Ret/Sé sham chide RBCW/SS/HKT2/L/2020/ 0033
owe Ne" A NOV 2020
PHU MWY VINH CONSTRUCTION AND INVESTAENT CORP (RIV)
CONG 1Y CO PHAN BAU TU'VA XAY DUNG PHU MP VINE (PMP)
BiohHuu2 Hamlet, Ouc Hoe Thuong Commune,
Ap Bink Hira 2, Xa Bie Ha Tong
Duc Hoa Distie,Long An Province, Vietnam
Fuygn Die Ha, Tinh Long An, VietNam
AATIN: Le Van Xin, General Dector
[Nagud nh: Ong Le Vin Xin, Tim Gin dhe
Dear si,
Kin it ned Tig Gin Bie,
ENGINEERING, PROCUREMENT AND CONSTRUCTION CONTRACT-HOA KHANH TAY
WATER SUPPLY SYSTEM PHASE TWO
HOP DONG THIET KE, CUNG CAP THIET BI CONG NGME VA THI CONG DY 4N HB
THONG CUNG CAP NUUOC HOA KHANH TAY GIA DOAN?
Re: PAYMENT REQUEST: ENGINEERING
Vive YBU CAU THANH TOAN: PHAN THIET KE.
Pursuant tothe Contact No. O4/HKT/PM4V/2020 dated on 10 February 2020 signed by
PMV and REC WATER SON BHO.
‘Dye theo Hop dng 56 04/HKT/PN4v/2020 ngiy 10 thing 02 nim 2020 dye ky gio
(ng ty 6 phon dt v8 xby cng Phi Vin (PMV) v8 cg ty RBC WATER SON. BH. |
We made reference to Article 12, Clause 12.1 Contract Price. We the Executive Office |
of RBCWATERSDN BHO's please to inform you that we have completed the Engineering
‘Works for Pakage 1, Package 2 and Package 3. The delvery order for the 3 packages
ae attached inthis eter.
Tham chu Bu 12, Khosin 12.1. Gi tr Hop na ching tl, Vin phng bleu hanh cba |
[RBC WATER SON BHD wu fing thing bo wd qu céng ty rng ching td hon thénh
(Cong we Thi ké'cho Ge thdu 1, Gol thbu 2 v8 Gai thdu 3. Blen bén bon gio cho 3
‘thd due di kam trong thu ny
Pertaining the above, we woud ke to request the payment for 60% of the works 35
fellows:
Theo db, ching t8| muéo yeu cbu than toén cho 60% cna vi 5 a6 te hu sow |
Total Contract Value for Engineering VND 7,796,448,714,
"ing Gi tr Hop dng cho phn Thiet ke
Contract Vale for Package 1 wo 1,846,967,823
Gié tr Hop dng eho Gai thou 1
id tr Hop dng cho ai théu 2
Contract Value for Package 3 wo 215,754,830,
|
|
Contract Vale for Package 2 VND 2,735754,160
.Gi6 tr Ho ding cho Gl thou 3Requested Payment Valve VND 4,798,476, 813 x60% =
Gi6 trl Yeu cu Than toon ‘vw02,879,086,088 RBC
WATER,
(in words: Vietnamese Dong Two Bilin Eight Hundred Seventy Nine Million Eighty Sb
Thousand Eighty Eight)
(ng cho: Bing Hal 1) Tm Trim By mul hin Tigu Tm moi Su Nohin Tm)
‘We willinclude the above payment in the Projets Payment Request No.1, and thatthe
[Advance Payment and Retention willbe deducted accordingly.
‘Ching ti 38 ia Khodnthanh ton trén vo Yeu cbu Thanh todn 56 1 ca Dv dn, vd
‘hod Tom Ung vi Gif a 8 de kh tr tong ing.
‘Thank you so much.
Xinchdn thin cm on.
‘Chai Kam Cheong
Project Director and Head of Executive Office
Ting Gidm dc Du énJOINT STOCK COMPANY
CONG TY cP XAY DUNG VA MOI TRUONG VIET NAM
‘Adi/ BC.No33, Lat 24, Tang Yeo 11 Ste, Trang Hoa Ws, Cau Gin, Hanoi
33 Us 24 Trung Yon 1, Trang Hoa, Cu Cid, Ha NB)
‘Ter 7 (6443 S11 3865 Pa (G44) 36268599 Ema vison.
: ETNA CONSTRUCTION ND ENRON
v
DELIVERY ORDER,
BIEN BAN BAN GIAO HO SO
«Based on the Consultancy Agreement between RBC WATER SDN BHID and Vietnam
‘Construction and Environment Joint Stock Company regarding Consulting services for Survey,
Deliled Design and Cost Estimate of Hoa Khanh Tay 2 Water Supply System Project.
‘Cn et Hop ding te vin gita REC WATER SDN BHD vii Cg ty CP Xay dmg vs Mot
ncn Vit Nao cho Dich vu Tir vn tho st, tit KE bin vE th cng a lp de toe Dn
‘Dai Ky dang HG thdng Cp nub ba Kh Ty Gil doan I.
“Today, November 06, 220, atthe offie of RBC WATER SDN BHD in Bish Hu 2 Hamlet,
Ducloa Thuong Cormne, Du Hoa Dist Lng An Proves Vietnam. |
Hom nay ny 0/11/2020, tl vin ping cia RBC WATER SDN BHD & dp Binh Hu 2, x8
Dic He Thong yea Dic Ha, in Long An, Vet Nem.
We includes:
hing im
{the Deere! Bex bn giao: VIETNAM CONSTRUCTION AND ENVIRONMENT
JOINT STOCK COMPANY (Party 4)/ CONG TY CP XAY DUNG VA MOI TRUONG
VIBT NAM (Bén A)
Address! Bac No.3, Lot 2A, Trang Yen 1 St, Trang Hoa War, Cau Gixy District,
ani 831624 ng Tan Yen 11, phn Tag Hs que Cl Gi. HN
Phone! BT #840243 5113555
= Representalive! Da di: Me. Nguyen Viet ung Ong Newn Vt Han
Postion! Chee Cio Executive Office! Gi dl du hint
He The Recplnt/Bén nhfn bin gia: RBC WATER SDN BHD (Party BY REC WATER
SDN BHD (in B)
Adres a ch: Bin Hus ? Hamlet, Du Hos Thuong Commune, De Hoa District,
Long An Provinee, Vita dp Bin Hau 3a Bi Ha Thy, én ic Hoa, Hoh Long
An MeeNan
Phone! BI: +84) 2723774196
= Representative! Bai din: Med Ong Chat Kam Cheong
- Position! Cite we: Head of Excoutive Office and Project Director! Trémg Van phong
iu hh vd Gli db Du
‘After checking the document, the Parties agre to deliver the following documents
‘Sau Bhi kd tra hs, fc Ban théng nbd bin giao cic hd so sau3 [BOW
iu kd emg
Nol Documents! ‘Quantigg” | Paper sie ] Remarial
sir bso Situs | Cogily | Ghiehi
(Gets 69)
Package 3 Gat hd 3
T | Dealed Engineering Design Drawings)? | _10 ry
Bin vt lek thi cng
2 | Dsailed Engineering Design Staements)7 [10 oo
Thue minh tid At eng
0 a
| Cost Estimate
Dy toin
‘Ben B vs Bon Bt nha bn ao Ay i chic Wb so tu trén tk Ben A
Ths ery ode in cp, ah pry Keg Oy wih ane el
value/ Bien bin Ban giao hb so ay dg dp think 02 cn. MI ben git 07 ban wi gid tri phdp
Babe nha.
iim pSc ou HANA
Apa Vi an
lead of
Executive
Chai Kam Cheemg
Parc Aas delivered the agreed documents to Pty B and Party Bas ily rceveda
accepted the above documents from Party AJ Bén A da bin giao cde id so da thang nhdt cho
officJOINT STOCK COMPANY
CONG TY cP XA¥ DUNG VA MOITRUONG VIETNAM
‘Ads BC: No33,Lot24, Trang Ye 11 Ste, Trang Hoa Wa, Cau Git, Hanoi
{88 3, £8 24. Drang Yn 11, Trang Ha, Cu iy, HN
“Te (gad) 3 513555 Fax (44) 36248599 al: ine. on
er CONTRUCTION ARV ENVIRONMNT
v
DELIVERY ORDER,
BIEN BAN BAN GIAO HO SO
Based on the Consultancy Agreement between RBC WATER SDN BHD and Vietnam
‘Construction and Environment Joint Stock Company regarding Consulting services for Survey,
Dealed Design end Cost Estimate of Hoa Khan Tay 2 Water Supply Sytem Project.
(Cin et Hop dbng a vin gta RBC WATER SDN BHD vit Céng ty CP Xay dmg vi MGi
nein Vigt Nam cho Djch w Ti vin thd sit hid ké bain ve tht cOng vd lép detain De dn |
‘Bt Ky dang He théng Cap mabe Hoa Kank Tay Gia dogn I.
Totay, Novenber 06,202, atthe ofce of RBC WATER SDN BHD in Binh Hun 2 Hamlet, == =}
Duc Hoa Thuong Commune, Duc Hoa Dstt, Long An Provinee, Vietnam. = 4
“Hom nay, ngdy 06/11/2020, tal vin phing ela RBC WATER SDN BHD & Ap Binh Hu 2,
ate Hoa Throng hyn Bite Ha, tin Long An, VietNam.
We ineludes:
Ching i gdm:
{E-The Deliverer/Bén bin giao: VIETNAM CONSTRUCTION AND ENVIRONMENT
‘JOINT STOCK COMPANY (Party A) CONG TY CP XAY DUNG VA MOI TRUONG
VIBT NAM (Bén A)
Address! Bja chit No.3, Lot2A, Trung Yeu 11 St, Trung Hoa Ward, Cau Giay Distt
Hanoi! 5435, L4 24, ng Trang Yon 1, phn Trang Hoa, quén Cu Gy, 1 NO
Phone! BT: +86 0243 5113855
Representative! Bu din: Me, Nguyen Viet Hung / Ong Newén Vit Hien
Postion! Chie we Chef Executive Offices Gm dd di hh
1H--The Recipient Bén nh bin giao: RBC WATER SDN BHD (Party By RBC WATER
‘SDN BHD (Bin B)
“Address! Bia chi: Bin Hu 2 Hart, Due Hoa Thuong Commune, Due Hoa Distt,
Long a Province, Vietnan dp Blnh ow 2, Bi Lou Thug, yen Dit Ho, tah Long