You are on page 1of 3

Building & Construction department

Concrete Laboratory

Test NO. 4 Name and signature of group supervisor:

Test Name: vee bee time test

Date of Experiment: 8/11/2020 Name and signature of the corrector

Date of report submission: 15/11/2020

Weekly test Report

Name: Lara kosrat Adel Class: B Group: G6

Data:

Concrete Mix Proportion 1:2:4

Cement Weight= 2000 gm

Sand Weight= 2000 ×2=4000 gm

Gravel= 2000 × 4=8000 gm

Water
Ratio=¿ 0.40×2000=800
Cement

Calculation:

W/C Ratio Mix Water Volume Vee-bee Time Workability


Group
(%) Proportion (ml) (Sec) Description
1 40 1;2;4 800 22 Extremely Dry
2 45 1;2;4 900 23 Extremely Dry
3 50 1;2;4 1000 20 Extremely Dry
4 55 1;2;4 1100 11 Very Stiff
5 60 1;2;4 1200 8 Stiff
6 65 1;2;4 1300 6 Stiff

Discussion:

Conclusion:
vee bee time test
25

20

15

10

0
35 40 45 50 55 60 65 70

You might also like