This document summarizes the delivery of soil for the Kunciran Airport-Cengkareng Toll Road Project. It lists 10 deliveries made on May 31, 2020 between 2:09-2:56, each with 6 trucks carrying 24,150 cubic meters of soil for a total delivery of 241,500 cubic meters.
This document summarizes the delivery of soil for the Kunciran Airport-Cengkareng Toll Road Project. It lists 10 deliveries made on May 31, 2020 between 2:09-2:56, each with 6 trucks carrying 24,150 cubic meters of soil for a total delivery of 241,500 cubic meters.
This document summarizes the delivery of soil for the Kunciran Airport-Cengkareng Toll Road Project. It lists 10 deliveries made on May 31, 2020 between 2:09-2:56, each with 6 trucks carrying 24,150 cubic meters of soil for a total delivery of 241,500 cubic meters.
UKURAN ISI BAK TOTAL BAK NO TANGGAL JAM NOPOL P L T ( M3 ) 1 2:09 T 9122 AA 6 2,3 1,75 24,150 2 2:10 B 9048 BYJ 6 2,3 1,75 24,150 3 2:15 B 9184 EB 6 2,3 1,75 24,150 4 2:19 B 9222 EB 6 2,3 1,75 24,150 5 2:25 B 9343 CYT 6 2,3 1,75 24,150 31/05/2020 6 2:32 B 9545 EB 6 2,3 1,75 24,150 7 2:38 T 9112 AA 6 2,3 1,75 24,150 8 2:42 B 9705 EDA 6 2,3 1,75 24,150 9 2:48 B 9176 EB 6 2,3 1,75 24,150 10 2:56 T 9118 AJ 6 2,3 1,75 24,150