You are on page 1of 4
: = MADHYA PRADESH POLLUTION CONTROL BOARD Paryawaran P; Arera Col BHOPAL- 462 0 BE 107551 2464428. 2466191 Fax: (0755) 2463742 E-mail: it moocbEreditfmcil com No. /TS/MPPCB/2010 Date: To, M/s, ARCIL Catalyst India Pvt. Ltd. (Formerly : Arkema Catalyst India Ltd.) Birlagram, NAGDA - 456 331 Distt. UJJAIN (M. Sub: Renewal of consent of the Board under section 25/26 of the Water [Prevention & Control of Pollution] Act, 1974. Ref: Your application No. ARCI/HR/MPPCB/2010/93, dated: 29/05/10, 21/08/10 and ‘subsequent correspondence ending letter dated: 27/09/10, With reference to your above application consent is hereby renewed for a period of One year i.e. from 01/12/2010 to 30/11/2011 subject to the fulfillment of the terms and conditions incorporated in the schedule of the consent letter No. 8099 dated: 20/10/06 Issued to you by this office and additional conditions mentioned below ‘This renewal of consent is valid for product & production capacity of:~ 4. ALUMINIUM CHLORIDE 30,000 T.P.A. (Thirty thousand tonnes per annum) 2. SODIUM HYPOCHLORIDE 1200 T.P.A. (One thousand Two hundred tonnes per annum) 3. HYDROCHLORIC ACID 600 T.P.A. (Six hundred tonnes per annum) ONAL CON! 1. The industry shall improve their existing pollution contro! facilities and maintain the same properly and the treated effluent shall be maintained within the prescribed standards. 2, Industry shall utilise the whole quantity of treated effluent within the premises for plantation, horticulture etc. Effluent shall not be discharged outside the factory premises in any circumstances, Hence zero discharge condition shall be maintained. 3. Extensive tree plantation shall be cared out in open areas available within the factory premises in consultation with the expert agency and good house keeping practices shalt Se maintained, The yearwise record shall be maintained for plantation and same shell be reported to the Board, hth smn it ns MADHYA PRADESH POLLUTION CONTROL BOARD Paryawaran Parisar, E-5, Arera Colony, BHOPAL- 462 016 BE 107551 2464423. 2400191 Fax {O75H}2463742 E-mail it. moncb@reditfinail com Industry shall take adequate precautionary measures before and during operation, maintenance and cleaning of pollution control equipment to avoid any accidental hazard. 5, Industry shall submit environmental statement for the previous year ending 31* March ‘on or before 30" September every year to the Board. 6. Industry shall make proper arrangement for the disposal of solid waste, also valid authorisation under Hazardous Waste (Management, Handling & Transboundary Movement) Rules, 2008 shalt be obtained from the Board. 7, “Industry shall comply with all the relevant acts/rules, directions, guidelines Issued by MoEF/CPCB/MPPCB from time to time as required and, if applicable 8. The consent/renewal license fee deposited by the industry is liable for revision, if at any point of time it is found necessary. 9. Industry shall submit a fresh application for next renewal of consent u/s 25/26 of Water (Prevention & Controi of Pollution) Act, 1974 180 days before the expiry of the date of this consent renewal letter. The application shall be made in prescribed application form with consent renewal fee along with report of compliance of consent conditions mentioned in original consent letter and its subsequent consent renewal letter. . The consent renewal fee shall be payable as per latest gazette notification dated: 07/10/09 in accordance with gross block mentioned. Pleas acknowledge the receipt of this,{etter. For & on behalf of M.P. Pollution Control Board ——svw— (1H, S. Malviya ) —sd— Executive Engineer (R.K.JAIN ) , Member Secretary Endt Wo. J6(797 —_/TS/MPPCB/2010 Date: Fey 4a Copy to: 1. ‘Regional Officer, M.P. Pollution Control Board, Ujjain 2, Monitoring Section, M.P. Pollution Control Board, Bhopal. 3, Cess Section, M.P. Pollution Control Board, Bhopal. 4, HSMD Section, M. P, Pollution Control Board, Bhopal. Ls IT section, M2, Pollution Contro! Board, Bhopal. Ae ‘Malviya )~ fpPeccstive Engineer (RK JAIN ) A member Secretary pare reat 203 ’ For gate apphcrerveomeyies, ust ur watste wun saoacb.it0 MADHYA PRADESH POLLUTION CONTROL BOARD Paryawaran Parisar, E-5, Arera Colony, BHOPAL- 462 016 (0755) 2464428, 2466101 Fox :(O7H5) 2463742 Eno nneeb@rediffmai “Wo. /TS/MPPCB/2010 Date: To, M/s. ARCIL Catalyst India Pvt. Ltd. (Formerly : Arkema Catalyst India Ltd.) Birlagram, NAGDA - 456 331 Distt, UJJAIN (M.P.) Sub: Renewal of consent of the Board under section 21 of the Air [Prevention & Control of Pollution] Act, 1981. Ref: Your application No. ARCI/HR/MPPCB/2010/93, dated: 29/05/10, 21/08/10 and subsequent correspondence ending letter dated: 27/09/10, With reference to your above application consent is hereby renewed for a period of One year ie. from 01/12/2010 to 30/11/2011 subject to the fulfillment of the terms and conditions incorporated in the schedule of the consent letter No. 8101 dated: 20/10/06 and subsequent renewal issued to you by this office and additional conditions mentioned below :~ This renewal of consent is valid for product & production capacity of:- 1, ALUMINIUM CHLORIDE 30,000 T.P.A. (Thirty thousand tonnes per annum) 2, SODIUM HYPOCHLORIDE 1200 T.P.A. (One thousand Two hundred tonnes per annum) 3. HYDROCHLORIC ACID 600 T.P.A. (Six hundred tonnes per annum) ADDITIONAL CONDITIONS: 1. The industry shall improve their existing pollution control facilities and maintain the same properly and the emission shall be maintained within the prescribed standards. 2 Extensive tree plantation shall be carried out in open areas available within the factory premises in consultation with the expert agency and good house keeping practices shall be maintained. The yearwise record shall be maintained for plantation and same shall be reported to the Board. 2 Fovonine spptenion/coresfes st our mebsto massmpoct nics MADHYA PRADESH POLLUTION CONTROL BOARD Paryawaran Parisar, E-5, Areta Colony, BHOPAL- 462 tory 2468420. 2405191 Fox 10755) 2863742. E nai st moved@redf fra com 3, Industry shall comply with the norms of Industrial Health & Safety Department. 4. Industry shall take adequate precautionary measures before and during operation, maintevance and cleaning of pollution control equipment to avoid any accidental hazard, 5, Industry shall submit environmental statement for the previous yer ending 31° March ‘on or before 30” September every year to the Board. 6, Industry shall comply with all the relevant acts/rules, directions, guidelines issued by MoEF/CPCB/MPPCB from time to time as required and, if applicable 7. ‘The consent/renewal license fee deposited by the industry is lable for revision, if at any point of time it is found necessary. 8 Industry shall submit a fresh application for next renewal of consent u/s 21 of Air (Prevention & Control of Pollution) Act, 1981 180 days before the expiry of the date of this consent renewat letter. “The application shall be made in prescribed application form with consent renewal fee along with report of compliance of consent conditions mentioned in original consent _ letter and its subsequent consent renewal letter. . The consent renewal fee shall be payable as per latest gazette noti ted: 07/30/09 in accordance with gross block mentioned. Please acknowledge the receipt of this letter. For & on behalf of ov M.P. Pollution Control Board (1H. S. Malviya ) — sai— Executive Engineer (R.K.JAIN) Member Secretary Enat No. Jaglyg — (TS/MPPCB/2010 Date: 255 pny 1. Regional Officer, M.P. Pollution Contro! Board, Ujjain 2. Monitoring Section, M.P. Pollution Control Board, Bhopal. 3. __ HSMD Section, M, P. Pollution Control Board, Bhopal. 4-7 IT Section, MP. Pollution Control Board, Bhopal. (HS. Malviya ) A Pecutne Engineer (R. K. JAIN ) lember Secretary ace ene(u) 20.7 a rar eine spplcsboncoresecs, ist or webste wamemgge a

You might also like