You are on page 1of 53

Mobilink 2G

3G Site SWAP
Solution
www.huawei.com

HUAWEI TECHNOLOGIES CO., LTD.


Agenda:
1. Project Background
2. SWAP Solution and Scenarios Overview
3. Indoor SWAP
A. Indoor HOT SWAP
B. Indoor COLD SWAP
4. Outdoor SWAP
A. Outdoor HOT SWAP
5. Appendix

HUAWEI TECHNOLOGIES CO., LTD. Page 2


2G3G Swap Background
2G3GProgram Delivery Map( 28 Cluster )

Footprint Regions
Swap Regions

Before Swap: After


Swap:

Swap

HUAWEI TECHNOLOGIES CO., LTD. Page 3


BTS Swap Solution : Scenarios
Existed Technologies:
Place: Indoor & Out Door 1) GSM (2G),
(G900)
Method: HOT SWAP & COLD SWAP
2) GSM (2G + 3G),
Existed Cabinets(All -48V DC): (G900 +G1800)
3) 2GSM+UMTS (2*2G + 3G),
1) RBS6201 (600x400)Indoor Feeder (G900+G1800+U2100)
2) RBS6101 (700x680)Outdoor Feeder
3) RBS6301 (450x500)Mini RRU Outdoor
4) RBS6102 (1300x700)Feeder Outdoor

Proposed Cabinets:
1) Huawei APM 30 (DBS 3900 BBU, 2G)
2) Huawei APM 30 (DBS 3900 BBU, 2G & 3G)

Dimensions of the cabinet (W x H x D)


600 mm x 700 mm x 480 mm

Locations/Regions:
Karachi & Hyderabad

HUAWEI TECHNOLOGIES CO., LTD. Page 4


BTS Swap Solution : Huawei Configurations

Power Multi- Control


Solution Band Configuration Product Backup
Output Mode Board
UBRI(if more
G900 S444_000 RRU 3936 20W with 4 TRX GO GTMU then 6
Carrier)
UBRI(if more
GTMU
G1800 S000_444 RRU 3936 20W with 4 TRX GO then 6
Wireless Macro Carrier
Solution
UBRI(if more
(DBS Combined) G900+D180 GTMU
S444_444 RRU 3936 20W GO then 6
RAN16.0 0
Carrier
UBBPd2
U2100 S222 RRU 3826 20W UO UMPT

G900+D180 S444_444+S22 RRU3936+RR GTMU+UMP UBBPd2+UB


20W GU
0+U2100 2 U 3826 T RI

HUAWEI TECHNOLOGIES CO., LTD. Page 5


BTS Swap Solution : Huawei Cabinet

3U
HUAWEI TECHNOLOGIES CO., LTD. Page 6
Main equipment – BBU3900
Specifications of BBU3900 Board Description
442 mm x 310 mmx86 mm WBBP WCDMA BaseBand Processing
unit(3G)
7~12 kg UBRI Universal BaseBand Radio
Interface board(2G )
2U Height, 8 slots A single BBU: Max 24 cells Max CE UMPT Universal Main Processing &
UL: 3072 DL: 4608 Transmission unit(2G/3G/4G co-
Processing unit)
Typical Power consumption: 200W
UPEU Universal Power and
Maximal Power consumption: 325W
Environment interface Unit
Standard 19 inch cabinet 2 FE/GE + 4 E1; Max 12 E1 (able to
UEIU Universal Environment Interface
share transmission with 2G)
Unit

86.1 mm
UEIU

HUAWEI TECHNOLOGIES CO., LTD. Page 7


Main equipment – RRU
BBU3900 RRU3936 900M RRU3936 1800M RRU3826 2100M

GSM/UMTS
Multi-mode BBU CPRI (Optical Fiber)

GU GUL UMTS only

Weight: 15Kg Weight: 15Kg Weight: 15 kg


Power: -48V DC Power: -48V DC Power: –48 V DC
400mm × 300mm 400mm × 300mm  400mm x 300mm
× 120mm (H*W*D) × 120mm (H*W*D) x 120mm (H*W*D)
Power consumption: Power  Power
270W consumption: 270W consumption: 260W
IT2R IT2R IT2R
Scenario:≤G444 Scenario:≤D444 UMTS only

HUAWEI TECHNOLOGIES CO., LTD. Page 8


BTS Swap IT/Mobile Tools

•Team Viewer
•Get your Smartphone
•WeChat
•Add your contact in advance.
•WhatsApp
•Line •Take and send pictures to show
others.
•Huawei APP
HUAWEI TECHNOLOGIES CO., LTD. Page 9
BTS Swap IT/Mobile Tools Team Viewer:
http://www.teamviewer.com/

HUAWEI TECHNOLOGIES CO., LTD. Page 10


BTS Swap IT/Mobile Tools
WeChat Application:
http://www.wechat.com/en/

HUAWEI TECHNOLOGIES CO., LTD. Page 11


BTS Swap Solution

A. Feeder Site Solution.


B. CRPI Site Solution.
C. Feeder + CPRI site Solution.
D. Micro Site Solution

HUAWEI TECHNOLOGIES CO., LTD. Page 12


Karachi and Hyderabad Swap Scenarios

New APM30 will be installed at all site


BBU will be installed in Huawei APM30 cabinet
For All
IDU shifting to APM30 is required in case E/// IDU is in same cabinet with E/// BTS
Scenario Reuse Jumper and DBC
Install RRU Pole before SWAP in case there is no space for new RRU.(CIVIL Part monopole MUST )

Specific
Feeder (macro) CPRI(macro) MIX (Feeder + CPRI) (macro) Micro
Scenario
Hot SWAP Hot SWAP Hot SWAP Cold Swap / Hot Swap
Dismantle E/// BTS, Dismantle E/// RRU first ,then Dismantle E/// RRU first ,then DAS part remain same .
Loop test install Huawei RRU during install Huawei RRU during Dismantle E/// RRU first ,then install
Ping test, SWAP. SWAP. Huawei RRU during SWAP.
Install Huawei Loop test Loop test Loop test
BTS,Integration Ping test, Ping test, Ping test
Install Huawei RRU\RRU Reuse exiting RCU. Reuse exiting Feeder if no Reuse exiting CPRI(if possible)
( 2G + 3G ) power cable and CPRI fiber Reuse exiting CPRI(if possible) space available for RRU. Reuse exiting RRU power Cable(If
SWAP, Reuse exiting RRU power Reuse exiting RCU. possible ).
Reuse exiting RCU. Cable(If possible ). Reuse exiting CPRI(if
Reuse exiting DBC. possible)
Reuse exiting RRU power
Cable(If possible ).Install
Jumper with feeder to RRU
HUAWEI TECHNOLOGIES CO., LTD. Page 13
Overview of E/// Existing Site——Indoor Site

HUAWEI TECHNOLOGIES CO., LTD. Page 14


E// BTS Swap solution : Indoor Site
Before Swap Key Points:

Remove E// cabinet;


Remove Dual band Combiner ;
Remove E// IDU if installed in
BTS Cabinet if its in E// BTS cab;

Install HW APM 30 then


DBS3900;

Reuse:
• existing DC power ;
•existing jumpers, antenna
and DBC;
New:
•Power & GND cable
•Transmission FE cable
(New port if E1 2G IP 3G )
• External Alarm cable

HUAWEI TECHNOLOGIES CO., LTD. Page 15


15
E// BTS Swap solution : Indoor Site & Outdoor
Swap Key Points

1. Remove RBS Cab 2. Remove Lighting protection 3. Remove Feeder

1. Reuse Antenna 2. Reuse existing breaker 3. Reuse DBC and RCU

HUAWEI TECHNOLOGIES CO., LTD. Page 16


16
Huawei DBS 3900
RCU ESN for RET
ESN needed

BBU ESN for commissioning

BBU
ESN

HUAWEI TECHNOLOGIES CO., LTD. Page 17


Scenario 1A: Feeder site solution E// BTS +MW in Separate Cab  APM30 + DBS3900

Before After

Overall view of site before swapping Overall view of site after swapping

E1 cable Equipment be swapped Transmission Cable IP MW ODU &


Antenna
AC power cable MW ODU & AC power cable New AC power cable
DC power cable Antenna DC power cable
New CPRI cable
Grounding cable Grounding cable
1/2” jumper 1/2” jumper
7/8” feeder 7/8” feeder Antenna+ RCU
Antenna MW IF cable
MW IF cable
Alarm Report Cable Alarm Report Cable
RRU power Cable RRU
ROOM ACDB ROOM

Grounding Bar Grounding


AC Grounding Bar Bar

AC Alarm Box
ATS ACDB
Alarm Box Grounding Bar Grounding
ATS Bar
DG
APM 30
DG 19 inch rack

GSM GSM BT
900 1800 2G&3G
Existing share
HW-MW
MW BBU

Grounding Bar Grounding Bar

Scenario description :

HUAWEI TECHNOLOGIES CO., LTD. Page 18


Scenario 1B: Feeder site solution E// BTS +MW in single Cab  APM30 + DBS3900

Before After

Overall view of site before swapping Overall view of site after swapping

E1 cable Equipment be swapped Transmission Cable IP MW ODU &


Antenna
AC power cable MW ODU & AC power cable New AC power cable
DC power cable Antenna DC power cable
New CPRI cable
Grounding cable Grounding cable
1/2” jumper 1/2” jumper
7/8” feeder 7/8” feeder Antenna+ RCU
Antenna MW IF cable
MW IF cable
Alarm Report Cable Alarm Report Cable
RRU power Cable RRU
ROOM ACDB ROOM

Grounding Bar Grounding


AC Grounding Bar Bar

AC Alarm Box
ATS ACDB
Alarm Box Grounding Bar Grounding
ATS Bar
DG
APM 30
DG

GSM GSM BT
900 1800

IDU HW-MW
Existing
MW
Grounding Bar Grounding Bar

Scenario description : In door to Indoor with IDU will be installed in DBS 3900 cab.

HUAWEI TECHNOLOGIES CO., LTD. Page 19


Scenario 1C: Feeder site Outdoor solution E// BTS +MW in Same Cab  APM30 + DBS3900

Before After

Overall view of site 2G Overall view of site after 2G & 3G

E1 cable Equipment be swapped E1 cable Existing Equipment


AC power cable MW ODU & AC power cable AC power cable
DC power cable Antenna DC power cable MW ODU &
CPRI cable
Grounding cable Grounding cable Antenna
1/2” jumper CPRI Cable Antenna + RCU
7/8” feeder Antenna 7/8” feeder
MW IF cable MW IF cable
Alarm Report Cable Alarm Report Cable
RRU
ACDB
Grounding Bar Grounding
Grounding Bar
AC Grounding Bar AC
Bar

ATS ACDB ATS


Grounding Bar Grounding Bar

DG DG
Existing

MW CPRI
Cable
Existing BBU
MW
APM 30

Grounding Bar Grounding Bar

Scenario description : Feeder is installed in existing scenario, we will remove the feeder , install RRU on Tower.

HUAWEI TECHNOLOGIES CO., LTD. Page 20 Page


Page20
20
Scenario 2: CPRI Site solution E// BTS +MW in Same Cab  APM30 + DBS3900

Before After

Overall view of site 2G/ 3G / 2G+3G Overall view of site after 2G & 3G

E1 cable Equipment be swapped E1 cable Existing Equipment


AC power cable MW ODU & AC power cable AC power cable
DC power cable CPRI cable Antenna DC power cable MW ODU &
CPRI cable
Grounding cable Grounding cable Antenna
1/2” jumper CPRI Cable Antenna + RCU
7/8” feeder Antenna
MW IF cable MW IF cable
Alarm Report Cable Alarm Report Cable
RRU
ACDB
Grounding Bar Grounding
Grounding Bar
AC Grounding Bar AC
Bar

ATS ACDB ATS


Grounding Bar Grounding Bar

DG CPRI DG
Cable CPRI
Existing Cable
MW

Existing BBU
MW
APM 30

Grounding Bar Grounding Bar

Scenario description : Reuse of existing CPRI & RRU Power cable, Reuse of RCU.

HUAWEI TECHNOLOGIES CO., LTD. Page 21


Scenario 3: MIX Feeder + CPRI Site solution E// BTS +MW in Same Cab  APM30 + DBS3900

Before After

Overall view of site 2G/ 3G / 2G+3G Overall view of site after 2G & 3G

E1 cable Equipment be swapped E1 cable Existing Equipment


AC power cable MW ODU & AC power cable AC power cable
DC power cable CPRI cable Antenna DC power cable MW ODU &
CPRI cable
Grounding cable Grounding cable Antenna
1/2” jumper CPRI Cable Antenna + RCU
7/8” feeder Antenna
MW IF cable MW IF cable
Alarm Report Cable Alarm Report Cable
BTS Shed
BTS Shed RRU
ACDB
Grounding Bar Grounding
Grounding Bar
AC Grounding Bar AC
Bar

ATS ACDB ATS


Grounding Bar Grounding Bar

DG DG
CPRI
CPRI Existing Cable
MW
Cable
Existing BBU
MW
APM 30 RRU ion tower leg if
no space on tower
Grounding Bar Grounding Bar

Scenario description : Reuse of existing CPRI & RRU Power cable, Reuse of RCU Install RRU on shed Leg in cross for load balance.

HUAWEI TECHNOLOGIES CO., LTD. Page 22


Per SWAP if possible : Indoor Site
Pre Installation Before Swap

Steps:

1. Install HW Temporary
APM30 & DBS3900;
5 2. Connect grounding and
Power cables
2 3. Power on HW DBS3900
4 cabinet;
7 4. Lay FE cables
5. Install RRU if space
2 available
6 RBS E// Cab 6. Lay RF jumpers
3 7. Lay External Alarm
IDU connection

HUAWEI TECHNOLOGIES CO., LTD. Page 23


23
Pre swap if possible: Indoor Site
Swap Remove Key Steps:
0. SWAP preparation &
Transmission check(ping)

1. Dismantle & Swap


Transmission (E1/FE)
cables
CPRI
2. Power off E// cabinet;
3 3. Disconnect RF
jumpers, Dismantle &
4 Lightening cable,
3. connect HW Jumpers;
1 4. Connect external
5 alarm cable
2 4 Dismantle 5. Disconnect Power &
grounding cables
6. Remove Cabinet
6 APM30

HUAWEI TECHNOLOGIES CO., LTD. Page 24


24
RRU Connectivity for 2G
A B C

*NOTE : Connect FE cable from BBU FE0 to IDU for Future use
HUAWEI TECHNOLOGIES CO., LTD. Page 25
RRU Connectivity for 2G Dual Band (6+ RRU)
A B C

HUAWEI TECHNOLOGIES CO., LTD. Page 26


RRU Connectivity for 2G Dual Band +3 G

HUAWEI TECHNOLOGIES CO., LTD. Page 27


RRU Connectivity for Configuration more 1 RRU in 1 Sec in same Freq

IF more then 1 RRU required in 1


Frequency band then short CPRI
will be used to cascade them.

HUAWEI TECHNOLOGIES CO., LTD. Page 28


RRU Installation with minimum Space
1 2 3

4 5
Note : To install 3 Blade RRU with using only 1 Bracket. 6

HUAWEI TECHNOLOGIES CO., LTD. Page 29


RRU Installation with minimum Space
Existing RRU Power cables will be reused for Newly
installed RRUs. Existing RRU CPRI Optical cable will
be reused for Newly installed RRU’s

RRU Mounting Options:

Priority1:
Install RRUs on back of Antenna using same Antenna
Mounts,

Priority2:
a.Install RRUs on tower Platform in case of
railing tower or on Ring poles
incase of monopole tower,

Priority3:
Install RRU on Tower leg,

HUAWEI TECHNOLOGIES CO., LTD. Page 30


2. Macro RT Site – RRU and Antenna install on Wall
Scenarios New solution New solution sketch
RRUs can’t be installed behind the antenna on
For rooftop Macro existing pole due to loading issue.
sites First option solution: install RRU on the wall,
recommended distance between RRUs is
500mm, minimum distance between RRUs is
300mm.

HUAWEI TECHNOLOGIES CO., LTD. Page 31


3 Micro / IBS RRU and Antenna install on Wall (installation location)
First option: Special case second option:

HUAWEI TECHNOLOGIES CO., LTD. Page 32


DBS Swap solution:
• RCU Connectivity
RRU 0 RRU 1 RRU 2

Sector A Sector B Sector C

HUAWEI TECHNOLOGIES CO., LTD. Page 33


Overview :Antenna System
3G Antenna

3G RCU

2G Antenna

HUAWEI TECHNOLOGIES CO., LTD. Page 34


Overview :SBT Site solution
Huawei Purposed SBT solution
Existing SBT solution

HUAWEI TECHNOLOGIES CO., LTD. Page 35


HW - Antenna Installation: Color Rings

Need confirm and


mark color ring for
existed system and
Huawei jumpers
BEFORE SWAP

Make feeder or jumper color rings for 2G & 3G


HUAWEI TECHNOLOGIES CO., LTD. Page 36
BTS Swap solution : Abis OverE1 & IUb IP Transmission
IDU Board Layout
E/// E1 Color Code
1st E1 White blue White orange

2nd E1 White green White brown

3rd E1 Red Blue Red Orange


FE Port
4th E1 RedGreen Red Brown

3G

HUAWEI TECHNOLOGIES CO., LTD. Page 37


37
BTS Swap solution : Transmission

20P 10 U space 6P 3 U Space 2P / CN 1 U Space

HUAWEI TECHNOLOGIES CO., LTD. Page 38


BTS Swap solution : MW Transmission

20P 10 U space

6P 3 U Space

HUAWEI TECHNOLOGIES CO., LTD. Page 39


BTS Swap solution : CN 210

HUAWEI TECHNOLOGIES CO., LTD. Page 40


BTS Swap solution : CN 210
This Port will be
E/// Node-B used for pre-
is connected. testing.

PMCL Will configure


the Free Port as mirror of
working port for testing.
And Media will be tested
Before swap on New Port.

HUAWEI TECHNOLOGIES CO., LTD. Page 41


BTS Swap solution : TN

HUAWEI TECHNOLOGIES CO., LTD. Page 42


BTS Swap solution : TN 2PB and TN 6PC

E/// Node-B
is connected. This Port will
be used for pre-
testing.

PMCL Will configure


the Free Port as
mirror of
working port for
testing.
And Media will be
tested
Before swap on New
Port.

HUAWEI TECHNOLOGIES CO., LTD. Page 43


BTS Swap solution : TN 20PB

E/// Node-B
is connected.

This Port will


be used for
pre-testing.
PMCL Will
configure
the Free Port as
mirror of
working port for
testing.
And Media will
be tested
Before swap on
New Port.

HUAWEI TECHNOLOGIES CO., LTD. Page 44


BTS Swap solution : MW IDU Detail

MW IDU Type Qty of sites

AMM 20PB 154

AMM 2PB 943

AMM 6PC 271

MINI-LINK CN210 101

SPO1410 13

SPO1460 38

Grand Total 1520

HUAWEI TECHNOLOGIES CO., LTD. Page 45


DBC Reuse solution:

Description Spec Quantity


Clamp set 30~127 mm 2PCS

HUAWEI TECHNOLOGIES CO., LTD. Page 46


External Alarm Swap solution :
Extend Alarm Solution

BBU Box

UEIU+UPEU Board Sensor DDF

HUAWEI TECHNOLOGIES CO., LTD. Page 47


47
External Alarm Swap solution :
Extend Alarm Solution

BBU Box

UEIU+UPEU Board Sensor DDF


DATB

HUAWEI TECHNOLOGIES CO., LTD. Page 48


48
External Alarm Swap solution : Indoor Site
Extend Alarm Solution
Indoor Scenario Outdoor Scenario
Cable Mobilink Alarm always Severi
Cable Mobilink Alarm always Seve PIN NO Color Cable Color Definition on/off ty
PIN NO Color Cable Color Definition on/off rity
1 White
P0 GENSET ON off 3
1 White
P0 GENSET ON off 3
14 Blue
14 Blue
2 White
P1 AC MAIN FAILURE off 2
2 White
P1 AC MAIN FAILURE off 2
15 Orange
15 Orange
3 White
P2 RECTIFIER DOOR on 3
3 White
P2 INTRUDER on 3
16 Green
16 Green
4 White
SA P3 DC LOAD FUSE on 3
4 White
P3 FIRE ALARM on 3
SA 17 Brown
17 Brown
5 White
5 White P4 BATTERIES HIGH TEMP on 2
P4 HIGH TEMP on 3
18 Gray
18 Gray
6 Red
6 Red P5 LOW VOLTAGE on 2
P5 LOW VOLTAGE on 2
19 Blue
19 Blue
7 Red
7 Red P6 RECTIFIER MAJOR on 2
P6 RECTIFIER MAJOR on 2
20 Orange
20 Orange
P7 SYSTEM ON BATTERIES on 3
8 Red
8 Red
P7 RECTIFIER MINOR on 2
P8 Rectifier Door on 3
21 Green

HUAWEI TECHNOLOGIES CO., LTD. Page 49


49
Ping Test for 3G site solution:

HUAWEI TECHNOLOGIES CO., LTD. Page 50


Pre Swap Testing , Swap Activity and Swap Troubleshooting
RM
Key Point Mobilink Huawei Third party

Site access arrangement ● O



Media Provisioning MW+ MSTP+ Datacom O

Core and PS Core CGI ,LAC,RAC definitions
● O
Neighbor addition
O
Acknowledgement on swap activity closure ●
Spares provision ● O
● O
Media verification MW+ MSTP+Datacom

Configuration and Troubleshooting of Huawei equipment
Configuration and Troubleshooting of other vendor equipment O ●

● O O
Conclusion of activity failure due to Other Vendor equipment

Decision of roll back
O O

O ● O
Perform Rollback

"●" indicates the Owner, while "O" indicates the support.


HUAWEI TECHNOLOGIES CO., LTD. Page 51
Page 51
Support Required from Mobilink

1. For 3G Sites additional port configuration to perform ping test before


swap-
2. Involve other vendor support for joint troubleshooting with SLA of 30min
3. 2 hour and 50min troubleshooting window before decision of rollback
4. Extension ECRF if needed will apply before 5:30AM and need PMCL
support to approve it before 5:45AM
5. One Swap TL from PMCL for each activity to coordinate with all internal
teams and Huawei Swap TL to assure activity successful
6. Spares availability for swap include RAN , Power, MW
7. Enough NOC and planning engineer of MSTP+ MW+Datacom during
activity consider work for cross connects , media verification of 50 sites
per night
HUAWEI TECHNOLOGIES CO., LTD. Page 52

8. MW,MSTP LLD await detailed topology +capacity+utilization from PMCL


Thank you
www.huawei.com

Copyright©2014 Huawei Technologies Co., Ltd. All Rights Reserved.


The information in this document may contain predictive statements including, without limitation, statements regarding the future financial and
operating results, future product portfolio, new technology, etc. There are a number of factors that could cause actual results and developments to
differ materially from those expressed or implied in the predictive statements. Therefore, such information is provided for reference purpose only and
constitutes neither an offer nor an acceptance. Huawei may change the information at any time without notice.

You might also like