paper No. B1-303
cycles, 4. IEEE Std. 400 – 2012: IEEE Guide for Field Testing and
 Confirm insulation type to ensure that criteria Evaluation of the Insulation of Shielded Power Cable Systems
apply, Rated 5 kV and Above.
 Verify the integrity of the terminations and if 5. IEEE Std. 400.2 – 2013: IEEE Guide for Field Testing of
Shielded Power Cable Systems Using Very Low Frequency
compromised replace them and repeat the test, (VLF) (less than 1 Hz). Prepared by NEETRAC under GTRC Project # E-21-RJT
 Retest in the near future and observe trends (6
months to a year), or,
 Place on “watch list” and consider system COPYRIGHT © 2016, GEORGIA TECH RESEARCH CORPORATION
replacement in the near future.
Historical figures of merit researched (Monitored Tan δ Monitored Withstand Framework Decision 2 – Amend Test Time?
Withstand) within CDFI for USA utility cable systems Made online during test
over a period of 7 years for more than 1380 separate “Reduce to 15 “Extend to
Feature [E-3]
measurements. min” 60 min”
Initial “Hold” Phase Evaluation
Tan δ Monitored Withstand Tests are conducted for Absolute
<0.6 >8.0
30 min as recommended by IEEE Std. 400.2 – 2013. Change in Tan Delta
ǀTD10-TD0ǀ & or
This time may be amended if the conditions listed in the Tan δ Stability
Framework and Tables below are fulfilled: <0.3 >5.0
(Standard Deviation –
STD10) & or
A minimum of 6 measurements should be made at each Tan δ Level
voltage level; to determine the parameters detailed <14.0 >70.0
(Mean Tan δ – TD10)
above.
Decision 3 – Final Assessment?
A TDR Measurement is always “Good Practice” in Made offline after test
advance of a Tan  measurement as it serves to confirm Decision 1 – Continue to “Hold” Phase? “No Action “Further Study “Action
Capacitance measurements and obtain a qualitative After “Ramp-up” – Made online during test Required” Advised” Required”
estimate of neutral condition. Feature [E-3] “No”* “Yes”** “No”*** Final “Hold” Phase Evaluation
Ramp-Up Phase Evaluation An excel tool, which simultaneously assesses all final
In these tests (all materials) the “Operational U0” is used to features (Speed 10-15, Speed 0-5, Speed 0-tfinal, Standard Deviation,
determine test voltages. Stability for TDU0 <0.1 0.1 to 1.0 >1.0 and Mean Tan δ) is under development to enhance the
(standard deviation) analyses, especially in the region of Further Study (cable
The maintenance test voltages for the “Hold” Phase as & or
6.7 to circuits ranked 5 to 15%) & “Action Required” (the
specified in the IEEE Std. 400.2 – 2013 are as follows: Tip Up <6.7 >94.0 lowest ranked 5% of cable circuits).
94.0
(TD1.5U0 – TD0.5U0) http://www.neetrac.gatech.edu/cdfi-publications.html
“Hold” Phase Recommended Test Voltage Levels & or
CABLE SYSTEM Tip Up Tip Up
15 20 25 35 {(TD1.5U0–TDU0) – 2.0 to
VOLTAGE (kV) <2.0 >50.0
50.0 DISCLAIMER OF WARRANTIES AND LIMITATION OF LIABILITIES

Maintenance Testing (TDU0–TD0.5U0)} This document was prepared by Board of Regents of the University System of Georgia by and on behalf of the
Georgia Institute of Technology NEETRAC (NEETRAC) as an account of work supported by the US Department of
16 20 24 33 Energy and Industrial Sponsors through agreements with the Georgia Tech Research Institute (GTRC).
RMS (kV) & or Neither NEETRAC, GTRC, any member of NEETRAC or any cosponsor nor any person acting on behalf of any
of them:
Maintenance Testing Mean TD at U0 6.0 to a) Makes any warranty or representation whatsoever, express or implied,
22 28 34 47 <6.0 >70.0 i. With respect to the use of any information, apparatus, method, process, or similar item disclosed in this
Peak (kV) 70.0 document, including merchantability and fitness for a particular purpose, or
ii. That such use does not infringe on or interfere with privately owned rights, including any party’s
* “Green No” – Cable system condition is assessed as best iii.
intellectual property, or
That this document is suitable to any particular user’s circumstance; or
Anticipated Failure rates On Test (FOT) for the “Hold” performing 80% and thus it is not necessary to continue to b) Assumes responsibility for any damages or other liability whatsoever (including any consequential damages,
even if NEETRAC or any NEETRAC representative has been advised of the possibility of such damages)
Phase are approximately as follows: “Hold” phase so that time and resources might be saved. resulting from your selection or use of this document or any information, apparatus, method, process or
similar item disclosed in this document.
DOE Disclaimer: This document was prepared as an account of work sponsored by an agency of the United States
Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any
 15 Minutes 2.0% per 1000ft ** “Amber Yes” – Cable system condition cannot be warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or
usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe
 30 Minutes 2.7% per 1000ft determined during the “Ramp-up” phase and thus systems privately owned rights. Reference herein to any specific commercial product, process, or service by trade name,
trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or
 60 Minutes 3.7% per 1000ft pass to the “Hold” phase for consideration in Decision 2 favoring by the United States Government or any agency thereof. The views and opinions of authors expressed herein
do not necessarily state or reflect those of the United States Government or any agency thereof.
and Decision 3. NOTICE
Copyright of this document and title to the evaluation data contained herein shall reside with GTRC.

*** “Red No” – Cable system condition is assessed as Reference herein to any specific commercial product, process or service by its trade name, trademark, manufacturer or
otherwise does not constitute or imply its endorsement, recommendation or favoring by NEETRAC.
being on the poorest performing 5% and thus it is not The information contained herein represents a reasonable research effort and is, to our knowledge, accurate and
reliable at the date of publication.
 necessary to continue to the “Hold” phase because the It is the user's responsibility to conduct the necessary assessments in order to satisfy themselves as to the suitability of
If used after 2016, consult the CDFI website for the higher risk of FOT is likely to result in inefficient testing the recommendations for the user's particular purpose

most recent version. Version 1 and high emergency repair cost. Systems in this category
http://www.neetrac.gatech.edu/cdfi-publications.html can be acted on in a planned manner by managing optimal
COPYRIGHT © 2016, GEORGIA TECH RESEARCH CORPORATION
time and cost.
INTERPRETATION
Cable systems with an evaluation in the
“Ramp-up” Phase resulting in a “Red No”
require remedial actions in the near future
FURTHER HELP
Rick Hartlein, NEETRAC
CDFI
and thus it is assumed that they have not rick.hartlein@neetrac.gatech.edu (CABLE DIAGNOSTICS FOCUSED INITIATIVE)
passed the monitored withstand test; then the
remedial actions following a “Red No” MONITORED
evaluation should be sequentially undertaken NEETRAC
as follows: WITHSTAND TAN δ
 Review data for a rogue measurement in the
sequence – most common in the first voltage cycle,
www.neetrac.gatech.edu USING THE CDFI MV
 Confirm insulation type to ensure that criteria
apply,
TEST PROTOCOL
 Verify the integrity of the terminations and if
compromised replace them and repeat the test,
Final Report available for download at:
http://www.neetrac.gatech.edu/cdfi-publications.html FILLED (i.e. EPR,
 Retest in the near future and observe trends (6
months to a year), or,
Other Useful Documents: KERITE, & VULKENE®)
 Place on “watch list” and consider system 1. Perkel, J.; Del Valle, Y.; Hampton, R.N.; Hernandez-mejia,
replacement in the near future. J.C.; Densley, J., “Interpretation of dielectric loss data on
service aged polyethylene based power cable systems using
VLF test methods,” IEEE Transactions on Dielectrics and DOE AWARD NO.
Electrical Insulation, Year: 2013, Volume: 20, Issue: 5,
Cable systems with an evaluation of the pp.1699 - 1711
2. First practical utility implementation of monitored withstand
DE-FC02-04CH11237
“Hold” Phase resulting in a “Further Study” diagnostics in the USA; CL Fletcher, J Perkel, RN Hampton,
may require remedial actions in the near JC Hernandez, J Hesse, MG Pearman, CT Wall, W Zenger;
future that should be sequentially undertaken International Conference on Insulated Power Cables
FOR FURTHER DETAILED
JICABLE11, Versailles France, June 2011; Paper A.10.2
as follows: 3. Hampton, R.N..Perkel. J., Hernandez, J.C., Begovic, M., Hans,
J., Riley, R., Tyschenko, P., Doherty, F., Murray, G., Hong, L., INFORMATION CONSULT
 Review data for a rogue measurement in the Pearman, M.G., Fletcher, C.L., and Linte, G.C., “Experience of http://www.neetrac.gatech.edu/cdfi-publications.html
sequence – most common during the first voltage Withstand Testing of Cable Systems in the USA”; CIGRE
2010, Paper No. B1-303
cycles, 4. IEEE Std. 400 – 2012: IEEE Guide for Field Testing and
 Confirm insulation type to ensure that criteria Evaluation of the Insulation of Shielded Power Cable Systems
apply, Rated 5 kV and Above.
 Verify the integrity of the terminations and if 5. IEEE Std. 400.2 – 2013: IEEE Guide for Field Testing of
Shielded Power Cable Systems Using Very Low Frequency
compromised replace them and repeat the test, (VLF) (less than 1 Hz).
 Retest in the near future and observe trends (6
months to a year), or,
Prepared by NEETRAC under GTRC Project # E-21-RJT
 Place on “watch list” and consider system
replacement in the near future.
COPYRIGHT © 2016, GEORGIA TECH RESEARCH CORPORATION
Historical figures of merit researched (Monitored Tan δ Monitored Withstand Framework Decision 2 – Amend Test Time?
Withstand) within CDFI for USA utility cable systems Made online during test
over a period of 7 years for more than 1380 separate “Reduce to 15 “Extend to
Feature [E-3]
measurements. min” 60 min”
Initial “Hold” Phase Evaluation
Tan δ Monitored Withstand Tests are conducted for Absolute
<0.6 >6.0
30 min as recommended by IEEE Std. 400.2 – 2013. Change in Tan Delta
ǀTD10-TD0ǀ & or
This time may be amended if the conditions listed in the Tan δ Stability
Framework and Tables below are fulfilled: <0.3 >5.0
(Standard Deviation –
STD10) & or
A minimum of 6 measurements should be made at each Tan δ Level
voltage level; to determine the parameters detailed <13.0 >105.0
(Mean Tan δ – TD10)
above.
Decision 3 – Final Assessment?
A TDR Measurement is always “Good Practice” in Made offline after test
advance of a Tan  measurement as it serves to confirm Decision 1 – Continue to “Hold” Phase? “No Action “Further Study “Action
Capacitance measurements and obtain a qualitative After “Ramp-up” – Made online during test Required” Advised” Required”
estimate of neutral condition. Feature [E-3] “No”* “Yes”** “No”*** Final “Hold” Phase Evaluation
Ramp-Up Phase Evaluation An excel tool, which simultaneously assesses all final
In these tests (all materials) the “Operational U0” is used to features (Speed 10-15, Speed 0-5, Speed 0-tfinal, Standard Deviation,
determine test voltages. Stability for TDU0 <0.1 0.1 to 1.2 >1.2 and Mean Tan δ) is under development to enhance the
(standard deviation) analyses, especially in the region of Further Study (cable
The maintenance test voltages for the “Hold” Phase as & or
Tip Up circuits ranked 5 to 15%) & “Action Required” (the
specified in the IEEE Std. 400.2 – 2013 are as follows: <3.0 3.0 to 30.0 >30.0
(TD1.5U0 – TD0.5U0) lowest ranked 5% of cable circuits).
& or
http://www.neetrac.gatech.edu/cdfi-publications.html
“Hold” Phase Recommended Test Voltage Levels Tip Up Tip Up 1.0
CABLE SYSTEM {(TD1.5U0–TDU0) – <1.0 To >18.0
15 20 25 35
VOLTAGE (kV) (TDU0–TD0.5U0)} 18.0 DISCLAIMER OF WARRANTIES AND LIMITATION OF LIABILITIES
This document was prepared by Board of Regents of the University System of Georgia by and on behalf of the
Maintenance Testing & or Georgia Institute of Technology NEETRAC (NEETRAC) as an account of work supported by the US Department of
16 20 24 33 Energy and Industrial Sponsors through agreements with the Georgia Tech Research Institute (GTRC).
RMS (kV) Mean TD at U0 Neither NEETRAC, GTRC, any member of NEETRAC or any cosponsor nor any person acting on behalf of any
25.0 to of them:
Maintenance Testing <25.0 >150.0 a) Makes any warranty or representation whatsoever, express or implied,
22 28 34 47 150.0 i. With respect to the use of any information, apparatus, method, process, or similar item disclosed in this
Peak (kV) document, including merchantability and fitness for a particular purpose, or
* “Green No” – Cable system condition is assessed as best ii. That such use does not infringe on or interfere with privately owned rights, including any party’s
intellectual property, or
performing 80% and thus it is not necessary to continue to iii. That this document is suitable to any particular user’s circumstance; or
Anticipated Failure rates On Test (FOT) for the “Hold” b) Assumes responsibility for any damages or other liability whatsoever (including any consequential damages,
“Hold” phase so that time and resources might be saved. even if NEETRAC or any NEETRAC representative has been advised of the possibility of such damages)
Phase are approximately as follows: resulting from your selection or use of this document or any information, apparatus, method, process or
similar item disclosed in this document.
DOE Disclaimer: This document was prepared as an account of work sponsored by an agency of the United States
** “Amber Yes” – Cable system condition cannot be Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any
 15 Minutes 2.0% per 1000ft determined during the “Ramp-up” phase and thus systems
warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or
usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe
 30 Minutes 2.7% per 1000ft pass to the “Hold” phase for consideration in Decision 2
privately owned rights. Reference herein to any specific commercial product, process, or service by trade name,
trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or
 60 Minutes 3.7% per 1000ft and Decision 3.
favoring by the United States Government or any agency thereof. The views and opinions of authors expressed herein
do not necessarily state or reflect those of the United States Government or any agency thereof.

NOTICE
Copyright of this document and title to the evaluation data contained herein shall reside with GTRC.
*** “Red No” – Cable system condition is assessed as
Reference herein to any specific commercial product, process or service by its trade name, trademark, manufacturer or
being on the poorest performing 5% and thus it is not otherwise does not constitute or imply its endorsement, recommendation or favoring by NEETRAC.
The information contained herein represents a reasonable research effort and is, to our knowledge, accurate and
necessary to continue to the “Hold” phase because the reliable at the date of publication.

higher risk of FOT is likely to result in inefficient testing It is the user's responsibility to conduct the necessary assessments in order to satisfy themselves as to the suitability of
If used after 2016, consult the CDFI website for the and high emergency repair cost. Systems in this category
the recommendations for the user's particular purpose

most recent version. Version 1 can be acted on in a planned manner by managing optimal
http://www.neetrac.gatech.edu/cdfi-publications.html
time and cost.
COPYRIGHT © 2016, GEORGIA TECH RESEARCH CORPORATION
INTERPRETATION
Cable systems with an evaluation in the
“Ramp-up” Phase resulting in a “Red No”
require remedial actions in the near future
FURTHER HELP
Rick Hartlein, NEETRAC
CDFI
and thus it is assumed that they have not rick.hartlein@neetrac.gatech.edu (CABLE DIAGNOSTICS FOCUSED INITIATIVE)
passed the monitored withstand test; then the
remedial actions following a “Red No” MONITORED
evaluation should be sequentially undertaken NEETRAC
as follows: WITHSTAND TAN δ
 Review data for a rogue measurement in the
sequence – most common in the first voltage cycle,
www.neetrac.gatech.edu USING THE CDFI MV
 Confirm insulation type to ensure that criteria
apply,
TEST PROTOCOL
 Verify the integrity of the terminations and if
compromised replace them and repeat the test,
Final Report available for download at:
http://www.neetrac.gatech.edu/cdfi-publications.html PAPER - PILC
 Retest in the near future and observe trends (6 Other Useful Documents:
months to a year), or,
 Place on “watch list” and consider system 1. Perkel, J.; Del Valle, Y.; Hampton, R.N.; Hernandez-mejia,
J.C.; Densley, J., “Interpretation of dielectric loss data on
DOE AWARD NO.
replacement in the near future.
service aged polyethylene based power cable systems using
VLF test methods,” IEEE Transactions on Dielectrics and
DE-FC02-04CH11237
Electrical Insulation, Year: 2013, Volume: 20, Issue: 5,
Cable systems with an evaluation of the pp.1699 - 1711
2. First practical utility implementation of monitored withstand
“Hold” Phase resulting in a “Further Study” diagnostics in the USA; CL Fletcher, J Perkel, RN Hampton, FOR FURTHER DETAILED
may require remedial actions in the near JC Hernandez, J Hesse, MG Pearman, CT Wall, W Zenger;
future that should be sequentially undertaken International Conference on Insulated Power Cables
JICABLE11, Versailles France, June 2011; Paper A.10.2
INFORMATION CONSULT
as follows: 3. Hampton, R.N..Perkel. J., Hernandez, J.C., Begovic, M., Hans,
http://www.neetrac.gatech.edu/cdfi-publications.html
J., Riley, R., Tyschenko, P., Doherty, F., Murray, G., Hong, L.,
 Review data for a rogue measurement in the Pearman, M.G., Fletcher, C.L., and Linte, G.C., “Experience of
sequence – most common during the first voltage Withstand Testing of Cable Systems in the USA”; CIGRE
2010, Paper No. B1-303
cycles, 4. IEEE Std. 400 – 2012: IEEE Guide for Field Testing and
 Confirm insulation type to ensure that criteria Evaluation of the Insulation of Shielded Power Cable Systems
apply, Rated 5 kV and Above.
 Verify the integrity of the terminations and if 5. IEEE Std. 400.2 – 2013: IEEE Guide for Field Testing of
Shielded Power Cable Systems Using Very Low Frequency
compromised replace them and repeat the test, (VLF) (less than 1 Hz). Prepared by NEETRAC under GTRC Project # E-21-RJT
 Retest in the near future and observe trends (6
months to a year), or,
 Place on “watch list” and consider system COPYRIGHT © 2016, GEORGIA TECH RESEARCH CORPORATION
replacement in the near future.
Historical figures of merit researched (Monitored Tan δ Monitored Withstand Framework
Withstand) within CDFI for USA utility cable systems Decision 2 – Amend Test Time?
over a period of 7 years for more than 1380 separate Made online during test
measurements. “Reduce to 15 “Extend to
Feature [E-3]
min” 60 min”
Tan δ Monitored Withstand Tests are conducted for Initial “Hold” Phase Evaluation
30 min as recommended by IEEE Std. 400.2 – 2013. Absolute <1.4 >5.0
Change in Tan Delta
This time may be amended if the conditions listed in the ǀTD10-TD0ǀ & or
Framework and Tables below are fulfilled: Tan δ Stability
<0.6 >5.4
(Standard Deviation –
A minimum of 6 measurements should be made at each STD10) & or
voltage level; to determine the parameters detailed Tan δ Level
above. <80.0 >180.0
(Mean Tan δ – TD10)

A TDR Measurement is always “Good Practice” in Decision 3 – Final Assessment?


advance of a Tan  measurement as it serves to confirm Decision 1 – Continue to “Hold” Phase? Made offline after test
Capacitance measurements and obtain a qualitative After “Ramp-up” – Made online during test “No Action “Further Study “Action
estimate of neutral condition. Feature [E-3] “No”* “Yes”** “No”*** Required” Advised” Required”
Ramp-Up Phase Evaluation Final “Hold” Phase Evaluation
In these tests (all materials) the “Operational U0” is used to An excel tool, which simultaneously assesses all final
determine test voltages. Stability for TDU0 <0.2 0.2 to 1.5 >1.5 features (Speed 10-15, Speed 0-5, Speed 0-tfinal, Standard Deviation,
(standard deviation) and Mean Tan δ) is under development to enhance the
The maintenance test voltages for the “Hold” Phase as & or
-30.0 -30 to -60 <-60.0 analyses, especially in the region of Further Study (cable
specified in the IEEE Std. 400.2 – 2013 are as follows: circuits ranked 5 to 15%) & “Action Required” (the
Tip Up to or or
(TD1.5U0 – TD0.5U0) 22.0 22 to 220 >220.0 lowest ranked 5% of cable circuits).
“Hold” Phase Recommended Test Voltage Levels http://www.neetrac.gatech.edu/cdfi-publications.html
CABLE SYSTEM & or
15 20 25 35 Tip Up Tip Up 9.0
VOLTAGE (kV)
Maintenance Testing {(TD1.5U0–TDU0) – <9.0 to >25.0 DISCLAIMER OF WARRANTIES AND LIMITATION OF LIABILITIES
16 20 24 33 (TDU0–TD0.5U0)} 25.0 This document was prepared by Board of Regents of the University System of Georgia by and on behalf of the
RMS (kV) Georgia Institute of Technology NEETRAC (NEETRAC) as an account of work supported by the US Department of
Energy and Industrial Sponsors through agreements with the Georgia Tech Research Institute (GTRC).
Maintenance Testing & or Neither NEETRAC, GTRC, any member of NEETRAC or any cosponsor nor any person acting on behalf of any
22 28 34 47 of them:
Peak (kV) Mean TD at U0 100.0 to a) Makes any warranty or representation whatsoever, express or implied,
<100.0 >250.0 i. With respect to the use of any information, apparatus, method, process, or similar item disclosed in this
250.0 ii.
document, including merchantability and fitness for a particular purpose, or
That such use does not infringe on or interfere with privately owned rights, including any party’s
Anticipated Failure rates On Test (FOT) for the “Hold” * “Green No” – Cable system condition is assessed as best intellectual property, or
iii. That this document is suitable to any particular user’s circumstance; or
Phase are approximately as follows: performing 80% and thus it is not necessary to continue to b) Assumes responsibility for any damages or other liability whatsoever (including any consequential damages,
even if NEETRAC or any NEETRAC representative has been advised of the possibility of such damages)
“Hold” phase so that time and resources might be saved. resulting from your selection or use of this document or any information, apparatus, method, process or
similar item disclosed in this document.
 15 Minutes 2.0% per 1000ft DOE Disclaimer: This document was prepared as an account of work sponsored by an agency of the United States
Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any
 30 Minutes 2.7% per 1000ft ** “Amber Yes” – Cable system condition cannot be warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or
usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe
 60 Minutes 3.7% per 1000ft determined during the “Ramp-up” phase and thus systems privately owned rights. Reference herein to any specific commercial product, process, or service by trade name,
trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or
pass to the “Hold” phase for consideration in Decision 2 favoring by the United States Government or any agency thereof. The views and opinions of authors expressed herein
do not necessarily state or reflect those of the United States Government or any agency thereof.
and Decision 3. NOTICE
Copyright of this document and title to the evaluation data contained herein shall reside with GTRC.

*** “Red No” – Cable system condition is assessed as Reference herein to any specific commercial product, process or service by its trade name, trademark, manufacturer or
otherwise does not constitute or imply its endorsement, recommendation or favoring by NEETRAC.
 being on the poorest performing 5% and thus it is not The information contained herein represents a reasonable research effort and is, to our knowledge, accurate and
reliable at the date of publication.
If used after 2016, consult the CDFI website for the necessary to continue to the “Hold” phase because the It is the user's responsibility to conduct the necessary assessments in order to satisfy themselves as to the suitability of
most recent version. Version 1 higher risk of FOT is likely to result in inefficient testing the recommendations for the user's particular purpose

http://www.neetrac.gatech.edu/cdfi-publications.html and high emergency repair cost. Systems in this category


COPYRIGHT © 2016, GEORGIA TECH RESEARCH CORPORATION
can be acted on in a planned manner by managing optimal
time and cost.