JADWAL MAINTENANCE AREA JEMBER

Bulan: Oktober 2019


Tanggal
No Customer Periode Unit
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
1 Lippo Plaza 2X(K) Esc.GF-UG(Atr)
Jember Esc.UG-GF(Atr)
Esc.UG-1F(Atr)
Esc.1F-UG(Atr)
Esc.1F-2F(Atr)
Esc.2F-1F(Atr)
Esc.2F-P3(Cm)
Esc.P3-2F(Cm)
Esc.P3-P4(Cm)
Esc.P4-P3(Cm)
Esc.P4-P5(Cm)
Esc.P5-P4(Cm)
Esc.P5-P6(Cm)
Esc.P6-P5(Cm)
Esc.GF-UG(Mds)
Esc.UG-GF(Mds)
Esc.GF-F1(Mds)
Esc.F1-GF(Mds)
Trav.LG-LGM
Trav.LGM-LG
Trav.LGM-GF
Trav.GF-LGM
Elv.Service 1
Elv.Service 2
Elv.Service 3
Elv.Service 4
Elv.Service 5
2 Johar Plaza 2X(k) Esc.Lt 1-2
Jember Esc.Lt 2-1
Esc.Lt 2-3
Esc.Lt 3-2
3 Ramayana 2X(k) Esc.Hyundai 1-2
Banyuwangi Esc.Hyundai 2-1
4 RS.Abdoerahim 1x(K) Elv.Pillar
Situbondo Elv.Pillar
5 Rein Collection 1x(F) Elv.Pillar
Jember
6 RS.Bina Sehat Elv.Pillar
Jember Elv.Pillar
7 RSD.KALISAT 1X(F) Elv.Pillar
8 RS.AL HUDA 1X(F) Elv.Pillar
Banyuwangi Elv.Pillar

Total 41 Unit.

: Libur (Standby Area). : Free Service. : Kontrak Service 1 X / Bulan.


: Service Periode 1. : Service Periode 2. : Standby Area.

Note : Jadwal sewaktu-waktu , bisa berubah sesuai kondisi lapangan.

PT.PILLAR UTAMA CONTRINDO


TEKNISI
(Win)