You are on page 1of 14

01

REYES'
RESIDENCE
DESIGN
PEGS
SCOPE OF
WORK

GROUND FLOOR
REMOVAL AND INSTALLATION OF TILES
ON AREAS AFFECTED

03
SLIDING DOOR-ACCESS TO BALCONY SECOND FLOOR
EXTENSION FOR BALCONY & PRAYER ROOM

ENCLOSE WINDOW

04
SECOND FLOOR
high window EXTENSION FOR BALCONY & PRAYER ROOM

SLIDING DOOR-
ACCESS TO BALCONY

OPTION 2: PLAIN AND


DECORATIVE TILE

05

PROPOSED BALCONY FLOORING


OPTION 1: PLAIN NON SKID TILE
MASTER
BEDROOM
ADDITIONAL (FUTURE) WORKS
-NEW BED AND NIGHT TABLE
-REPAINTING OF WALLS

BALCONY

06

PLAN VIEW
MASTER
BEDROOM
ADDITIONAL (FUTURE) WORKS
-NEW BED AND NIGHT TABLE
-REPAINTING OF WALLS

07
SECOND FLOOR
EXTENSION FOR BALCONY & PRAYER ROOM
-FLOORING
-SECURITY GRILLES
-TRUSSES & ROOFING
-CEILING & ELECTRICAL
-ALUMINUM & GLASS WINDOW WITH SCREEN
BALCONY

PRAYER ROOM

OPEN ACCESS
TO PRAYER ROOM

SECOND FLOOR ADDITIONAL (FUTURE) WORKS


EXTENSION FOR BALCONY & PRAYER ROOM -RELOCATION OF STAIRS FAMILY AREA
-FLOORING
-SECURITY GRILLES
-TRUSSES & ROOFING
-CEILING & ELECTRICAL
-ALUMINUM & GLASS WINDOW WITH SCREEN PLAN VIEW
ABRAM'S
ROOM
ADDITIONAL (FUTURE) WORKS
-INSTALLATION OF POCKET SLIDING DOOR
-REPAINTING OF BED
-CUSTOMIZED CABINET
-CUSTOMIZED WORKING TABLE
-INSTALLATION OF WALL MIRROR

PLAN VIEW
MIRROR
INSTALLATION OF
POCKET SLIDING DOOR

HEADBOARD SIDE

CABINET AND
WORKSTATION SIDE
ADDITIONAL
(FUTURE) WORKS
-STAIRS(DISMANTLING)
AND ACCENT WALL ON LANDING PART
PROPOSED ADDITIONAL
(FUTURE) WORKS
-REUPHOLSTER OF LIVING FURNITURE
-REPAINTING OF BEDROOMS AND CABINETS

You might also like