You are on page 1of 1

Sanitary plumbing layout

Isometric layout

Sanitary plumbing permit together with all other permits


Will be signed by district master’s plumber or sanitary engineer

Ciriaco is also a master plumber

Pencil is okay as long as the weight lines is okay

Do not erase the construction lines

Alphabet of lines should be observed


No erasure of construction lines
All numerical labeling on top of dimension lines
All lettering and numerical letterings are all in chisel point
Chisel point in all letterings

Catch basin- temporary area for rain water coming from the downspout going to the drainage system

Big catch basin for barangays


Architectural plan- object line is the wall
0.15 because it is scaled to the hollowblock walls 6 inches
0.10 interior wall 4 inches by 20 cm by
Major plate drafting/ laboratory storm drainage layout all interior wall and exterior wall should be 0.15
and 0.10
Adopt the design standard

CATCH BASIN
4mm height lettering
All numerical are at the top of the dimension line

Research plates serves as references

HOW CATCH BASINS WORK

Catch basins should be object lines


Catch basins should be visible lines
Have your metros at all times

Catch basin as isometric show it as a box


Catch basin can