This document summarizes the delivery of land to a road project from May 8, 2020. It lists 16 deliveries between 1:01 PM and 3:15 PM, each with a vehicle number, time of delivery, and volume of 24.15 cubic meters. The total volume delivered was 386,400 cubic meters.
This document summarizes the delivery of land to a road project from May 8, 2020. It lists 16 deliveries between 1:01 PM and 3:15 PM, each with a vehicle number, time of delivery, and volume of 24.15 cubic meters. The total volume delivered was 386,400 cubic meters.
This document summarizes the delivery of land to a road project from May 8, 2020. It lists 16 deliveries between 1:01 PM and 3:15 PM, each with a vehicle number, time of delivery, and volume of 24.15 cubic meters. The total volume delivered was 386,400 cubic meters.