You are on page 1of 58

Government of Nepal

National Reconstruction Authority


Central Level Project Implementation Unit (Education)
District Level Project Implementation Unit (Education),Gorkha
Emergency School Reconstruction Project (ESRP), JICA Loan No. : NE-P11
Contract Bills
FINAL INTERIM PAYMENT CERTIFICATE
Period: 15th November 2018 to 14th January 2020
Name of School: Shree Devi Jal Kumari L. S. School Payment Voucher no:
Name of Contractor:Sharma-A.M Joint Venture Date of payment:
Contract Number:ESRP/MOE/CLPIU/074/075-GORKHA-15 Page no of measurement book:
Serial no. of previous payment bills: 7
Voucher no.of previous payment bills:
Date of order for commencement of work: 15th November, 2018
Date of work to be completed: 14th January, 2020
Date of completion of work:
Bill of Quantities Up to Date of work till now Previous Bill Currently Accomplished work

Pay
Item Description Unit Quantity As Remarks
No. Rate Amount Quantity Amount Quantity Amount Quantity Amount % completion
per Contract

GENERAL
MOBILIZATION AND DEMOBILIZATION
L.S. 1.00 500,000.00 500,000.00 1.00 500,000.00 1.00 500,000.00 - - 100.00%
1 Mobilization of the construction by constructing temporaty
acomodation
SITE OFFICE forESTABLISHMENT
labours and site staff with required suitable Per
facilities 14.00 25,000.00 350,000.00 14.00 350,000.00 14.00 350,000.00 - - 100.00%
2 Providingand andkeeping
Maintainingthe sameSite inOffice
good of hygenic condition
two Rooms for
having Month
entire project
total Area 20 completion
sq.m for the time.useDemolition
of Client ofand the Consultant
same and
PROJECT INFORMATION BOARD
3 cleaning
includingthe site after completion
office of thefile
construction activities nos. 1.00 10,000.00 10,000.00 1.00 10,000.00 1.00 10,000.00 - - 100.00%
Providing and chair,
FixingTable, Lockable
of Project cabinet,board
Information Stationery
with
all complete.
Items (Ink,Text
Paper,[Note:
Pen, 50% payment
Pencils etc.), shall be made
1 Computer after
approved
SAFETY SIGN inBOARD
appropriate location includingand all 1required
Printer
completion
with all of mobilization
necessary set up. all and remaining
complete as per 50% after
instruction of nos. 1.00 10,000.00 10,000.00 1.00 10,000.00 1.00 10,000.00 - - 100.00%
fixing accessories
Providing and as perofdrawing
Fixing all complete.
4 completion
engineer. The as perSafety
of Specification
works contract]Sign Board with approved
of computer shall not be less than
Text and Sinage including
BARRICADING WORKS required fixing accessories as per
(19.5" led monitor with Core i5, 7th Generation, 500 gb Hdd, R.m 45.00 2,000.00 90,000.00 45.00 90,000.00 45.00 90,000.00 - - 100.00%
drawing all complete.
Barricading between
5 8gb ddr 4 ram), Printer theshould School
function Academic
at least ofarea and
Printing,
Construction
SAFETY
Scanning and area
MATERIALS with 1.8&
Photocopy mSITE
of high
A4 CGI size Sheet
SAFETY fixed toProviding
documents. Bamboo
support frame L.S. 1.00 100,000.00 100,000.00 1.00 100,000.00 1.00 100,000.00 - - 100.00%
6 Providing andall
and Maintaining complete
all aboveasitems
Maintaining per instruction
Construction
on Rental ofBasis
Safety Engineer.
Measures
for entirein
Construction
project completion
RELOCATING SiteOF with
time. proper Safety
EXISTING TLCmeasures to person and
work area (Helmet, Shoes, First AidLearning
Kit, Clothing, Glove, sq.m 19.21 3,000.00 57,630.00 18.00 54,000.00 18.00 54,000.00 - - 93.70%
7 Relocating of Existing Temporary Centre (TLC),
Guardconstruction
from Rail for edge siteprotection,
to Safety
other place by Net, Safety rope,
Demolition Fall
and using
LAB TEST(WATER TEST)
8 Protection
existing and etc.)
materials as required
obtained by
fromthe Contract
demolition Clause
of TLC GCC 24
to the job 1.00 7,500.00 7,500.00 - - - - - 0.00%
Testing Providing Lab Test Report for Quality of Water in
and Specification
place decided division 1 "GENERAL REQUIREMENT
Water
TEMPORARY Streamby (Up SMC.and Down streem) located near by
TOILET
CLAUSE 8(C)". The number of Safety Materials Personal nos. 2.00 150,000.00 300,000.00 2.00 300,000.00 2.00 300,000.00 - - 100.00%
9 Construction of
Construction sitetemporary
before Starting
toilet and CGI
with after Sheet
completion
fixed of
to
Protecting Equipments (PPE) shall be minimum but not
construction
Bamboo work. Thisand
support Testallhas to be done toincluding
mark the Septic
affect
ROAD
limited to 35 sets.frame
REPAIR AND
Payment necesary
MAINTENANCE
shall be made items
in Prorata Basis for
of
pit,construction
Pipeline, work in water stream. Km. 56.00 50,000.00 2,800,000.00 56.00 2,800,000.00 56.00 2,800,000.00 - - 100.00%
10 Providing
entire andToilet
duration Pan etc. for
Maintaining
of project. the entire
roadsproject completion
as necessary time
to avoid
all complete
blockage as per Instruction
by Landslides of Engineer.
and Rockfall Rate shall
for regular include
transport of
all Material
construction cost
materials with fixing, construction
and site inspection during overallcharges and
CIVIL WORKS-
demolition & BUILDING
cleaning of the same after completion of the
construction period. Rate shall include all Material cost with
SITE CLEARANCE
construction activities & complete.
all MOBILIZATION:
demolition charges, cleaning, fixing & construction charges of
Clearing and grubbing the site for construction by removing sq.m 352.54 100.00 35,254.00 343.75 34,375.00 376.75 37,675.00 (33.00) (3,300.00) 97.51%
the same after completion of the construction activities all
150mm
1.1 complete. thick top soil including bushes, small trees, leveling of
undulated
EARTHWORK ground,INshorting
EXCAVATION and stacking/storing
: selected top
soil for reuse in landscaping cu.m 195.91 400.00 78,364.00 188.67 75,467.12 188.67 75,468.82 (0.00) (1.70) 96.30%
1.2 Excavation in foundations in all works,
type of disposing unsuitable
soils for foundation,
materials footing,
trenches, from site, pits etc.,
etc. all
to thecomplete
requiredas depth
per drawings,
including
specificationsbyandmanual
dewatering instructions of the Engineer.
or mechanical means etc. as per
specifications with all contractor’s own machinery and
equipment's, providing crossing of track, shoring, strutting,
timbering and buttressing with appropriate materials and all
Preparedsuch measures necessary to retain in position the sides of the
by contractor Checked by Consultant, DSC Verified by (Engineer), DLPIU Recommended by DLPIU Chief Checked and forwarded by CLPIU DPD Approved by CLPIU, project Director
foundation pit and including refilling the excavated material
with watering, ramming, leveling the site and disposing off the
surplus/unusable earth to outside the construction premises,
Bill of Quantities Up to Date of work till now Previous Bill Currently Accomplished work

Pay
Item Description Unit Quantity As Remarks
No. Rate Amount Quantity Amount Quantity Amount Quantity Amount % completion
per Contract

EARTH BACK FILLING :


1.3 cu.m 130.90 300.00 39,270.00 102.97 30,890.66 95.23 28,569.00 7.74 2,321.66 78.66%
Back filling in foundation and sides of foundation with
approved
1.4 BOULDER soil obtained SOLING from : the excavation at site and stacked
at site or brought from uncoursed
outside in layer cu.m 58.53 6,000.00 351,180.00 60.80 364,813.07 57.12 342,722.94 3.68 22,090.13 103.88%
1.4 Providing and laying hand not packed exceedingDry Rubble15 cm
thick (compacted
Stone soling in foundation, thickness) including transportation of soil,
2. CONCRETE WORKS under floor plinth with out any
spreading
special dressing of stone including filling intersticeswater,
in required line and level, sprinkling with cu.m 10.47 14,000.00 146,580.00 10.70 149,771.56 10.40 145,659.50 0.29 4,112.06 102.18%
2.1.1 2.1 P.C.C
ramming, compacting with mechanical rammers, testing, etc.,
suitable
2.1.1 P.C.Cquarry waste or stone chips or quarry sand, watering,
2.1.2 P.C.C (1:3:6)
all complete (1:2:4) WORKS
as perappropriate
drawing, specification and instructions of
compacting
Providing and usinglaying machine mechanical
mixed Plain compaction
Cement means
Concrete cu.m 14.98 16,000.00 239,680.00 13.47 215,537.62 11.74 187,902.12 1.73 27,635.50 89.93%
Providing
2.1.2 with
the Engineer. and laying machine mixed Plain Cement Concrete
all contractors
of nominal
nominal mix 1:2:41:3:6 (1 (1materials,
cement :: 2 3handling,
sand :: 4 6 coarseplacing
coarse etc. all)
aggregate
of
P.C.C. FOR mix R.C.C. WORKS cement : sand aggregate )
complete
for leveling
leveling as course
per drawings,
in foundations specifications
foundations and under and floor
under instruction of the
of building,
building, cu.m 269.45 20,000.00 5,389,000.00 276.07 5,521,331.95 263.53 5,270,600.00 12.54 250,731.95 102.46%
for
2.2 Providing and course
laying in in item
position and
machine mixed floorand of machine
Engineer.
etc. in all The
level complete
with broken including
stone all lead
aggregate of &sizelift. not more
etc. in allcement
vibrated level with concrete broken of mix stone aggregate
1:1.5:3 of size not
(1 cement:1.5 more3
sand:
SILICA CEMENT ADMIXTURE
2.3 than
than 25
coarse
mm
mm of
25aggregate) of approved
approvedM20 grade
quality
qualityfor including
including
reinforced
formwork
formwork wherever
cement whereverconcrete kg 2,694.50 300.00 808,350.00 2,760.67 828,201.00 2,635.28 790,584.00 125.39 37,617.00 102.46%
Providing
necessary, and mixing
dewatering, Silica mixing,
batching, Cement Admixture
transporting, of in
placing,
necessary, dewatering,
work usingconcrete approved batching,
cement mixing, transporting, placing,
structural
STEEL
compacting, REINFORCEMENT the rate with
curing,at including
including
20 mmbygraded
ofall2.50%lead and and weight
machine
lift, etc. of the
etc. all
compacting,
crushed for stonecuring, aggregate workability,of approvedall lead qualitylift, in strength,
variousall Mt. 43.12 130,000.00 5,605,600.00 41.91 5,448,565.05 37.89 4,925,700.00 4.02 522,865.05 97.20%
2.4 cement
Providing
complete as
complete
locations
andper
as
and
perpromoting
fixing in position
drawings,
drawings,
heights including
Fe 500 steel
specifications
specifications
transportation
improving
andreinforcement
and the instructions
the
of
instructions
concrete
of
to
achieving
various
of the waterproofing
diameter
Engineer. confirming properties,
to bleeding
relevant IS prevention,
code in etc.
R.C.C.
FORM
of the
site WORKS
of Engineer.
placing, compaction,shall finished to product
requiredofline and Japan
level,
Silica
works Cement
including Admixture
straightening, be the
cutting, bending, Silica
binding with sq.m 1,634.16 800.00 1,307,328.00 1,625.25 1,300,200.53 1,826.77 1,461,416.00 (201.52) (161,215.47) 99.45%
2.5 Supplying
protection
or superior
and
and laying centering,
and curing,
shallwire meet
shuttering
complete of
etc.theallrequirements asasvarious
per pattern
drawings,
mentioned in
20 SWG annealed
formworks withand 19/12 forthicktying the proof
reinforcement bars at
3. BRICK MASONRY
specifications
specification of(binding themm
materials WORKS
instructions
and
water
Workmanship, of theplyEngineer, wood &
Division
steel
–but
4:
each junctions
adjustable props for all wire
kinds shall
of not be
RCC measured
works for separately)
foundations,
3.1 BRICK
excluding
Concrete theMASONRY
Works, costArticle
of centering,
2.4 WORKS shuttering, ( 1 : 4and c/sreinforcement,
) ONE SIDE cu.m 81.73 20,000.00 1,634,600.00 - - -
including all
columns, shear waste and beams, cut pieces, slab, provision forlintel,
adequate
3.1 FAIRFACE
all complete as perwalls,drawings, specifications staircase,
and instructions sill,
of
numbers
pergola, of spacers, nails,
including chairs, proppingproviding and placing staging, cement
Providing
the
CLEAREngineer. and
SILICON laying first class selected scaffolding,
WATER-REPELLANT factory pressed COATNG wire
mortar
supporting (1:1) cover
and blocks
bracing to keep
in proper the bars
lines in
andone intended
level, position
sealing the
7.2.3 cut Fair Face brick (machine made brick) or on more brick sq.m 326.92 550.00 179,806.00 - - - - - -
Providingwithand
at all levels
joints allApplying
complete Water Repellant
as perself drawings, Coating
specifications Exposedand
thick
Brickandwall
Surfaceinheavy
cement duty mortarbrown 1:4 (1Base adhesive
cement : tape,
4coarse aligning
sand) to
in
instructions
POINTING
line levels theusing
ofWORK Engineer.
IN
including Silicone
BRICK (Authorized
Ties, MASONRY
PVC MC-Nisiwa
lap length
Spacer, and
Providing SH
forand
Providing or
the
,superstructure
8.1.1 equivalent or and other
superior specified
including places brick
cleaning in allsurface heightsusingand sq.m 287.39 400.00 114,956.00 - - - - - -
bar lengthatcutouts/
applying
openings/ exceeding
all levels 10 meter
Pointing
pockets, in length
Works
applying shall beMortar
inDe-shuttering
Cement measured 1:2for
chemical, (1
level
brick including
cleaning the
chemical, cost of single
single or multi stage self standing
the
BOQ payment,
cement
De-shuttering:2 fine
Total
scaffolding, ofexcept
asitems
soaking sand)to3.1.,
approved column).
bricks,on bythe
7.2.3 theor
curing, &facemulti-stage
Engineer
8.1.1: of brick
raking etc.,scaffolding,
joints, masonry
complete
provision
etc.
atwall
all
for - - - - - - -
all
levelscomplete
including mixing
as openings,
per as mortar,
drawing, per manufacturer's
laying
specifications incomplete
perfectinstruction,
andfollowing line,
instructions project
level and
of for
the
recesses,
Replaced
specification items 3.1, toothing
7.2.3
and instruction and etc.,
8.1.1
of the all with
Engineer. as per drawing,
items
plumb
Engineer. and finishing in regular
specifications and instructions of the Engineer. and even surface ,all complete - - - - - - -
3-9C(XS)-B
as per drawing , specification and instruction of the Engineer.
Brick Masonry Works (1:4 c/s) cu.m 18,000.00 - - - - - - -
Cement Plaster Works on Outer Wall (1:6) sq.m 600.00 - - - -
Exterior Weather Coat Paint sq.m 350.00 - - - - - - -
3.2 BRICK MASONRY WORKS ( 1 : 4 c/s )
cu.m 42.44 18,000.00 763,920.00 114.98 2,069,586.63 42.44 763,920.00 72.54 1,305,666.63 270.92%
3.2 Providing and laying first class chimney fired brick one or
more
3.3 HALF brick thick BRICK wallWORKS in cement( mortar 1 : 4 c/s 1:4) (1 cement and
Providing : 4
3.3 coarse sand) in foundation up to plinth, superstructure and sq.m 35.92 1,500.00 53,880.00 35.67 53,497.88 34.22 51,330.00 1.45 2,167.88 99.29%
laying non-fairfaced half brick work masonry in cement
other specified
mortar 1:4 (1 places in all inheights and level with including the
4. DOORS &cement:4
WINDOWS sand) WORKS superstructure 4.1approved
4.1 cost of single
first class fired or multiin stage
bricks perfectscaffolding,
line & level, soaking
required bricks,
size - - - 0.00 - - -
METAL FRAME Providing
curing,
and fixing
shape atraking joints, provision for recesses, openings,
4.1.1 and
Door Frame in anypositionheight and level,line
in required including
and level thepressed
cost of single
rm. 134.30 1,100.00 147,730.00 134.30 147,730.00 134.30 147,730.00 - - 100.00%
toothing
or multi etc.,
stage allscaffolding,
complete ascleaning,
per drawing, soaking specifications
of installation
the and
WINDOW
(folded) Steel SHUTTER
door and window Providing, frame fabrication
of size shown and in bricks,
instructions
packing
4.1.2 in position
Window of
Frame of
the the
35 mm thickfromEngineer.
joints, raking
glazed joints,
windowiron provision
and sheet
ventilator for recesses,
shutter rm. 263.45 1,100.00 289,795.00 263.45 289,795.00 263.45 289,795.00 - - 100.00%
drawings manufacture galvanized of 1.20 mm
4.2 FLUSH
openings,
made
thick
METAL withDOOR
includingcuring,
1.2mm
SHUTTER SHUTTER
hinges,providing
thick galvanized
jamb, (32MM)
25x3mm
lock ironProviding
jamb, GI Straps
sheet
head, folded& fixing
base Fixed
in
ties of 1.2to - - - 0.00 - - -
32mm
columns
required
mm thick
pressed at GI
size solid
every
andweldedcore
5th flush
shape course
includingdoor
on rigidly of shutters,
brick together
glazing
fixed and in single
with 60mm by leaf
5 mm or 14
width
thick
4.2.1 double
gaugefloat
clear
mechanical leafglass
welded as per
GI
means, withdetailed
meshglazing
adjustable drawing.
anchored lugs to
beads, The
washer
with flush
GIsplitstrap,and doors
end all
special
tail shall
complete
to eachbe as sq.m 63.80 7,500.00 478,500.00 50.86 381,461.81 63.80 478,500.00 (12.94) (97,038.19) 79.72%
factory
per design,
glazing
jamb made
putty,solid
including steelcore
drawing,
required butt block
numbers
hinges board
specifications
and
2.5 mm shutters
sizesthick bonded
instructions
hardware with mortar with
like of the
4.3 phenol
WOODEN
Engineer.
hinges, SHUTTER
formaldehyde resin. The lipping shall be of teakwood
guards, tower-bolts,
reinforcing tohandles, door hardware,eye-hook, applying priming
strike-plate, shock coat
all-round
Zinc the flush doorfactory
ofwith a applied
minimum thickness of 12mm.
4.3.1 with
absorbers Rich
as Primer
required, approved make, Zinc etc.,
Rich allPrimer
complete etc.,as sq.m 51.83 8,000.00 414,640.00 46.66 373,276.00 51.83 414,640.00 (5.17) (41,364.00) 90.02%
The
per following
drawings,
all complete C.P. fittings shall
asspecification
per drawings, and be used: (a)
instruction
specification of
and -the
2-150 mm of
Engineer.
instruction
Handles
UPVC in each leaf; (b) Tower-bolt – 300 mm long at top 1 in
DOOR
the Engineer.
4.4.1 each leaf and 200 at bottom in each leaf; ( c ) 1 no. 300 mm sq.m 13.30 9,000.00 119,700.00 12.90 116,122.50 12.90 116,122.50 - - 97.01%
SHUTTER/FRAME
long C.P.
Providing Aldrops and fixingwith Godrejto doormade frames padlock;
24barsmmof (d)
thick125factory
mm
WINDOW GRILL Providing, MS solid required size
4.5 heavy duty door
madefixing
PVC GI But Hinges
shutter made 3 nos. in each
of grille
styles and leaf.rails (rate UPVCshall sq.m 34.05 2,500.00 85,125.00 54.28 135,694.56 34.05 85,125.00 20.23 50,569.56 159.41%
and in position mild steel made withofrequired MS
include section
hollow all required of door
size 59 hardware).
x 24 mm and wall thickness 2 mm
flats, strips, bars fabricated
COLLAPSIBLE GATE as per drawings, fixing in position
4.6 � 0.2 mm
using approved with inbuilt
fasteners edging on both sides. The styles and sq.m 10.03 10,000.00 100,300.00 10.03 100,300.00 0.00 - 10.03 100,300.00 100.00%
Supplying andincluding
fixing in2position coat of enamel local make and Zinc
rails motred
Rich Primergate and
baseof jointed
coat, at the
etc., all corners by as means of in
collapsible
5. FLOORING approved
WORKS sizecomplete
and make properly detailed fabricated
galvanized/plastic
5.1 drawing, specification brackets
and of size 75 x of
instructions 220 the mm having wall
Engineer. sq.m 817.86 900.00 736,074.00 780.27 702,243.00 725.24 652,716.00 55.03 49,527.00 95.40%
withHARDENED
5.1 vertical double channels 20
CEMENT x 10 x 2mm at 100mm
thickness 1.0 mm and stainlessCONCETE steel screws.FLOOR The styles of the
centers and braced withProviding, M.S. flat laying diagonal 20
intube x 5mm,
required with
line, top
shutter reinforced by inserting galvanized of size 20 level
x20
and
and bottom rails of T iron 40 x 40 xfinish
6mmwith with 38mm concrete dia steel
mm pattern
and 1 mm 40 mm � 0.1 thickmmIPS wall floor
thickness. The cementlock rail made
pulleys
of complete with bolts nuts: locking arrangements
of mix 1:2:4
'H' section, (1a cement
UPVC hollow : 2 sand 4 crushed
section of size stone100aggregate
x 24 mm 12
steppers
mm handles including
laid inapplying
alternatea panel priming coat of Zinc
and 2and mm� down grade) or providing glass
Rich Primer
dividing strips carriage
and hoisting
finished withall approved
complete floor as perhardener
specification
0.2
Preparedand
by mm wall thickness fixed to the
contractor shutter styles
Checked by by means of
Consultant, a
(Dreitop FH of equivalent
plastic/galvanized floor hardener)
iron 'U' cleats. The shutter appliedframeasshall per beDSC Verified by (Engineer), DLPIU Recommended by DLPIU Chief Checked and forwarded by CLPIU DPD Approved by CLPIU, project Director
direction
manufacturer'sof theinstructions
Engineer. including mixing laying in
filled with UPVC multichambered single panel of required
required
size having slope, overintrigal finishing
all thickness of 20using mmappropriate
and 1 mm power � 0.1 mm
Bill of Quantities Up to Date of work till now Previous Bill Currently Accomplished work

Pay
Item Description Unit Quantity As Remarks
No. Rate Amount Quantity Amount Quantity Amount Quantity Amount % completion
per Contract

NEAT CEMENT SKIRTING


5.2 r.m 284.29 100.00 28,429.00 344.62 34,462.10 0.00 - 344.62 34,462.10 121.22%
- do - as above, but for 100 mm high skirting.
TERRAZZO CAST-IN SITU DADO
5.3 sq.m 56.78 1,500.00 85,170.00 56.36 84,535.20 56.36 84,535.20 - - 99.25%
Providing and laying 25 mm thick terrazzo cast-in-situ dado
up to the height shown
7. PLASTERING/ WALL in drawing
FINISHING with marble WORKS chips rubbed
7.1.1 and CEMENT
polished to PLASTER granolithic finish under layer of 19 mm thick sq.m 859.19 600.00 515,514.00 750.32 450,189.53 735.72 441,432.00 14.60 8,757.53 87.33%
7.1 WORKS
cement
7.1.1 concrete 1:2:4 (1 cement : 2 sand : 4 crushed stone
7.1.2 ON
ON INNERCEILING WALL (1:4) (1:6)
7.1.2 aggregate 10 mm andand
Providing down grade)atbase
applying and topand
all levels layer of 620mm
shape sq.m 540.15 500.00 270,075.00 569.32 284,660.98 540.15 270,075.00 29.17 14,585.98 105.40%
12.5.mm, thick cement and sand plaster work of mix
thick
mm(1 with
thick required
cement color
plaster marble
in building chips of sizes
inside from 1 mm
inceiling
specified cementto 4
1:4 cement
7.1.3nominal
ON OUTER & 4 sand)
WALL in concrete
(1:6):marble powder mix 3:1 (3 at
surface, surface
7.1.3.1 mm
mortar in two size laid
layersmixing in cement
as 6 to mortar,
8 mm thick final coat with 1:6level(1 sq.m 604.57 600.00 362,742.00 1,059.72 635,832.32 713.77 428,262.00 345.95 207,570.32 175.29%
all height
7.1.3.1 including
EXTERNAL PLASTER laying in perfect line,
cement :6
cement : 1 marble powder mix : 7 marble chips) toby14volume
and plumbfine andsand)finishing cement mortar
inapplying
regular overeven
and the 12
surface mm
including
7.1.3.2 7.1.3.2
including
thick 1:6do(1 asProviding
cement above
cement for
slurry,
:or
and Band
required
6 multi-stage
coarse Plaster
sand)
at all
pigment, levels
under coat
and shape
grinding,
in all surface
20 rm. 273.41 100.00 27,341.00 - - 0.00 - - - 0.00%
all necessary
mm thick cement single plaster in building scaffolding,
exterior in providing
specified andat
polishing,
7.2
all PAINTING
height buffingWORKS
including and applying
mixing mortar, sealer coat,inetc.,
laying all complete
perfect line, level
7.2.1 fixing
cement 200 mm
mortar with wide 24 gauge
1:6 (1 cement GI Chicken
:6 fine sand) wire mesh
in all at
surface at sq.m 1399.34 200.00 279,868.00 1,319.64 263,927.57 1,275.87 255,174.00 43.77 8,753.57 94.30%
as
and per
DISTEMPERdrawing,
plumb and specification
PAINT
finishing and instruction
in regular and even of the
surface Engineer.
junction
heightofincluding
all Providing R.C.C. and masonry,
mixing mortar, making
laying grooves
in perfect andincluding
recesses,
line, level
all necessary
EXTERIOR
throating, and
single
dusting, applying
WEATHER dripping, two
or multi-stage
COAT or more
wetting, PAINT coats
scaffolding,
curing, ofmaking
washable
protection, etc.
7.2..2 and plumb
distemper and
paint finishing
of approved in regular and
manufacturer even andsurface
shade including sq.m 617.15 350.00 216,002.50 1,059.73 370,905.50 604.57 211,599.50 455.16 159,306.00 171.71%
grooves and
all necessary
all complete as recesses,
Providing
per
single
throating,
drawing
or and dusting,
applying
, specification
multi-stage
dripping,
twoand
scaffolding, or more coats aof
over
wetting,
instruction.
making
RAILING
coat ofshall
curing,
first alkali Providing,
protection,resistant fabrication
cement
providing primer
chicken as paint
per
of
wire design
approved
mesh drawings
atmoulds,
the shade and
junction
[Ratequality
ENAMEL
grooves andalsohundred
PAINT include
recesses, percent
throating, acrylic
for providing dusting, drips of approved
band,
dripping,
7.2.4 installation
manufacturer
of
and concrete
pattern
groove, chicken
in
to as
and position
the per
masonry
exterior
wire
Mild
mesh etc.,Steel
manufacturer's
walls
at allof railing
complete
junctionbuildings inasstaircase,
specifications
oftwo
RCC per
etc.,
and towetting,
drawing
The verandah
the
rates
masonry, ,of sq.m 287.39 400.00 114,956.00 365.69 146,276.00 287.13 114,851.66 78.56 31,424.34 127.25%
Providing
curing,
and other and
protection,
areas applying
providing
including by spray/brush
chicken
cutting to wire
required or
mesh more
shape at the
andcoats
junction
size,
surface
shall
etc., of wall,
specification
include
to complete andceiling,
for instruction
scrapping
the worksbeams columns,
ofany
,atwashing the canopies,
theheights.
Engineer. surface [Ratewithstaircase,
shall also
water,
8 1st
of quality
concrete
MISCELLANEOUS
welding synthetic
and
joints, masonry enamel
installation etc.,
of paint
base of
alldrawings,approved
complete
anchor as per
plates manufacturer
drawing
of ,
appropriate - - - 0.00 - - -
lobbies
applying etc.,
include Berger
for
a coat all complete
providing as
drips band,
ofinstruction
approved per
quality moulds, specifications
water groove,
base cementchicken and
primer,
(Asian,
specification
size with and
required or equivalent)
numbers ofofover
the wooden
Engineer.
expansion or[Rate
bolts metal surface
shall
ofwashing
required also in
size,
8.3 instruction.
wire
surfacemesh atThe
preparation, rates
junction shall
of RCC include
scaffolding andetc.,forallscraping,
masonry, completeetc., to
as complete
per thethe kg 1,610.53 6,500.00 10,468,445.00 1,738.63 11,301,106.08 1,610.53 10,468,445.00 128.10 832,661.08 107.95%
required
include
providing shade
for required at
providing anysizeheight,
drips shape,
band,
bends, including
moulds,
finishing weldgroove,surfacechicken
jointsbyetc.,
tothe
produce
surface
the works with
manufacturer's at water,
any surface
heights].
recommendations preparation,
and as scaffolding
approved all
preparation,
wire mesh fillers/putty, scaffolding, protection etc.,etc. all two or
smooth
complete
PUMP
Engineer. asatper
surface,
SHED
junction
applying
the of RCCone coat
manufacturer's and masonry,
of Metal
recommendationsPrimer toand
complete
and as
8.4 complete
the
more works
coats asatofper
any drawings,
heights.
enamel paintspecifications
of required and instructions.
shade, etc.,1m allhigh The nos. 1.00 80,000.00 80,000.00 1.00 80,000.00 1.00 80,000.00 - - 100.00%
approved
Supply, by the
fabrication, Engineer.
installation of 2mx1.5m and
finished surface
complete as per shall give specifications
drawings, even and uniform and surface.
instruction of the
pump shedRAIN
SEWER, made AND with 50x50x6
WASTEMS WATER Angle frame , covered
INSTALLATION
8.5 Engineer.
outside and (Soil,
roof with CGIRain)
sheet, locakable door, including R.m 44.26 1,500.00 66,390.00 39.10 58,650.00 38.50 57,750.00 0.60 900.00 88.34%
PVC SWR Waste, pipes with all necessary ringpad
lock, base
gaskets, PVC PCCfittings,
(1:2:4)including
75mm allMS complete
clamps,ashangers,
per design, cutting,
drawing, and instructions
jointing, sealing, installation of the Engineer.
of pipes and specials including
C ELECTRICAL WORKS
making holes and cutting grooves on walls or floor and
A. Common Installation
repairing the same to its original finish. Pipes to be installed
1.1 Stand
on Alone
trenches or 40 wallsA DP MCBorwith
or floor ductEnclosure
as per drawings, nos. 1.00 12,000.00 12,000.00 1.00 12,000.00 1.00 12,000.00 - - 100.00%
2 CABLES & WIRES
specifications, manufacturer's recommendations, instructions, - - -
cleaning
2 Nos 10of the system,
Sq.mm + 1 Notesting6 Sq.mm and mutistranded
ready for operation. copper The
2.1 r.m 60.00 800.00 48,000.00 56.00 44,800.00 56.00 44,800.00 - - 93.33%
rate shall include
conductor wires for all labour and materials required. The
B measurement
School Blocks shall be done for running meters, fittings etc not -
1 payable
DISTRIBUTIONseperately.BOARDS -
- 110 mm ED 6 kg/sqcm
1.1 Ground Floor DB (DB-1) nos. 1.00 32,000.00 32,000.00 1.00 32,000.00 1.00 32,000.00 - - 100.00%
1.2 First Floor DB (DB-2) nos. 1.00 32,000.00 32,000.00 1.00 32,000.00 1.00 32,000.00 - - 100.00%
1.3 Second Floor DB (DB-3) nos. 1.00 32,000.00 32,000.00 1.00 32,000.00 1.00 32,000.00 - - 100.00%
2 CABLES & WIRES
2 Nos 6 Sq mm Multistranded Cu Wire + 1 No 4 Sq mm
2.1 r.m 10.00 600.00 6,000.00 9.00 5,400.00 9.00 5,400.00 - - 90.00%
Multistranded Cu wire
2 Nos 4 Sq mm Multistranded Cu Wire + 1 No 2.5 Sq mm
2.2 r.m 15.00 500.00 7,500.00 13.00 6,500.00 13.00 6,500.00 - - 86.67%
Multistranded Cu wire
2 Nos 2.5 Sq mm Multistranded Cu Wire + 1 No 1.5 Sq mm
2.3 r.m 30.00 250.00 7,500.00 31.00 7,750.00 31.00 7,750.00 - - 103.33%
Multistranded Cu wire
3 General Service Light Point Wiring
3.1 One Way Light Point pts. 59.00 700.00 41,300.00 59.00 41,300.00 59.00 41,300.00 - - 100.00%
3.2 Two Way Light Point pts. 2.00 900.00 1,800.00 2.00 1,800.00 2.00 1,800.00 - - 100.00%
3.4 Exhaust Fan point pts. 4.00 900.00 3,600.00 4.00 3,600.00 4.00 3,600.00 - - 100.00%
4 6A Universal Pin Light Power Socket Wiring pts. 42.00 700.00 29,400.00 42.00 29,400.00 42.00 29,400.00 - - 100.00%
5 Switch Socket Outlets
5.1 6A Universal Power Switch Socket nos. 42.00 900.00 37,800.00 42.00 37,800.00 42.00 37,800.00 - - 100.00%
6 Sweep Ceiling/ Exhaust Fan/Wall Fan
6.1 225mm dia M/D exhaust Fan nos. 4.00 6,000.00 24,000.00 4.00 24,000.00 4.00 24,000.00 - - 100.00%

Prepared by contractor Checked by Consultant, DSC Verified by (Engineer), DLPIU Recommended by DLPIU Chief Checked and forwarded by CLPIU DPD Approved by CLPIU, project Director
Bill of Quantities Up to Date of work till now Previous Bill Currently Accomplished work

Pay
Item Description Unit Quantity As Remarks
No. Rate Amount Quantity Amount Quantity Amount Quantity Amount % completion
per Contract

7 Light Fixtures/Luminaires & Accessories


7.1 24 W LED Recessed Mounted Square type nos. 4.00 4,500.00 18,000.00 4.00 18,000.00 4.00 18,000.00 - - 100.00%
7.2 18 W LED Surface Mounted Square type nos. 28.00 2,700.00 75,600.00 28.00 75,600.00 28.00 75,600.00 - - 100.00%
7.3 12 W LED Surface Mounted Cylindrical type nos. 20.00 2,400.00 48,000.00 20.00 48,000.00 20.00 48,000.00 - - 100.00%
7.4 6 W LED Circular Surface type nos. 5.00 1,800.00 9,000.00 5.00 9,000.00 5.00 9,000.00 - - 100.00%
7.5 LED Wall Light nos. 1.00 1,800.00 1,800.00 1.00 1,800.00 1.00 1,800.00 - - 100.00%
8 Pull Box
Junction Box At External Post Top Light no. 3.00 700.00 2,100.00 3.00 2,100.00 3.00 2,100.00 - - 100.00%
11 Earthing & Lighting Protection
11.1 Chemical Earthing no. 3.00 45,000.00 135,000.00 3.00 135,000.00 3.00 135,000.00 - - 100.00%
11.2 Earthing Bar no. 3.00 22,000.00 66,000.00 3.00 66,000.00 3.00 66,000.00 - - 100.00%
12 Earthing Strip/Wires
12.3.1 25 x 3 mm GI strip r.m 65.00 300.00 19,500.00 67.00 20,100.00 67.00 20,100.00 - - 103.08%
12.3.2 12 SWG Cu wire r.m 15.00 200.00 3,000.00 14.00 2,800.00 14.00 2,800.00 - - 93.33%
13 Earth Test link nos. 1.00 1,500.00 1,500.00 1.00 1,500.00 1.00 1,500.00 - - 100.00%
14 Lightning Arrester nos. 1.00 7,500.00 7,500.00 1.00 7,500.00 1.00 7,500.00 - - 100.00%
C Solar PV System - - -
1 Solar PV Panel nos. 8.00 26,000.00 208,000.00 8.00 208,000.00 8.00 208,000.00 - - 100.00%
2 Tubular Deep Cycle Battery nos. 4.00 30,000.00 120,000.00 4.00 120,000.00 4.00 120,000.00 - - 100.00%
3 Hybrid Inverter no. 1.00 100,000.00 100,000.00 1.00 100,000.00 1.00 100,000.00 - - 100.00%
D Fire Extinguisher - - -
a ABC Stored Pressure 5.0kg size nos. 4.00 8,000.00 32,000.00 4.00 32,000.00 4.00 32,000.00 - - 100.00%

D Sanitary Works
1 WATER SUPPLY INSTALLATION
a CPVC pipes SDR-11
40 mm r.m 92.00 1,600.00 147,200.00 88.00 140,800.00 88.00 140,800.00 - - 95.65%
25mm r.m 6.00 1,000.00 6,000.00 6.00 6,000.00 6.00 6,000.00 - - 100.00%
c CPVC Ball Valve - - -
40 mm nos. 3.00 2,000.00 6,000.00 3.00 6,000.00 3.00 6,000.00 - - 100.00%
25 mm nos. 2.00 900.00 1,800.00 2.00 1,800.00 2.00 1,800.00 - - 100.00%
d Electrical Centrifugal Water Pump nos. 1.00 12,500.00 12,500.00 1.00 12,500.00 1.00 12,500.00 - - 100.00%
e 2000 litres Capacity Water Storage Tank nos. 1.00 34,000.00 34,000.00 1.00 34,000.00 1.00 34,000.00 - - 100.00%
2 Sewer, Rain and Waste Water Installation - - -
110 mm r.m 23.00 1,400.00 32,200.00 22.00 30,800.00 22.00 30,800.00 - - 95.65%
75mm r.m 20.00 1,200.00 24,000.00 19.00 22,800.00 19.00 22,800.00 - - 95.00%
50mm r.m 6.00 350.00 2,100.00 5.00 1,750.00 5.00 1,750.00 - - 83.33%
B School Blocks - - -
1 Sanitary Installation - - -
a Water Closet Set set 1.00 30,000.00 30,000.00 1.00 30,000.00 1.00 30,000.00 - - 100.00%
b Orissa Pan set 4.00 3,100.00 12,400.00 4.00 12,400.00 4.00 12,400.00 - - 100.00%
c Hand Wash Basin set 5.00 8,000.00 40,000.00 5.00 40,000.00 5.00 40,000.00 - - 100.00%
d Ladies Urinal set 2.00 11,000.00 22,000.00 2.00 22,000.00 2.00 22,000.00 - - 100.00%
e Self Closing Bib Cock nos. 4.00 4,000.00 16,000.00 4.00 16,000.00 4.00 16,000.00 - - 100.00%
f CP Spreader in Urinal set 4.00 2,500.00 10,000.00 4.00 10,000.00 4.00 10,000.00 - - 100.00%
g Toilet Paper Holder nos. 1.00 2,600.00 2,600.00 1.00 2,600.00 1.00 2,600.00 - - 100.00%
h Commode Spray nos. 1.00 2,000.00 2,000.00 1.00 2,000.00 1.00 2,000.00 - - 100.00%
i PVC Multi Floor Trap nos. 3.00 600.00 1,800.00 3.00 1,800.00 3.00 1,800.00 - - 100.00%
j Waste Coupling and PVC Bottle Trap nos. 1.00 1,500.00 1,500.00 1.00 1,500.00 1.00 1,500.00 - - 100.00%
k 40mm SS Grab Bar-Side nos. 1.00 4,500.00 4,500.00 1.00 4,500.00 1.00 4,500.00 - - 100.00%
l 40mm SS Grab Bar-Rear nos. 1.00 4,500.00 4,500.00 1.00 4,500.00 1.00 4,500.00 - - 100.00%

Prepared by contractor Checked by Consultant, DSC Verified by (Engineer), DLPIU Recommended by DLPIU Chief Checked and forwarded by CLPIU DPD Approved by CLPIU, project Director
Bill of Quantities Up to Date of work till now Previous Bill Currently Accomplished work

Pay
Item Description Unit Quantity As Remarks
No. Rate Amount Quantity Amount Quantity Amount Quantity Amount % completion
per Contract

m CP Foldable Hinge nos. 1.00 5,500.00 5,500.00 1.00 5,500.00 1.00 5,500.00 - - 100.00%
- -
E CIVIL WORKS : SITE DEVELOPMENT - -
1 EARTHWORKS - -
1 SITE CLEARANCE AND MOBILIZATION Sq.m 186.30 100.00 18,630.00 181.61 18,161.12 136.50 13,650.00 45.11 4,511.12 97.48%
2 EARTHWORK IN EXCAVATION Cu.m 151.05 400.00 60,420.00 80.15 32,059.05 26.58 10,631.40 53.57 21,427.65 53.06%
3 EARTHBACK FILLING Cu.m 6.26 300.00 1,878.00 5.09 1,525.73 - 5.09 1,525.73 81.24%
4 BOULDER SOLING Cu.m 19.80 6,000.00 118,800.00 21.18 127,083.75 21.18 127,083.75 - - 106.97%
5 P.C.C (1:3:6) Cu.m 0.54 14,000.00 7,560.00 0.54 7,602.00 0.54 7,602.00 - - 100.56%
6 P.C.C (1:2:4) Cu.m 10.64 16,000.00 170,240.00 10.24 163,800.00 10.24 163,800.00 - - 96.22%
7 P.C.C FOR R.C.C WORK cu.m 0.99 20,000.00 19,800.00 0.99 19,766.20 0.99 19,766.20 - - 99.83%
8 SILICA CEMENT ADMIXTURE Kg 9.90 300.00 2,970.00 9.88 2,964.93 9.88 2,964.93 - - 99.83%
9 STEEL REINFORCEMENT Mt. 0.10 130,000.00 13,000.00 0.10 12,902.51 0.10 12,902.51 - - 99.25%
10 FORM WORKS Sq.m 9.12 800.00 7,296.00 11.33 9,064.00 9.12 7,292.80 2.21 1,771.20 124.23%
13 BRICKS MASONRY WORKS (1:4 c/s) Cu.m 0.22 18,000.00 3,960.00 0.72 13,032.72 0.72 13,032.72 - - 329.11%
14 NEAT CEMENT SKIRTING r.m 4.72 100.00 472.00 4.40 440.00 4.40 440.00 - - 93.22%
15 METAL WORKS FOR FENCE k.g 1477.83 220.00 325,122.60 1,035.50 227,810.00 1,035.50 227,810.00 - - 70.07%
16 METAL WORKS FOR GATE k.g 130.78 600.00 78,468.00 123.31 73,986.00 118.89 71,333.04 4.42 2,652.96 94.29%
17 PLASTER ON OUTER WALL Sq.m 7.92 600.00 4,752.00 7.80 4,679.04 7.80 4,679.04 - - 98.46%
18 EXTERIOR WEATHER COAT PAINT Sq.m 8.87 350.00 3,104.50 8.27 2,895.20 8.27 2,895.20 - - 93.26%
19 CHAIN LINK FENCE Sq.m 150.14 1,000.00 150,140.00 159.60 159,600.00 159.60 159,600.00 - - 106.30%
20 FLAG POLE nos. 2.00 25,000.00 50,000.00 2.00 50,000.00 2.00 50,000.00 - - 100.00%
- - -
CIVIL WORKS-RESERVIOR TANK - - -
1.1 SITE CLEARANCE & MOBILIZATION:
sq.m 22.31 50.00 1,115.50 22.31 1,115.50 22.31 1,115.50 - - 100.00%
1.1 Clearing and grubbing the site for construction by removing
150mm
1.2 thick top soil IN
EARTHWORK including
EXCAVATION bushes, small : trees, leveling of
undulated ground, shortinginand cu.m 24.58 400.00 9,832.00 24.57 9,828.72 24.57 9,828.00 0.00 0.72 99.97%
1.2 Excavation in foundations all stacking/storing
type of soils forselected foundation, top
soil for reuse
trenches, footing, in landscaping works, disposing unsuitable
1.3 EARTH BACKpits etc. to the
FILLING : required depth including
1.3 materials
dewatering from site, etc., all complete as per drawings, cu.m 4.02 300.00 1,206.00 4.01 1,202.85 4.01 1,203.00 (0.00) (0.15) 99.74%
Back fillingbyin manual foundation or mechanical
and sides of means etc. as with
foundation per
specifications
specifications andwith instructions
allfrom of the Engineer.
contractor’s own machinery and
approved
1.4 BOULDER soil obtained
SOLING : the excavation at site and stacked
equipment's,
at site or brought providing crossing
from uncoursed
outside in layer of track, shoring, strutting, cu.m 2.08 6,000.00 12,480.00 2.08 12,462.00 2.08 12,480.00 (0.00) (18.00) 99.86%
1.4 Providing and laying hand not packedexceeding 15 cm
Dry Rubble
timbering
thick (compactedand buttressing
thickness) with appropriate
including materials of andsoil,
all
Stone soling in foundation,
2. CONCRETE WORKSto retain under floortransportation
plinth with out any
such measures
spreading in necessary
required line and inlevel,
position the sides water,
sprinkling of the cu.m 0.78 14,000.00 10,920.00 0.78 10,904.25 0.78 10,920.00 (0.00) (15.75) 99.86%
special
2.1.1 2.1 P.C.C dressing of stone including filling interstices with
foundationcompacting
ramming, pit and including with refilling the
mechanical excavated
rammers, material
testing, etc.,
suitable
2.1.1 quarry
P.C.C waste or
(1:3:6) stone chips or quarry sand, watering,
2.2
all P.C.C.
withcomplete
watering, FOR perR.C.C.
asramming, drawing, WORKS
leveling the: site and
specification and disposing
instructions off the
of
compacting
Providing and using
laying appropriate
machine mechanical
mixed Plain compaction
Cement means
Concrete cu.m 7.42 20,000.00 148,400.00 7.41 148,295.00 7.41 148,200.00 0.00 95.00 99.93%
Providing
surplus/unusable
2.2 with
the Engineer. and layingearth in position
to outside machine
the mixed
construction and machine
premises,
of all contractors
nominal mix 1:3:6 (1materials,
cement 3handling,
:1:1.5:3
sand(1 placing
: 6specifications
coarse etc. all)
aggregate
vibrated
etc. all
2.3 SILICA cement
complete
CEMENTconcrete as of
per mix
ADMIXTURE drawings, cement:1.5 sand:and 3
2.3 complete
for leveling
coarse
as course
aggregate)
instructions
per drawings,
of themixingM20
Engineer.
specifications
in foundations
grade and
forCement
and floor
under
reinforced
instruction
cement
of the
of building,
concrete kg 74.20 300.00 22,260.00 74.15 22,244.25 74.15 22,245.00 (0.00) (0.75) 99.93%
Providing
Engineer. Theand complete itemSilica
including Admixture
all lead &sizelift. notofmore in
etc. in all level
work usingconcrete with
approved broken stone aggregate of
structural
2.4 STEEL REINFORCEMENTat cement
the rate with of 2.50%20 mmbygraded weightmachineof the
than
crushed25 mm stone of approved
aggregatequality including formwork
of approved quality inwherever various Mt. 1.46 130,000.00 189,800.00 1.47 191,574.92 1.58 205,400.00 (0.11) (13,825.08) 100.94%
cement
2.4 Providing for
and promoting
fixing inbatching, workability,
position Fe improving
500 steel reinforcementstrength, of
necessary,and
locations dewatering,
heights including mixing, transporting,
transportation of placing,
concrete to
achievingdiameter
various waterproofing confirming properties,
to all bleeding
relevant prevention,
ISandcode etc.
2.5
site FORM
compacting,
of placing,WORKS
curing,
compaction,including finished tolead
required lift,in
line and
R.C.C.
etc. all
level,
Silica Cement
works including Admixture
straightening, shall cutting,
be the productbending, ofbinding
Silica Japan
with sq.m 54.93 800.00 43,944.00 54.67 43,738.00 56.46 45,168.00 (1.79) (1,430.00) 99.53%
Supplying
complete asand
2.5 or
protection andperlaying
drawings,centering, shuttering
etc.specifications
completeand of various
asasthe pattern
instructions
20 superior
SWG and curing,
annealed shallwiremeet theallrequirements
forthick
tying the proof
reinforcement
per drawings,
mentioned bars in
at
formworks
of the
INTERNAL Engineer.
specifications with 19/12
CEMENT
and themm PLASTER
instructions water (1:4) theplyEngineer,
of WITH wood
PUNNING & steel
specification
each junctions of(binding
materials wire and Workmanship,
shall not be measured Division –but
separately) 4: sq.m 33.66 700.00 23,562.00 33.66 23,565.25 33.65 23,555.00 0.01 10.25 100.01%
adjustable
excludingWorks,
3.1.1 Concrete props for
the costArticle all kinds
of centering, of RCC works for
shuttering, and reinforcement, foundations,
including all waste and beams, 2.4cut pieces,
columns,
all complete shear
as perwalls,
drawings, specifications slab, provision
staircase, forlintel,
and instructions
adequate
sill,
of
4 WATER
numbers PROOF
of spacers, COATING
chairs, propping
providing scaffolding,
and placing staging, cement sq.m 33.66 550.00 18,513.00 33.66 18,515.55 33.65 18,507.50 0.01 8.05 100.01%
pergola,
the Engineer. including nails,
mortar (1:1) cover blocks to keep the
supporting and bracing in proper lines and level, sealing the bars in intended position - - -
F at all levels
Furniture
joints with Works all complete
heavy duty brown as perself drawings,
adhesivespecifications
tape, aligningand to lot 1.00 3,000,000.00 3,000,000.00 1.00 3,000,000.00 1.00 3,000,000.00 - - 100.00%
instructions
line and levels of the including
Engineer. Total (Authorized
Ties, PVClapSpacer, length and for the
Providing 41,958,840.10 42,241,224.74 38,853,405.83 3,387,818.91
bar length cutouts/
openings/ exceeding 10 meter
pockets, in length
applying shall be measured
De-shuttering chemical, for
the payment, except
De-shuttering as approvedto column).by the Engineer etc., complete at all
levels as per drawing, specifications and instructions of the
Engineer.

Prepared by contractor Checked by Consultant, DSC Verified by (Engineer), DLPIU Recommended by DLPIU Chief Checked and forwarded by CLPIU DPD Approved by CLPIU, project Director
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-9C(XS)-B
School Name : Shree Devi Jal Kumari Lower Secondary School
Location : Aaruarbang, Gorkha
Abstract of Cost - Civil Works
Pay Type Design
Quantity in Total
Item Description of Works Unit Rate (NRs.) Amount Remarks
BOQ 3-9C(XS)-B Site Development Water Tank Quantity
No.
GENERAL
1 MOBILIZATION AND DEMOBILIZATION L.S. 1.00 500,000.00 1.00 500,000.00
2 SITE OFFICE ESTABLISHMENT Per Month 14.00 25,000.00 14.00 350,000.00
3 PROJECT INFORMATION BOARD nos. 1.00 10,000.00 1.00 10,000.00
4 SAFETY SIGN BOARD nos. 1.00 10,000.00 1.00 10,000.00
5 BARRICADING WORKS R.m 45.00 2,000.00 45.00 90,000.00
6 SAFETY MATERIALS & SITE SAFETY L.S. 1.00 100,000.00 1.00 100,000.00
7 RELOCATING OF EXISTING TLC sq.m 19.21 3,000.00 18.00 54,000.00
9 TEMPORARY TOILET nos. 2.00 150,000.00 2.00 300,000.00
10 ROAD REPAIR AND MAINTENANCE Km. 56.00 50,000.00 56.00 2,800,000.00

CIVIL WORKS- BUILDING


1.1 SITE CLEARANCE & MOBILIZATION: sq.m 352.54 100.00 343.75 343.75 34,375.00
1.2 EARTHWORK IN EXCAVATION : cu.m 195.91 400.00 188.67 188.67 75,467.12
1.3 EARTH BACK FILLING : cu.m 130.90 300.00 102.97 102.97 30,890.66
1.4 BOULDER SOLING : cu.m 58.53 6,000.00 60.80 60.80 364,813.07
2. CONCRETE WORKS
2.1.1 2.1 P.C.C cu.m 10.47 14,000.00 10.70 10.70 149,771.56
2.1.1 P.C.C (1:3:6)
2.1.2 2.1.2 P.C.C (1:2:4) WORKS cu.m 14.98 16,000.00 13.47 13.47 215,537.62
2.2 P.C.C. FOR R.C.C. WORKS : cu.m 269.45 20,000.00 276.07 276.07 5,521,331.95
2.3 SILICA CEMENT ADMIXTURE kg 2,694.50 300.00 2,760.67 2,760.67 828,201.00
2.4 STEEL REINFORCEMENT Mt. 43.12 130,000.00 41.91 41.91 5,448,565.05
2.5 FORM WORKS sq.m 1,634.16 800.00 1,625.25 1,625.25 1,300,200.53
3. BRICK MASONRY WORKS
3.1 3.1 BRICK MASONRY WORKS ( 1 : 4 c/s ) ONE SIDE cu.m 81.73 20,000.00 - -

7.2.3 CLEAR SILICON WATER-REPELLANT COATNG Providing and sq.m 326.92 550.00 - -
8.1.1 POINTING WORK IN BRICK MASONRY sq.m 287.39 400.00 - -
BOQ Total of items 3.1., 7.2.3 & 8.1.1:
Replaced items 3.1, 7.2.3 and 8.1.1 with following items for 3-
9C(XS)-B
Brick Masonry Works (1:4 c/s) cu.m 18,000.00 - -
Cement Plaster Works on Outer Wall (1:6) sq.m 600.00 - -
Exterior Weather Coat Paint sq.m 350.00 - -
3.2 BRICK MASONRY WORKS ( 1 : 4 c/s ) cu.m 42.44 18,000.00 114.98 114.98 2,069,586.63

Prepared By: Checked By: Verified By:


Sharma AM JV Consultant Engineer DLPIU
Pay Type Design
Quantity in Total
Item Description of Works Unit Rate (NRs.) Amount Remarks
BOQ 3-9C(XS)-B Site Development Water Tank Quantity
No.
3.3 HALF BRICK WORKS ( 1 : 4 c/s ) sq.m 35.92 1,500.00 35.67 35.67 53,497.88
4.1 4. DOORS & WINDOWS WORK
4.1.1 Door Frame rm. 134.30 1,100.00 134.30 134.30 147,730.00
4.1.2 Window Frame rm. 263.45 1,100.00 263.45 263.45 289,795.00
4.2 METAL SHUTTER
4.2.1 WINDOW SHUTTER sq.m 63.80 7,500.00 50.86 50.86 381,461.81
4.3 WOODEN SHUTTER
4.3.1 FLUSH DOOR SHUTTER (32MM) sq.m 51.83 8,000.00 46.66 46.66 373,276.00
4.4.1 UPVC DOOR sq.m 13.30 9,000.00 12.90 12.90 116,122.50
4.5 SHUTTER/FRAME
WINDOW GRILL sq.m 34.05 2,500.00 54.28 54.28 135,694.56
4.6 COLLAPSIBLE GATE sq.m 10.03 10,000.00 10.03 10.03 100,300.00
5.1 5. FLOORING WORKS
5.1 HARDENED CEMENT CONCETE FLOOR sq.m 817.86 900.00 780.27 780.27 702,243.00

5.2 NEAT CEMENT SKIRTING r.m 284.29 100.00 344.62 344.62 34,462.10
5.3 TERRAZZO CAST-IN SITU DADO sq.m 56.78 1,500.00 56.36 56.36 84,535.20
7.1.1 7. PLASTERING/ WALL FINISHING WORKS
7.1 CEMENT PLASTER WORKS sq.m 859.19 600.00 750.32 750.32 450,189.53

7.1.2 7.1.1
7.1.2 ON
ON INNER WALL
CEILING (1:4) (1:6) sq.m 540.15 500.00 569.32 569.32 284,660.98
7.1.3.1 7.1.3 ON OUTER WALL (1:6):
7.1.3.1 EXTERNAL PLASTER sq.m 604.57 600.00 1,059.72 1,059.72 635,832.32

7.1.3.2 7.1.3.2 do as above for Band Plaster rm. 273.41 100.00


7.2.1 7.2 PAINTING WORKS
DISTEMPER PAINT sq.m 1399.34 200.00 1,319.64 1,319.64 263,927.57

7.2..2 EXTERIOR WEATHER COAT PAINT sq.m 617.15 350.00 1,059.73 1,059.73 370,905.50
7.2.4 ENAMEL PAINT sq.m 287.39 400.00 365.69 365.69 146,276.00
8 MISCELLANEOUS - -
8.3 RAILING kg 1,610.53 6,500.00 1,738.63 1,738.63 11,301,106.08
8.4 PUMP SHED nos. 1.00 80,000.00 1.00 1.00 80,000.00
8.5 SEWER, RAIN AND WASTE WATER INSTALLATION R.m 44.26 1,500.00 39.10 39.10 58,650.00

C ELECTRICAL WORKS
A. Common Installation
1.1 Stand Alone 40 A DP MCB with Enclosure nos. 1.00 12,000.00 1.00 1.00 12,000.00
2 CABLES & WIRES
2.1 2 Nos 10 Sq.mm + 1 No 6 Sq.mm mutistranded copper conductor r.m 60.00 800.00 56.00 56.00 44,800.00
B wires
School Blocks - -
1 DISTRIBUTION BOARDS - -
1.1 Ground Floor DB (DB-1) nos. 1.00 32,000.00 1.00 1.00 32,000.00
1.2 First Floor DB (DB-2) nos. 1.00 32,000.00 1.00 1.00 32,000.00
1.3 Second Floor DB (DB-3) nos. 1.00 32,000.00 1.00 1.00 32,000.00

Prepared By: Checked By: Verified By:


Sharma AM JV Consultant Engineer DLPIU
Pay Type Design
Quantity in Total
Item Description of Works Unit Rate (NRs.) Amount Remarks
BOQ 3-9C(XS)-B Site Development Water Tank Quantity
No.
2 CABLES & WIRES
2.1 2 Nos 6 Sq mm Multistranded Cu Wire + 1 No 4 Sq mm Multistranded r.m 10.00 600.00 9.00 9.00 5,400.00
2.2 2CuNos
wire
4 Sq mm Multistranded Cu Wire + 1 No 2.5 Sq mm r.m 15.00 500.00 13.00 13.00 6,500.00
2.3 2Multistranded Cu Multistranded
Nos 2.5 Sq mm wire Cu Wire + 1 No 1.5 Sq mm r.m 30.00 250.00 31.00 31.00 7,750.00
3 Multistranded Cu wire
General Service Light Point Wiring
3.1 One Way Light Point pts. 59.00 700.00 59.00 59.00 41,300.00
3.2 Two Way Light Point pts. 2.00 900.00 2.00 2.00 1,800.00
3.4 Exhaust Fan point pts. 4.00 900.00 4.00 4.00 3,600.00
4 6A Universal Pin Light Power Socket Wiring pts. 42.00 700.00 42.00 42.00 29,400.00
5 Switch Socket Outlets
5.1 6A Universal Power Switch Socket nos. 42.00 900.00 42.00 42.00 37,800.00
6 Sweep Ceiling/ Exhaust Fan/Wall Fan
6.1 225mm dia M/D exhaust Fan nos. 4.00 6,000.00 4.00 4.00 24,000.00
7 Light Fixtures/Luminaires & Accessories
7.1 24 W LED Recessed Mounted Square type nos. 4.00 4,500.00 4.00 4.00 18,000.00
7.2 18 W LED Surface Mounted Square type nos. 28.00 2,700.00 28.00 28.00 75,600.00
7.3 12 W LED Surface Mounted Cylindrical type nos. 20.00 2,400.00 20.00 20.00 48,000.00
7.4 6 W LED Circular Surface type nos. 5.00 1,800.00 5.00 5.00 9,000.00
7.5 LED Wall Light nos. 1.00 1,800.00 1.00 1.00 1,800.00
8 Pull Box
Junction Box At External Post Top Light no. 3.00 700.00 3.00 3.00 2,100.00
11 Earthing & Lighting Protection
11.1 Chemical Earthing no. 3.00 45,000.00 3.00 3.00 135,000.00
11.2 Earthing Bar no. 3.00 22,000.00 3.00 3.00 66,000.00
12 Earthing Strip/Wires
12.3.1 25 x 3 mm GI strip r.m 65.00 300.00 67.00 67.00 20,100.00
12.3.2 12 SWG Cu wire r.m 15.00 200.00 14.00 14.00 2,800.00
13 Earth Test link nos. 1.00 1,500.00 1.00 1.00 1,500.00
14 Lightning Arrester nos. 1.00 7,500.00 1.00 1.00 7,500.00
C Solar PV System
1 Solar PV Panel nos. 8.00 26,000.00 8.00 8.00 208,000.00
2 Tubular Deep Cycle Battery nos. 4.00 30,000.00 4.00 4.00 120,000.00
3 Hybrid Inverter no. 1.00 100,000.00 1.00 1.00 100,000.00
D Fire Extinguisher
a ABC Stored Pressure 5.0kg size nos. 4.00 8,000.00 4.00 4.00 32,000.00

D Sanitary Works
1 WATER SUPPLY INSTALLATION
a CPVC pipes SDR-11
40 mm r.m 92.00 1,600.00 88.00 88.00 140,800.00
25mm r.m 6.00 1,000.00 6.00 6.00 6,000.00

Prepared By: Checked By: Verified By:


Sharma AM JV Consultant Engineer DLPIU
Pay Type Design
Quantity in Total
Item Description of Works Unit Rate (NRs.) Amount Remarks
BOQ 3-9C(XS)-B Site Development Water Tank Quantity
No.
c CPVC Ball Valve
40 mm nos. 3.00 2,000.00 3.00 3.00 6,000.00
25 mm nos. 2.00 900.00 2.00 2.00 1,800.00
d Electrical Centrifugal Water Pump nos. 1.00 12,500.00 1.00 1.00 12,500.00
e 2000 litres Capacity Water Storage Tank nos. 1.00 34,000.00 1.00 1.00 34,000.00
2 Sewer, Rain and Waste Water Installation
110 mm r.m 23.00 1,400.00 22.00 22.00 30,800.00
75mm r.m 20.00 1,200.00 19.00 19.00 22,800.00
50mm r.m 6.00 350.00 5.00 5.00 1,750.00
B School Blocks
1 Sanitary Installation
a Water Closet Set set 1.00 30,000.00 1.00 1.00 30,000.00
b Orissa Pan set 4.00 3,100.00 4.00 4.00 12,400.00
c Hand Wash Basin set 5.00 8,000.00 5.00 5.00 40,000.00
d Ladies Urinal set 2.00 11,000.00 2.00 2.00 22,000.00
e Self Closing Bib Cock nos. 4.00 4,000.00 4.00 4.00 16,000.00
f CP Spreader in Urinal set 4.00 2,500.00 4.00 4.00 10,000.00
g Toilet Paper Holder nos. 1.00 2,600.00 1.00 1.00 2,600.00
h Commode Spray nos. 1.00 2,000.00 1.00 1.00 2,000.00
i PVC Multi Floor Trap nos. 3.00 600.00 3.00 3.00 1,800.00
j Waste Coupling and PVC Bottle Trap nos. 1.00 1,500.00 1.00 1.00 1,500.00
k 40mm SS Grab Bar-Side nos. 1.00 4,500.00 1.00 1.00 4,500.00
l 40mm SS Grab Bar-Rear nos. 1.00 4,500.00 1.00 1.00 4,500.00
m CP Foldable Hinge nos. 1.00 5,500.00 1.00 1.00 5,500.00

E CIVIL WORKS : SITE DEVELOPMENT


1 EARTHWORKS
1 SITE CLEARANCE AND MOBILIZATION Sq.m 186.30 100.00 181.61 181.61 18,161.12
2 EARTHWORK IN EXCAVATION Cu.m 151.05 400.00 80.15 80.15 32,059.05
3 EARTHBACK FILLING Cu.m 6.26 300.00 5.09 5.09 1,525.73
4 BOULDER SOLING Cu.m 19.80 6,000.00 21.18 21.18 127,083.75
5 P.C.C (1:3:6) Cu.m 0.54 14,000.00 0.54 0.54 7,602.00
6 P.C.C (1:2:4) Cu.m 10.64 16,000.00 10.24 10.24 163,800.00
7 P.C.C FOR R.C.C WORK cu.m 0.99 20,000.00 0.99 0.99 19,766.20
8 SILICA CEMENT ADMIXTURE Kg 9.90 300.00 9.88 9.88 2,964.93
9 STEEL REINFORCEMENT Mt. 0.10 130,000.00 0.10 0.10 12,902.51
10 FORM WORKS Sq.m 9.12 800.00 11.33 11.33 9,064.00
12 BRICKS MASONRY WORKS (1:4 c/s) Cu.m 0.22 18,000.00 0.72 0.72 13,032.72
13 NEAT CEMENT SKIRTING r.m 4.72 100.00 4.40 4.40 440.00
14 METAL WORKS FOR FENCE k.g 1477.83 220.00 1,035.50 1,035.50 227,810.00
15 METAL WORKS FOR GATE k.g 130.78 600.00 123.31 123.31 73,986.00

Prepared By: Checked By: Verified By:


Sharma AM JV Consultant Engineer DLPIU
Pay Type Design
Quantity in Total
Item Description of Works Unit Rate (NRs.) Amount Remarks
BOQ 3-9C(XS)-B Site Development Water Tank Quantity
No.
16 PLASTER ON OUTER WALL Sq.m 7.92 600.00 7.80 7.80 4,679.04
17 EXTERIOR WEATHER COAT PAINT Sq.m 8.87 350.00 8.27 8.27 2,895.20
18 CHAIN LINK FENCE Sq.m 150.14 1,000.00 159.60 159.60 159,600.00
19 FLAG POLE nos. 2.00 25,000.00 2.00 2.00 50,000.00

CIVIL WORKS-RESERVIOR TANK


1.1 SITE CLEARANCE & MOBILIZATION: sq.m 22.31 50.00 22.31 22.31 1,115.50
1.2 EARTHWORK IN EXCAVATION : cu.m 24.58 400.00 24.57 24.57 9,828.72
1.3 EARTH BACK FILLING : cu.m 4.02 300.00 4.01 4.01 1,202.85
1.4 BOULDER SOLING : cu.m 2.08 6,000.00 2.08 2.08 12,462.00
CONCRETE WORKS
2.1.1 2.1 P.C.C cu.m 0.78 14,000.00 0.78 0.78 10,904.25
2.1.1 P.C.C (1:3:6)
2.2 P.C.C. FOR R.C.C. WORKS : cu.m 7.42 20,000.00 7.41 7.41 148,295.00
2.3 SILICA CEMENT ADMIXTURE kg 74.20 300.00 74.15 74.15 22,244.25
2.4 STEEL REINFORCEMENT Mt. 1.46 130,000.00 1.47 1.47 191,574.92
2.5 FORM WORKS sq.m 54.93 800.00 54.67 54.67 43,738.00
3.1.1 INTERNAL CEMENT PLASTER (1:4) WITH PUNNING sq.m 33.66 700.00 33.66 33.66 23,565.25
4 WATER PROOF COATING sq.m 33.66 550.00 33.66 33.66 18,515.55

F Furniture Works lot 1.00 3,000,000.00 1.00 1.00 3,000,000.00


Total 42,241,224.74

Prepared By: Checked By: Verified By:


Sharma AM JV Consultant Engineer DLPIU
Project Name : Emergency School Reconstruction Project (ESRP)
School Name : Shree Basuki Lower Secondary School
Location : Aaruarbang, Gorkha
S. No. Description No. Length Breadth Height Qty. Unit
1 Mobilization and Demobilization 1 1 L.S

2 Site Office Establishment 1 14 Per month

3 Project Information Board 1 1 No.

4 Safety Sign Board 1 1 No.

5 Barricading Works 1 45 45 Rm

6 Safety materials and site safety 1 1 L.S

7 Relocating of existing TLC 1 3.7 3.5 12.95 sq.m

9 Construction of Temporary Toilet 2 2 Nos.

10 Road Repair and maintenance 56 km


Remarks
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-9C(XS)-B
School Name : Shree Devi Jal Kumari Lower Secondary School
Location : Aaruarbang, Gorkha
Breadth Height
S.N Description No. Length (m) Qty. Unit Remarks
(m) (m)
1 Earthworks
1.1 Site Clearance
3-9C(XS)-B 1 27.50 12.50 343.75
Total 343.75 Sq.m

1.2 Earthwork in excavation


For Footing
Footing (F1) 3 2.10 2.10 1.50 19.85
Combine Footing (CF1) 3 7.50 2.50 1.50 84.38
Combine Footing (CF2) 2 7.50 2.10 1.50 47.25
Combine Footing (CF3) 1 6.80 2.10 1.50 21.42

Excavation for lower tie beam


Grid 1 1 12.90 0.55 0.55 3.90
Grid 2 1 12.90 0.55 0.55 3.90
Grid 3 1 11.50 0.55 0.55 3.48
Grid A 1 0.20 0.55 0.55 0.06
Grid B 1 0.20 0.55 0.55 0.06
Grid C 1 0.20 0.55 0.55 0.06
Grid D 1 0.20 0.55 0.55 0.06
Grid E 1 0.20 0.55 0.55 0.06

Ramp
For Slope 1 1.30 0.52 Area 0.67
Wall Along Grid B 1 0.50 0.45 0.45 0.10
Wall Parallel to Ramp 1 6.80 0.45 0.41 1.25
Outside Steps 1 18.93 0.68 0.15 1.92
1 2.50 0.68 0.15 0.25
Total 188.67 Cu.m

1.3 Earth Back filling


Earthwork 188.67
Boulder Soling -20.49
PCC -10.24
RCC -71.85
Brick masonry -8.71
Class room 3 5.70 4.70 0.18 14.06
Stair case 1 4.70 4.20 0.18 3.45
Corridoor 1 21.30 2.20 0.18 8.20
Ramp
For Slope 1 1.30 0.52 Area -0.67
1 1.30 0.42 Area 0.54
Total 102.97 Cu.m

1.4 Boulder Soling


For Footing
Footing (F1) 3 1.80 1.80 0.20 1.94
Combine Footing (CF1) 3 7.20 2.20 0.20 9.50
Combine Footing (CF2) 2 7.20 1.80 0.20 5.18
Combine Footing (CF3) 1 6.50 1.80 0.20 2.34

Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant SE DLPIU Engineer
For Lower Tie Beam
Grid 1&2 2 12.90 0.40 0.10 1.03
Grid 3 1 11.50 0.40 0.10 0.46
Grid A,B,C,D&E 3 0.20 0.40 0.10 0.02

Building Floors
Classroom 3 5.70 4.70 0.20 16.07
Corridor 1 21.30 2.20 0.20 9.37
Staircase 1 4.70 4.20 0.20 3.95

Ramp
Slopped Portion 1 1.30 1.36 Area 1.77
Wall Along Grid B 1 0.50 0.45 0.10 0.02
Wall Parallel to Ramp 1 6.80 0.45 0.10 0.31
At Slope 1 22.93 0.99 0.10 2.26
Pebbles Compacted Earth 1 22.93 0.63 0.10 1.43
Outside Steps 1 18.93 0.68 0.10 1.28
1 2.50 0.68 0.10 0.17

Septic Tank 1 5.30 3.85 0.06 1.28


2 1.40 0.83 0.06 0.14
Inside of soak Pit 1 1.13 Area 2.00 2.26
Total 60.80 Cu.m
Sand Filling
Periphery ot Soak pit 1 1.88 Area 1.32 2.49
Total 2.49 cu.m

2 CONCRETE WORKS
2.1 P.C.C. Works
2.1.1 P.C.C.(1:3:6) Works
For Footing
Footing (F1) 3 1.80 1.80 0.10 0.97
Combine Footing (CF1) 3 7.20 2.20 0.10 4.75
Combine Footing (CF2) 2 7.20 1.80 0.10 2.59
Combine Footing (CF3) 1 6.50 1.80 0.10 1.17

For Lower Tie Beam


Grid 1&2 2 12.90 0.40 0.05 0.52
Grid 3 1 11.50 0.40 0.05 0.23
Grid A,B,C,D&E 3 0.20 0.40 0.05 0.01

Ramp
Wall Along Grid B 1 0.50 0.45 0.05 0.01
Wall Parallel to Ramp 1 6.80 0.45 0.05 0.15

Septic Tank
1 0.83 1.45 0.08 0.09
Sewer Manhole (Rectangular)
Bottom 2 1.00 1.00 0.10 0.20
Total 10.70 Cu.m

2.1.2 P.C.C.(1:2:4) Works


Classrooms 3 5.70 4.70 0.08 6.03
Staircase 1 4.70 4.20 0.08 1.48
Corridor 1 21.30 2.20 0.08 3.51

Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant SE DLPIU Engineer
Outside Steps 1 18.93 0.68 0.05 0.64
2 2.50 0.68 0.05 0.17
Ramp
Sloped 1 1.30 0.51 Area 0.66
Wall Top 1 1.33 0.25 0.05 0.02
1 6.80 0.13 0.05 0.04
Slope Behind Block 1 22.93 0.80 0.05 0.92
Total 13.47 Cu.m

2.2 P.C.C For R.C.C. Works


R.C.C Works M20
Foundation
Rectangular part
F1 3 1.80 1.80 0.20 1.94
Trapezoidal part
F1 3 1.31 1.13 0.45 1.99
CF1 3 7.50 2.20 0.65 32.18
CF2 2 7.50 1.80 0.65 17.55
CF3 1 6.80 1.80 0.65 7.96

Beam
Foundation Tie Beam(250x300)
Along grid 1,2,3 3 20.80 0.30 0.30 5.62
Along grid A,B,C,D,E 5 6.45 0.30 0.30 2.90

Plinth Beam(300x300)
Along grid 1,2,3 3 20.80 0.30 0.30 5.62
Along grid A,B,C,D,E 5 6.45 0.30 0.53 5.08

Beam at first,second and Third floor level


Main Beam(300x500)
Along grid 1,2,3 9 20.80 0.30 0.50 28.08
Along grid A,B,C,D,E 15 6.45 0.30 0.50 14.51

Secondary beam(250x425)
Along A1,B1,D1 9 6.90 0.25 0.43 6.60

Top Floor Level


Along Grid 1,2,3 3 4.08 0.30 0.50 1.83
Along Grid C,D 2 6.45 0.30 0.50 1.94

Edges Beam 1 12.13 0.37 0.13 0.58

Slab deduction
Beam at first,second and Third floor level
Main Beam(300x500)
Along grid 1,2,3 -9 20.80 0.30 0.13 -7.30
Along grid A,B,C,D,E -15 6.45 0.30 0.13 -3.77

Secondary beam(250x425)
Along A1,B1,D1 -9 6.90 0.25 0.13 -2.02

Top Floor Level


Along Grid 1,2,3 -3 4.08 0.30 0.13 -0.48
Along Grid C,D -2 6.45 0.30 0.13 -0.50

Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant SE DLPIU Engineer
Column
Foundation to Plinth 15 0.45 0.45 1.00 3.04
Ground Floor 15 0.53 0.43 3.00 10.04
First Floor 15 0.53 0.43 3.00 10.04
Second Floor 15 0.53 0.43 3.00 10.04
Top Floor(Staircase Cover) 6 0.53 0.43 2.60 3.48

Slab
First Floor Level Slab 1 22.80 7.80 0.13 23.12
Projection at Grid 1 1 11.58 0.58 0.13 0.87
1 5.58 0.58 0.13 0.42
Projection at Grid 3 12.13 1.01 0.13 1.60
Projection on staircase Landing on 1st Floor 1 4.08 0.60 0.13 0.32
Deduction
Staircase Void -1 4.70 4.20 0.13 -2.57

Second floor level slab 1 22.80 7.80 0.13 22.23


Projection at Grid 1 1 11.58 0.58 0.13 0.87
1 5.58 0.58 0.13 0.42
Projection on staircase Landing on 2nd Floor 1 4.08 0.60 0.13 0.32
Deduction
Staircase Void -1 4.70 4.20 0.13 -2.57

Third floor level slab 1 22.80 7.80 0.13 22.23


Projection at Grid 1 1 7.30 1.00 0.13 0.91
1 13.30 1.00 0.13 1.66
Projection at Grid 3 2 5.94 1.00 0.13 1.48
1 12.93 1.50 0.13 2.42
Projection at Grid A and E 2 7.80 1.00 0.13 1.95
Deduction
Staircase Void -1 4.70 4.20 0.13 -2.57

Top Floor Slab(Staircase Cover) 1 9.30 6.30 0.15 8.79

Bench slab 2 2.40 0.50 0.08 0.18

Staircase
Ground Floor to First Floor
Steps 19 0.023 Area 2.00 0.86
Waist Slab 1 3.38 2.00 0.20 1.35
1 3.35 2.00 0.20 1.34
Landing 1 4.17 1.65 0.21 1.41
1 4.05 0.90 0.30 1.09
Landing Beam 1 4.08 0.25 0.43 0.43

First Floor Level to Second floor


Steps 19 0.023 Area 2.00 0.86
Waist Slab 1 3.38 2.00 0.15 1.01
1 3.35 2.00 0.15 1.01
Landing 1 4.17 1.65 0.21 1.41
Landing Beam 1 4.08 0.25 0.43 0.43

Second Floor Level to Third floor


Steps 19 0.023 Area 2.00 0.86
Waist Slab 1 3.38 2.00 0.15 1.01

Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant SE DLPIU Engineer
1 3.35 2.00 0.15 1.01
Landing 1 4.17 1.65 0.21 1.41
Landing Beam 1 4.08 0.25 0.43 0.43

Lintel Band
Ground Floor
Along grid 1 1 6.03 0.23 0.08 0.10
Along grid 2 1 6.83 0.23 0.08 0.12
Along grid A,B,C,D,E 5 4.48 0.23 0.08 0.39
Wall Partition Between Male and Female Toilet 1 2.73 0.23 0.08 0.05
1 3.75 0.23 0.08 0.06
Partition Wall at Toilet
Boys Toilet 1 2.28 0.13 0.08 0.02
1 1.18 0.13 0.08 0.01
Girls Toilet 1 2.28 0.13 0.08 0.02
1 1.18 0.13 0.08 0.01
Disabled Toilet 1 1.82 0.13 1.08 0.24
1 2.35 0.13 2.08 0.61

First Floor
Along grid 1 1 6.03 0.23 0.08 0.10
Along grid 2 1 6.83 0.23 0.08 0.12
Along grid A,B,C,D,E 5 4.48 0.23 0.08 0.39

Second Floor
Along grid 1 1 6.03 0.23 0.08 0.10
Along grid 2 1 6.83 0.23 0.08 0.12
Along grid A,B,C,D,E 5 4.48 0.23 0.08 0.39

Sill band
Ground Floor
Along grid 1 1 20.80 0.23 0.08 0.36
Along grid 2 1 16.73 0.23 0.08 0.29
Along grid A,B,C,D,E 5 4.48 0.23 0.08 0.39
At store Below Landing 1 1.92 0.23 0.08 0.03
Wall Partition Between Male and Female Toilet 1 2.73 0.23 0.08 0.05
1 3.75 0.23 0.08 0.06
Partition Wall at Toilet
Boys Toilet 1 2.28 0.13 0.08 0.02
1 1.18 0.13 0.08 0.01
Girls Toilet 1 2.28 0.13 0.08 0.02
1 1.18 0.13 0.08 0.01
Disabled Toilet 1 1.82 0.13 1.08 0.24
1 2.35 0.13 2.08 0.61
First Floor
Along grid 1 1 16.73 0.23 0.08 0.29
Along grid 2 1 16.73 0.23 0.08 0.29
Along grid A,B,C,D,E 5 4.48 0.23 0.08 0.39

Second Floor
Along grid 1 1 16.73 0.23 0.08 0.29
Along grid 2 1 16.73 0.23 0.08 0.29
Along grid A,B,C,D,E 5 4.48 0.23 0.08 0.39

Top Floor (Staircase Cover)


Along grid 1 1 4.08 0.23 0.08 0.94

Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant SE DLPIU Engineer
Along grid 3 1 4.08 0.23 0.08 0.94
Along grid C,D 2 4.48 0.23 0.08 2.06
Deduction
D1 -16 1.10 0.23 0.08 -0.30
D2 -1 1.00 0.23 0.08 -0.02
D3 -2 1.10 0.23 0.08 -0.04
D4 -1 1.00 0.23 0.08 -0.02
D5 -1 0.90 0.23 0.08 -0.02
D6 -4 0.75 0.13 0.08 -0.03
D7 -1 1.00 0.13 0.08 -0.01
Opening -1 1.16 0.23 0.08 -0.02

Band at Parapet
Band at Top Floor Wall (Below door) 2 6.45 0.23 0.20 0.59
Third Floor Level 1 65.78 0.35 0.10 2.30
Vertical Band 44 0.80 0.23 0.23 1.86
Roof Top 1 29.20 0.35 0.10 1.02
Vertical Band 19 0.90 0.23 0.23 0.93

Pedestal
Base Block 11 0.50 0.25 0.25 0.34

Septic Tank
At Bottom 1 4.33 2.15 0.12 1.13
1 1.98 2.15 0.15 0.64
Band 1 1.40 0.23 0.15 0.05
2 1.13 0.23 0.12 0.06
1 0.95 0.23 0.12 0.03
1 0.95 0.13 0.12 0.01
1 4.78 2.15 0.12 1.23
Deduction of cover -1 0.60 0.60 0.12 -0.04

1 0.98 0.85 0.12 0.10


Deduction of Manhole -1 0.60 0.60 0.12 -0.04
1 1.10 0.85 0.12 0.11
Deduction of Manhole -1 0.60 0.60 0.12 -0.04

Concealed Beam 1 0.34 Area 0.15 0.05

Soak Pit
RCC slab 1 2.27 Area 0.13 0.28

Manhole/Waste Chamber
Sewer Manhole (Rectangular)
Top Cover 2 1.00 1.00 0.10 0.20
Deduction Cap -2 0.28 Area 0.10 -0.06
Total 276.07 cu.m

2.3 Silica Cement Admixture


10 Kg per cu.m. of R.C.C. M20 10 276.07 2,760.67
Total 2,760.67 Kg

2.5 Formworks
Foundation
F1 3 7.20 0.20 4.32
CF1 3 18.80 0.65 36.66

Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant SE DLPIU Engineer
CF2 2 18.00 0.65 23.40
CF3 1 16.60 0.65 10.79

Beam
Foundation Tie Beam(250x300)
Along grid 1,2 2 20.80 0.60 24.95
Along grid 3 1 20.00 0.60 12.00
Along grid A,B,C,D,E 5 6.45 0.60 19.35

Plinth Beam(300x300)
Along grid 1,2 2 20.80 0.60 24.96
Along grid 3 1 20.00 0.60 12.00
Along grid A,B,C,D,E 5 6.45 0.60 19.35

Beam at First,Second and Third floor level


Main beam(300x500)
Along grid 1,2,3 9 20.80 1.30 243.36
Along grid A,B,C,D,E 15 6.45 1.30 125.78

Secondary Beam(250x425)
Along A1,B1,D1 9 6.90 1.10 68.31

Top Floor Level


Along grid 1,2,3 3 4.08 1.30 15.90
Along grid C and D 5 6.45 1.30 41.93

Edges Beam 1 14.15 1.01 14.32


Slab deduction
Beam at First,Second and Third floor level
Main beam(300x500)
Along grid 1,2,3 -9 20.80 0.26 -48.67
Along grid A,B,C,D,E -15 6.45 0.26 -25.16

Secondary Beam(250x425)
Along A1,B1,D1 -9 6.90 0.26 -16.15

Top Floor Level


Along grid 1,2,3 -3 4.08 0.26 -3.18
Along grid C and D -5 6.45 0.26 -8.39

Column
Foundation to Plinth 15 1.90 1.00 28.50
Ground Floor 15 1.90 3.00 85.50
First Floor 15 1.90 3.00 85.50
Second Floor 15 1.90 3.00 85.50

Slab
First Floor Level Slab 1 23.06 8.06 185.86
Projection at Grid 1 1 11.58 0.58 6.66
1 5.58 0.58 3.21
Projection at Grid 3 12.13 1.01 12.28
Projection on staircase Landing on 1st Floor 1 4.21 0.86 3.62
Deduction
Staircase Void -1 4.70 4.20 -19.74

Second floor level slab 1 23.06 8.06 185.86

Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant SE DLPIU Engineer
Projection at Grid 1 1 11.58 0.58 6.66
1 5.58 0.58 3.21
Projection on staircase Landing on 2nd Floor 1 4.21 0.86 3.62
Deduction
Staircase Void -1 4.70 4.20 -19.74

Third floor level slab 1 23.06 8.06 185.86


Projection at Grid 1 1 7.30 1.00 7.30
1 13.30 1.00 13.30
Projection at Grid 3 2 5.94 1.00 11.87
1 12.93 1.50 19.39
Projection at Grid A and E 2 7.80 1.00 15.60
Deduction
Staircase Void -1 4.70 4.20 -19.74

Top Floor Slab(Staircase Cover) 1 9.60 6.60 63.36

For Beam at First,Second and Third floor level


Main Beam(300x500)
Along grid 1,2,3 -9 20.80 0.30 -56.16
Along grid A,B,C,D,E -15 6.45 0.30 -29.03

Secondary Beam(250x425)
Along A1,B1,D1 -9 6.90 0.25 -15.53

Top Floor Level


Along Grid 1,2,3 -3 4.08 0.30 -3.67
Along Grid C,D -2 6.45 0.30 -3.87

Staircase
Upto first floor level
Steps 38 0.021 Area 0.80
Waist slab 1 3.38 2 6.75
1 3.38 2 6.75
Side formwork for waist slab 2 3.38 0.2 1.35
2 3.38 0.2 1.35
Landing 1 4.20 1.67 7.01
Side formwork for landing 1 3.34 0.21 0.68
Tread 19 2.00 0.15 5.70
Landing Beam 1 4.08 1.07 4.34

First to second floor


Steps 38 0.021 Area 0.80
Waist slab 1 3.38 2 6.75
1 3.38 2 6.75
Side formwork for waist slab 2 3.38 0.2 1.35
2 3.38 0.2 1.35
Landing 1 4.20 1.67 7.01
Side formwork for landing 1 3.34 0.21 0.68
Tread 19 2.00 0.15 5.70
Landing Beam 1 4.08 0.77 3.12
Projection on Landing Slab 1 4.08 0.6 2.45

Second to Third Floor


Steps 38 0.021 Area 0.80

Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant SE DLPIU Engineer
Waist slab 1 3.38 2 6.75
1 3.38 2 6.75
Side formwork for waist slab 2 3.38 0.2 1.35
2 3.38 0.2 1.35
Landing 1 4.20 1.67 7.01
Side formwork for landing 1 3.34 0.21 0.68
Tread 19 2.00 0.15 5.70
Landing Beam 1 4.08 0.77 3.12
Projection on Landing Slab 1 4.08 0.6 2.45

Lintel Band
Ground Floor
Along grid 1 1 6.03 0.15 0.90
Along grid 2 1 6.83 0.15 1.02
Along grid A,B,C,D,E 5 4.48 0.15 3.36
Wall Partition Between Male and Female Toilet 1 2.73 0.15 0.41
1 3.75 0.15 0.56
Partition Wall at Toilet
Boys Toilet 1 2.28 0.15 0.34
1 1.18 0.15 0.18
Girls Toilet 1 2.28 0.15 0.34
1 1.18 0.15 0.18
Disabled Toilet 1 1.82 0.15 0.27
1 2.35 0.15 0.35

First Floor 0.15


Along grid 1 1 6.03 0.15 0.90
Along grid 2 1 6.83 0.15 1.02
Along grid A,B,C,D,E 5 4.48 0.15 3.36

Second Floor
Along grid 1 1 6.03 0.15 0.90
Along grid 2 1 6.83 0.15 1.02
Along grid A,B,C,D,E 5 4.48 0.15 3.36

Sill band
Ground Floor
Along grid 1 1 20.80 0.15 3.12
Along grid 2 1 16.73 0.15 2.51
Along grid A,B,C,D,E 5 4.48 0.15 3.36
At store Below Landing 1 1.92 0.15 0.29
Wall Partition Between Male and Female Toilet 1 2.73 0.15 0.41
1 3.75 0.15 0.56
Partition Wall at Toilet
Boys Toilet 1 2.28 0.15 0.34
1 1.18 0.15 0.18
Girls Toilet 1 2.28 0.15 0.34
1 1.18 0.15 0.18
Disabled Toilet 1 1.82 0.15 0.27
1 2.35 0.15 0.35

First Floor
Along grid 1 1 16.73 0.15 2.51
Along grid 2 1 16.73 0.15 2.51
Along grid A,B,C,D,E 5 4.48 0.15 3.36

Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant SE DLPIU Engineer
Second Floor
Along grid 1 1 16.73 0.15 2.51
Along grid 2 1 16.73 0.15 2.51
Along grid A,B,C,D,E 5 4.48 0.15 3.36

Top Floor (Staircase Cover)


Along grid 1 1 4.08 0.15 0.61
Along grid 3 1 4.08 0.15 0.61
Along grid C,D 2 4.48 0.15 1.34
Deduction
D1 -16 1.10 0.15 -2.64
D2 -1 1.00 0.15 -0.15
D3 -2 1.10 0.15 -0.33
D4 -1 1.00 0.15 -0.15
D5 -1 0.90 0.15 -0.14
D6 -4 0.75 0.15 -0.45
D7 -1 1.00 0.15 -0.15
Opening -1 1.16 0.15 -0.17

Band at Parapet
Band at Top Floor Wall (Below door) 2 6.45 0.40 5.16
1 47.71 0.30 14.31
1 13.80 0.30 4.14
1 28.19 0.30 8.46
Total 1,625.25 sq.m

3 Brickworks
3.2 Full Brick (230 mm) Works (1:4c/s)
Below Plinth level
Along Grid 1,2,3 3 20.78 0.23 0.40 5.73
Along Grid A,B,C,D,E 5 6.45 0.23 0.40 2.97
Ground Floor
Along grid 1 1 16.73 0.23 2.35 9.04
1 4.08 0.23 2.00 1.87
Along grid 2 1 16.73 0.23 2.35 9.04
Along Grid A,B,C,D,E 5 4.48 0.23 2.35 12.09
Wall Partition Between Male and Female Toilet 1 2.73 0.23 2.42 1.52
1 3.50 0.23 2.72 2.19

Deduction
D1 -4 1.10 0.23 2.35 -2.38
D4 -1 1.00 0.23 2.35 -0.54
D5 -1 0.90 0.23 2.35 -0.49
W1 -8 1.10 0.23 1.13 -2.28
W3 -1 1.50 0.23 0.33 -0.11
V1 -8 1.10 0.23 0.55 -1.11
V2 -1 2.63 0.23 0.55 -0.33
V3 -1 2.70 0.23 0.55 -0.34
Toilet Opening -1 1.16 0.23 2.35 -0.63

First Floor
Along grid 1 1 16.73 0.23 2.35 9.04
1 4.08 0.23 2.08 1.94
Along grid 2 1 16.73 0.23 2.35 9.04
Along Grid A,B,C,D,E 5 4.48 0.23 2.35 12.09
Partition Wall at Computer Lab 1 3.38 0.23 1.20 0.93

Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant SE DLPIU Engineer
Deduction
D1 -6 1.10 0.23 2.35 -3.57
W1 -12 1.10 0.23 1.13 -3.42
W2 -1 1.50 0.23 1.08 -0.37
V1 -12 1.10 0.23 0.55 -1.67

Second Floor
Along grid 1 1 16.73 0.23 2.35 9.04
1 4.08 0.23 2.08 1.94
Along grid 2 1 16.73 0.23 2.35 9.04
Along Grid A,B,C,D,E 5 4.48 0.23 2.35 12.09
Partition Wall at Principal/Administration 1 1.48 0.23 2.72 0.92

Deduction
D1 -6 1.10 0.23 2.35 -3.57
W1 -12 1.10 0.23 1.13 -3.42
W2 -1 1.50 0.23 1.08 -0.37
V1 -12 1.10 0.23 0.55 -1.67

Top Floor
Along Grid 1,3 2 4.08 0.23 2.03 3.80
Along Grid C,D 2 6.45 0.23 1.83 5.41
Deduction
D2 -2 1.00 0.23 2.10 -0.97
W2 -1 1.50 0.23 1.08 -0.37

Parapet Wall
1 47.71 0.23 0.80 8.78
1 13.80 0.23 1.40 4.44
1 28.19 0.23 0.90 5.84

Outside
Steps 1 19.27 0.30 0.10 0.58
1 18.61 0.30 0.25 1.40
1 0.60 0.50 0.30 0.09
1 0.54 0.50 0.30 0.08
1 0.60 0.50 0.30 0.09

Ramp
Wall Along -B 1 1.33 0.25 Area 0.33
1 6.91 0.17 Area 1.19
Total 114.98 cu.m

3.3 Half Brick (125 mm) Works (1:4c/s)


Below Staircase 1 1.20 Area 1.20
1 1.15 1.25 1.44
Partition Wall at Principal/Administration 1 4.20 2.72 11.42
Partition Wall at Toilet
Boys Toilet 1 2.28 1.95 4.44
1 1.18 1.95 2.29
1 0.60 1.20 0.72
Girls Toilet 1 2.28 1.95 4.44
1 1.18 1.95 2.29
1 0.60 1.20 0.72
Disabled Toilet 1 1.80 2.73 4.91

Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant SE DLPIU Engineer
1 2.35 2.73 6.40
Deduction
D6 -4 0.75 2.10 -6.30

Bench 8 0.50 0.43 1.70


Total 35.67 Sq.m

4 DOORS & WINDOWS


4.1 Metal Frame
4.1.1 Doors Frame
D1 16 7.20 Perimeter 115.20
D2 1 5.20 Perimeter 5.20
D3 2 4.90 Perimeter 9.80
D7 1 4.10 Perimeter 4.10
Total 134.30 r.m

4.1.2 Windows Frame


Windows Frame W1 32 4.45 Perimeter 142.40
Windows Frame W2 3 5.15 Perimeter 15.45
Ventilations Frame V1 32 3.30 Perimeter 105.60
Total 263.45 r.m

4.2 Metal Shutter


4.2.1 Windows shutter
W1 32 0.97 1.04 31.96
W2 3 1.37 0.99 4.03
V1 32 1.01 0.46 14.87
Total 50.86 Sq.m

4.3 Wooden Shutter


4.3.1 Flush Doors Shutter
Doors D1 16 1.01 2.46 39.67
D2 1 0.91 2.06 1.87
D3 2 1.01 1.86 3.75
D7 1 0.91 1.51 1.37
Total 46.66 Sq.m

4.4 UPVC Doors


4.4.1 UPVC Doors Shutter
Disable Toilet D3 1 1.00 2.50 2.50
Boys Toilet
D4 1 0.95 2.50 2.38
D5 2 0.75 1.90 2.85
Ladies Toilet
D4 1 0.95 2.45 2.33
D5 2 0.75 1.90 2.85
Total 12.90 sq.m

4.5 Window Grill


Windows W1 32 0.97 1.04 31.96
W2 3 1.37 0.99 4.03
W3 1 1.50 0.33 0.49
V1 32 1.01 0.46 14.87
V2 1 2.63 0.55 1.44
V3 1 2.70 0.55 1.49
Total 54.28 Sq.m

Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant SE DLPIU Engineer
4.6 Collapsable Gate
1 4.075 2.46 10.02
Total 10.03 Sq.m

5 FLOORING WORKS
Cement Concrete Flooring (40mm) With Neat
5.1 Cement Punning
Ground floor
Rooms 3 5.75 4.75 81.94
Below staircase 1 4.2 4.75 19.95
Corridor 1 22.8 2.525 57.57

Staircase
Landing 1 4.2 2 8.40
Tread 18 1.95 0.3 10.53
Riser 19 1.95 0.15 5.56

First floor
Rooms 3 5.75 4.75 81.94
Corridor 1 22.8 2.525 57.57

Staircase
Landing 1 4.2 2 8.40
Tread 18 1.95 0.3 10.53
Riser 19 1.95 0.15 5.56
Second floor
Rooms 3 5.75 4.75 81.94
Corridor 1 22.8 2.525 57.57

Staircase
Landing 1 4.2 2 8.40
Tread 18 1.95 0.3 10.53
Riser 19 1.95 0.15 5.56

Top Floor 1 176.005 Area 176.01


Staircase cover 1 43.99 Area 43.99

Outside
Outer steps 1 18.91 0.90 17.02
Ramp 1 8.39 Area 8.39

Slope at Back Side of Building 1 22.925 1 22.93


Total 780.27 sq.m

5.2 Neat cement skirting


Ground floor
Classroom-2 1 18.88 18.88
Classroom-3 1 18.88 18.88
Corridor 1 14.13 14.13
Corridor Column 5 1.90 9.50

Below staircase 1 13.48 13.48


Staircase 1 13.78 13.78

Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant SE DLPIU Engineer
First floor
Classroom-4 1 18.88 18.88
Classroom-5 1 18.88 18.88
Classroom-6 1 18.88 18.88
Corridor 1 14.13 14.13
Corridor Column 2 0.65 1.31
3 0.87 2.61
Staircase 1 13.78 13.78
Second floor
Classroom-4 1 18.88 18.88
Classroom-5 1 18.88 18.88
Classroom-6 1 18.88 18.88
Partition Wall at Principal/Administration 2 4.88 9.75
Corridor 1 14.13 14.13
Corridor Column 2 0.65 1.31
3 0.87 2.61
Staircase 1 13.78 13.78
Top Floor 1 59.70 59.70
Roof Top 1 9.60 9.60
Total 344.62 r.m

5.3 25mm Terrazo Finishing


Bench 2 2.40 0.50 2.40
Boys Toilet 1 17.84 1.20 21.41
Girls Toilet 1 19.80 1.20 23.76
Disable Toilet 1 7.33 1.20 8.79
Total 56.36 sq.m

7 PLASTER/PAINTING WORKS
7.1 Internal Plaster
7.1.1 Internal Plaster on Wall (1:6)
Ground floor
Classroom-1 1 21 2.905 61.01
Classroom-2 1 21 2.905 61.01
Classroom-3 1 21 2.905 61.01
Staircase 1 13.43 2.82 37.82
Wall Partition Between Male and Female Toilet 2 2.73 1.15 6.27
2 3.75 1.52 11.40
Partition Wall at Toilet
Boys Toilet 2 2.28 2.10 9.56
2 1.18 2.10 4.94
1 1.33 1.20 1.59
Girls Toilet 1 2.28 2.10 4.78
1 1.18 2.10 2.47
1 1.33 1.20 1.59
Disabled Toilet 1 1.82 2.88 5.22
1 2.35 2.88 6.76
Deduction
D1 -4 1.10 2.50 -5.50
D4 -1 1.00 2.50 -1.25
D5 -1 0.90 2.50 -1.13
W1 -8 1.10 1.13 -4.95
W3 -1 1.50 0.33 -0.24
V1 -8 1.10 0.55 -2.42
V2 -1 2.63 0.55 -0.72
V3 -1 2.70 0.55 -0.74

Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant SE DLPIU Engineer
Toilet Opening -1 1.16 2.50 -1.45

First floor
Classroom-3 1 21 2.905 61.01
Classroom-4 1 21 2.905 61.01
Classroom-5 1 21 2.905 61.01
Partition Wall at Computer Lab 2 3.38 1.20 8.10
2 0.25 1.20 0.60
Staircase 1 13.43 2.82 37.82

Deduction
D1 -6 1.10 2.50 -8.25
W1 -12 1.10 1.13 -7.43
W2 -1 1.50 1.08 -0.81
V1 -12 1.10 0.55 -3.63

Second floor
Classroom-6 1 21 2.905 61.01
Classroom-7 1 21 2.905 61.01
Classroom-8 1 21 2.905 61.01
Partition Wall at Principal/Administration 1 5.88 2.72 15.98
1 5.75 2.72 15.64
Staircase 1 13.43 2.82 37.82

Deduction
D1 -6 1.10 2.50 -8.25
D2 -1 1.00 2.10 -1.05
W1 -12 1.10 1.13 -7.43
W2 -1 1.50 1.08 -0.81
V1 -12 1.10 0.55 -3.63

Top Floor
1 23.15 2.40 55.51
Deduction
W2 -1 1.50 1.08 -0.81
D3 -2 1.10 1.90 -2.09
Total 750.32 sq.m

7.1.2 Internal Plaster on Ceiling (1:4)


First floor level slab
Classroom-1 1 5.75 4.75 27.31
Classroom-2 1 5.75 4.75 27.31
Classroom-3 1 5.75 4.75 27.31
Corridor 1 22.75 2.53 57.44
Staircase waist slab 2 2.72 1.95 10.59
Staircase landing 1 1.67 4.20 6.993

First floor level beam


Along grid A1,B1,D1 3 7.20 0.840 18.14

Second floor level slab


Classroom-4 1 5.75 4.75 27.31
Classroom-5 1 5.75 4.75 27.31
Classroom-6 1 5.75 4.75 27.31
Corridor 1 22.75 2.53 57.44
Staircase waist slab 2 2.72 1.95 10.5924

Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant SE DLPIU Engineer
Staircase landing 1 1.67 4.20 6.993

Second floor level beam


Along grid A1,B1,D1 3 7.20 0.840 18.14

Top Floor Level Beam


Classroom-4 1 5.75 4.75 27.31
Classroom-5 1 5.75 4.75 27.31
Classroom-6 1 5.75 4.75 27.31
Corridor 1 22.75 2.53 57.44
Staircase waist slab 2 2.72 1.95 10.5924
Staircase landing 1 1.67 4.20 6.993

Top floor level beam


Along grid A1,B1,D1 3 7.20 0.840 18.14

At Staircase Cover
Slab 1.00 8.30 5.30 43.99
Total 569.32 sq.m

7.1.3 External Plaster


Outer Plaster
Slab
Projected Slab at Staircase
First Floor 1.00 4.08 1.33 5.42
Second Floor 1.00 4.08 1.33 5.42
At Staircase Cover slab(At Level 11600) 1.00 29.20 1.15 33.58
Projected Slab at Third Floor Level(+9000) 1.00 60.88 1.88 114.45
Projected Slab at First Floor Level(+3000) 1.00 22.93 2.65 60.64

Outer Beam
First floor level beam
Along grid 1 1 20.80 0.55 11.44
Along grid A and E 2 4.48 0.55 4.92
Landing beam 1 4.05 0.60 2.41

Second floor level beam


Along grid 1 1 20.80 0.55 11.44
Along grid A and E 2 4.48 0.55 4.92
Landing beam 1 4.05 0.60 2.41

Third floor level


Along grid 1 1 20.80 0.55 11.44
Along grid A and E 2 4.48 0.55 4.92
Landing beam 1 4.05 0.60 2.41
Outer column
Ground Floor
Class Room Corner 4 1.18 3.35 15.75
Intermediate Corner 6 0.70 3.45 14.49
Corridor Column 5 1.80 2.40 21.60

First Floor
Class Room Corner 4 1.18 3.00 14.10
Intermediate Corner 6 0.70 3.00 12.60
Corridor Column 5 1.90 3.00 28.50

Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant SE DLPIU Engineer
Second Floor
Class Room Corner 4 1.18 3.00 14.10
Intermediate Corner 6 0.70 3.00 12.60
Corridor Column 5 1.90 3.00 28.50

Top Floor (Stair case Cover) 4 1.15 3.00 13.80

Outer Plaster on Walls


Ground Floor
Along grid 1 1 16.73 2.50 41.81
1 4.08 2.08 8.46
Along grid 2 1 16.73 2.50 41.81
Along grid A,E/(1-2) 2 4.48 2.50 22.38

Deduction
D1 -6 1.10 2.50 -16.50
W1 -12 1.10 1.13 -14.85
W3 -1 1.50 0.33 -0.49
V1 -12 1.10 0.55 -7.26

First Floor
Along grid 1 1 16.73 2.50 41.81
1 4.08 2.08 8.46
Along grid 2 1 16.73 2.50 41.81
Along grid A,E/(1-2) 2 4.48 2.50 22.38

Deduction
D1 -6 1.10 2.50 -16.50
W1 -12 1.10 1.13 -14.85
W2 -1 1.50 1.08 -1.61
V1 -12 1.10 0.55 -7.26

Second Floor
Along grid 1 1 16.73 2.50 41.81
1 4.08 2.08 8.46
Along grid 2 1 16.73 2.50 41.81
Along grid A,E/(1-2) 2 4.48 2.50 22.38

Deduction
D1 -6 1.10 2.50 -16.50
W1 -12 1.10 1.13 -14.85
W2 -1 1.50 1.08 -1.61
V1 -12 1.10 0.55 -7.26

Top Floor
Along Grid 1,3 2 4.08 2.10 17.12
Along Grid C,D 2 6.45 1.90 24.51
Deduction
D2 -2 1.00 2.10 -4.20
W2 -1 1.50 1.08 -1.62

Plaster in Parapet Walls


Third Floor Level 1 49.00 1.84 90.16
1 13.30 3.30 43.89
Roof Top 1 28.20 2.18 61.48

Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant SE DLPIU Engineer
For Ramp
3A-3B 1.00 0.68 Area 0.68
Wall Along Grid-B 1.00 1.33 1.09 1.44
Wall Parallel to Grid-B 1.00 6.80 0.75 5.10
Parapet Wall
Band at Top Floor Wall (Below door) 2 6.45 0.20 2.58
1 47.71 1.51 72.05
1 13.80 2.05 28.29
1 28.19 1.51 42.57
Total 1,059.72 sq.m

7.2 PAINTING WORKS


7.2.1 Distemper paint
As per Internal Plaster on Wall 1 750.32 750.32
As per Internal Plaster on Ceiling 1 569.32 569.32
Total 1,319.64 sq.m

7.2.2 Exterior Weather Coat Paint


As per External Plaster 1 1059.72 1,059.72
Total 1,059.73 sq.m

7.2.4 Enamel Paint Factor


Doors D1 16 1.10 2.50 2.00 88.00
D2 1 1.00 2.10 2.00 4.20
D3 2 1.10 1.90 2.00 8.36
D7 1 1.00 1.55 2.00 3.10
Windows W1 32 1.10 1.13 2.00 79.20
W2 3 1.50 1.08 2.00 9.68
V1 32 1.10 0.55 2.00 38.72
Windows Grill W1 32 1.10 1.13 2.00 79.20
W2 3 1.50 1.08 2.00 9.68
W3 1 1.50 0.33 2.00 0.98
V1 32 1.10 0.55 2.00 38.72
V2 1 2.63 0.55 2.00 2.89
V3 1 2.70 0.55 2.00 2.97
Total 365.69 sq.m

8 MISCELLANEOUS
Total
8.3 Railling Length kg/m
Length
Staircase Railing
Ground Floor Lvl to First Floor Level
ISNB 40M(Horizontal Handrail) 1 6.28 6.28 3.56 22.36
25mm Square Pipe(Horizontal Bars) 4 6.19 24.74 0.85 21.03
Vertical 38mm Square Pipe 8 0.9 7.20 2.82 20.30

First Floor Lvl to Second Floor Level


ISNB 40M(Horizontal Handrail) 1 6.28 6.28 3.56 22.36
25mm Square Pipe(Horizontal Bars) 4 6.19 24.74 0.85 21.03
Vertical 38mm Square Pipe 8 0.9 7.20 2.82 20.30

Second Floor Lvl to Third Floor Level


ISNB 40M(Horizontal Handrail) 1 6.28 6.28 3.56 22.36
25mm Square Pipe(Horizontal Bars) 4 6.19 24.74 0.85 21.03
Vertical 38mm Square Pipe 8 0.9 7.20 2.82 20.30

Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant SE DLPIU Engineer
Parapet Railing
For First and Second Floor
ISNB 40M(Horizontal Bars) 2 24.75 49.50 3.56 176.22
ISNB 32M(Horizontal Bars) 4 24.75 99.00 3.10 306.90
ISNB 32M(Vertical Bars) 38 1.08 41.00 3.10 127.11
25mm Square Pipe(Vertical Bars) 342 0.82 280.44 0.85 238.37

For Terrace
ISNB 40M(Horizontal Bars) 1 81.63 81.63 3.56 290.59
ISNB 32M(Horizontal Bars) 1 52.75 52.75 3.10 163.53
ISNB 32M(Vertical Bars) 36 0.36 12.89 3.10 39.95
25mm Square Pipe(Vertical Bars) 350 0.26 90.30 0.85 76.76

Base plate 102 0.00009375 0.01 7850 75.07


12 mm dia. Anchor Bolt, Nut 408 0.13 53.04
Total 1,738.63 Kg

8.5 Sewer, Rain and Waste Water Installation


Top Floor to Ground Level 4 9.00 36.00
Roof to Top Floor 1 3.10 3.10
Total 39.10 R.m

8.4 Pump Shed


1 1.00 1.00
Total 1.00 Nos.

Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant SE DLPIU Engineer
BAR BENDING SCHEDULE
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-9C(XS)-B
School Name : Shree Devi Jal Kumari Lower Secondary School
Location : Aaruarbang, Gorkha
Dia. of Cut Total
No. of Wt/m Weight
S. No. Description No. Bar Length Length Bar Shape
Bars (Kg) (Kg)
(mm) (m) (m)
A Foundation for footing
1 Footing (F1,1800 X1800) 3
X- direction 16 8 2.02 48.48 1.59 77.08 0.16 0.16
Y- direction 16 8 2.02 48.48 1.59 77.08 1.7

2 Combine Footing CF1 3


For bottom mesh
X- direction 16 36 2.42 261.36 1.59 415.56 0.16 0.16
Y- direction 16 11 7.42 244.86 1.59 389.33 2.1
For top mesh
X- direction 16 36 2.42 261.36 1.59 415.56 0.16 0.16
Y- direction 20 11 7.42 244.86 2.47 604.80 7.1

3 Combine Footing CF2 2


For bottom mesh
X- direction 16 36 2.02 145.44 1.59 231.25
Y- direction 16 6 7.42 89.04 1.59 141.57 0.16 0.16
For top mesh 1.7
X- direction 16 36 2.02 145.44 1.59 231.25
Y- direction 20 9 7.42 133.56 2.47 329.89 0.16 0.16
7.1

4 Combine Footing CF3 1


For bottom mesh
X- direction 16 29 2.02 58.58 1.59 93.14
Y- direction 16 6 6.69 40.14 1.59 63.82 0.16 0.16
For top mesh 1.7
X- direction 16 29 2.02 58.58 1.59 93.14
Y- direction 20 6 6.69 40.14 2.47 99.15 0.16 0.16
6.37

B Column
1 All Grid 15 20mm ɸ 16mm ɸ
Main Bar 20 2 7.11 213.30 2.47 526.85
20 2 4.04 121.20 2.47 299.36
16 4 3.56 213.60 1.59 339.62
16 4 6.55 393.00 1.59 624.87 6.29 5.97

0.125 0.125
0.7 0.46

2 Stiruups 0.345 0.124


For 15 column 15 10 18 1.78 467.25 0.6 289.70 0.1 0.1
10 18 1.21 317.625 0.6 196.93 0.445 0.445
10 18 1.34 351.75 0.6 218.09

0.345
0.158 0.1

C For lower tie beam


1 Grid 1,2 & 3 3 9.32 2.97
Top bar (T/O) 12 2 12.00 72.00 0.89 64.08 0.485 12 0.485
12 2 3.46 20.73 0.89 18.45 4.14 8.15

Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant SE DLPIU Engineer
12 2 9.81 58.83 0.89 52.36
12 1 12.00 36.00 0.89 32.04 0.485 12 0.485
12 1 4.63 13.88 0.89 12.35
12 1 8.64 25.91 0.89 23.06
Bottom Bar (T/O) 3 12 2 2.93 17.55 0.89 15.62
12 2 12.00 72.00 0.89 64.08
12 2 10.34 62.01 0.89 55.19 0.485 12 0.485
12 1 4.79 14.36 0.89 12.78
12 1 12.00 36.00 0.89 32.04 2.44 9.85
12 1 8.45 25.34 0.89 22.55 12
0.485 0.485
7.96 4.3
2 Grid A,B,C,D & E 5
Top bar (T/O) 12 3 8.65 129.75 0.89 115.48 7.88
Bottom bar (T/O) 12 3 8.65 129.75 0.89 115.48 0.385 0.385

3 Stirrups 0.385 0.385


Grid 1,2,3 3 10 180 1.20 648.00 0.62 401.76 7.88
Grid A,B,C,D,E 5 10 60 1.20 360.00 0.62 223.20
0.25
0.1
0.25

D Plinth Tie beam


1 For Grid 1,2 &3 3 3.67 9.1
Top bar 16 2 4.44 26.61 1.59 42.31 0.765 12 0.765
16 2 12.00 72.00 1.59 114.48
16 2 9.87 59.19 1.59 94.11 2.97 9.32
12 1 12.00 36.00 0.89 32.04
12 1 3.46 10.37 0.89 9.22 0.485 12 0.485
12 1 9.81 29.42 0.89 26.18

Bottom Bar 16 2 5.72 34.29 1.59 54.52 11.46


16 2 11.46 68.77 1.59 109.34 0.765 0.765
16 2 9.13 54.75 1.59 87.05 4.95 8.36
12 1 4.82 14.45 0.89 12.86
12 1 12.00 36.00 0.89 32.04 12
12 1 8.45 25.34 0.89 22.55 0.485 0.485
4.33 7.96

2 Grid A,B,C,D & E 5 0.665 0.665


Top Bar 16 2 9.21 92.10 1.59 146.44 7.88
12 1 8.65 43.25 0.89 38.49
Bottom bar 16 2 9.21 92.10 1.59 146.44 0.385 0.385
12 1 8.65 43.25 0.89 38.49 7.88

Stirrups 0.25
Grid 1,2,3 3 10 209 1.20 752.40 0.62 466.49 0.1
Grid A,B,C,D,E 5 10 65 1.20 390.00 0.62 241.80 0.25

E GF Column
1 All Grid 15
Main Bar 20 2 7.20 216.00 2.47 533.52 20mmɸ 16mmɸ
16 4 6.96 417.60 1.59 663.98 6 6

1.2 0.96

Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant SE DLPIU Engineer
2 Stiruups 0.345 0.124
For 15 column 15 10 30 1.78 801 0.6 496.62 0.1 0.1
10 30 1.21 544.5 0.6 337.59 0.445 0.445
10 30 1.34 603 0.6 373.86

0.345
0.158 0.1

F Staircase
1 First Flight
Top Main Bar 16 16 6.50 104.00 1.59 165.36 3 1.95
Bottom Main Bar 16 16 2.10 33.60 1.59 53.42 0.9 0.35
Top Distribution Bar 10 14 1.96 27.44 0.62 17.01 0.2
Bottom Distribution Bar 10 30 1.96 58.80 0.62 36.46 1
Extra Bar 16 15 2.00 30.00 1.59 47.70 0.2 0.9
2 Landing
Bottom bar in first flight 16 12 3.10 37.16 1.59 59.09 1
Top Distribution Bar 16 7 1.96 13.72 1.59 21.81 1
Bottom Distribution Bar 10 14 4.16 58.24 0.62 36.11
Top Distribution Bar 10 14 4.16 58.24 0.62 36.11 4.16
Extra Bar 16 15 2.00 30.00 1.59 47.70 1.88
3 Second Flight 1 0.21
Top Main Bar 16 12 6.50 78.00 1.59 124.02
Bottom main Bar 16 12 3.45 41.40 1.59 65.83 0.75 3
Bottom Distribution Bar 10 23 1.96 44.43 0.62 27.54 0.4
Top Distribution Bar 10 14 1.96 27.44 0.62 17.01 2.1 0.35
Extra Bar 16 30 2.00 60.00 1.59 95.40 1
4 Nosing Bar 10 20 1.96 39.20 0.62 24.30 2.1 0.35

5 Nosing ties 5 8 20 0.67 67.00 0.40 26.80


0.25 0.15
0.12
0.15

G First Floor Beam


Main Beam
1 Grid 1 1 9.84 3.45
Top Bar 20 2 10.88 65.28 2.47 161.24
20 2 12.00 72.00 2.47 177.84 1.045 12 1.045
20 2 4.50 27.00 2.47 66.69
16 1 4.69 14.07 1.59 22.37 11.91
16 1 11.91 35.73 1.59 56.81 0.765 3.93 8.88 0.765
16 1 9.64 28.92 1.59 45.98
Bottom bar 16 2 5.72 34.29 1.59 54.52
16 2 11.46 68.77 1.59 109.34 4.96 8.365
16 2 9.13 54.75 1.59 87.05 0.765 0.765
16 1 10.10 30.30 1.59 48.18 11.46
16 1 11.96 35.88 1.59 57.05 9.335 3.625
16 1 4.39 13.17 1.59 20.94 0.765 11.96 0.765
Stirupps 10 209 1.60 334.40 0.62 207.33

2 Grid 2 1 9.84 3.45


Top Bar 20 2 10.88 65.28 2.47 161.24
20 2 12.00 72.00 2.47 177.84 1.045 12 1.045
20 2 4.50 27.00 2.47 66.69
20 1 5.29 15.87 2.47 39.20 11.95
20 1 11.95 35.85 2.47 88.55 1.045 4.245 8.985 1.045

Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant SE DLPIU Engineer
20 1 10.03 30.09 2.47 74.32
Bottom bar 16 2 5.72 34.29 1.59 54.52
16 2 11.46 68.77 1.59 109.34 4.96 8.365
16 2 9.13 54.75 1.59 87.05 0.765 0.765
16 1 10.10 30.30 1.59 48.18 11.46
16 1 11.96 35.88 1.59 57.05 9.335 3.625
16 1 4.39 13.17 1.59 20.94 0.765 11.96 0.765
Stirupps 10 209 1.60 334.40 0.62 207.33

3 Grid 3 1 9.84 3.45


Top Bar 20 2 10.88 65.28 2.47 161.24
20 2 12.00 72.00 2.47 177.84 1.045 12 1.045
20 2 4.50 27.00 2.47 66.69
16 1 4.69 14.07 1.59 22.37 11.91
16 1 11.91 35.73 1.59 56.81 0.765 3.93 8.88 0.765
16 1 9.64 28.92 1.59 45.98
Bottom bar 16 2 5.72 34.29 1.59 54.52
16 2 11.46 68.77 1.59 109.34 4.96 8.365
16 2 9.13 54.75 1.59 87.05 0.765 0.765
16 1 10.10 30.30 1.59 48.18 11.46
16 1 11.96 35.88 1.59 57.05 9.335 3.625
16 1 4.39 13.17 1.59 20.94 0.765 11.96 0.765
Stirupps 10 209 1.60 334.40 0.62 207.33

4 Grid A 1 7.89
Top bar 20 2 9.78 19.56 2.47 48.31 0.945 0.945
16 1 9.22 9.22 1.59 14.66
Bottom bar 16 3 9.22 138.30 1.59 219.90 0.665 7.89 0.665
Stirupps 10 57 1.60 91.60 0.62 56.79

5 Grid B 1 7.89
Top bar 20 2 9.78 19.56 2.47 48.31 0.945 0.945
16 1 9.22 9.22 1.59 14.66
Bottom bar 16 3 9.22 138.30 1.59 219.90 0.665 7.89 0.665
Stirupps 10 57 1.60 91.60 0.62 56.79

6 Grid C 1 7.89
Top bar 20 2 9.78 19.56 2.47 48.31 0.945 0.945
16 1 9.22 9.22 1.59 14.66
Bottom bar 16 3 9.22 138.30 1.59 219.90 0.665 7.89 0.665
Stirupps 10 57 1.60 91.60 0.62 56.79

7 Grid D 1 7.89
Top bar 20 3 9.78 29.34 2.47 72.47 0.945 0.945
Bottom bar 16 3 9.22 138.30 1.59 219.90
Stirupps 10 57 1.60 91.60 0.62 56.79 0.665 7.89 0.665

8 Grid E 1 7.89
Top bar 20 3 9.78 29.34 2.47 72.47 0.945 0.945
Bottom bar 16 3 9.22 138.30 1.59 219.90
Stirupps 10 57 1.60 91.60 0.62 56.79 0.665 7.89 0.665

Secondary beam
1 Grid A1,B1,D1 3 7.89
Top bar 16 3 9.22 138.30 1.59 659.69 0.665 0.665
Bottom bar 16 3 9.22 138.30 1.59 659.69
Stirupps 10 56 1.35 75.94 0.62 141.24 0.665 7.89 0.665

Extra bar
Long span

Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant SE DLPIU Engineer
Grid A 1 12 1 1.84 1.84 0.89 1.64 0.385
12 1 1.88 1.88 0.89 1.67
Grid C 1 12 1 1.84 1.84 0.89 1.64 1.68
12 1 1.88 1.88 0.89 1.67 0.1 0.1
Grid D 1 12 1 1.84 1.84 0.89 1.64
12 1 1.88 1.88 0.89 1.67 1.355 0.1
Grid E 1 16 1 2.12 2.12 1.59 3.37 0.665
16 1 1.88 1.88 1.59 2.99
For short span 1.68
Grid 2 1 12 2 3.60 7.20 0.89 6.41 0.1 0.1
12 1 3.00 3.00 0.89 2.67
12 1 2.25 2.25 0.89 2.00 3.4
0.1 0.1

0.96 0.96
H Bent up bar in primary and 16 30 3.01 90.3 1.59 143.58
secondary beam junction 0.42

0.25
I Landing Beam 4.85
Top bar 16 3 5 15 1.59 23.85 0.075 0.075
Bottom bar 16 3 5 15 1.59 23.85 0.2
Stirrups 1 10 42 1.35 56.7 0.62 35.154 0.1
0.375

J FF Slab Rebar 0.375 Type A


Grid A-C and D-E 3 0.085
Short Span 8.28
Main Bar Type A 8 20 8.74 524.10 0.4 209.64
Main bar Type B 8 20 8.83 530.04 0.4 212.02 Type B

0.375 0.55
Long Span 0.085 0.33
A-C 1
Main Bar Type A 8 19 13.92 264.48 0.4 105.79 0.45 Type A 0.45
Main bar Type B 8 19 14.12 268.24 0.4 107.30 0.085 0.085
6.2
D-E 1
Main Bar Type A 8 19 7.27 138.13 0.4 55.25
Main bar Type B 8 19 7.34 139.38 0.4 55.75

A-E Grid (2-3) 1 Type B


Main bar 0.45 1.35 0.45
Main Bar Type A 8 13 24.62 320.06 0.4 128.02 0.085 0.33
Main bar Type B 8 13 25.02 325.21 0.4 130.08

Distribution Bar 12
Along Grid 1 1 8 2 18 36.00 0.4 14.40
Along Grid 2 1 8 13 22.98 298.74 0.4 119.50 8.5
Along Grid 3 1 8 2 22.98 45.96 0.4 18.38
Along Grid A 1 8 2 8.5 17.00 0.4 6.80
Along Grid A1,B,B1 & D1 4 8 12 8.5 408.00 0.4 163.20
Along Grid C, D and E 3 8 5 8.5 127.50 0.4 51.00
3.75
Negative bar
Along Grid A1,B1 & D1 4 8 14 2.16 120.96 0.4 48.38 0.055 2.05 0.055
Along Grid 2( A-D and D-E) 2 8 11 2.06 45.32 0.4 18.13 0.055 1.95 0.055
Along Grid 2 (C-D) 1 8 4 2.17 8.69 0.4 3.48
0.055 2.06 0.055

Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant SE DLPIU Engineer
Edge Beam
Along short Span 2
Top Bar 12 2 2.5 10 0.89 8.90 0.75 1 0.75
Bottom Bar 12 2 2.2 8.8 0.89 7.83

Along Long Span 1


Top Bar 12 2 7.6 15.2 0.89 13.53 0.75 6.1 0.75
Bottom Bar 12 2 7.6 15.2 0.89 13.53
Stirrup 1 10 55 1.28 70.4 0.62 43.65

1 FF Column
1.1 Grid A,B and E 9
Main Bar 20 2 6.48 116.64 2.47 288.10 20mmɸ 16mmɸ
16 4 6.24 224.64 1.59 357.18 6.48 6.24

1.2 Grid C and D 6


Main Bar 20 2 7.20 86.40 2.47 213.41
16 4 6.96 167.04 1.59 265.59

1.3 Stiruups 0.345 0.124


For 15 column 15 10 30 1.78 801 0.6 496.62 0.1 0.1
10 30 1.21 544.5 0.6 337.59 0.445 0.445
10 30 1.34 603 0.6 373.86

0.345
0.158 0.1

2 Staircase
2.1 First Flight
Top Main Bar 16 16 7.08 113.28 1.59 180.12 3 1.95
Bottom Main Bar 16 16 2.10 33.60 1.59 53.42 0.9 0.35
Top Distribution Bar 10 14 1.96 27.44 0.62 17.01 0.2
Bottom Distribution Bar 10 30 1.96 58.80 0.62 36.46 1
Extra Bar 16 15 2.00 30.00 1.59 47.70 0.2 0.9

Landing
Bottom bar in first flight 16 12 3.10 37.16 1.59 59.09 1
Top Distribution Bar 16 7 1.96 13.72 1.59 21.81 1
Bottom Distribution Bar 10 14 4.16 58.24 0.62 36.11
Top Distribution Bar 10 14 4.16 58.24 0.62 36.11 4.16
Extra Bar 16 15 2.00 30.00 1.59 47.70

Projected Portion
Top Bar 16 1.96 5.00 9.80 1.59 15.58
Bottom Bar 16 1.96 5.00 9.80 1.59 15.58
1.88
2.2 Second Flight 1 0.21
Top Main Bar 16 12 7.08 84.96 1.59 135.09
Bottom main Bar 16 12 3.45 41.40 1.59 65.83 0.75 3
Bottom Distribution Bar 10 23 1.96 44.43 0.62 27.54 0.4
Top Distribution Bar 10 14 1.96 27.44 0.62 17.01 2.1 0.35
Extra Bar 16 30 2.00 60.00 1.59 95.40 1

2.3 Nosing Bar 10 20 1.96 39.20 0.62 24.30 2.1 0.35

2.4 Nosing ties 5 8 20 0.67 67.00 0.40 26.80


0.25 0.15
0.12

Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant SE DLPIU Engineer
0.15
3 Second Floor Beam
Main Beam
3.1 Grid 1 1 9.84 3.45
Top Bar 20 2 10.88 21.76 2.47 53.75
20 2 12.00 24.00 2.47 59.28 1.045 12 1.045
20 2 4.50 9.00 2.47 22.23
16 1 4.69 4.69 1.59 7.46 11.91
16 1 11.91 11.91 1.59 18.94 0.765 3.93 8.88 0.765
16 1 9.64 9.64 1.59 15.33
Bottom bar 16 2 5.72 11.43 1.59 18.17
16 2 11.46 22.92 1.59 36.45 4.96 8.365
16 2 9.13 18.25 1.59 29.02 0.765 0.765
16 1 10.10 10.10 1.59 16.06 11.46
16 1 11.96 11.96 1.59 19.02
16 1 4.39 4.39 1.59 6.98 9.335 3.625
Stirupps 10 209 1.60 334.40 0.62 207.33 0.765 11.96 0.765

3.2 Grid 2 1 9.84 3.45


Top Bar 20 2 10.88 21.76 2.47 53.75
20 2 12.00 24.00 2.47 59.28 1.045 12 1.045
20 2 4.50 9.00 2.47 22.23
20 1 5.29 5.29 2.47 13.07 11.95
20 1 11.95 11.95 2.47 29.52 1.045 4.245 8.985 1.045
20 1 10.03 10.03 2.47 24.77
Bottom bar 16 2 5.72 11.43 1.59 18.17
16 2 11.46 22.92 1.59 36.45 4.96 8.365
16 2 9.13 18.25 1.59 29.02 0.765 0.765
16 1 10.10 10.10 1.59 16.06 11.46
16 1 11.96 11.96 1.59 19.02 9.335 3.625
16 1 4.39 4.39 1.59 6.98 0.765 11.96 0.765
Stirupps 10 209 1.60 334.40 0.62 207.33

3.3 Grid 3 1 9.84 3.45


Top Bar 20 2 10.88 21.76 2.47 53.75
20 2 12.00 24.00 2.47 59.28 1.045 12 1.045
20 2 4.50 9.00 2.47 22.23
16 1 4.69 4.69 1.59 7.46 11.91
16 1 11.91 11.91 1.59 18.94 0.765 3.93 8.88 0.765
16 1 9.64 9.64 1.59 15.33
Bottom bar 16 2 5.72 11.43 1.59 18.17
16 2 11.46 22.92 1.59 36.45 4.96 8.365
16 2 9.13 18.25 1.59 29.02 0.765 0.765
16 1 10.10 10.10 1.59 16.06 11.46
16 1 11.96 11.96 1.59 19.02 9.335 3.625
16 1 4.39 4.39 1.59 6.98 0.765 11.96 0.765
Stirupps 10 209 1.60 334.40 0.62 207.33

3.4 Grid A 1 7.89


Top bar 20 2 9.78 19.56 2.47 48.31 0.945 0.945
16 1 9.22 9.22 1.59 14.66
Bottom bar 16 3 9.22 27.66 1.59 43.98 0.665 7.89 0.665
Stirupps 10 57 1.60 91.60 0.62 56.79

3.5 Grid B 1 7.89


Top bar 20 2 9.78 19.56 2.47 48.31 0.945 0.945
16 1 9.22 9.22 1.59 14.66
Bottom bar 16 3 9.22 27.66 1.59 43.98
Stirupps 10 57 1.60 91.60 0.62 56.79 0.665 7.89 0.665

Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant SE DLPIU Engineer
3.6 Grid C 1 7.89
Top bar 20 2 9.78 19.56 2.47 48.31 0.945 0.945
16 1 9.22 9.22 1.59 14.66
Bottom bar 16 3 9.22 27.66 1.59 43.98 0.665 7.89 0.665
Stirupps 10 57 1.60 91.60 0.62 56.79

3.7 Grid D 1 7.89


Top bar 20 3 9.78 29.34 2.47 72.47 0.945 0.945
Bottom bar 16 3 9.22 27.66 1.59 43.98
Stirupps 10 57 1.60 91.60 0.62 56.79 0.665 7.89 0.665

3.8 Grid E 1 7.89


Top bar 20 3 9.78 29.34 2.47 72.47 0.945 0.945
Bottom bar 16 3 9.22 27.66 1.59 43.98
Stirupps 10 57 1.60 91.60 0.62 56.79 0.665 7.89 0.665

3.9 Secondary beam


Grid A1,B1,D1 3 7.89
Top bar 16 3 9.22 82.98 1.59 395.81 0.665 0.665
Bottom bar 16 3 9.22 82.98 1.59 395.81
Stirupps 10 56 1.35 227.81 0.62 423.73 0.665 7.89 0.665

Extra bar 1.68


For short span 0.1 0.1
Grid 2 1 12 2 3.60 7.20 0.89 6.41 3.4
12 1 3.00 3.00 0.89 2.67 0.1 0.1
12 1 2.25 2.25 0.89 2.00
0.96 0.96
0.42

Bent up bar in primary and


16 18 3.01 54.18 1.59 86.15 0.25
secondary beam junction
4.47
0.765 0.765
4 Landing Beam 0.2
Top bar 16 3 6 18 1.59 28.62 0.1
Bottom bar 16 3 6 18 1.59 28.62 0.375
Stirrups 1 10 42 1.35 56.7 0.62 35.154

5 Second Floor Slab Rebar 0.375 Type A


Grid A-C and D-E 3 0.085
Short Span 8.28
Main Bar Type A 8 20 8.74 524.10 0.4 209.64
Main bar Type B 8 20 8.83 530.04 0.4 212.02 Type B
0.375 0.55
Grid C-D 1 0.085 0.33
Main Bar Type A 8 15 3.66 54.90 0.4 21.96
Main bar Type B 8 15 3.86 57.90 0.4 23.16

Long Span
A-C 1
Main Bar Type A 8 19 13.92 264.48 0.4 105.79 0.45 Type A 0.45
Main bar Type B 8 19 14.12 268.24 0.4 107.30 0.085 0.085
6.2
D-E 1
Main Bar Type A 8 19 7.27 138.13 0.4 55.25
Main bar Type B 8 19 7.34 139.38 0.4 55.75

Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant SE DLPIU Engineer
A-E Grid (2-3) 1 Type B
Main bar 0.45 1.35 0.45
Main Bar Type A 8 13 24.62 320.06 0.4 128.02 0.085 0.33
Main bar Type B 8 13 25.02 325.21 0.4 130.08

Projected Portion
Along Long Span 2
Grid A-C 8 8 12.00 192.00 0.4 76.80
Grid D-E 8 8 6.00 96.00 0.4 38.40

Distribution Bar 12
Along Grid 1 1 8 4 18 72.00 0.4 28.80
Along Grid 2 1 8 13 22.98 298.74 0.4 119.50 8.5
Along Grid 3 1 8 4 22.98 91.92 0.4 36.77
Along Grid A 1 8 4 8.5 34.00 0.4 13.60
Along Grid A1,B,B1 & D1 3 8 12 8.5 306.00 0.4 122.40
Along Grid B,C, D and E 4 8 5 8.5 170.00 0.4 68.00
3.75

Negative bar
Along Grid A1,B1 & D1 3 8 14 2.16 90.72 0.4 36.29 0.055 2.05 0.055
Along Grid 2( A-C and D-E) 3 8 11 2.06 67.98 0.4 27.19 0.055 1.95 0.055
Along Grid 2 (C-D) 1 8 4 2.17 8.69 0.4 3.48
0.055 2.06 0.055

6 Second Floor Column


Grid A,B and E 9
Main Bar 20 2 3.48 62.64 2.47 154.72 20mmɸ 16mmɸ
16 4 3.24 116.64 1.59 185.46 6.48 6.24

Grid C and D 6
Main Bar 20 2 6.48 77.76 2.47 192.07
16 4 6.24 149.76 1.59 238.12

Stiruups 0.345 0.124


For 15 column 15 10 30 1.78 801 0.6 496.62 0.1 0.1
10 30 1.21 544.5 0.6 337.59 0.445 0.445
10 30 1.34 603 0.6 373.86

0.345
0.158 0.1

7 Staircase
7.1 First Flight
Top Main Bar 16 16 6.50 104.00 1.59 165.36 3 1.95
Bottom Main Bar 16 16 2.10 33.60 1.59 53.42 0.9 0.35
Top Distribution Bar 10 14 1.96 27.44 0.62 17.01 0.2
Bottom Distribution Bar 10 30 1.96 58.80 0.62 36.46 1
Extra Bar 16 15 2.00 30.00 1.59 47.70 0.2 0.9

Landing
Bottom bar in first flight 16 12 3.10 37.16 1.59 59.09 1
Top Distribution Bar 16 7 1.96 13.72 1.59 21.81 1
Bottom Distribution Bar 10 14 4.16 58.24 0.62 36.11
Top Distribution Bar 10 14 4.16 58.24 0.62 36.11 4.16
Extra Bar 16 15 2.00 30.00 1.59 47.70

Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant SE DLPIU Engineer
Projected Portion
Top Bar 16 1.96 5.00 9.80 1.59 15.58
Bottom Bar 16 1.96 5.00 9.80 1.59 15.58
1.88
7.2 Second Flight 1 0.21
Top Main Bar 16 12 6.50 78.00 1.59 124.02
Bottom main Bar 16 12 3.45 41.40 1.59 65.83 0.75 3
Bottom Distribution Bar 10 23 1.96 44.43 0.62 27.54 0.4
Top Distribution Bar 10 14 1.96 27.44 0.62 17.01 2.1 0.35
Extra Bar 16 30 2.00 60.00 1.59 95.40 1

Nosing Bar 10 20 1.96 39.20 0.62 24.30 2.1 0.35

Nosing ties 5 8 20 0.67 67.00 0.40 26.80


0.25 0.15
0.12
0.15
8 Third Floor Beam
Main Beam
8.1 Grid 1 1 9.34 3.63
Top Bar 16 2 5.72 11.43 1.59 18.17
16 2 11.46 22.92 1.59 36.45 0.765 12 0.765
16 2 9.13 18.25 1.59 29.02
16 1 10.10 10.10 1.59 16.06 11.46
16 1 11.96 11.96 1.59 19.02 0.765 4.96 8.37 0.765
16 1 4.39 4.39 1.59 6.98
Bottom bar 16 2 5.72 11.43 1.59 18.17 4.96 11.46 8.37
16 2 11.46 22.92 1.59 36.45 0.765 0.765
16 2 9.13 18.25 1.59 29.02
16 1 10.10 10.10 1.59 16.06
16 1 11.96 11.96 1.59 19.02 9.335 3.625
16 1 4.39 4.39 1.59 6.98 0.765 11.96 0.765
Stirupps 10 209 1.60 334.40 0.62 207.33

8.2 Grid 2 1 9.84 3.45


Top Bar 20 2 10.88 21.76 2.47 53.75
20 2 12.00 24.00 2.47 59.28 1.045 12 1.045
20 2 4.50 9.00 2.47 22.23
16 1 4.69 4.69 1.59 7.46 11.91
16 1 11.91 11.91 1.59 18.94 0.765 3.93 8.88 0.765
16 1 9.64 9.64 1.59 15.33
Bottom bar 16 2 5.72 11.43 1.59 18.17
16 2 11.46 22.92 1.59 36.45 4.96 8.365
16 2 9.13 18.25 1.59 29.02 0.765 0.765
16 1 10.10 10.10 1.59 16.06 11.46
16 1 11.96 11.96 1.59 19.02 9.335 3.625
16 1 4.39 4.39 1.59 6.98 0.765 11.96 0.765
Stirupps 10 209 1.60 334.40 0.62 207.33

8.3 Grid 3 1 9.34 3.63


Top Bar 16 2 5.72 11.43 1.59 18.17
16 2 11.46 22.92 1.59 36.45 0.765 12 0.765
16 2 9.13 18.25 1.59 29.02
16 1 10.10 10.10 1.59 16.06 11.46
16 1 11.96 11.96 1.59 19.02 0.765 4.96 8.37 0.765
16 1 4.39 4.39 1.59 6.98
Bottom bar 16 2 5.72 11.43 1.59 18.17 4.96 8.365
16 2 11.46 22.92 1.59 36.45 0.765 0.765

Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant SE DLPIU Engineer
16 2 9.13 18.25 1.59 29.02 11.46
16 1 10.10 10.10 1.59 16.06 9.335 3.625
16 1 11.96 11.96 1.59 19.02 0.765 11.96 0.765
16 1 4.39 4.39 1.59 6.98
Stirupps 10 209 1.60 334.40 0.62 207.33
7.89
8.4 Grid A 1 0.665 0.665
Top bar 16 3 9.22 27.66 1.59 43.98
Bottom bar 16 3 9.22 27.66 1.59 43.98 0.665 7.89 0.665
Stirupps 10 57 1.60 91.60 0.62 56.79
7.89
8.5 Grid B 1 0.665 0.665
Top bar 16 3 9.22 27.66 1.59 43.98
Bottom bar 16 3 9.22 27.66 1.59 43.98
Stirupps 10 57 1.60 91.60 0.62 56.79 0.665 7.89 0.665

8.6 Grid C 1 7.89


Top bar 20 2 9.78 19.56 2.47 48.31 0.945 0.945
16 1 9.22 9.22 1.59 14.66
Bottom bar 16 3 9.22 27.66 1.59 43.98 0.665 7.89 0.665
Stirupps 10 57 1.60 91.60 0.62 56.79

8.7 Grid D 1 7.89


Top bar 20 2 9.78 19.56 2.47 48.31 0.945 0.945
16 1 9.22 9.22 1.59 14.66
Bottom bar 16 3 9.22 27.66 1.59 43.98 0.665 7.89 0.665
Stirupps 10 57 1.60 91.60 0.62 56.79
7.89
8.8 Grid E 1 0.665 0.665
Top bar 16 3 9.22 27.66 1.59 43.98
Bottom bar 16 3 9.22 27.66 1.59 43.98 0.665 7.89 0.665
Stirupps 10 57 1.60 91.60 0.62 56.79
7.89
8.9 Secondary beam 0.665 0.665
Grid A1,B1,D1 3
Top bar 16 3 9.22 82.98 1.59 395.81 0.665 7.89 0.665
Bottom bar 16 3 9.22 82.98 1.59 395.81
Stirupps 10 56 1.35 227.81 0.62 423.73 1.68
0.1 0.1
Extra bar
For short span 3.4
Grid 2 1 12 2 3.60 7.20 0.89 6.41 0.1 0.1
12 1 3.00 3.00 0.89 2.67
12 1 2.25 2.25 0.89 2.00 0.96 0.96
0.42

0.25
Bent up bar in primary and
16 18 3.01 54.18 1.59 86.15 4.47
secondary beam junction
0.765 0.765
0.2
9 Landing Beam 0.1
Top bar 16 3 6 18 1.59 28.62 0.375
Bottom bar 16 3 6 18 1.59 28.62
Stirrups 1 10 42 1.35 56.7 0.62 35.154

10 Third Floor Slab Rebar Type A


Grid A-C and D-E 3
Short Span 9.8

Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant SE DLPIU Engineer
Main Bar Type A 8 20 9.80 588.00 0.4 235.20
Main bar Type B 8 20 10.20 612.00 0.4 244.80 Type B
2.4 1.88 2.05
Grid C-D 1
Main Bar Type A 8 15 4.30 64.50 0.4 25.80
Main bar Type B 8 15 4.5 67.50 0.4 27.00

Long Span
A-C 1
Main Bar Type A 8 19 14.16 269.04 0.4 107.62 0.45 Type A 0.45
Main bar Type B 8 19 14.86 282.34 0.4 112.94 0.085 0.085
6.2
D-E 1
Main Bar Type A 8 19 8.16 155.04 0.4 62.02 Type B
Main bar Type B 8 19 8.86 168.34 0.4 67.34
2.4 1.88 2.05
A-E Grid (2-3) 1
Main bar
Main Bar Type A 8 13 25.76 334.88 0.4 133.95
Main bar Type B 8 13 27.16 353.08 0.4 141.23

Projected Poetion 8
Along Long Span
Along Grid 1 1
Grid A-C 8 16 14.00 224.00 0.4 89.60
Grid D-E 8 16 8.00 128.00 0.4 51.20

Along Grid 3 1 12
Grid A-C 8 22 14.00 308.00 0.4 123.20
Grid D-E 8 22 8.00 176.00 0.4 70.40

Along Grid A and E 2 8 14 9.50 266.00 0.4 106.40 12

Distribution Bar 8.5


Along Grid 1 1 8 2 18 36.00 0.4 14.40
Along Grid 2 1 8 13 22.98 298.74 0.4 119.50
Along Grid 3 1 8 2 22.98 45.96 0.4 18.38
Along Grid A 1 8 2 8.5 17.00 0.4 6.80
Along Grid A1,B,B1 & D1 4 8 12 8.5 408.00 0.4 163.20
Along Grid C, D and E 3 8 5 8.5 127.50 0.4 51.00
3.75
Negative bar
Along Grid A1,B1 & D1 4 8 14 2.16 120.96 0.4 48.38 0.055 2.05 0.055
Along Grid 2( A-D and D-E) 2 8 11 2.06 45.32 0.4 18.13 0.055 1.95 0.055
Along Grid 2 (C-D) 1 8 4 2.17 8.69 0.4 3.48
0.055 2.06 0.055

11 Third Floor Column


Grid C and D 6
Main Bar 20 2 3.48 41.76 2.47 103.15 20mmɸ 16mmɸ
16 4 3.24 77.76 1.59 123.64 3.48 3.24

Stiruups 0.345 0.124


For 6 column 6 10 26 1.78 277.68 0.6 172.16 0.1 0.1
10 26 1.21 188.76 0.6 117.03 0.445 0.445
10 26 1.34 209.04 0.6 129.60

0.345

Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant SE DLPIU Engineer
0.158 0.1

12 Roof Top Beam


Grid 1, and 3 3 4.91
Top bar 16 3 6.44 57.96 1.59 92.16 0.765 0.765
Bottom bar 16 3 6.44 57.96 1.59 92.16
Stirupps 10 34 1.60 163.20 0.62 101.18 0.765 4.91 0.765

Grid C and D 2 7.89


Top bar 16 3 9.22 55.32 1.59 87.96 0.665 0.665
Bottom bar 16 3 9.22 55.32 1.59 87.96
Stirupps 10 57 1.60 183.20 0.62 113.58 0.665 7.89 0.665

13 Roof Top Slab Rebar Type A


Grid C-D 1 6.30
Short Span
Main Bar Type A 8 25 6.30 157.50 0.4 63.00 2.02 Type B 2.02
Main bar Type B 8 25 6.50 162.50 0.4 65.00

Grid C-D 1
Long Span Type A
A-C 1
Main Bar Type A 8 20 9.3 186.00 0.4 74.40 6.2
Main bar Type B 8 20 9.70 194.00 0.4 77.60
Type B

2.4 1.88 2.05

Distribution Bar
Along Grid C, D 2 8 5 8.5 85.00 0.4 34.00
3.75
Negative bar
Along Grid 2 (C-D) 1 8 4 2.17 8.69 0.4 3.48
0.055 2.06 0.055

14 Lintel Bands
Ground floor level
Main Bar
Along grid A,B,C,D,E 10 10 2 4.93 98.60 0.62 61.13
Along grid 1 3 10 2 6.03 36.18 0.62 22.43
Along grid 2 3 10 2 6.03 36.18 0.62 22.43 0.075 0.075
At store 2 10 2 6.03 24.12 0.62 14.95 6.03
Tie Bar 0.075 0.075
Along grid A,B,C,D,E 10 8 38 0.40 152.00 0.40 60.80 0.25
Along grid 1 3 8 38 0.40 45.60 0.40 18.24
Along grid 2 3 8 38 0.40 45.60 0.40 18.24
At store 2 8 38 0.40 30.40 0.40 12.16

First floor level


Main Bar
Along grid A,B,C,D,E 10 10 2 4.93 98.60 0.62 61.13
Along grid 1 3 10 2 6.03 36.18 0.62 22.43
Along grid 2 3 10 2 6.03 36.18 0.62 22.43
Tie Bar
Along grid A,B,C,D,E 10 8 38 0.40 152.00 0.40 60.80
Along grid 1 3 8 38 0.40 45.60 0.40 18.24
Along grid 2 3 8 38 0.40 45.60 0.40 18.24

Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant SE DLPIU Engineer
Second floor level
Main Bar
Along grid A,B,C,D,E 10 10 2 4.93 98.60 0.62 61.13
Along grid 1 3 10 2 5.85 35.10 0.62 21.76
Along grid 2 3 10 2 5.85 35.10 0.62 21.76
Tie Bar
Along grid A,B,C,D,E 10 8 38 0.40 152.00 0.40 60.80
Along grid 1 3 8 38 0.40 45.60 0.40 18.24 0.075 0.075
Along grid 2 3 8 38 0.40 45.60 0.40 18.24 5.88

Third floor level


Main Bar
Along grid C,D 2 10 2 4.93 19.72 0.62 12.23
Along grid 1 1 10 2 5.85 11.70 0.62 7.25
Along grid 3 1 10 2 5.85 11.70 0.62 7.25
Tie Bar
Along grid C,D 2 8 38 0.40 30.40 0.40 12.16
Along grid 1 1 8 38 0.40 15.20 0.40 6.08
Along grid 3 1 8 38 0.40 15.20 0.40 6.08

15 Sill Bands
Ground floor level
Main Bar
Along grid A,B,C,D,E 10 10 2 4.93 98.60 0.62 61.13
Along grid 1 3 10 2 6.03 36.18 0.62 22.43
Along grid 2 3 10 2 6.03 36.18 0.62 22.43 0.075 0.075
At store 2 10 2 6.03 24.12 0.62 14.95 5.88
Tie Bar 0.075 0.075
Along grid A,B,C,D,E 10 8 38 0.40 152.00 0.40 60.80 0.25
Along grid 1 3 8 38 0.40 45.60 0.40 18.24
Along grid 2 3 8 38 0.40 45.60 0.40 18.24
At store 2 8 38 0.40 30.40 0.40 12.16

First floor level


Main Bar
Along grid A,B,C,D,E 10 10 2 4.93 98.60 0.62 61.13
Along grid 1 3 10 2 6.03 36.18 0.62 22.43
Along grid 2 3 10 2 6.03 36.18 0.62 22.43
Tie Bar
Along grid A,B,C,D,E 10 8 38 0.40 152.00 0.40 60.80
Along grid 1 3 8 38 0.40 45.60 0.40 18.24
Along grid 2 3 8 38 0.40 45.60 0.40 18.24

Second floor level


Main Bar
Along grid A,B,C,D,E 10 10 2 4.93 98.60 0.62 61.13
Along grid 1 3 10 2 6.03 36.18 0.62 22.43
Along grid 2 3 10 2 6.03 36.18 0.62 22.43
Tie Bar
Along grid A,B,C,D,E 10 8 38 0.40 152.00 0.40 60.80
Along grid 1 3 8 38 0.40 45.60 0.40 18.24 0.075 0.075
Along grid 2 3 8 38 0.40 45.60 0.40 18.24 5.88

Third floor level


Main Bar
Along grid C,D 2 10 2 4.93 19.72 0.62 12.23
Along grid 1 1 10 2 5.85 11.70 0.62 7.25
Along grid 3 1 10 2 5.85 11.70 0.62 7.25
Tie Bar
Along grid C,D 2 8 38 0.40 30.40 0.40 12.16

Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant SE DLPIU Engineer
Along grid 1 1 8 38 0.40 15.20 0.40 6.08
Along grid 3 1 8 38 0.40 15.20 0.40 6.08

16 Band at Parapet
Band at Top Floor Wall 2 10 2 6.45 25.80 0.40 10.32
1 10 2 48.00 96.00 0.40 38.40
1 10 2 13.00 26.00 0.40 10.40
1 10 2 30.00 60.00 0.40 24.00
Tie Bar 1 8 640 0.40 256.00 0.40 102.40

17 Vertical Bands
Ground Floor 12
Main Bar 10 2 2.95 70.80 0.62 43.90
Tie Bar 8 17 0.40 81.60 0.40 32.64

First Floor 12
Main Bar 10 2 2.95 70.80 0.62 43.90
Tie Bar 8 17 0.40 81.60 0.40 32.64

Second Floor 12
Main Bar 10 2 2.95 70.80 0.62 43.90
Tie Bar 8 17 0.40 81.60 0.40 32.64
Total 41014.65 kgs
41.01 MT.

Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant SE DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-9C(XS)-B
School Name : Shree Devi Jal Kumari Lower Secondary School
Location : Aaruarbang, Gorkha
Reinforcement of Septic and Soak pit tank
length Total Total
S. No Item Description Dia Lot No wt/m Remarks
m length Quantity
1 Septic tank
Beam
Long span

16 2 2 8.34 33.36 1.58 52.71


695 6950 695

12 2 1 7.78 15.56 0.89 13.82


415 6950 415

85 85 16 2 2 7.12 28.48 1.58 45.00


6950

85 85 12 2 1 7.12 14.24 0.89 12.65

6950
200

8 2 70 1.06 148.40 0.40 58.62


80
250

short span

16 1 2 5.79 11.58 1.58 18.30


695 4400 695

12 1 1 5.23 5.23 0.89 4.64


415 4400 415

85 85 16 2 2 4.57 18.28 1.58 28.88

4400

85 85 12 2 1 4.57 9.14 0.89 8.12

4400
200

8 1 45 1.06 47.70 0.40 18.84


80
250

slab
Along Y axis

110 8 1 45 5.12 230.40 0.40 91.01 Main Bar


5010

distribution bar 8 2 13 4.91 127.66 0.40 50.43


negetive bar 8 1 47 5.06 237.82 0.40 93.94
along X axis

1915
110 8 1 34 9.03 306.85 0.40 121.21 Main Bar
7000
distribution bar 8 2 10 7.00 140.00 0.40 55.30
Corner bars 10 12 3 0.60 21.60 0.62 13.33
Concealed beam
main bars 10 2 4 6.60 52.80 0.62 32.58

Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant SE DLPIU Engineer
stirrups 8 2 41 0.56 45.92 0.40 18.14
Steps at septic tank 16 2 5 0.60 6.00 1.58 9.48
2 Soak pit
Beam 16 1 4 12.74 50.94 1.58 80.49
12 1 2 12.50 24.99 0.89 22.19
Slab 8 1 2 1.17 2.33 0.40 0.92
8 1 2 1.80 3.60 0.40 1.42
8 1 2 2.23 4.45 0.40 1.76
8 1 2 2.55 5.09 0.40 2.01
8 1 2 2.80 5.60 0.40 2.21
8 1 2 3.00 6.00 0.40 2.37
8 1 2 3.16 6.32 0.40 2.50
8 1 2 3.28 6.56 0.40 2.59
8 1 2 3.38 6.76 0.40 2.67
8 1 4 1.35 5.40 0.40 2.13
8 1 4 1.37 5.47 0.40 2.16
8 1 4 1.38 5.50 0.40 2.17
negetive bar 8 1 23 0.60 13.80 0.40 5.45
distribution bar 8 1 4 10.99 43.96 0.40 17.36
Total 897.38 Kg
0.90 Mt.

Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant SE DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Job: Site Development
School Name : Shree Devi Jal Kumari Lower Secondary School
Location : Aaruarbang, Gorkha

Length Breadth
S.No Description No. Height (m) Qty. Unit Remarks
(m) (m)
1 Site Clearance
Infront of Bldg 1 16.50 2.50 41.25
1 6.00 1.50 9.00
Side of Bldg 1 6.00 2.50 15.00
From Gate to Bldg 1 23.50 2.50 58.75
At Gate 1 5.00 2.50 12.50
Septic Tank 1 8.75 3.95 34.56
Soak Pit 1 8.55 Area 8.55
For Sewer Manhole (Rectangular) 2 1.00 1.00 2.00
Total 181.61 sq.m
2 Earth Work Excavation
Infront of Bldg 1 16.50 2.50 0.15 6.19
1 6.00 1.50 0.15 1.35
Side of Bldg 1 6.00 2.50 0.15 2.25
From Gate to Bldg 1 23.50 2.50 0.15 8.81
At Gate 1 5.00 2.50 0.15 1.88

Excavation For Boundary Wall


Chain Link Fence 55 0.15 0.15 0.60 0.74
Excavation For Gate Column
Column 2 1.20 1.20 1.50 4.32
Excavation For Flag Pole
Flag Pole 2 0.60 0.60 1.00 0.72
2 1.10 0.50 0.15 0.17
2 1.60 0.25 0.15 0.12
1 0.60 0.40 0.15 0.04

For Septic Tank 1 6.30 2.45 2.77 42.75


1 1.43 1.75 1.19 2.97
Soak Pit small 1 4.15 Area 1.55 6.44
For Sewer Manhole (Rectangular) 2 1.00 1.00 0.71 1.41
Total 80.15 cu.m

3 Earth Back Filling


Total Excavation Work 1 26.58 26.58
Deduction
Soling -1 19.79 -19.79
PCC -1 1.70 -1.70
5.09 cu.m

4 Boulder Soling
Infront of Bldg 1 16.50 2.50 0.15 6.19
1 6.00 1.50 0.15 1.35
Side of Bldg 1 6.00 2.50 0.15 2.25
From Gate to Bldg 1 23.50 2.50 0.15 8.81
At Gate 1 5.00 2.50 0.15 1.88
Chain Link Fence 55 0.15 0.15 0.15 0.19
Soling For Gate Column
Column 2 0.90 0.90 0.20 0.32
Stone Soling for Flag Pole 1 0.70 0.80 0.35 0.20
Total 21.18 cu.m
5 P.C.C.(1:3:6) Works
PCC For Gate Column

Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant SE DLPIU Engineer
Length Breadth
S.No Description No. Height (m) Qty. Unit Remarks
(m) (m)
Column 2 0.90 0.90 0.08 0.12
PCC For Flag Pole
Flag Pole 2 0.30 0.30 1.20 0.22
1 2.40 0.80 0.10 0.19
2 0.30 0.30 0.08 0.01
Total 0.54 cu.m
6 P.C.C.(1:2:4) Works
Infront of Bldg 1 16.50 2.50 0.08 3.09
1 6.00 1.50 0.08 0.68
Side of Bldg 1 6.00 2.50 0.08 1.13
From Gate to Bldg 1 23.50 2.50 0.08 4.41
At Gate 1 5.00 2.50 0.08 0.94
Total 10.24 cu.m
7 P.C.C For R.C.C. Works
R.C.C. Works M20
A Foundation
Gate Column Footing
Footing 2 0.90 0.90 0.25 0.41

B Column
Gate Column 2 0.30 0.30 2.95 0.53
Top RCC Coping 2 0.59 0.59 0.05 0.03
2 0.175 0.05 0.02
Total 0.99 cu.m

8 Silica Cement Admixture


10 Kg per cu.m. of R.C.C. M20 10.00 0.98831 9.88
Total 9.88 Kg
9 Steel Reinforcement
For gate
Total
At base of the footing kg per m
length
Main bar(10mm) 12 0.9 10.80 0.62 6.70
Distribution bar(10mm) 12 0.9 10.80 0.62 6.70
For column Ld (12mm) 16 0.4815 7.70 0.89 6.86
For column (12mm) 16 2.8 44.80 0.89 39.87
For stirrups (external) 8mm 54 1.138 61.45 0.39 23.97
For stirrups (Internal)) 8mm 54 0.72 38.88 0.39 15.16
Total 99.25 Kg
0.10 Tons
10 Formworks
A Entrance Gate-Foundation 2 3.60 0.35 2.52
Gate Column 2 1.20 3.15 7.56
Flag Pole Steps 2 0.25 0.80 0.4
Flag Pole Masonry Top Surface 1 1.70 0.50 0.85
Total 11.33 sq.m

12 Full Brick (230 mm) Works (1:4c/s)


Gate Column 2 0.54 0.23 1.85 0.46
2 0.3 0.23 0.45 0.06
Flag Pole Base 2 0.8 0.23 0.55 0.20
Total 0.72 cu.m

13 Neat Cement Skirting works


Gate Column 2 2.2 4.40
Total 4.40 r.m

14 Metal Works (Fence)

Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant SE DLPIU Engineer
Length Breadth
S.No Description No. Height (m) Qty. Unit Remarks
(m) (m)
Total
Description Nos length Kg/m Total
Length
Chain Link Fence
ISA 40x40x4mm 2 133 266.00 2.40 638.40
ISA 50x50x5mm 55 1.90 104.50 3.80 397.10
Total 1,035.50 k.g

15 Metal work (Entrance Gate)


Metal Gate
50mm Dia MS Pipe 2 7.13 14.26 3.61 51.48
25mm Dia MS Pipe 56 0.7 39.2 1.58 61.94
Middle sheet 1 0.74 0.0012 7850 6.97
Hole Fast 4 0.45 1.8 3.61 2.92
Total 123.31 k.g

16 Chain Link Fence(50x50 Mesh)


Fencing 1.00 133 1.20 159.60
Total 159.60 sq.m

17 External Plaster
Column Inside face 4 0.54 1.64 3.54
Column Outside face 2 1.2 0.20 0.48
4 0.54 1.70 3.67
Deduct -2 0.3 1.40 -0.84
Top Coping 2 2.36 0.05 0.24
4 0.59 0.30 0.71
Total 7.80 sq.m

18 Exterior Weather Coat Paint


As per Outside Plaster 1 7.8 7.80
Gate Column Skirting 2 2.36 0.10 0.47
Total 8.27 sq.m

19 Flag Pole
75 Dia GI Pipe 2.00 1 2.00
Total 2.00 nos

Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant SE DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: 3-9C(XS)
School Name : Shree Devi Jal Kumari Lower Secondary School
Location : Aaruarbang, Gorkha

Site 3-9C(XS)-A Total


S. No. Description Unit Remarks
Development G.F F.F S.F TF Quantity
A. Common Installation
1.1 Stand Alone 40 A DP MCB with Enclosure 1 nos.
2 CABLES & WIRES
2 Nos 10 Sq.mm + 1 No 6 Sq.mm mutistranded
2.1 56 r.m
copper conductor wires
B School Blocks
1 DISTRIBUTION BOARDS 1.00 1.00 1.00 3.00 nos.
2 CABLES & WIRES
2 Nos 6 Sq mm Multistranded Cu Wire + 1 No 4
2.1 9.00 r.m
Sq mm Multistranded Cu wire
2 Nos 4 Sq mm Multistranded Cu Wire + 1 No 2.5
2.2 13.00 r.m
Sq mm Multistranded Cu wire
2 Nos 2.5 Sq mm Multistranded Cu Wire + 1 No
2.3 31.00 r.m
1.5 Sq mm Multistranded Cu wire
3 General Service Light Point Wiring
3.1 One Way Light Point 6 17.00 17.00 17.00 2.00 59.00 pts.
3.2 Two Way Light Point 1.00 1.00 2.00 pts.
3.4 Exhaust Fan point 4 4.00 nos.
4 6A Universal Pin Light Power Socket Wiring 4.00 22.00 16.00 42.00 pts.
5 Switch Socket Outlets
5.1 6A Universal Power Switch Socket 4.00 22.00 16.00 42.00 nos.
6 Sweep Ceiling/ Exhaust Fan/Wall Fan
6.1 225mm dia M/D exhaust Fan 4 4.00 nos.
7 Light Fixtures/Luminaires & Accessories
7.1 24 W LED Recessed Mounted Square type 4 4 nos.
7.2 18 W LED Surface Mounted Square type 8 12 8 28 nos.
7.3 12 W LED Surface Mounted Cylindrical type 8 5 5 2 20 nos.
7.4 6 W LED Circular Surface type 5 5 nos.
7.5 LED Wall Light 1 1 nos.
8 Pull Box nos.
Junction Box At External Post Top Light 3 3 no.
11 Earthing & Lighting Protection
11.1 Chemical Earthing 3 3 no.
11.2 Earthing Bar 3 3 no.
12 Earthing Strip/Wires
12.3.1 25 x 3 mm GI strip 67 r.m
12.3.2 12 SWG Cu wire 14 r.m
13 Earth Test link 1 nos.
14 Lightning Arrester 1 nos.
C Solar PV System
1 Solar PV Panel 8 nos.
2 Tubular Deep Cycle Battery 4 nos.
3 Hybrid Inverter 1 no.
D Fire Extinguisher
a ABC Stored Pressure 5.0kg size 1 3 4 nos.

Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant SE DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: 3-9C(XS)
School Name : Shree Devi Jal Kumari Lower Secondary School
Location : Aaruarbang, Gorkha
Length
S. No. Description No. Quantity Unit Remarks
(m)
1 WATER SUPPLY INSTALLATION
a CPVC pipes SDR-11
40 mm 1 88 88.00 r.m
25mm 1 6 6.00 r.m
c CPVC Ball Valve
40 mm 3 3.00 nos.
25 mm 2 2.00 nos.
d Electrical Centrifugal Water Pump 1 1.00 nos.
e 2000 litres Capacity Water Storage Tank 1 1.00 nos.
2 Sewer, Rain and Waste Water Installation
110 mm 1 22 22.00 r.m
75mm 1 19 19.00 r.m
50mm 1 5 5.00 r.m
B School Blocks
1 Sanitary Installation
a Water Closet Set 1 1.00 set
b Orissa Pan 4 4.00 set
c Hand Wash Basin 5 5.00 set
d Ladies Urinal 2 2.00 set
e Self Closing Bib Cock 4 4.00 nos.
f CP Spreader in Urinal 4 4.00 set
g Toilet Paper Holder 1 1.00 nos.
h Commode Spray 1 1.00 nos.
i PVC Multi Floor Trap 3 3.00 nos.
j Waste Coupling and PVC Bottle Trap 1 1.00 nos.
k 40mm SS Grab Bar-Side 1 1.00 nos.
l 40mm SS Grab Bar-Rear 1 1.00 nos.
m CP Foldable Hinge 1 1.00 nos.

Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant SE DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: 3-9C(XS)
School Name : Shree Devi Jal Kumari Lower Secondary School
Location : Aaruarbang, Gorkha

S.N Furniture Description Symbol Qty Unit Remarks


Classroom
1 ECD Student Desk (6 Seater) D-03 2 nos.
2 Student Desk G3-5 (3 Seater) D-02B 7 nos.
3 Student Bench G3-5 (3 Seater) B-02B 7 nos.
4 Student Desk G6-12 (3 Seater) D-02C 21 nos.
5 Student Bench G6-12 (3 Seater) B-02C 27 nos.
6 Soft Board F-01 1 nos.
7 Book Shelf F-02 3 nos.
8 Teacher's Table T-01 7 nos.
9 Teacher's Chair C-01 7 nos.
10 White Board F-03 6 nos.
Library
11 Library Table T-02 4 nos.
12 Library Shelf F-04 3 nos.
Computer
13 Computer Table T-04 8 nos.
14 Computer Shelf C-02 16 nos.
15 White Board with Stand F-05 1 nos.
Office
16 Cabinet F-06 2 nos.
17 Office Table (2 sides Drawe Unit) T-05 1 nos.
18 Office Table (1 sides Drawe Unit) T-06 2 nos.
19 Office Chair C-03 4 nos.
20 Office Chair- Headmaster C-04 1 nos.
21 Office Visitor Chair C-05 6 nos.
Miscellaneous
22 Cusions F-16 12 nos.
23 Carpet 38.98 sq.m
24 File Cabinet F-10 2 nos.
25 Notice Board F-14 1 nos.
Total 151 nos.

Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant SE DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Job : Reservoir Water Tank
School Name : Shree Devi Jal Kumari Lower Secondary School
Location : Aaruarbang, Gorkha

Description Length Breadth Height


S. No. No. Quantity Unit Remarks
(m) (m) (m)
1 Earthworks
1.1 Site Clearance & Mobilization
For Water Tank 1 4.85 4.6 22.31
Total 22.31 sq.m

1.2 Earthwork in excavation


For Water Tank 1 3.65 3.40 1.98 24.57
Total 24.57 Cu.m.

1.3 Earthback Filling


Total Earthwork Excavated 24.57
Water Tank Volume -1 3.35 3.1 1.98 -20.56
Total 4.01 Cu.m.

1.4 Boulder soling


Below Water Tank 1 3.35 3.1 0.2 2.077
Total 2.08 Cu.m.

2 Concrete Works
2.1 PCC
2.1.1 PCC Work (1:3:6)
Below Water Tank 1 3.35 3.1 0.075 0.78
Total 0.78 Cu.m.

2.2 PCC for RCC Work 1:1.5:3


For Base Slab 1 3.35 3.10 0.18 1.82
For Water Tank Wall
Long Wall 2 3.35 0.18 1.68 1.96
Short Wall 2 2.75 0.18 1.68 1.61
Trianagle Portion
Long Wall 2 3.00 0.05 Area 0.27
Short Wall 2 2.75 0.05 Area 0.25
Slab 1 3.35 3.1 0.15 1.56
Manhole openings -1 0.6 0.6 0.15 -0.05
Total 7.41 Cu.m.

2.3 Silica Admixture


10 Kg per cu.m. of R.C.C. M20 10 7.41 74.15
Total 74.15 kg

2.5 Form works


For Base Slab 1 12.9 0.18 2.26
For Water Tank Wall
Outer Side
Long Wall 2 3.35 1.83 12.23 23.18
Short Wall 2 3.00 1.83 10.95
Inside wall

Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant SE DLPIU Engineer
Description Length Breadth Height
S. No. No. Quantity Unit Remarks
(m) (m) (m)
Long Wall 2 3.00 1.53 9.15
Short Wall 2 2.75 1.53 8.39
Trianagle Portion
Long Wall 2 3.00 0.30 1.80
Short Wall 2 2.75 0.30 1.65
Slab 1 3 2.75 8.25
Side for Manhole openings 1 2.4 0.15 0.36
Deduct Manhole openings -1 0.6 0.60 -0.36
Total 54.67 Sq.m.

3 PLASTERING WALL FINISHING WORKS


3.1.1 CEMENT PLASTER WORKS WITH PUNNING
Base Slab 1 2.30 2.13 4.90
For Water Tank Wall
Long Wall 2 3.05 1.37 8.36
Short Wall 2 2.78 1.37 7.62
Triangle Portion
Long Wall 2 3.00 0.42 2.54
Short Wall 2 2.78 0.42 2.36
Top Slab 1 3.00 2.75 8.25
Deduct Manhole openings -1 0.6 0.60 -0.36
Total 33.66 Sq.m.

4 Water Proof Coating


Inside Water tank 1 33.66
Total 33.66 sq.m

Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant SE DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Job : Reservoir Water Tank
School Name : Shree Devi Jal Kumari Lower Secondary School
Location : Aaruarbang, Gorkha
Bar Bending Schedule
Cut Total
Dia. of No. of Wt/m Weight
S. No. Description No. Length Length Bar Shape
Bar (mm) Bars (Kg) (Kg)
(m) (m)
A Outer Vertical Bars 1
1 Shorter Span 10 33 7.01 231.33 0.62 143.42 0.083 0.083

1.915 1.915

3.02

2 Longer span 10 28 7.286 204.008 0.62 126.48


0.083 0.083

1.915 1.915

3.29

B Inner Vertical Bars 2


1 Shorter Span 10 33 2.503 165.198 0.62 102.4228 0.079 0.079

1.884 1.884

0.05
0.49 0.49

2 Longer Span 10 28 2.503 170.204 0.62 105.5265 0.079 0.079

1.884 1.884

0.05
0.49 0.49

C. Extra Bars 2 10 62 1.79 221.96 0.62 137.62 0.6 0.6

0.592
0.592 0.6 0.6

D. Horizontal Bars(outer 4
0.3 0.3
1 Shorter Span 10 20 3.62 289.6 0.62 179.552

3.02 3.02

0.3 0.3

2 Longer Span 10 20 3.87 309.6 0.62 191.952 0.3 0.3

Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant SE DLPIU Engineer
Cut Total
Dia. of No. of Wt/m Weight
S. No. Description No. Length Length Bar Shape
Bar (mm) Bars (Kg) (Kg)
(m) (m)

3.27 3.27

0.3 0.3
E. Base Slab bar 4
1 Shorter Span 10 32 3.14 401.92 0.62 249.19 3.045
0.05 0.05

2 Longer Span 10 28 3.42 383.04 0.62 237.48 3.32


0.05 0.05
1473.65 Kg
1.47 Mt.

Submitted By: Checked By: Approved By: