You are on page 1of 101

MUSTER ROLL

Project Name: Emergency School Reconstruction Project


School Name: Shree gyanjyoti S.S, Hansapur, Gorkha

Month: Chaitra
Dates
S.N Name of worker Category of Labour Type of Work Rate Amount(NRS)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

1 Bhim tamang Skilled 1300

2 Ramesh tamang Skilled 1300

3 Arun tamang Skilled 1300

4 Surendra tamang Skilled 1300

5 Suresh tamang Skilled 1300

6 Ajay tamang Unskilled 800

7 Bhim limbu Unskilled Site clearance ü 800 800

8 Karan limbu Unskilled Site clearance ü 800 800

9 Shyam limbu Unskilled 800


manual excavation for reservoir
10 Manu tamang Unskilled tank ü 800 800
manual excavation for reservoir
11 Ashish limbu Unskilled tank ü 800 800

12 Ashok tamang Unskilled 800

13 Santosh tamang Unskilled 800

Total Amt 3200

Checked by:
Prepared by: Nawaraj gurung and Kushal Gurung Abiral K. Bhattarai
Site Engineer
MUSTER ROLL
Project Name: Emergency School Reconstruction Project
School Name: Shree gyanjyoti S.S, Hansapur, Gorkha

Month: Baisakh
Dates
S.N Name of worker Category of Labour Type of Work Rate Amount(NRS)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

1 Bhim tamang Skilled 1300

2 Ramesh tamang Skilled 1300

3 Arun tamang Skilled 1300

4 Surendra tamang Skilled 1300

5 Suresh tamang Skilled Channel installation(Mixer) ü 1300 1300

6 Ajay tamang Unskilled Channel installation(Mixer) ü 800 800

7 Bhim limbu Unskilled Site clearance ü 800 800

8 Karan limbu Unskilled Site clearance ü 800 800

9 Shyam limbu Unskilled 800

10 Manu tamang Unskilled 800

11 Ashish limbu Unskilled 800

12 Ashok tamang Unskilled 800

13 Santosh tamang Unskilled 800

Total Amt 3700

Checked by:
Prepared by: Nawaraj gurung and Kushal Gurung Abiral K. Bhattarai
Site Engineer
Government of Nepal
National Reconstruction Authority
Central Level Project Implementation Unit (Education)
District Level Project Implementation Unit (Education),Gorkha
Emergency School Reconstruction Project (ESRP), JICA Loan No. : NE-P11
Contract Bills
FINAL INTERIM PAYMENT CERTIFICATE
Period: 15th November 2018 to 10th August 2020
Name of School: Shree Gyanjyoti S. S. School Payment Voucher no:
Name of Contractor:Sharma-A.M Joint Venture Date of payment:
Contract Number:ESRP/MOE/CLPIU/074/075-GORKHA-15 Page no of measurement book:
Serial no. of previous payment bills: 7
Voucher no.of previous payment bills:
Date of order for commencement of work: 3rd October,2018
Date of work to be completed: 2nd February,2020
Date of completion of work:
Bill of Quantities Up to Date of work till now Previous Bill Currently Accomplished work
Pay
Item Description Unit Quantity As % completion Remarks
No. Rate Amount Quantity Amount Quantity Amount Quantity Amount
per Contract

GENERAL
1. MOBILIZATION AND DEMOBILIZATION
1 L.S. 1.00 500,000.00 500,000.00 1.00 500,000.00 1.00 500,000.00 0.00 - 100.00%
Mobilization of the construction by constructing
temporary
2. SITE OFFICE acomodation for labours and site staff with Per
ESTABLISHMENT
2 required 16.00 25,000.00 400,000.00 16.00 400,000.00 16.00 400,000.00 0.00 - 100.00%
Providingsuitable facilities andSite
and Maintaining keeping
Officetheofsame two in good Month
Rooms
hygenic
having condition
total Area for sq.m
20 entirefor project
the use completion
of Clienttime. and
3. PROJECT INFORMATION BOARD
3 Demolition including
Consultant of the same and cleaning
Table, the site afterfile nos. 1.00 10,000.00 10,000.00 1.00 10,000.00 1.00 10,000.00 0.00 - 100.00%
Providing and Fixing office of Project chair,
Information Lockable
board with
completion
cabinet, of the Items
Stationery construction
(Ink, activities
Paper, Pen, all complete.
Pencils etc.),
approved
4. SAFETY TextSIGN in BOARD
appropriate location including all
[Note: 50%
1 Computer payment shall
and 1 Printer as be
with made after completion of nos.
4 required
Providingfixing andaccessories
Fixing of Safety per all necessary
drawing
Signall
set up. all
complete.
Board with
1.00 10,000.00 10,000.00 1.00 10,000.00 1.00 10,000.00 0.00 - 100.00%
mobilization
complete asandperremaining instruction 50% of after completion
engineer. Theof
approved
5. BARRICADING
works Text
as per and WORKS
contract] Sinage including required fixing
5 Specification of computer shall not be less than (19.5" R.m 98.88 2,000.00 197,760.00 120.00 240,000.00 120.00 240,000.00 0.00 - 121.36%
accessories
Barricading as per
between drawing all complete.
led monitor with Core the i5, 7th School Academic
Generation, 500area gb Hdd, and
Construction
6.
8gbSAFETY
ddr 4 ram), area with
MATERIALS Printer 1.8 should
m SITE
& highfunction
CGI
SAFETY Sheet fixed of
at least to
6 Bamboo support frame all complete as per instruction of L.S. 1.00 100,000.00 100,000.00 1.00 100,000.00 1.00 100,000.00 0.00 - 100.00%
Providing
Printing, Scanningand Maintainingand Photocopy Construction
of A4Safetysize
Engineer.
Measures
documents. inProviding
Construction and Site with all
Maintaining proper
above Safetyitems
7. LAB TEST(WATER TEST)
7 measures to person and Lab work areacompletion
(Helmet, job 1.00 - 0.00 - 0.00 - 0.00 - 0.00%
on Rentaland
Testing Basis for entire
Providing project
Test Report forShoes,
time.
Quality First
of
Aid
Water Kit, Clothing,
in Water Stream Glove, Guard Rail
(Up and Down streem) located for edge
8. TEMPORARY TOILET
8 protection, Safety Net, Safety
near by Construction sitetoiletrope, Fall
before Protection etc.) nos. 2.00 150,000.00 300,000.00 2.00 300,000.00 2.00 300,000.00 0.00 - 100.00%
Construction of temporary with Starting
CGI Sheet and fixedafter
to
as required ofbyconstruction
completion the Contract work. Clause GCChas
This items
Test 24toand be
Bamboo
9. ROAD support
REPAIR frameAND andMAINTENANCE
all necesary including
9 Specification
done to mark division
the affect 1 "GENERAL
of construction REQUIREMENT
work in water Km. 38.00 50,000.00 1,900,000.00 38.00 1,900,000.00 38.00 1,900,000.00 0.00 - 100.00%
Septic pit, and
Providing Pipeline, Toilet Pan
Maintaining etc. for
the roads as entire
necessary project to
CLAUSE 8(C)".
stream. The number of Safety Materials
completion
avoid blockage timeby all complete asRockfall
Landslides per Instruction of
Personal Protecting Equipmentsand (PPE) shall befor regular
minimum -
Engineer.
transport Rate
of shall include
construction all Material
materials cost
andshall
site bewith fixing,
inspection
but not WORKS-
CIVIL limited toBUILDING
35 sets. Payment made in -
construction
during overall charges and demolition
construction period. Rate& shall
cleaningincludeof theall
1 Prorata
EARTH Basis
WORKS for entire duration of project. -
same after
Material cost completion
with demolition of thecharges,
construction activities
cleaning, fixing all &
SITE CLEARANCE
complete. charges of&the MOBILIZATION:
1.1 construction
Clearing and grubbing the
same after completion of the sq.m
site for construction by 598.98 100.00 59,898.00 634.56 63,456.10 710.50 71,050.00 -75.94 (7,593.90) 105.94%
construction activities all complete.
removing
EARTHWORK 150mmIN thick top soil including
EXCAVATION : bushes, small
1.2 trees, leveling of undulated ground, shorting and cu.m 342.79 400.00 137,116.00 320.88 128,351.35 413.06 165,223.10 -92.18 (36,871.75) 93.61%
Excavation in foundations in all type of soils for
stacking/storing
foundation, selected
trenches, top soilpits
footing, for etc.
reusetointhe landscaping
required
EARTH BACK
works, including
disposing FILLING
unsuitable materials: from
1.3 depth
Back filling dewatering
in foundation and bysides
manual or site,
of foundation
etc., all cu.m
mechanical with
201.25 300.00 60,375.00 234.34 70,300.76 214.80 64,440.00 19.54 5,860.76 116.44%
complete as
means etc.soil per
as per drawings,
specifications specifications and instructions
with all contractor’s own
approved
BOULDER
of the Engineer. obtained
SOLING : from the excavation at site and
machinery
1.4 stacked at and
site equipment's,
or brought providing
from crossing
outside in of track,
layer not cu.m 100.15 6,000.00 600,900.00 122.45 734,711.70 104.14 624,813.45 18.32 109,898.25 122.27%
Providing and laying uncoursed hand packed Dry Rubble
shoring, strutting,
exceeding 15 in timbering
cmfoundation,
thick (compacted andthickness)
buttressing with
Stone
SAND soling
FILLING : under floor plinth including
with out
appropriate
1.5 any
transportation materials
of soil, and all
spreadingsuch measures
in required necessary
line and to cu.m 7.40 6,000.00 44,400.00 7.07 42,395.40 0.00 - 7.07 42,395.40 95.49%
specialand
Providing dressing
filling of
sandstone including
in soak allfilling
pit.foundation
complete interstices
retain in position
level,suitable
sprinkling the
water, sides of the
ramming, compacting pitaswith
per
and
with
drawings, quarry
specifications waste or stone
and instruction chips or
of withquarry
the Engineer. sand,
including refilling
mechanical rammers, the excavated
testing, material watering,
watering, compacting using etc., all complete
appropriate as per
mechanical
ramming,specification
drawing, leveling the and site and disposing
instructions of the Engineer.off the
compaction means with all contractors materials,
surplus/unusable earth to outside the construction
handling, placing etc. all complete as per drawings,
premises, etc. all complete as per drawings,
specifications and instruction of the Engineer. The
specifications
Prepared by contractorand instructions ofChecked the Engineer.by Consultant, DSC Verified by (Engineer), DLPIU Recommended by DLPIU Chief Checked and forwarded by CLPIU DPD Approved by CLPIU, project Director
complete item including all lead & lift.
Bill of Quantities Up to Date of work till now Previous Bill Currently Accomplished work
Pay
Item Description Unit Quantity As % completion Remarks
No. Rate Amount Quantity Amount Quantity Amount Quantity Amount
per Contract

2. CONCRETE WORKS
2.1 2.1 P.C.C cu.m 17.00 14,000.00 238,000.00 17.67 247,429.00 16.19 226,660.00 1.48 20,769.00 103.96%
2.1.1 P.C.C (1:3:6)
Providing
2.1.2 P.C.Cand (1:2:4)laying WORKS machine mixed Plain Cement
2.1.2 Concrete of nominal mix 1:3:6 (1 cement : 3 sand : 6 cu.m 25.69 16,000.00 411,040.00 22.97 367,598.12 24.14 386,278.12 -1.17 (18,680.00) 89.43%
Providing and laying machine mixed Plain Cement
coarse
Concrete aggregate ) for leveling1:2:4course in foundations
: 2 sand and
2.2 P.C.C.ofFOR nominal R.C.C. mixWORKS (1 :cement : 4
2.2 under
coarsefloor of building,
aggregate etc. in all
) for leveling levelinwith
course broken stone
foundations and cu.m 381.20 20,000.00 7,624,000.00 390.87 7,817,350.42 404.41 8,088,251.96 -13.55 (270,901.54) 102.54%
Providing
aggregate and
ofof sizelaying in
not more position
than machine
25 with
mm brokenofmixed
approvedand
under
machine floor vibratedbuilding,cement etc. in all
concrete level of mix 1:1.5:3 stone
(1
2.3 SILICA
quality CEMENT
including ADMIXTURE
formwork
2.3 aggregate
cement:1.5of size not
sand: 3 coarse than wherever
more aggregate) 25 mm M20 of necessary,
approved
grade kg 3,812.00 300.00 1,143,600.00 3,908.68 1,172,602.56 4044.13 1,213,237.79 -135.45 (40,635.23) 102.54%
Providing
dewatering, and mixing
batching, Silica
mixing, Cement Admixture
transporting, of for
placing, in
quality including
reinforced cement formwork
concrete work wherever
using approved necessary,
cement
structural
compacting,
2.4 STEEL concrete
curing, at including
REINFORCEMENT the rate ofall2.50% lead by andweight of the
lift, placing,
etc. all
dewatering,
2.4 with 20 mm batching,
graded machinemixing,crushed transporting,
stone aggregate of Mt. 61.00 130,000.00 7,930,000.00 60.27 7,835,663.19 61.40 7,981,358.97 -1.12 (145,695.77) 98.81%
cement
complete for and
promoting workability, improving strength,
compacting,as
Providing
approved
perfixing
curing,
quality
drawings,
inincluding
various
specifications
in position
all lead and
locations
Fe lift,
500and the
etc.steel
all
achieving
instructions
reinforcement waterproofing
of of
the Engineer. properties, bleedingand heights
prevention,
2.5 FORMtransportation
complete
including asWORKSpervarious diameter
drawings,
of concrete
confirming
specifications
to site
toand
of
relevant
the
placing,
2.5 etc.
IS Silica
code in R.C.C. Cement Admixture
works shall
including shutteringbe the
straightening, product of
cutting, sq.m 2,547.51 800.00 2,038,008.00 2,561.56 2,049,244.48 2426.32 1,941,056.72 135.23 108,187.76 100.55%
Supplying
instructions
compaction, and
of the laying
Engineer. centering, of various
Silica
bending, Japan orfinished
binding superior
with 20
to required
andSWG meet line
shallannealed thewire and level,
requirements
for tying
pattern
3. BRICK
protection formworks
MASONRY
and curing, with 19/12
WORKS mm
etc. all complete thick water proof ply
as
the mentioned
reinforcement inbarsspecification
at props
each junctions of asmaterials
per drawings,
(binding and
wire
wood
3.1 3.1 BRICK& steelMASONRY adjustable forof all 1 kinds
4 c/sof) ONERCC
specifications
Workmanship,
shall
and
Division
notforbe foundations,
measured – 4:WORKS
the instructions
Concrete
separately)
(the
Works,
including
:Engineer,
allArticle
waste
but
2.4
and cu.m 114.50 20,000.00 2,290,000.00 - - 0.00 - 0.00 - 0.00%
works
SIDE
excluding FAIRFACE the cost ofcolumns, centering, shearshuttering,
walls, beams,
and
cut pieces,
slab, staircase,provisionlintel, forsill,
adequate
pergola, numbers of spacers,
including nails,
Providing
reinforcement,
CLEAR and SILICON
layingall first class WATER-REPELLANT
complete selected
as per factory pressed
drawings,
chairs, providing
propping scaffolding, and placing
staging, cement
supporting mortarand (1:1)bracing
cover
wire cut Fair
specifications
7.2.3 COATNG Faceinstructions
and
Providing brickand (machine
of the made
Applying Engineer.
Water brick) one or
Repellant sq.m 535.30 550.00 294,415.00 - - 0.00 - 0.00 - 0.00%
blocks
in proper to keep
lines the
and bars
level,in sealing
intended position
the joints at all heavy
with levels
more
Coating brick on thick
Exposed wall in
Brick cement
Surface mortar
using 1:4 (1
Siliconecement
Base :
all complete
duty brown self inas per
adhesive drawings,
tape, aligning specifications
toother
line and and
levels
4coarse
MC-Nisiwa sand) SH or ,superstructure
equivalent or and
superior specified
including
instructions
POINTING
including of the
WORK
Ties, PVC Engineer. IN (Authorized
Spacer, BRICKProviding lap length
MASONRY and
places
cleaning in all
brickheights
surface and using
level including
brick the costopenings/
of single
for the bar
8.1.1 Providing
cutouts/ length
and
pockets, exceeding
applying
applying at all metercleaning
10levels
De-shuttering in length
Pointing chemical,
chemical, shallDe-
Works be
in sq.m 535.30 400.00 214,120.00 - - 0.00 - 0.00 - 0.00%
or multi
single stage
orMortar self
multi-stage standing
scaffolding,scaffolding,
etc. soaking
allsand)
complete bricks,
measured
Cement
shuttering for
as
curing, raking joints,
the payment,
1:2
approved (1 by except
cement
the
provision :2 tofine
Engineer column).
for recesses,etc., on theasface
complete
openings,
per
at
manufacturer's
of brick masonry instruction,
wall3.1.,
including project
mixing specification and
all
BOQ levels
toothing Total
instruction
as of
etc.,
of
per drawing,
items
all
the complete
Engineer. 7.2.3
as per& 8.1.1:mortar,
specifications
drawing, laying in
andspecifications
instructions - - - 0.00 - 0.00 -
perfect
of
and the line, levelofand
Engineer.
instructions plumb
the7.2.3
Engineer. and finishing in regular and
Replaced items 3.1, and 8.1.1 with following
even surface ,all complete as per drawing , specification
items for 3-LaLiEACCr(F) and T(S)F - - - 0.00 - 0.00 -
and instruction of the Engineer.

Brick Masonry Works (1:4 c/s) cu.m 18,000.00 - - 0.00 - 0.00 -


Cement Plaster Works on Outer Wall (1:6) sq.m 600.00 - - - 0.00 - 0.00 -
Exterior Weather Coat Paint sq.m 350.00 - - - 0.00 - 0.00 -
- - - 0.00 - 0.00 -
3.2 BRICK MASONRY WORKS ( 1 : 4 c/s )
3.2 cu.m 71.88 18,000.00 1,293,840.00 179.28 3,227,121.36 238.30 4,289,400.81 -59.02 (1,062,279.45) 249.42% 179.71
Providing and laying first class chimney fired brick one
or more
HALF BRICKbrick WORKSthick wall ( 1 in: 4 c/scement) mortar 1:4 (1
cement : and
3.3 Providing 4 coarse
laying sand) in foundation
non-fairfaced half brick upworkto plinth, sq.m 92.52 1,500.00 138,779.99 62.04 93,054.41 - 62.04 93,054.41 67.05%
superstructure
masonry in cement and mortar
other specified
1:4 (1 cement:4 places sand) in all inheights
and level
superstructure
HONEY including
COMB withBRICK the
approved cost
WORKS of single
first class (1:3 or
fired multi
c/s)bricks in stage
3.4 perfect
scaffolding,line & soaking
level, required bricks, sizeand curing,
andlaying
shape raking
at any combjoints, cu.m
height 4.52 9,000.00 40,680.00 3.45 31,093.20 0.24 2,160.00 3.21 28,933.20 76.43%
Providing honey
provision
and
brick level,
one or for
including
more recesses,
the cost
brick thickopenings,
ofwall
single toothing
or
in cement multimortar etc.,1:3all
stage
4. DOORS
complete as &per WINDOWS
drawing, WORKS
specifications and 4.1
instructions
scaffolding,
4.1 (1 cementFRAME
METAL : 3cleaning,
coarse soaking
sand) in soak of the pitbricks,
in all packing
heights of
and - - - 0.00 - 0.00 -
of the Engineer.
the joints, raking thejoints, provision
level
Providingincluding
and fixing cost of soaking
in position infor recesses,
bricks,
required lineopenings,
curing, andraking
4.1.1 level
Door pressed
curing,
joints, Frame
providing
provision 25x3mm
for
(folded) Steel GI
recesses, door Straps
openings, Fixed
and window toframe
toothing etc.,ofallat rm.
columns 170.90 1,100.00 187,990.00 177.97 195,767.00 170.90 187,990.00 7.07 7,777.00 104.14%
4.1.2 every
complete
Window
size 5thFrame
shown course
as inper of brickmanufacture
drawing,
drawings and 60mm width
specifications from 14 gauge
andgalvanized
instructions rm. 497.50 1,100.00 547,250.00 468.08 514,888.00 470.90 517,990.00 -2.82 (3,102.00) 94.09%
welded
of
4.2 iron the
METAL GI of 1.20 mm thick including hinges, jamb,aslock
mesh
Engineer.
sheetSHUTTER anchored to GI strap, all complete per - - - 0.00 - 0.00 -
design,
WINDOW drawing,
jamb, head, SHUTTER specifications
base ties of 1.2 instructions
mm pressed
Providing, of
GI welded
fabrication the
and on
4.2.1 rigidly
Engineer. fixedintogether sq.m 98.88 7,500.00 741,600.00 97.07 728,025.00 95.89 719,175.00 1.18 8,850.00 98.17%
installation positionby 35mechanical
mm thick glazed means,window adjustable and
lugs with
ventilator
4.3 WOODEN SHUTTER split
shutter end tail
made to each
with jamb
1.2mm including
thick steel
galvanized butt - - - 0.00 - 0.00 -
hinges
iron 2.5 folded
sheet mm thick with mortar
in required size guards,
and shape reinforcing
including to
FLUSH DOOR SHUTTER (32MM) Providing &
door hardware,
4.3.1 glazing with 5thick strike-plate,
mm thick coreclear shockfloatabsorbers withasglazing
glassshutters, required, sq.m 65.60 8,000.00 524,800.00 68.28 546,228.00 65.60 524,800.00 2.68 21,428.00 104.08%
fixing 32mm solid flush door in
factorywasher
beads, appliedand Zinc Rich Primer etc.,
special putty,alldrawing.
complete as
single leaf
UPVC DOOR or double leaf asglazing
per detailed required The
4.4.1 per
flush
drawings,
numbers doors andshall specification
sizes behardware
factory made
and
likeinstruction
hinges,
solid core
of the
tower-bolts,
block board sq.m 7.14 9,000.00 64,260.00 7.14 64,260.00 7.11 63,954.00 0.03 306.00 100.00%
SHUTTER/FRAME
Engineer.eye-hook, applying priming coat with Zinc Rich
handles,
shutters bonded
Providing with phenol formaldehyde resin. The
WINDOW
Primer of GRILLand
approved make, fixing
Providing,etc., toalldoor
MS frames
solid
complete bars 24of
as mm
per
lipping
4.5 thick shall be of teakwood all-round the flush doorand
required
drawings,factory
size made
and fixing
specification PVCand door
in shutter
position made
mild of Engineer.
ofsteel styles
grille made sq.m 59.00 2,500.00 147,500.00 103.85 259,625.00 50.83 127,075.00 53.02 132,550.00 176.02%
with of
rails a minimum
UPVCMS thickness
hollow ofinstruction
12mm. The the
x following C.P.
with required flats,section
strips, of barssize 59
fabricated 24 mmas per and
fittings
COLLAPSIBLE shall be2used: (a)0.2- 2-150 mm Handles in each
wall thickness
4.6 drawings, fixing mm inGATE �
position mm
usingwith inbuiltfasteners
approved edging on
leaf; (b) Tower-bolt
both sides.2The
including

Supplying
coatstyles
of
300 mm
and rails
enamel and
long
andmotred
fixing
Zinc
at
Rich
top
and 1 in
in position each
jointedbase
Primer at the sq.m
leaf
local 9.90 10,000.00 99,000.00 9.90 99,000.00 9.90 99,000.00 0.00 - 100.00%
and
make 200
corners at bottom
collapsible
by all
means in
gate each
of leaf;
approved
of galvanized/plastic ( c ) 1
size no.
and 300
make mm
brackets of size long
coat,
5. etc.,
FLOORING complete
WORKS as detailed in drawing, HARDENED
C.P. x Aldrops
5.1 properly
75 220 fabricated
mm and with
having Godrej
with made padlock;
wallvertical
thickness double
1.0 mm(d)
channels125stainless
and mm
20 x 10 sq.m 1273.37 900.00 1,146,033.00 1,247.85 1,123,067.03 1229.71 1,106,738.78 18.14 16,328.25 98.00%
specification
CEMENT CONCETE instructions FLOOR of the Engineer.
heavy
x 2mm
steel duty GIThe
at 100mm
screws. Butstyles
Hinges
centers 3 nos.
ofand
the bracedin each
shutter with leaf.
M.S.
reinforced (rate
by shall
flat
include all20 Providing,
required
x 5mm,door laying in required line, level and
diagonal
inserting galvanized tube hardware).
with top and20
of size bottom
x20 mm railsandof T1 mmiron
pattern
40 x0.1 40mm40 mm thick
x 6mm IPS floordiafinish with cement
� wallwith 38mm
thickness. The steel rail
lock pulleysmadecomplete
of 'H'
concrete
with bolts ofnuts
mixlocking
1:2:4 (1arrangements
cement : 2 sand : 4 crushed
steppers handles
section,
Prepared by contractora UPVC hollow sectionChecked of size 100 byxConsultant,
24 mm and
stone
including aggregate 12 mm and down grade) laid in alternate DSC Verified by (Engineer), DLPIU Recommended by DLPIU Chief Checked and forwarded by CLPIU DPD Approved by CLPIU, project Director
2 mm� applying a priming coat of Zinc Rich Primer
panel
carriage or hoisting
providingallglass completedividingper strips and finished andwith
0.2 mm wall thickness fixed toasthe specification
shutter styles by
approved
direction floor
the hardener
Engineer.(Dreitop FH of equivalent floor
means of ofa plastic/galvanized iron 'U' cleats. The shutter
hardener) applied as per manufacturer's instructions
Bill of Quantities Up to Date of work till now Previous Bill Currently Accomplished work
Pay
Item Description Unit Quantity As % completion Remarks
No. Rate Amount Quantity Amount Quantity Amount Quantity Amount
per Contract
5.2NEAT CEMENT SKIRTING r.m 693.07 100.00 69,307.00 576.36 57,636.00 582.96 58,296.00 -6.60 (660.00) 83.16%
TERRAZZO CAST-IN SITU DADO
5.3 Providing and laying 25 mm thick terrazzo cast-in-situ sq.m 56.79 1,500.00 85,185.00 61.54 92,302.50 56.64 84,956.25 4.90 7,346.25 108.36%
dado up to the height shown in drawing with marble
6 ROOFING/ TERRACING
chips rubbed and polished to granolithic finish under WORKS - - - - 0.00 - #DIV/0!
METAL
layer of 19WORKS mm thick(TRUSS) cement concrete 1:2:4 (1 cement : 2
sand : 4 crushed Providing
stone aggregate and fixing 10 tubular
mm androof down trusses
grade)
6.1 with rafters, purlins, wind ties, brackets etc., made with k.g 513.54 220.00 112,978.80 699.65 153,923.00 - 699.65 153,923.00 136.24%
base and top layer of 6 mm thick with required color
required
marble chips gradeofmild sizessteel fromtubes 1 mm andto mild
4 mmsteel nominal sections sizeof
required
laid inSHEET sizes, marble
cement including powderhoisting, mix fixing
3:1 (3 in position
cement : 1 with
CGI ROOFING
MS bedpowder plates, shoe mix :angles, anchor bolts etc., and
6.2 marble
concrete
Providing
grouting,
7&marble
concreting
fixing chips) precoated
nut bolts,
by volume
galvanized iron sq.m
fabrication, 33.54 2,000.00 67,080.00 33.54 67,080.00 - 33.54 67,080.00 100.00%
including
profile Terracota cement colour slurry, required
sheets pigment,
(size, shape grinding,
and pitch of
fixing
polishing, and buffing
treated with two coatssealer
and applying of anticorrosive
coat,mm etc.,+/- paints
all
corrugation
CGI SHEET as ROOFING
approved byRIDGEEngineer) 0.52 5%
all complete
complete as per
as thickness
per drawings,
drawing, specifications
specification and
and instruction of
total coated
Providing &of
6.3 instructions laying (TCT),
prefinished Base
plain Material
(colour Thickness
matching to r.m 6.95 1,200.00 8,340.00 6.95 8,340.00 - 6.95 8,340.00 100.00%
the Engineer. the Engineer. Rate shall include preparing
(BMT)
roofing of 0.50
sheet) CGI mm, Zinc
Sheet Ridge coating 120gsm
Cover as per IS: 277 ,
shop drawings, obtaining Engineer's orof 0.52 mm
Client's +/-
approval,
5-7
5% microns
total coated epoxy primer
thickness on both
(TCT), Base side of the
Material sheet and
supplying,
GI FACIA fabricating,
(EAVES) delivering at site, hoisting and
polyester top coat 15-18 0.50microns. Sheet and should haveas
6.4 Thickness
fixing in position,(BMT)
Providing, of
temporary
fabrication mmstaging,
(Coating
to required preparation Primer
size and of Kg 69.60 250.00 17,400.00 63.27 15,817.50 - 63.27 15,817.50 90.91%
protective
above) over guard
ridge film
with ofall25required
micronsfixing minimum to avoid
surface,
shape andapplying
fixing in Zincposition
Rich Primer1.2 mmofthick oneaccessories
GI
coat folded
before
scratches
like self while
tapping transportation
screw, clips, and
clamps, should washer be supplied
etc.all in
and
plates
CEMENTone of coat
size after
shown
BOARD erection
in drawing
FALSE including including two coats
the cost
of fixing
single
complete length up to 6 meter
on building floors orasCEILING
asperdesired
design, bydrawing,
Engineer.
6.5 brackets,
synthetic flats,
The
enamel screws,
sheet shallinstructions
specifications
paintProviding
be fixed
of
painting
approved
using
with
and
self
make
enamel
fixing
drilling
of specification
the Engineer.
and
at withcolor
all Zinc
heightetc.6 sq.m 23.75 1,500.00 35,625.00 23.75 35,625.00 - 23.75 35,625.00 100.00%
all
Rich
mm complete
Primer, as
required
per drawing,
scaffolding to work and
at anyinstruction
height,
/self thick
tapping Cementscrews Board
of size false (5.5xceiling,
55mm) including
with EPDM
of theallEngineer.
etc.,
providing complete
and fixing as per design,work
ofupframe drawing, specifications
seal
7. etc., all
PLASTERING/ complete WALL to any pitchmade
FINISHING of
in horizontal/
WORKS special
instructions
sections power of the Engineer.
pressed from MS sheetthe Galvanized with
vertical
7.1 CEMENT or curved surfaces
PLASTER excluding
WORKS cost of purlins,
zinc
7.1.1 ON
rafterscoating
INNERand trussesand
WALL consisting
and(1:6) including anglecutting
hangerto ofsize25x25x0.55
and sq.m 1,175.78 600.00 705,468.00 1,231.04 738,626.53 1129.31 677,587.11 101.73 61,039.42 104.70%
of required
shape wherever length at 1250mm
Providing and applying c/c fixed
at all to purlins
levels andwithshape
nut ans thick
required.
20 mm bolts and cement other end ofinangle
plaster building hanger inside being in fixed
with nut
specified
7.1.2 ONand cement boltsmortar
CEILING to GI (1:4) main
in twochannel layers as 45x18x0.6
6 to 8 mm thick
7.1.2 running at the
final coat with12.5.mm, rate of 900mm
1:6 (1 cement thick :6 c/c
cement to which
fine sand)and sand ceiling
cement section
plastermortar sq.m 664.28 500.00 332,140.00 857.16 428,580.14 653.21 326,602.50 203.96 101,977.64 129.04%
0.55mm
work
over the thick
of mix
12 to1:4 bottom
14 (1mm cementwedge
thick &1:6of
4 (145mm
sand)cement inwith : 6tapered
concrete coarse surface,
7.1.3
flanges ON of OUTER
26mm allWALL
each having (1:6):
clips
at allof 2.3mm at 613mm
7.1.3.1 ceiling
sand)
7.1.3.1
with ceiling
surface
under
EXTERNAL
coatatin
section
height
all surface
PLASTER
including mixing
height mortar,
including sq.m 638.97 600.00 383,382.00 1,035.65 621,390.00 1005.18 603,105.00 30.48 18,285.00 162.08%
mixing
laying in
mortar,
perfect line,and
laying inperimeter
level perfect
and plumb channels
line, level of 0.5mm
and finishing
and plumbin
thick 25mm high Providing
having and
flanges applying
of 20mm at andall levels
30mm alland
7.1.3.2 regular
and finishing
7.1.3.2
shape
andaseven
do
20 perimeter
mm
in regular
above
thick
surface
for
cement
and
including
Band even
plaster
surface
Plaster all necessary
in
including single or rm. 428.88 100.00 42,888.00 - - 0.00 - 0.00 -
long, the
multi-stage
necessary or of
scaffolding,
single ceiling
providing
multi-stage fixed tobuilding
and
scaffolding, wall/partition
fixingmaking exterior
200 mm within
INTERNAL
specified
the help ofcement
raw PALSTER mortar
plugs at ON 1:6
with
450mm WALL (1 with (1:4)WITH
cement :6 fineof sand)
wide
grooves
CEMENT 24 andgauge GI
recesses,
PUNNING Chicken throating, wire c/c mesh
dusting, finished
at junction
dripping, 12.5.mm,
25mm
7.1.4 in
longalldrive
R.C.C.
wetting, surface
and all at all height
screws
masonry,
curing, @
making including
230mm grooves mixing
interval, and mortar,and
jointing
recesses, mesh sq.m 35.21 700.00 24,647.00 35.66 24,962.00 35.66 24,962.00 0.00 - 101.28%
thick
laying
fixing cement
in in
to perfect andprotection,
required sand
line, plaster
level
pattern,
providing
and work
plumb
finished
chicken
ofwith
mix
and 1:4 wire
finishing (1 cement
recommended in
at
throating,
& the junction
4 sand) dusting,
and 3ofmm concrete
dripping,
thick andwetting,
cement masonry curing,
punning etc., all
overprotection,
complete
plaster
regular
filler,
7.2
as
etc.per
all and
making
PAINTING
drawing
completeeven , surface
openings
WORKS
specification
as per forincluding
drawing lightand , all
fittings, necessary
specification
instruction access of andsingle
panel,
the or
for watermade
multi-stage
cutouts tank,Septic
scaffolding,
with frametank,Man
making
ofinclude hole
grooves
perimeter e.t.c on concrete
and
channels recesses,
suitably
DISTEMPER
instruction.
Engineer.ceiling
7.2.1 surface, [Rate
[Rate PAINT
shall
shall
surface alsoalso
and include
wall forforproviding
surface providing
at all height drips
drips sq.m 1,835.49 200.00 367,098.00 2,111.95 422,390.91 1,806.30 361,259.85 305.66 61,131.06 115.06%
throating,
fixed
band, all dusting,
complete
Providing
moulds, groove, dripping,
asand per drawing
applying
chicken wetting, andmesh
two
wire curing,
orspecification
more at protection,
coats
junction and
of of
including
providing
direction mixing
chicken
of the Engineermortar,
wire meshlaying
but at thein
excluding perfect
junctionthe line,
of at
cost level
concrete
ofanyand and
washable
RCC
plumb and distemper
masonry,
and finishing paint
etc.,
in to of
regular approved
completeand the
even manufacturer
works
surface
EXTERIOR
and masonry
painting.
shade overalla coat WEATHER
etc., allalkali
of complete COAT as per
resistant PAINT
drawing
cement primer, of
heights].
heights.
including necessary single
7.2..2 specification
approved and instruction
manufacturer Providing
as per ofor multi-stage
and
the applyingscaffolding,
Engineer.
manufacturer's two
[Rateorshall sq.m 1,027.57 350.00 359,649.50 1,035.65 362,477.50 1,005.18 351,813.00 30.47 10,664.50 100.79%
providing
more coats, of making
first grooveshundred and band,
recesses, throating,
also include
specifications
dusting,
for
dripping, thequality
toproviding surface drips
of wall, percent
moulds,
ceiling, acrylic groove,
beams paint
of approved
chicken
columns, wire meshwetting,
shade
canopies, and
at pattern
junction
staircase,
curing,to the
of
lobbiesRCCprotection,
exterior
andall
etc.,
etc. all
walls
masonry,
complete ofetc.,as
ENAMEL
complete
buildings as PAINT
etc.,per Thedrawing
ratesatshall, specification
include and
for scrappinginstruction. ,
to complete thespecifications
works anyand heights.
7.2.4 per
[Rate drawings,
washing Providing
shall the also
surface and with
include applying
for providing
water,
instruction.
byapplying
spray/brush
dripsa coat The
band,two of
rates
or sq.m 443.36 400.00 177,344.00 551.96 220,782.80 444.09 177,635.16 107.87 43,147.64 124.49%
shall
more include
coats
moulds, groove, of for
1st scraping,
quality
etc., to base washing
synthetic
complete the
enamel
theprimer, surface
works at paint with
anyof
approved
water, quality
surface water
preparation, cement
scaffolding etc., surface
all complete
approved
heights.
preparation, manufacturer
scaffolding etc., (Asian, Berger
all complete asand or equivalent)
per as the
8 MISCELLANEOUS
as perwooden
over the manufacturer's
orrecommendations
metal surface recommendations
in required shade at any - - - - 0.00
manufacturer's
8.2 CEMENT
approved by the BOARD
Engineer. WALLpreparation, and as approved by the
height, shape, including surface fillers/putty,
8.2 Engineer. Supplying,
scaffolding, protection etc. all complete as per drawings, fabrication, fixing of sq.m 3.38 6,500.00 21,970.00 3.38 21,970.00 - 3.38 21,970.00 100.00%
cement board in
specifications andposition
instructions. for internal and external
The finished surface made shall
RAILING
with even
9mmand Providing,
thick cementfabrication
board (Shera as per designCement
or Siam drawings
8.3 give
and
Board installation
or equivalent)
uniform
in position
surface.
from both Mildsides Steelfixed railing to in 75mm staircase,
X kg 2,410.90 220.00 530,398.00 2,424.07 533,296.18 2342.58 515,368.69 81.49 17,927.50 100.55%
verandah
0.6mm thick andC-studother areas fixedincluding
to U-Track cutting to required
with spacing
PUMP SHED
8.4 shape
300mm
Supply,
ando/csize,
fabrication,
welding joints,
of horizontal frame,installation
installation
central coreoffilled
of 2mx1.5m
base with
and 1m
anchor nos. 1.00 80,000.00 80,000.00 1.00 80,000.00 1.00 80,000.00 0.00 - 100.00%
plates
cementofmortar appropriate with PE size with required
granules havingnumbers combinedof
high pump
expansion shed
bolts ofAND maderequiredwith 50x50x6
size, providing MS Angle frame ,
density approximately
SEWER, RAIN 900
WASTE kg/m3, includingrequired
WATER sealing size
8.5 covered
bends,
joints with
INSTALLATION
outside
finishing
fiber tapes
and
weldroof jointswith
and joint to CGI
produce sheet, locakable
smooth
sealing compound,
door,
filling R.m
surface, 45.05 1,500.00 67,575.00 41.80 62,700.00 41.00 61,500.00 0.80 1,200.00 92.79%
including
applying padcoat
one lock,ofbase Metal PCC (1:2:4)
Primer and 75mm
twoallorall complete
more coats
screw
PVC heads as perWaste, manufacturer's installation guidelines,
as
of perSWR
enamel design, (Soil,
paint drawing,
ofgaps
required andRain)
shade,
pipes
instructions with thenecessary
of complete Engineer. - - - - 0.00
sealing
ring perimeter
gaskets, PVC fittings, siliconetc.,
withincluding all
sealant,
MS etc., all as
clamps,
3 ELECTRICAL
per drawings,
complete
hangers, as per
cutting, specifications
WORKS
drawing,
jointing,specificationsand instruction
sealing, and of
installation thepipes
instructions
of - - - - 0.00
A. Engineer.
of the
Common
and Engineer.
specials Installation
includingRate shall making includeholesthe and cost of metal
cutting grooves - - - - 0.00
framing,
on walls or jointfloor andand screw head sealing,
repairing the samerequired to its original
additional strengthening member
finish. Pipes to be installed on trenches or walls or floor for the wall length
exceeding
or duct as per3 meterdrawings, in length or around door
specifications, and window
manufacturer's
Prepared by contractor
opening, sealing perimeter
Checked
with cleaning
silicon sealant.
by Consultant,
Total
DSC Verified by (Engineer), DLPIU Recommended by DLPIU Chief Checked and forwarded by CLPIU DPD Approved by CLPIU, project Director
recommendations, instructions, of the system,
finishedand
testing wall readythickness 93 mm. The rate shall include for
for operation.
8.2.1
all FORand
labour PARTITION
materials required. The measurement shall
Bill of Quantities Up to Date of work till now Previous Bill Currently Accomplished work
Pay
Item Description Unit Quantity As % completion Remarks
No. Rate Amount Quantity Amount Quantity Amount Quantity Amount
per Contract
1.1 Stand Alone 40 A DP MCB with Enclosure no. 1 12,000.00 12,000.00 1.00 12,000.00 1.00 12,000.00 0.00 - 100.00%
1.2 Stand Alone 6 A DP MCB with Enclosure no. 1 8,500.00 8,500.00 1.00 8,500.00 1.00 8,500.00 0.00 - 100.00%
2 CABLES & WIRES - - - 0.00 - 0.00
2 Nos 10 Sq.mm + 1 No 6 Sq.mm mutistranded copper
2.1 conductor wires rm 50 800.00 40,000.00 53.00 42,400.00 53.00 42,400.00 0.00 - 106.00%
2 Nos 2.5 Sq.mm mutistranded copper conductor wires +
2.2 1 Nos. 1.5sq mm multistranded Cu wire rm 60 250.00 15,000.00 64.00 16,000.00 64.00 16,000.00 0.00 - 106.67%
B School Blocks - - - - 0.00
1 DISTRIBUTION BOARDS nos. - - - - 0.00
1.1 Ground Floor nos. 1 32,000.00 32,000.00 1.00 32,000.00 1.00 32,000.00 0.00 - 100.00%
1.2 First Floor nos. 1 22,000.00 22,000.00 1.00 22,000.00 1.00 22,000.00 0.00 - 100.00%
1.3 Second Floor nos. 1 30,000.00 30,000.00 1.00 30,000.00 1.00 30,000.00 0.00 - 100.00%
1.4 Stand Alone 6 A DP MCB with Enclosure nos. 1 8,500.00 8,500.00 1.00 8,500.00 1.00 8,500.00 0.00 - 100.00%
2 CABLES & WIRES - - - - 0.00 -
2 Nos 6 Sq mm Multistranded Cu Wire + 1 No 4 Sq mm
2.1 Multistranded Cu wire rm 10 600.00 6,000.00 10.50 6,300.00 10.50 6,300.00 0.00 - 105.00%
2 Nos 4 Sq mm Multistranded Cu Wire + 1 No 2.5 Sq
2.2 mm Multistranded Cu wire rm 15 500.00 7,500.00 16.00 8,000.00 16.00 8,000.00 0.00 - 106.67%
2 Nos 2.5 Sq mm Multistranded Cu Wire + 1 No 1.5 Sq
2.3 mm Multistranded Cu wire rm 25 250.00 6,250.00 28.00 7,000.00 28.00 7,000.00 0.00 - 112.00%
3 General Service Light Point Wiring - - - - 0.00 -
3.1 One Way Light Point pts. 78 700.00 54,600.00 78.00 54,600.00 78.00 54,600.00 0.00 - 100.00%
3.2 Two Way Light Point pts. 3 900.00 2,700.00 3.00 2,700.00 3.00 2,700.00 0.00 - 100.00%
3.3 Ceiling Fan Point pts. 2 900.00 1,800.00 2.00 1,800.00 2.00 1,800.00 0.00 - 100.00%
4 6A Universal Pin Light Power Socket Wiring pts. 97 900.00 87,300.00 97.00 87,300.00 97.00 87,300.00 0.00 - 100.00%
5 Switch Socket Outlets - - - - 0.00 -
5.1 6A Universal Power Switch Socket nos. 97 700.00 67,900.00 97.00 67,900.00 97.00 67,900.00 0.00 - 100.00%
6 Sweep Ceiling/Exhaust Fans/ Wall Fan - - - - 0.00 -
6.1 225mm dia M/D Exhaust Fan nos. 2 6,000.00 12,000.00 2.00 12,000.00 2.00 12,000.00 0.00 - 100.00%
7 Light Fixtures/Luminaires & Accessories - - - - 0.00 -
7.1 18 W LED Surface Mounted Square type nos. 44 2,700.00 118,800.00 44.00 118,800.00 44.00 118,800.00 0.00 - 100.00%
7.3 12 W LED Surface Mounted Cylindrical type nos. 27 2,400.00 64,800.00 27.00 64,800.00 27.00 64,800.00 0.00 - 100.00%
7.4 7W LED Wall Light nos. 2 1,800.00 3,600.00 2.00 3,600.00 2.00 3,600.00 0.00 - 100.00%
7.6 9W LED Surface Mounted Cylindrical type nos. 1 2,000.00 2,000.00 1.00 2,000.00 1.00 2,000.00 0.00 - 100.00%
7.7 6W LED Recessed Mounted Circular type nos. 3 1,800.00 5,400.00 3.00 5,400.00 3.00 5,400.00 0.00 - 100.00%
7.8 7W LED T5 Slim Mirror Light nos. 1 2,000.00 2,000.00 1.00 2,000.00 1.00 2,000.00 0.00 - 100.00%
9 External Post Top Light Pole nos. 3 7,500.00 22,500.00 3.00 22,500.00 3.00 22,500.00 0.00 - 100.00%
10 Post Top External Light Fixtures nos. 3 9,800.00 29,400.00 3.00 29,400.00 3.00 29,400.00 0.00 - 100.00%
11 Earthing & Lighting Protection - - - - 0.00
11.1 Chemical Earthing nos. 3 45,000.00 135,000.00 3.00 135,000.00 3.00 135,000.00 0.00 - 100.00%
11.2 Earthing Bar nos. 3 2,200.00 6,600.00 3.00 6,600.00 3.00 6,600.00 0.00 - 100.00%
12 Earthing Strip/Wires - - - - 0.00 -
12.1 25 x 3 mm GI strip mtr. 65 300.00 19,500.00 65.00 19,500.00 65.00 19,500.00 0.00 - 100.00%
12.2 12 SWG Cu wire mtr. 15 200.00 3,000.00 15.00 3,000.00 15.00 3,000.00 0.00 - 100.00%
13 Earth Test link nos. 1 1,500.00 1,500.00 1.00 1,500.00 1.00 1,500.00 0.00 - 100.00%
14 Lightning Arrester nos. 1 7500 7500 1.00 7,500.00 - 1.00 7,500.00 100.00%
C Solar PV System - - - - 0.00 -
1 Solar PV Panel nos. 8 26,000.00 208,000.00 8.00 208,000.00 8.00 208,000.00 0.00 - 100.00%
2 Tubular Deep Cycle Battery nos. 4 30,000.00 120,000.00 4.00 120,000.00 4.00 120,000.00 0.00 - 100.00%
3 Hybrid Inverter nos. 1 100,000.00 100,000.00 1.00 100,000.00 1.00 100,000.00 0.00 - 100.00%
D FIRE EXTINGUISHER - - - - 0.00
a Fire extinguisher ABC stored Pressure 5.0kg size ABC nos. 7 8,000.00 56,000.00 7.00 56,000.00 7.00 56,000.00 0.00 - 100.00%
stored pressure type Fire extinguisher.
b Dry Powder Fire Extinguisher nos. 1 8,000.00 8,000.00 1.00 8,000.00 1.00 8,000.00 0.00 - 100.00%
- - - - 0.00
D SANITARY WORKS - - - - 0.00

Prepared by contractor Checked by Consultant, DSC Verified by (Engineer), DLPIU Recommended by DLPIU Chief Checked and forwarded by CLPIU DPD Approved by CLPIU, project Director
Bill of Quantities Up to Date of work till now Previous Bill Currently Accomplished work
Pay
Item Description Unit Quantity As % completion Remarks
No. Rate Amount Quantity Amount Quantity Amount Quantity Amount
per Contract
1 WATER SUPPLY INSTALLATION - - - - 0.00
a CPVC pipes SDR-11 - - - - 0.00
40 mm r.m 124.00 1,600.00 198,400.00 120.00 192,000.00 120.00 192,000.00 0.00 - 96.77%
25mm r.m 10.00 1,000.00 10,000.00 30.00 30,000.00 9.00 9,000.00 21.00 21,000.00 300.00%
20mm r.m 26.00 700.00 18,200.00 57.00 39,900.00 20.00 14,000.00 37.00 25,900.00 219.23%
15mm r.m 2.00 500.00 1,000.00 2.00 1,000.00 2.00 1,000.00 0.00 - 100.00%
c CPVC Ball Valve - - - - 0.00
40 mm nos. 3.00 2,000.00 6,000.00 6.00 12,000.00 6.00 12,000.00 0.00 - 200.00%
25 mm nos. 2.00 900.00 1,800.00 2.00 1,800.00 2.00 1,800.00 0.00 - 100.00%
20mm nos. 2.00 400.00 800.00 2.00 800.00 2.00 800.00 0.00 - 100.00%
d 40mm dia Gun Metal Check Valve nos. 1.00 4,500.00 4,500.00 1.00 4,500.00 1.00 4,500.00 0.00 - 100.00%
e Electrical Centrifugal Water Pump nos. 1.00 12,500.00 12,500.00 1.00 12,500.00 1.00 12,500.00 0.00 - 100.00%
f 1000 litres Capacity Water Storage Tank nos. 1.00 34,000.00 34,000.00 1.00 34,000.00 1.00 34,000.00 0.00 - 100.00%
2 Sewer, Rain and Waste Water Installation - - - - 0.00
110 mm r.m 42.00 1,400.00 58,800.00 72.00 100,800.00 40.00 56,000.00 32.00 44,800.00 171.43%
75mm r.m 46.00 1,200.00 55,200.00 40.00 48,000.00 40.00 48,000.00 0.00 - 86.96%
50mm r.m 20.00 250.00 5,000.00 33.00 8,250.00 15.00 3,750.00 18.00 4,500.00 165.00%
B School Blocks - - - - 0.00
1 Sanitary Installation - - - - 0.00
a Kitchen Sink of size 750*450*225mm set 5.00 30,000.00 150,000.00 5.00 150,000.00 5.00 150,000.00 0.00 - 100.00%
b Kitchen Sink of size 900*450*225mm set 1.00 35,000.00 35,000.00 1.00 35,000.00 1.00 35,000.00 0.00 - 100.00%
c PVC Multi Floor Trap no. 2.00 600.00 1,200.00 2.00 1,200.00 2.00 1,200.00 0.00 - 100.00%
2 Sanitary Installation - - - - 0.00
a Water Closet Set set 1.00 34,000.00 34,000.00 1.00 34,000.00 1.00 34,000.00 0.00 - 100.00%
b Orissa Pan set 2.00 3,100.00 6,200.00 2.00 6,200.00 2.00 6,200.00 0.00 - 100.00%
c Hand Wash Basin set 1.00 8,000.00 8,000.00 1.00 8,000.00 1.00 8,000.00 0.00 - 100.00%
d Ladies Urinal set 2.00 110,000.00 220,000.00 2.00 220,000.00 2.00 220,000.00 0.00 - 100.00%
e Self Closing Bib Cock nos. 6.00 4,000.00 24,000.00 6.00 24,000.00 6.00 24,000.00 0.00 - 100.00%
f CP Spreader in Urinal set 2.00 2,500.00 5,000.00 2.00 5,000.00 2.00 5,000.00 0.00 - 100.00%
g Toilet Paper Holder nos. 1.00 2,600.00 2,600.00 1.00 2,600.00 1.00 2,600.00 0.00 - 100.00%
h Commode Spray nos. 1.00 2,000.00 2,000.00 1.00 2,000.00 1.00 2,000.00 0.00 - 100.00%
i PVC Multi Floor Trap nos. 5.00 600.00 3,000.00 5.00 3,000.00 5.00 3,000.00 0.00 - 100.00%
j Waste Coupling and PVC Bottle Trap nos. 2.00 1,500.00 3,000.00 2.00 3,000.00 2.00 3,000.00 0.00 - 100.00%
k 40mm SS Grab Bar-Side nos. 1.00 4,500.00 4,500.00 1.00 4,500.00 1.00 4,500.00 0.00 - 100.00%
l 40mm SS Grab Bar-Rear nos. 1.00 4,500.00 4,500.00 1.00 4,500.00 1.00 4,500.00 0.00 - 100.00%
m CP Foldable Hinge nos. 2.00 5,500.00 11,000.00 2.00 11,000.00 2.00 11,000.00 0.00 - 100.00%
-
E CIVIL WORKS : SITE DEVELOPMENT -
1 EARTHWORKS -
1 SITE CLEARANCE AND MOBILIZATION Sq.m 249.65 1,000.00 249,650.00 128.21 128,210.90 128.21 128,210.90 0.00 - 51.36%
2 EARTHWORK IN EXCAVATION Cu.m 206.38 400.00 82,552.00 22.18 8,871.05 22.18 8,871.05 0.00 - 10.75%
3 BOULDER SOLING Cu.m 30.74 6,000.00 184,440.00 19.75 118,509.81 19.75 118,509.81 0.00 - 64.25%
6 P.C.C (1:2:4) Cu.m 15.27 16,000.00 244,320.00 9.62 153,853.08 9.62 153,853.08 0.00 - 62.97%
7 BRICKS MASONRY WORKS (1:4 c/s) Cu.m 0.22 18,000.00 3,960.00 0.20 3,643.20 0.20 3,643.20 0.00 - 92.00%
8 FLAG POLE nos. 2.00 25,000.00 50,000.00 2.00 50,000.00 2.00 50,000.00 0.00 - 100.00%
- - - - 0.00
CIVIL WORKS-RESERVIOR TANK - - - - 0.00
1.1 SITE CLEARANCE & MOBILIZATION:
1.1 sq.m 22.31 50.00 1,115.50 22.31 1,115.50 22.31 1,115.50 0.00 - 100.00%
Clearing and grubbing the site for construction by
removing 150mm thick
1.2 EARTHWORK IN top soil including :bushes, small
EXCAVATION
1.2 trees, leveling of undulated ground, shorting and cu.m 24.58 400.00 9,832.00 24.57 9,828.72 24.57 9,827.22 0.00 1.50 99.97%
Excavation in foundations in all type of soils for
stacking/storing
foundation, selected top soilpits
for etc.
reusetointhelandscaping
1.3 EARTHtrenches,
BACK FILLINGfooting, : required
works, including
1.3 depth disposing dewatering
unsuitable materials
bysides
manualfrom or site, etc., all cu.m
mechanical 4.02 300.00 1,206.00 4.01 1,202.85 4.01 1,202.85 0.00 - 99.74%
Back filling in foundation and of foundation with
complete as
means etc.soil per
as per drawings, specifications
specifications and instructions
with all contractor’s own
approved
1.4the
BOULDER obtained
SOLING from
: the excavation at site and
of
1.4 stacked Engineer.
machinery and equipment's, providing crossing of track,
at site or brought from outside
Providing and laying uncoursed hand packed Dry Rubble in layer not cu.m 2.08 6,000.00 12,480.00 2.08 12,462.00 2.08 12,462.00 0.00 - 99.86%
shoring, strutting,
exceeding 15 in timbering
cmfoundation,
thick (compacted andthickness)
buttressing with
Stone soling under floor plinth including
with out
appropriate
transportation materials
of soil,and all such
spreading measures
in required necessary
line and to
any special dressing of stone including filling interstices
retain in position the
level,suitable
sprinkling sidesramming,
of the foundation pit with
and
with quarrywater,
waste or stone chipscompacting
or quarry sand,
including
Prepared by
mechanical refilling
contractor rammers, the excavated
testing, material
Checked with
by watering,
Consultant,
as per DSC Verified by (Engineer), DLPIU Recommended by DLPIU Chief Checked and forwarded by CLPIU DPD Approved by CLPIU, project Director
watering, compacting using etc., all complete
appropriate mechanical
ramming,specification
drawing, leveling the and site and disposing
instructions off the
of the Engineer.
compaction means with all contractors materials,
surplus/unusable earth to outside the construction
handling, placing etc. all complete as per drawings,
premises, etc. all complete as per drawings,
specifications and instruction of the Engineer. The
Bill of Quantities Up to Date of work till now Previous Bill Currently Accomplished work
Pay
Item Description Unit Quantity As % completion Remarks
No. Rate Amount Quantity Amount Quantity Amount Quantity Amount
per Contract

2. CONCRETE WORKS
2.1.1 cu.m 0.78 14,000.00 10,920.00 0.78 10,904.25 0.78 10,904.25 0.00 - 99.86%
2.1 P.C.C
2.1.1
2.2 P.C.CFOR
P.C.C. (1:3:6) R.C.C. WORKS :
2.2 Providing and and laying
laying inmachine cu.m 7.42 20,000.00 148,400.00 7.41 148,295.00 7.41 148,295.00 0.00 - 99.93%
Providing positionmixedmachine Plain
mixedCement
and
Concrete
machine of nominal
vibrated mix 1:3:6
cement (1 cement
concrete of mix: 31:1.5:3
sand : (1 6
2.3 SILICA CEMENT ADMIXTURE
2.3 coarse aggregate
cement:1.5 sand: ) for leveling
3 coarse course in foundations and kg 74.20 300.00 22,260.00 74.15 22,244.25 74.15 22,244.25 0.00 - 99.93%
Providing and mixing Silicaaggregate) M20 grade
Cement Admixture of forin
under floorcement
reinforced of building, etc. work
concrete in all using
level with broken stone
structural
2.4 STEEL concrete at the rate
REINFORCEMENT of 2.50% approved
by weightcement
of the
2.4 aggregate
with 20 mm of graded
size not more crushed
machine than 25 stone
mm of approved
aggregate of Mt. 1.46 130,000.00 189,800.00 1.58 204,902.61 1.58 204,902.61 0.00 - 107.96%
cement for and
Providing promotingfixingworkability,
in position improving
Fe 500 strength,
steel
quality including
approved quality informwork various wherever
locations necessary,
achieving waterproofing
reinforcement properties,
of various mixing, bleedingand
diameter transporting,
confirming
heights
prevention,
to relevant
2.5 FORM
dewatering,
including WORKS
batching,
transportation of concrete to placing,
2.5 etc.
IS Silica
code Cementworks
in R.C.C. Admixture
including shall be site
the of
straightening,
placing,
product of sq.m 54.93 800.00 43,944.00 56.46 45,170.80 56.46 45,170.80 0.00 - 102.79%
Supplying
compacting,
compaction, and laying
curing, centering,
including all shuttering
lead and lift, of cutting,
various
etc. all
Silica
bending,Japan orfinished
binding superior
with 20
to required
and
SWG meet line
shallannealed thewireand level,
requirements
for tying
pattern
complete
protectionformworks
as per
and curing, with 19/12
drawings, mm thick water
specifications
etc. all complete proof
and ply
the - - 0.00
as
the mentioned
reinforcement inbarsspecification
at props of asmaterials
each junctions
per drawings,
(binding and
wire
F wood & steel
instructions
specifications
Furniture of andadjustable
the Engineer.
the instructions forof all
thekinds of RCC
Engineer, but lot 1.00 4,000,000.00 4,000,000.00 1.00 4,000,000.00 1.00 4,000,000.00 0.00 - 100.00%
shall
works notforbeWorks
Workmanship, Division
measured
foundations,
– 4: Concrete
separately) Works,
including allArticle
waste 2.4
and
excluding the cost ofcolumns, centering,
Total
shearshuttering,
walls, beams,
and 42,426,569.79 42,070,496.18 42,331,401.78 - 260,905.60
cut pieces,
slab, staircase,provision
lintel,forsill,
adequate numbers
pergola, of spacers,
including nails,
reinforcement, all complete as per drawings,
chairs, providing
propping scaffolding, and placing
staging,cement mortarand
supporting (1:1)bracing
cover
specifications and instructions of the Engineer.
blocks
in to keep
proper lines the andbars in sealing
level, intendedthe position
joints at all heavy
with levels
all complete as per drawings, specifications
duty brown self adhesive tape, aligning to line and levels and
instructions
including of the Engineer.
Ties, PVC Spacer, (Authorized
Providing lap length and
openings/
for the bar
cutouts/ length applying
pockets, exceedingDe-shuttering
10 meter in lengthchemical,shallDe-be
measured for
shuttering as the payment,
approved except
by the to column).
Engineer etc., complete at
all levels as per drawing, specifications and instructions
of the Engineer.

Prepared by contractor Checked by Consultant, DSC Verified by (Engineer), DLPIU Recommended by DLPIU Chief Checked and forwarded by CLPIU DPD Approved by CLPIU, project Director
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block 3-LaLiEACCr(F), T(S)F
School Name : Shree Gyanjyoti Secondary School
Location : Hansapur-.3, Gorkha
Abstract of Cost - Civil Works
Pay Quantity
Quantity
Item Description of Works Unit Rate (NRs.) Qty Site Water Amount
in BOQ 3LaLiEACCr(F)-A T(S)F Total
No. Development Tank
GENERAL -
1 MOBILIZATION AND DEMOBILIZATION L.S. 1.00 500,000.00 1.00 500,000.00
2 SITE OFFICE ESTABLISHMENT Per Month 16.00 25,000.00 16.00 400,000.00
3 PROJECT INFORMATION BOARD nos. 1.00 10,000.00 1.00 10,000.00
4 SAFETY SIGN BOARD nos. 1.00 10,000.00 1.00 10,000.00
5 BARRICADING WORKS R.m 98.88 2,000.00 120.00 240,000.00
6 SAFETY MATERIALS & SITE SAFETY L.S. 1.00 100,000.00 1.00 100,000.00
7 LAB TEST(WATER TEST) job 1.00 0.00 -
8 TEMPORARY TOILET nos. 2.00 150,000.00 2.00 300,000.00
9 ROAD REPAIR AND MAINTENANCE. Km. 38.00 50,000.00 38.00 1,900,000.00
0.00 -
CIVIL WORKS- BUILDING 0.00 -
1 EARTH WORKS 0.00 -
1.1 SITE CLEARANCE & MOBILIZATION: sq.m 598.98 100.00 550.65 83.91 634.56 63,456.10
1.2 EARTHWORK IN EXCAVATION : cu.m 342.79 400.00 249.69 71.19 320.88 128,351.35
1.3 EARTH BACK FILLING : cu.m 201.25 300.00 171.13 63.21 234.34 70,300.76
1.4 BOULDER SOLING : cu.m 100.15 6,000.00 107.98 14.48 122.45 734,711.70
1.5 SAND FILLING : cu.m 7.40 6,000.00 4.91 2.16 7.07 42,395.40
2. CONCRETE WORKS
2.1 2.1 P.C.C cu.m 17.00 14,000.00 15.19 2.49 17.67
2.1.1 P.C.C (1:3:6) 247,429.00
2.1.2 P.C.C (1:2:4) WORKS cu.m 25.69 16,000.00 22.41 0.56 22.97 367,598.12
2.2 P.C.C. FOR R.C.C. WORKS : cu.m 381.20 20,000.00 374.40 16.46 390.87 7,817,350.42
2.3 SILICA CEMENT ADMIXTURE kg 3,812.00 300.00 3744.04 164.63 3,908.68 1,172,602.56
2.4 STEEL REINFORCEMENT Mt. 61.00 130,000.00 58.15 2.13 60.27 7,835,663.19
2.5 FORM WORKS sq.m 2,547.51 800.00 2433.42 128.13 2,561.56 2,049,244.48
3. BRICK MASONRY WORKS
3.1 3.1 BRICK MASONRY WORKS ( 1 : 4 c/s ) ONE SIDE cu.m 114.50 20,000.00 0.00
-
7.2.3 FAIRFACE
CLEAR SILICON WATER-REPELLANT COATNG sq.m 535.30 550.00 0.00 -
8.1.1 POINTING WORK IN BRICK MASONRY sq.m 535.30 400.00 0.00 -

Prepared By: Checked By: Approved By:


Sharma AM JV Consultant Engineer DLPIU
Pay Quantity
Quantity
Item Description of Works Unit Rate (NRs.) Qty Site Water Amount
in BOQ 3LaLiEACCr(F)-A T(S)F Total
No. Development Tank
BOQ Total of items 3.1., 7.2.3 & 8.1.1: 0.00 -
Replaced items 3.1, 7.2.3 and 8.1.1 with following items for 3-
LaLiEACCr(F) and T(S)F 0.00
-
Brick Masonry Works (1:4 c/s) cu.m 18,000.00 0.00 -
Cement Plaster Works on Outer Wall (1:6) sq.m 600.00 0.00 -
Exterior Weather Coat Paint sq.m 350.00 0.00 -
0.00 -
3.2 BRICK MASONRY WORKS ( 1 : 4 c/s ) cu.m 71.88 18,000.00 154.40 24.88 179.28 3,227,121.36
3.3 HALF BRICK WORKS ( 1 : 4 c/s ) sq.m 92.52 1,500.00 51.43 10.61 62.04 93,054.41
3.4 HONEY COMB BRICK WORKS (1:3 c/s) cu.m 4.52 9,000.00 3.21 0.24 3.45 31,093.20
4. DOORS & WINDOWS WORKS
4.1 4.1 METAL FRAME 0.00
-
4.1.1 Door Frame rm. 170.90 1,100.00 177.97 177.97 195,767.00
4.1.2 Window Frame rm. 497.50 1,100.00 468.08 468.08 514,888.00
4.2 METAL SHUTTER 0.00 -
4.2.1 WINDOW SHUTTER sq.m 98.88 7,500.00 97.07 97.07 728,025.00
4.3 WOODEN SHUTTER 0.00 -
4.3.1 FLUSH DOOR SHUTTER (32MM) sq.m 65.60 8,000.00 68.28 68.28 546,228.00
UPVC DOOR
4.4.1 SHUTTER/FRAME sq.m 7.14 9,000.00 7.14
7.14 64,260.00
4.5 WINDOW GRILL sq.m 59.00 2,500.00 97.62 6.23 103.85 259,625.00
4.6 COLLAPSIBLE GATE sq.m 9.90 10,000.00 9.90 9.90 99,000.00
5. FLOORING WORKS
5.1 HARDENED CEMENT CONCETE FLOOR sq.m 1273.37 900.00 1,247.85
1206.32 41.53 1,123,067.03
5.2 NEAT CEMENT SKIRTING r.m 693.07 100.00 564.86 11.50 576.36 57,636.00
5.3 TERRAZZO CAST-IN SITU DADO sq.m 56.79 1,500.00 28.66 32.88 61.54 92,302.50
6 ROOFING/ TERRACING WORKS 0.00 -
6.1 METAL WORKS (TRUSS) k.g 513.54 220.00 699.65 699.65 153,923.00
6.2 CGI SHEET ROOFING sq.m 33.54 2,000.00 33.54 33.54 67,080.00
6.3 CGI SHEET ROOFING RIDGE r.m 6.95 1,200.00 6.95 6.95 8,340.00
6.4 GI FACIA (EAVES) Kg 69.60 250.00 63.27 63.27 15,817.50
6.5 CEMENT BOARD FALSE CEILING sq.m 23.75 1,500.00 23.75 23.75 35,625.00
7. PLASTERING/ WALL FINISHING WORKS
7.1.1 7.1 CEMENT PLASTER WORKS sq.m 1,175.78 600.00 1,231.04
ON INNER WALL (1:6) 1,178.52 52.52 738,626.53

Prepared By: Checked By: Approved By:


Sharma AM JV Consultant Engineer DLPIU
Pay Quantity
Quantity
Item Description of Works Unit Rate (NRs.) Qty Site Water Amount
in BOQ 3LaLiEACCr(F)-A T(S)F Total
No. Development Tank
7.1.2 7.1.2 ON CEILING (1:4) sq.m 664.28 500.00 833.56 23.60 857.16 428,580.14
7.1.3 ON OUTER WALL (1:6):
7.1.3.1 7.1.3.1 EXTERNAL PLASTER sq.m 638.97 600.00 1,035.65
966.72 68.93 621,390.00
7.1.3.2 7.1.3.2 do as above for Band Plaster rm. 428.88 100.00 0.00 -
INTERNAL PALSTER ON WALL (1:4)WITH CEMENT
7.1.4 PUNNING sq.m 35.21 700.00 35.66
35.66 24,962.00
7.2 PAINTING WORKS
7.2.1 DISTEMPER PAINT sq.m 1,835.49 200.00 2,111.95
2,012.08 99.87 422,390.91
7.2..2 EXTERIOR WEATHER COAT PAINT sq.m 1,027.57 350.00 966.72 68.93 1,035.65 362,477.50
7.2.4 ENAMEL PAINT sq.m 443.36 400.00 545.73 6.23 551.96 220,782.80
8 MISCELLANEOUS 0.00 -
8.2 CEMENT BOARD WALL
8.2.1 FOR PARTITION sq.m 3.38 6,500.00 3.38
3.38 21,970.00

8.3 RAILING kg 2,410.90 220.00 2,424.07 2,424.07 533,296.18


8.4 PUMP SHED nos. 1.00 80,000.00 1.00 1.00 80,000.00
8.5 SEWER, RAIN AND WASTE WATER INSTALLATION R.m 45.05 1,500.00 41.80 41.80 62,700.00
0.00 -
3 ELECTRICAL WORKS 0.00 -
A. Common Installation 0.00 -
1.1 Stand Alone 40 A DP MCB with Enclosure no. 1 12,000.00 1.00 1.00 12,000.00
1.2 Stand Alone 6 A DP MCB with Enclosure no. 1 8,500.00 1.00 1.00 8,500.00
2 CABLES & WIRES 0.00 -
2 Nos 10 Sq.mm + 1 No 6 Sq.mm mutistranded copper conductor
2.1 wires rm 50 800.00 53.00
53.00 42,400.00
2 Nos 2.5 Sq.mm mutistranded copper conductor wires + 1 Nos. 1.5sq
2.2 mm multistranded Cu wire rm 60 250.00 64.00
64.00 16,000.00
B School Blocks 0.00 -
1 DISTRIBUTION BOARDS nos. 0.00 -
1.1 Ground Floor nos. 1 32,000.00 1 1.00 32,000.00
1.2 First Floor nos. 1 22,000.00 1 1.00 22,000.00
1.3 Second Floor nos. 1 30,000.00 1 1.00 30,000.00
1.4 Stand Alone 6 A DP MCB with Enclosure nos. 1 8,500.00 1.00 1.00 8,500.00
2 CABLES & WIRES 0.00 -

Prepared By: Checked By: Approved By:


Sharma AM JV Consultant Engineer DLPIU
Pay Quantity
Quantity
Item Description of Works Unit Rate (NRs.) Qty Site Water Amount
in BOQ 3LaLiEACCr(F)-A T(S)F Total
No. Development Tank
2 Nos 6 Sq mm Multistranded Cu Wire + 1 No 4 Sq mm Multistranded
2.1 Cu wire rm 10 600.00 10.50
10.50 6,300.00
2 Nos 4 Sq mm Multistranded Cu Wire + 1 No 2.5 Sq mm
2.2 Multistranded Cu wire rm 15 500.00 16.00
16.00 8,000.00
2 Nos 2.5 Sq mm Multistranded Cu Wire + 1 No 1.5 Sq mm
2.3 Multistranded Cu wire rm 25 250.00 28.00
28.00 7,000.00
3 General Service Light Point Wiring 0.00 -
3.1 One Way Light Point pts. 78 700.00 72.00 6.00 78.00 54,600.00
3.2 Two Way Light Point pts. 3 900.00 3.00 3.00 2,700.00
3.3 Ceiling Fan Point pts. 2 900.00 2.00 2.00 1,800.00
4 6A Universal Pin Light Power Socket Wiring pts. 97 900.00 97.00 97.00 87,300.00
5 Switch Socket Outlets 0.00 -
5.1 6A Universal Power Switch Socket nos. 97 700.00 97.00 97.00 67,900.00
6 Sweep Ceiling/Exhaust Fans/ Wall Fan 0.00 -
6.1 225mm dia M/D Exhaust Fan nos. 2 6,000.00 2.00 2.00 12,000.00
7 Light Fixtures/Luminaires & Accessories 0.00 -
7.1 18 W LED Surface Mounted Square type nos. 44 2,700.00 44.00 44.00 118,800.00
7.3 12 W LED Surface Mounted Cylindrical type nos. 27 2,400.00 27.00 27.00 64,800.00
7.4 7W LED Wall Light nos. 2 1,800.00 1.00 1.00 2.00 3,600.00
7.6 9W LED Surface Mounted Cylindrical type nos. 1 2,000.00 1.00 1.00 2,000.00
7.7 6W LED Recessed Mounted Circular type nos. 3 1,800.00 3.00 3.00 5,400.00
7.8 7W LED T5 Slim Mirror Light nos. 1 2,000.00 1.00 1.00 2,000.00
9 External Post Top Light Pole nos. 3 7,500.00 3.00 3.00 22,500.00
10 Post Top External Light Fixtures nos. 3 9,800.00 3.00 3.00 29,400.00
11 Earthing & Lighting Protection 0.00 -
11.1 Chemical Earthing nos. 3 45,000.00 3.00 3.00 135,000.00
11.2 Earthing Bar nos. 3 2,200.00 3.00 3.00 6,600.00
12 Earthing Strip/Wires 0.00 -
12.1 25 x 3 mm GI strip mtr. 65 300.00 65.00 65.00 19,500.00
12.2 12 SWG Cu wire mtr. 15 200.00 15.00 15.00 3,000.00
13 Earth Test link nos. 1 1,500.00 1.00 1.00 1,500.00
4 Lightning Arrester nos. 1 7500 1.00 1.00 7,500.00
C Solar PV System 0.00 -
1 Solar PV Panel nos. 8 26,000.00 8.00 8.00 208,000.00
2 Tubular Deep Cycle Battery nos. 4 30,000.00 4.00 4.00 120,000.00

Prepared By: Checked By: Approved By:


Sharma AM JV Consultant Engineer DLPIU
Pay Quantity
Quantity
Item Description of Works Unit Rate (NRs.) Qty Site Water Amount
in BOQ 3LaLiEACCr(F)-A T(S)F Total
No. Development Tank
3 Hybrid Inverter nos. 1 100,000.00 1.00 1.00 100,000.00
D FIRE EXTINGUISHER 0.00 -
Fire extinguisher ABC stored Pressure 5.0kg size ABC stored pressure
a type Fire extinguisher. nos. 7 8,000.00 7.00
7.00 56,000.00
b Dry Powder Fire Extinguisher nos. 1 8,000.00 1.00 1.00 8,000.00
0.00 -
D SANITARY WORKS 0.00 -
1 WATER SUPPLY INSTALLATION 0.00 -
a CPVC pipes SDR-11 0.00 -
40 mm r.m 124.00 1,600.00 120.00 120.00 192,000.00
25mm r.m 10.00 1,000.00 30.00 30.00 30,000.00
20mm r.m 26.00 700.00 57.00 57.00 39,900.00
15mm r.m 2.00 500.00 2.00 2.00 1,000.00
c CPVC Ball Valve 0.00 -
40 mm nos. 3.00 2,000.00 6.00 6.00 12,000.00
25 mm nos. 2.00 900.00 2.00 2.00 1,800.00
20mm nos. 2.00 400.00 2.00 2.00 800.00
d 40mm dia Gun Metal Check Valve nos. 1.00 4,500.00 1.00 1.00 4,500.00
e Electrical Centrifugal Water Pump nos. 1.00 12,500.00 1.00 1.00 12,500.00
f 1000 litres Capacity Water Storage Tank nos. 1.00 34,000.00 1.00 1.00 34,000.00
2 Sewer, Rain and Waste Water Installation 0.00 -
110 mm r.m 42.00 1,400.00 72.00 72.00 100,800.00
75mm r.m 46.00 1,200.00 40.00 40.00 48,000.00
50mm r.m 20.00 250.00 33.00 33.00 8,250.00
B School Blocks 0.00 -
1 Sanitary Installation 0.00 -
a Kitchen Sink of size 750*450*225mm set 5.00 30,000.00 5.00 5.00 150,000.00
b Kitchen Sink of size 900*450*225mm set 1.00 35,000.00 1.00 1.00 35,000.00
c PVC Multi Floor Trap no. 2.00 600.00 2.00 2.00 1,200.00
2 Sanitary Installation 0.00 -
a Water Closet Set set 1.00 34,000.00 1.00 1.00 34,000.00
b Orissa Pan set 2.00 3,100.00 2.00 2.00 6,200.00
c Hand Wash Basin set 1.00 8,000.00 1.00 1.00 8,000.00
d Ladies Urinal set 2.00 110,000.00 2.00 2.00 220,000.00
e Self Closing Bib Cock nos. 6.00 4,000.00 6.00 6.00 24,000.00

Prepared By: Checked By: Approved By:


Sharma AM JV Consultant Engineer DLPIU
Pay Quantity
Quantity
Item Description of Works Unit Rate (NRs.) Qty Site Water Amount
in BOQ 3LaLiEACCr(F)-A T(S)F Total
No. Development Tank
f CP Spreader in Urinal set 2.00 2,500.00 2.00 2.00 5,000.00
g Toilet Paper Holder nos. 1.00 2,600.00 1.00 1.00 2,600.00
h Commode Spray nos. 1.00 2,000.00 1.00 1.00 2,000.00
i PVC Multi Floor Trap nos. 5.00 600.00 5.00 5.00 3,000.00
j Waste Coupling and PVC Bottle Trap nos. 2.00 1,500.00 2.00 2.00 3,000.00
k 40mm SS Grab Bar-Side nos. 1.00 4,500.00 1.00 1.00 4,500.00
l 40mm SS Grab Bar-Rear nos. 1.00 4,500.00 1.00 1.00 4,500.00
m CP Foldable Hinge nos. 2.00 5,500.00 2.00 2.00 11,000.00
0.00 -
E CIVIL WORKS : SITE DEVELOPMENT 0.00 -
1 EARTHWORKS 0.00 -
1 SITE CLEARANCE AND MOBILIZATION Sq.m 249.65 1,000.00 128.21 128.21 128,210.90
2 EARTHWORK IN EXCAVATION Cu.m 206.38 400.00 22.18 22.18 8,871.05
3 BOULDER SOLING Cu.m 30.74 6,000.00 19.75 19.75 118,509.81
6 P.C.C (1:2:4) Cu.m 15.27 16,000.00 9.62 9.62 153,853.08
7 BRICKS MASONRY WORKS (1:4 c/s) Cu.m 0.22 18,000.00 0.20 0.20 3,643.20
8 FLAG POLE nos. 2.00 25,000.00 2.00 2.00 50,000.00
0.00 -
CIVIL WORKS-RESERVIOR TANK 0.00 -
1.1 SITE CLEARANCE & MOBILIZATION: sq.m 22.31 50.00 22.31 22.31 1,115.50
1.2 EARTHWORK IN EXCAVATION : cu.m 24.58 400.00 24.57 24.57 9,828.72
1.3 EARTH BACK FILLING : cu.m 4.02 300.00 4.01 4.01 1,202.85
1.4 BOULDER SOLING : cu.m 2.08 6,000.00 2.08 2.08 12,462.00
2. CONCRETE WORKS
2.1.1 2.1 P.C.C cu.m 0.78 14,000.00 0.78
2.1.1 P.C.C (1:3:6)
0.78 10,904.25
2.2 P.C.C. FOR R.C.C. WORKS : cu.m 7.42 20,000.00 7.41 7.41 148,295.00
2.3 SILICA CEMENT ADMIXTURE kg 74.20 300.00 74.15 74.15 22,244.25
2.4 STEEL REINFORCEMENT Mt. 1.46 130,000.00 1.58 1.58 204,902.61
2.5 FORM WORKS sq.m 54.93 800.00 56.46 56.46 45,170.80
0.00 -
F Furniture Works lot 1.00 4,000,000.00 1 1.00 4,000,000.00
Total 42,070,496.18

Prepared By: Checked By: Approved By:


Sharma AM JV Consultant Engineer DLPIU
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block 3-LaLiEACCr(F), T(S)F
School Name : Shree Gyanjyoti Secondary School
Location : Hansapur-.3, Gorkha
Abstract of Cost - Civil Works
Pay Quantity
Quantity
Item Description of Works Unit Rate (NRs.) Qty Site Water Amount Remarks
in BOQ 3LaLiEACCr(F)-A T(S)F Total
No. Development Tank
GENERAL -
1 MOBILIZATION AND DEMOBILIZATION L.S. 1.00 500,000.00 1.00 500,000.00
2 SITE OFFICE ESTABLISHMENT Per Month 16.00 25,000.00 16.00 400,000.00
3 PROJECT INFORMATION BOARD nos. 1.00 10,000.00 1.00 10,000.00
4 SAFETY SIGN BOARD nos. 1.00 10,000.00 1.00 10,000.00
5 BARRICADING WORKS R.m 98.88 2,000.00 120.00 240,000.00
6 SAFETY MATERIALS & SITE SAFETY L.S. 1.00 100,000.00 1.00 100,000.00
7 LAB TEST(WATER TEST) job 1.00 0.00 -
8 TEMPORARY TOILET nos. 2.00 150,000.00 2.00 300,000.00
9 ROAD REPAIR AND MAINTENANCE. Km. 38.00 50,000.00 38.00 1,900,000.00
0.00 -
CIVIL WORKS- BUILDING 0.00 -
1 EARTH WORKS 0.00 -
1.1 SITE CLEARANCE & MOBILIZATION: sq.m 598.98 100.00 550.65 83.91 634.56 63,456.10
1.2 EARTHWORK IN EXCAVATION : cu.m 342.79 400.00 249.69 71.19 320.88 128,351.35
1.3 EARTH BACK FILLING : cu.m 201.25 300.00 171.13 63.21 234.34 70,300.76
1.4 BOULDER SOLING : cu.m 100.15 6,000.00 107.98 14.48 122.45 734,711.70
1.5 SAND FILLING : cu.m 7.40 6,000.00 4.91 2.16 7.07 42,395.40
2. CONCRETE WORKS
2.1 2.1 P.C.C cu.m 17.00 14,000.00 15.19 2.49 17.67
2.1.1 P.C.C (1:3:6) 247,429.00
2.1.2 P.C.C (1:2:4) WORKS cu.m 25.69 16,000.00 22.41 0.56 22.97 367,598.12
2.2 P.C.C. FOR R.C.C. WORKS : cu.m 381.20 20,000.00 374.40 16.46 390.87 7,817,350.42
2.3 SILICA CEMENT ADMIXTURE kg 3,812.00 300.00 3744.04 164.63 3,908.68 1,172,602.56
2.4 STEEL REINFORCEMENT Mt. 61.00 130,000.00 58.15 2.13 60.27 7,835,663.19
2.5 FORM WORKS sq.m 2,547.51 800.00 2433.42 128.13 2,561.56 2,049,244.48
3. BRICK MASONRY WORKS
3.1 3.1 BRICK MASONRY WORKS ( 1 : 4 c/s ) ONE SIDE cu.m 114.50 20,000.00 0.00
-
7.2.3 FAIRFACE
CLEAR SILICON WATER-REPELLANT COATNG sq.m 535.30 550.00 0.00 -
8.1.1 POINTING WORK IN BRICK MASONRY sq.m 535.30 400.00 0.00 -

Prepared By: Checked By: Approved By:


Sharma AM JV Consultant Engineer DLPIU
Pay Quantity
Quantity
Item Description of Works Unit Rate (NRs.) Qty Site Water Amount Remarks
in BOQ 3LaLiEACCr(F)-A T(S)F Total
No. Development Tank
BOQ Total of items 3.1., 7.2.3 & 8.1.1: 0.00 -
Replaced items 3.1, 7.2.3 and 8.1.1 with following items for 3-
LaLiEACCr(F) and T(S)F 0.00
-
Brick Masonry Works (1:4 c/s) cu.m 18,000.00 0.00 -
Cement Plaster Works on Outer Wall (1:6) sq.m 600.00 0.00 -
Exterior Weather Coat Paint sq.m 350.00 0.00 -
0.00 -
3.2 BRICK MASONRY WORKS ( 1 : 4 c/s ) cu.m 71.88 18,000.00 154.40 24.88 179.28 3,227,121.36
3.3 HALF BRICK WORKS ( 1 : 4 c/s ) sq.m 92.52 1,500.00 51.43 10.61 62.04 93,054.41
3.4 HONEY COMB BRICK WORKS (1:3 c/s) cu.m 4.52 9,000.00 3.21 0.24 3.45 31,093.20
4. DOORS & WINDOWS WORKS
4.1 4.1 METAL FRAME 0.00
-
4.1.1 Door Frame rm. 170.90 1,100.00 177.97 177.97 195,767.00
4.1.2 Window Frame rm. 497.50 1,100.00 468.08 468.08 514,888.00
4.2 METAL SHUTTER 0.00 -
4.2.1 WINDOW SHUTTER sq.m 98.88 7,500.00 97.07 97.07 728,025.00
4.3 WOODEN SHUTTER 0.00 -
4.3.1 FLUSH DOOR SHUTTER (32MM) sq.m 65.60 8,000.00 68.28 68.28 546,228.00
UPVC DOOR
4.4.1 SHUTTER/FRAME sq.m 7.14 9,000.00 7.14
7.14 64,260.00
4.5 WINDOW GRILL sq.m 59.00 2,500.00 97.62 6.23 103.85 259,625.00
4.6 COLLAPSIBLE GATE sq.m 9.90 10,000.00 9.90 9.90 99,000.00
5. FLOORING WORKS
5.1 HARDENED CEMENT CONCETE FLOOR sq.m 1273.37 900.00 1,247.85
1206.32 41.53 1,123,067.03
5.2 NEAT CEMENT SKIRTING r.m 693.07 100.00 564.86 11.50 576.36 57,636.00
5.3 TERRAZZO CAST-IN SITU DADO sq.m 56.79 1,500.00 28.66 32.88 61.54 92,302.50
6 ROOFING/ TERRACING WORKS 0.00 -
6.1 METAL WORKS (TRUSS) k.g 513.54 220.00 699.65 699.65 153,923.00
6.2 CGI SHEET ROOFING sq.m 33.54 2,000.00 33.54 33.54 67,080.00
6.3 CGI SHEET ROOFING RIDGE r.m 6.95 1,200.00 6.95 6.95 8,340.00
6.4 GI FACIA (EAVES) Kg 69.60 250.00 63.27 63.27 15,817.50
6.5 CEMENT BOARD FALSE CEILING sq.m 23.75 1,500.00 23.75 23.75 35,625.00
7. PLASTERING/ WALL FINISHING WORKS
7.1.1 7.1 CEMENT PLASTER WORKS sq.m 1,175.78 600.00 1,231.04
ON INNER WALL (1:6) 1,178.52 52.52 738,626.53

Prepared By: Checked By: Approved By:


Sharma AM JV Consultant Engineer DLPIU
Pay Quantity
Quantity
Item Description of Works Unit Rate (NRs.) Qty Site Water Amount Remarks
in BOQ 3LaLiEACCr(F)-A T(S)F Total
No. Development Tank
7.1.2 7.1.2 ON CEILING (1:4) sq.m 664.28 500.00 833.56 23.60 857.16 428,580.14
7.1.3 ON OUTER WALL (1:6):
7.1.3.1 7.1.3.1 EXTERNAL PLASTER sq.m 638.97 600.00 1,035.65
966.72 68.93 621,390.00
7.1.3.2 7.1.3.2 do as above for Band Plaster rm. 428.88 100.00 0.00 -
INTERNAL PALSTER ON WALL (1:4)WITH CEMENT
7.1.4 PUNNING sq.m 35.21 700.00 35.66
35.66 24,962.00
7.2 PAINTING WORKS
7.2.1 DISTEMPER PAINT sq.m 1,835.49 200.00 2,111.95
2,012.08 99.87 422,390.91
7.2..2 EXTERIOR WEATHER COAT PAINT sq.m 1,027.57 350.00 966.72 68.93 1,035.65 362,477.50
7.2.4 ENAMEL PAINT sq.m 443.36 400.00 545.73 6.23 551.96 220,782.80
8 MISCELLANEOUS 0.00 -
8.2 CEMENT BOARD WALL
8.2.1 FOR PARTITION sq.m 3.38 6,500.00 3.38
3.38 21,970.00

8.3 RAILING kg 2,410.90 220.00 2,424.07 2,424.07 533,296.18


8.4 PUMP SHED nos. 1.00 80,000.00 1.00 1.00 80,000.00
8.5 SEWER, RAIN AND WASTE WATER INSTALLATION R.m 45.05 1,500.00 41.80 41.80 62,700.00
0.00 -
3 ELECTRICAL WORKS 0.00 -
A. Common Installation 0.00 -
1.1 Stand Alone 40 A DP MCB with Enclosure no. 1 12,000.00 1.00 1.00 12,000.00
1.2 Stand Alone 6 A DP MCB with Enclosure no. 1 8,500.00 1.00 1.00 8,500.00
2 CABLES & WIRES 0.00 -
2 Nos 10 Sq.mm + 1 No 6 Sq.mm mutistranded copper conductor
2.1 wires rm 50 800.00 53.00
53.00 42,400.00
2 Nos 2.5 Sq.mm mutistranded copper conductor wires + 1 Nos. 1.5sq
2.2 mm multistranded Cu wire rm 60 250.00 64.00
64.00 16,000.00
B School Blocks 0.00 -
1 DISTRIBUTION BOARDS nos. 0.00 -
1.1 Ground Floor nos. 1 32,000.00 1 1.00 32,000.00
1.2 First Floor nos. 1 22,000.00 1 1.00 22,000.00
1.3 Second Floor nos. 1 30,000.00 1 1.00 30,000.00
1.4 Stand Alone 6 A DP MCB with Enclosure nos. 1 8,500.00 1.00 1.00 8,500.00
2 CABLES & WIRES 0.00 -

Prepared By: Checked By: Approved By:


Sharma AM JV Consultant Engineer DLPIU
Pay Quantity
Quantity
Item Description of Works Unit Rate (NRs.) Qty Site Water Amount Remarks
in BOQ 3LaLiEACCr(F)-A T(S)F Total
No. Development Tank
2 Nos 6 Sq mm Multistranded Cu Wire + 1 No 4 Sq mm Multistranded
2.1 Cu wire rm 10 600.00 10.50
10.50 6,300.00
2 Nos 4 Sq mm Multistranded Cu Wire + 1 No 2.5 Sq mm
2.2 Multistranded Cu wire rm 15 500.00 16.00
16.00 8,000.00
2 Nos 2.5 Sq mm Multistranded Cu Wire + 1 No 1.5 Sq mm
2.3 Multistranded Cu wire rm 25 250.00 28.00
28.00 7,000.00
3 General Service Light Point Wiring 0.00 -
3.1 One Way Light Point pts. 78 700.00 72.00 6.00 78.00 54,600.00
3.2 Two Way Light Point pts. 3 900.00 3.00 3.00 2,700.00
3.3 Ceiling Fan Point pts. 2 900.00 2.00 2.00 1,800.00
4 6A Universal Pin Light Power Socket Wiring pts. 97 900.00 97.00 97.00 87,300.00
5 Switch Socket Outlets 0.00 -
5.1 6A Universal Power Switch Socket nos. 97 700.00 97.00 97.00 67,900.00
6 Sweep Ceiling/Exhaust Fans/ Wall Fan 0.00 -
6.1 225mm dia M/D Exhaust Fan nos. 2 6,000.00 2.00 2.00 12,000.00
7 Light Fixtures/Luminaires & Accessories 0.00 -
7.1 18 W LED Surface Mounted Square type nos. 44 2,700.00 44.00 44.00 118,800.00
7.3 12 W LED Surface Mounted Cylindrical type nos. 27 2,400.00 27.00 27.00 64,800.00
7.4 7W LED Wall Light nos. 2 1,800.00 1.00 1.00 2.00 3,600.00
7.6 9W LED Surface Mounted Cylindrical type nos. 1 2,000.00 1.00 1.00 2,000.00
7.7 6W LED Recessed Mounted Circular type nos. 3 1,800.00 3.00 3.00 5,400.00
7.8 7W LED T5 Slim Mirror Light nos. 1 2,000.00 1.00 1.00 2,000.00
9 External Post Top Light Pole nos. 3 7,500.00 3.00 3.00 22,500.00
10 Post Top External Light Fixtures nos. 3 9,800.00 3.00 3.00 29,400.00
11 Earthing & Lighting Protection 0.00 -
11.1 Chemical Earthing nos. 3 45,000.00 3.00 3.00 135,000.00
11.2 Earthing Bar nos. 3 2,200.00 3.00 3.00 6,600.00
12 Earthing Strip/Wires 0.00 -
12.1 25 x 3 mm GI strip mtr. 65 300.00 65.00 65.00 19,500.00
12.2 12 SWG Cu wire mtr. 15 200.00 15.00 15.00 3,000.00
13 Earth Test link nos. 1 1,500.00 1.00 1.00 1,500.00
4 Lightning Arrester nos. 1 7500 1.00 1.00 7,500.00
C Solar PV System 0.00 -
1 Solar PV Panel nos. 8 26,000.00 8.00 8.00 208,000.00
2 Tubular Deep Cycle Battery nos. 4 30,000.00 4.00 4.00 120,000.00

Prepared By: Checked By: Approved By:


Sharma AM JV Consultant Engineer DLPIU
Pay Quantity
Quantity
Item Description of Works Unit Rate (NRs.) Qty Site Water Amount Remarks
in BOQ 3LaLiEACCr(F)-A T(S)F Total
No. Development Tank
3 Hybrid Inverter nos. 1 100,000.00 1.00 1.00 100,000.00
D FIRE EXTINGUISHER 0.00 -
Fire extinguisher ABC stored Pressure 5.0kg size ABC stored pressure
a type Fire extinguisher. nos. 7 8,000.00 7.00
7.00 56,000.00
b Dry Powder Fire Extinguisher nos. 1 8,000.00 1.00 1.00 8,000.00
0.00 -
D SANITARY WORKS 0.00 -
1 WATER SUPPLY INSTALLATION 0.00 -
a CPVC pipes SDR-11 0.00 -
40 mm r.m 124.00 1,600.00 120.00 120.00 192,000.00
25mm r.m 10.00 1,000.00 30.00 30.00 30,000.00
20mm r.m 26.00 700.00 57.00 57.00 39,900.00
15mm r.m 2.00 500.00 2.00 2.00 1,000.00
c CPVC Ball Valve 0.00 -
40 mm nos. 3.00 2,000.00 6.00 6.00 12,000.00
25 mm nos. 2.00 900.00 2.00 2.00 1,800.00
20mm nos. 2.00 400.00 2.00 2.00 800.00
d 40mm dia Gun Metal Check Valve nos. 1.00 4,500.00 1.00 1.00 4,500.00
e Electrical Centrifugal Water Pump nos. 1.00 12,500.00 1.00 1.00 12,500.00
f 1000 litres Capacity Water Storage Tank nos. 1.00 34,000.00 1.00 1.00 34,000.00
2 Sewer, Rain and Waste Water Installation 0.00 -
110 mm r.m 42.00 1,400.00 72.00 72.00 100,800.00
75mm r.m 46.00 1,200.00 40.00 40.00 48,000.00
50mm r.m 20.00 250.00 33.00 33.00 8,250.00
B School Blocks 0.00 -
1 Sanitary Installation 0.00 -
a Kitchen Sink of size 750*450*225mm set 5.00 30,000.00 5.00 5.00 150,000.00
b Kitchen Sink of size 900*450*225mm set 1.00 35,000.00 1.00 1.00 35,000.00
c PVC Multi Floor Trap no. 2.00 600.00 2.00 2.00 1,200.00
2 Sanitary Installation 0.00 -
a Water Closet Set set 1.00 34,000.00 1.00 1.00 34,000.00
b Orissa Pan set 2.00 3,100.00 2.00 2.00 6,200.00
c Hand Wash Basin set 1.00 8,000.00 1.00 1.00 8,000.00
d Ladies Urinal set 2.00 110,000.00 2.00 2.00 220,000.00
e Self Closing Bib Cock nos. 6.00 4,000.00 6.00 6.00 24,000.00

Prepared By: Checked By: Approved By:


Sharma AM JV Consultant Engineer DLPIU
Pay Quantity
Quantity
Item Description of Works Unit Rate (NRs.) Qty Site Water Amount Remarks
in BOQ 3LaLiEACCr(F)-A T(S)F Total
No. Development Tank
f CP Spreader in Urinal set 2.00 2,500.00 2.00 2.00 5,000.00
g Toilet Paper Holder nos. 1.00 2,600.00 1.00 1.00 2,600.00
h Commode Spray nos. 1.00 2,000.00 1.00 1.00 2,000.00
i PVC Multi Floor Trap nos. 5.00 600.00 5.00 5.00 3,000.00
j Waste Coupling and PVC Bottle Trap nos. 2.00 1,500.00 2.00 2.00 3,000.00
k 40mm SS Grab Bar-Side nos. 1.00 4,500.00 1.00 1.00 4,500.00
l 40mm SS Grab Bar-Rear nos. 1.00 4,500.00 1.00 1.00 4,500.00
m CP Foldable Hinge nos. 2.00 5,500.00 2.00 2.00 11,000.00
0.00 -
E CIVIL WORKS : SITE DEVELOPMENT 0.00 -
1 EARTHWORKS 0.00 -
1 SITE CLEARANCE AND MOBILIZATION Sq.m 249.65 1,000.00 128.21 128.21 128,210.90
2 EARTHWORK IN EXCAVATION Cu.m 206.38 400.00 22.18 22.18 8,871.05
3 BOULDER SOLING Cu.m 30.74 6,000.00 19.75 19.75 118,509.81
6 P.C.C (1:2:4) Cu.m 15.27 16,000.00 9.62 9.62 153,853.08
7 BRICKS MASONRY WORKS (1:4 c/s) Cu.m 0.22 18,000.00 0.20 0.20 3,643.20
8 FLAG POLE nos. 2.00 25,000.00 2.00 2.00 50,000.00
0.00 -
CIVIL WORKS-RESERVIOR TANK 0.00 -
1.1 SITE CLEARANCE & MOBILIZATION: sq.m 22.31 50.00 22.31 22.31 1,115.50
1.2 EARTHWORK IN EXCAVATION : cu.m 24.58 400.00 24.57 24.57 9,828.72
1.3 EARTH BACK FILLING : cu.m 4.02 300.00 4.01 4.01 1,202.85
1.4 BOULDER SOLING : cu.m 2.08 6,000.00 2.08 2.08 12,462.00
2. CONCRETE WORKS
2.1.1 2.1 P.C.C cu.m 0.78 14,000.00 0.78
2.1.1 P.C.C (1:3:6)
0.78 10,904.25
2.2 P.C.C. FOR R.C.C. WORKS : cu.m 7.42 20,000.00 7.41 7.41 148,295.00
2.3 SILICA CEMENT ADMIXTURE kg 74.20 300.00 74.15 74.15 22,244.25
2.4 STEEL REINFORCEMENT Mt. 1.46 130,000.00 1.58 1.58 204,902.61
2.5 FORM WORKS sq.m 54.93 800.00 56.46 56.46 45,170.80
0.00 -
F Furniture Works lot 1.00 4,000,000.00 1 1.00 4,000,000.00
Total 42,070,496.18

Prepared By: Checked By: Approved By:


Sharma AM JV Consultant Engineer DLPIU
Project Name : Emergency School Reconstruction Project (ESRP)
Building: 3LaLiEACCr(F)-A
School Name : Shree Chaturmala Secondary School
Location : Muchhok-01, Gorkha

Breadth Height
S. No. Description No. Length (m) Quantity Unit Remarks
(m) (m)
1 EARTH WORKS
1.1 Site Clearance
Building 1 34.50 15.50 534.75
Soak Pit 1 15.90 Area 15.90
Total 550.65 sq.m

1.2 Earth Work Excavation


For Isolated Foundation
F1 2 2.80 2.80 1.50 23.52
F2 4 3.30 3.30 1.50 65.34
For Combined Foundation
CF1 3 2.10 5.30 1.50 50.09
CF2 1 3.30 5.30 1.50 26.24
CF3 2 3.10 5.30 1.50 49.29

Along Lower Tie Beam


Along Grid A & F 2 3.50 0.55 0.75 2.89
Along Grid B 1 3.30 0.55 0.75 1.36
Grid C & D 2 3.55 0.55 0.75 2.93
Along Grid E 1 3.25 0.55 0.75 1.34
Along Grid 1 1 12.50 0.55 0.75 5.16
Along Grid 2,3 2 15.10 0.55 0.75 12.46

Drain 1 29.00 0.60 0.05 0.87


Pavement Along Drain 1 29.00 0.75 0.15 3.26
External Steps 1 27.90 0.70 0.15 2.93

Ramp
For Slope 1 1.30 0.52 Area 0.67
Wall Along Grid B 1 0.50 0.45 0.45 0.10
Wall Parallel to Ramp 1 6.80 0.45 0.41 1.25
Total 249.69 cu.m

1.3 Earth Back Filling


Excavated Soil 249.69
Additional Quantities Required
Lab/ECD/Store/Pantry 4 6.70 5.70 0.18 26.73
Staircase 1 6.70 4.20 0.18 4.92
Corridor 4 5.70 2.20 0.18 8.78
1 4.20 2.20 0.18 1.62
Deductions 0.00
Boulder Soling -1 27.04 -27.04
PCC -1 15.19 -15.19
RCC -1 77.98 -77.98
Wall -1 0.40 -0.40
Total 171.13 cu.m

1.4 Boulder Soling


Footing
Isolated F1 2 2.50 2.50 0.20 2.50
Isolated F2 4 3.00 3.00 0.20 7.20
Combined CF1 3 1.80 5.00 0.20 5.40
Combined CF2 1 3.00 5.00 0.20 3.00
Combined CF3 2 2.80 5.00 0.20 5.60
Below Foundation Beam

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Breadth Height
S. No. Description No. Length (m) Quantity Unit Remarks
(m) (m)
Along Grid A & F 2 3.50 0.55 0.75 2.89
Along Grid B 1 3.30 0.55 0.75 1.36
Grid C & D 2 3.55 0.55 0.75 2.93
Along Grid E 1 3.25 0.55 0.75 1.34
Along Grid 1 1 12.50 0.55 0.75 5.16
Along Grid 2,3 2 15.10 0.55 0.75 12.46

Pavement along Drain 1 29.00 1.00 0.10 2.90


Pebbels along Drain 1 29.00 0.60 0.05 0.87
External Steps 1 28.58 0.70 0.10 2.00
Ramp
Slopped Portion 1 1.30 1.36 Area 1.77
Wall Along Grid B 1 0.50 0.45 0.10 0.02
Wall Parallel to Ramp 1 6.80 0.45 0.10 0.31
Classroom
Lab/ECD/Store/Pantry 4 5.70 6.70 0.20 30.55
Corridor 4 5.70 2.20 0.20 10.03
1 4.20 2.20 0.20 1.85
Below Staircase 1 4.20 6.65 0.20 5.59
Inside of soak Pit 1 1.13 2.00 2.26
Total 107.98 cu.m

1.5 Sand Filling


Periphery ot Soak pit 1 2.07 Area 2.37 4.91
Total 4.91 cu.m

2 CONCRETE WORKS
2.1 P.C.C.
2.1.1 P.C.C.(1:3:6) Works
Footing
Isolated F1 2 2.50 2.50 0.10 1.25
Isolated F2 4 3.00 3.00 0.10 3.60
Combined CF1 3 1.80 5.00 0.10 2.70
Combined CF2 1 3.00 5.00 0.10 1.50
Combined CF3 2 2.80 5.00 0.10 2.80

Below Foundation Beam


Along Grid A,B,C,D,E,F/ 1-2 6 4.55 0.40 0.10 1.09
Along Grid 1 1 23.50 0.40 0.10 0.94
Along Grid 2,3 2 16.30 0.40 0.10 1.30
Total 15.19 cu.m

2.1.2 P.C.C.(1:2:4) Works


Pavement along Drain 1 29.00 1.00 0.05 1.45
Below External Steps 1 28.58 0.70 0.05 1.00
Above External Steps 1 27.08 0.90 0.05 1.22

Ramp
Sloped 1 1.30 0.51 Area 0.66
Wall Top 1 1.33 0.25 0.05 0.02
1 6.80 0.13 0.05 0.04
Lab/ECD/Store/Pantry 4 5.70 6.70 0.08 11.46
Corridor 4 5.70 2.20 0.08 3.76
1 4.20 2.20 0.08 0.69
Below Staircase 1 4.20 6.70 0.08 2.11
Total 22.41 cu.m

2.2 P.C.C For R.C.C. Works


A Foundation
Isolated F1 Base 2 2.50 2.50 0.25 3.13
Isolated F1 Slope 2 3.63 Area 0.35 2.54
Isolated F2 Base 4 3.00 3.00 0.25 9.00

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Breadth Height
S. No. Description No. Length (m) Quantity Unit Remarks
(m) (m)
Isolated F2 Slope 4 5.00 Area 0.35 7.00
Combined CF1 3 1.80 5.00 0.60 16.20
Combined CF2 1 3.00 5.00 0.60 9.00
Combined CF3 2 2.80 5.00 0.60 16.80

B Beam
Foundation beam (300x400)
Along Grid A & F 2 3.50 0.30 0.40 0.84
Along Grid B 1 3.30 0.30 0.40 0.40
Grid C & D 2 3.55 0.30 0.40 0.85
Along Grid E 1 3.25 0.30 0.40 0.39
Along Grid 1 1 12.50 0.30 0.40 1.50
Along Grid 2,3 2 15.10 0.30 0.40 3.62

Plinth Tie beam(300x450)


Along grid 1,2,3 3 26.00 0.30 0.45 10.53
Along Grid A,B,C,D,E,F 6 8.50 0.30 0.45 6.89

First floor level (+3.00m Lvl)


Main beam
Along grid 1,2 & 3 3 26 0.3 0.4 9.36
Along grid A,B,C,D,E & F 6 8.5 0.3 0.4 6.12

Secondary beam
Along grid 1a 2 10.9 0.25 0.3 1.64
Along grid 1b 1 4.2 0.25 0.3 0.32
Along grid A1,B1,D1 & E1 4 8.9 0.25 0.3 2.67

Edge Beam(125x525)
Grid B,C 1 7.90 0.13 0.3 0.30

Second floor level (+6.00m Lvl)


Main beam
Along grid 1,2 & 3 3 26 0.3 0.4 9.36
Along grid A,B,C,D,E & F 6 8.5 0.3 0.4 6.12

Secondary beam
Along grid 1a 2 10.9 0.25 0.3 1.64
Along grid 1b 1 4.2 0.25 0.3 0.32
Along grid A1,B1,D1 & E1 4 8.9 0.25 0.3 2.67

Beam(Third floor level)


Main beam
Along grid 1,2 & 3 3 26 0.3 0.4 9.36
Along grid A,B,C,D,E & F 6 8.5 0.3 0.4 6.12

Secondary beam
Along grid 1a 2 10.9 0.25 0.3 1.64
Along grid 1b 1 4.2 0.25 0.3 0.32
Along grid A1,B1,D1 & E1 4 8.9 0.25 0.3 2.67

Beam(Roof level)
Main beam
Along grid 1,2 & 3 3 4 0.3 0.4 1.44
Along grid C & D 2 8.5 0.3 0.4 2.04

Secondary beam
Along grid 1a 1 4.2 0.25 0.3 0.32

C Column
Ground floor plan

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Breadth Height
S. No. Description No. Length (m) Quantity Unit Remarks
(m) (m)
Total columns(500x500) 18 0.50 0.50 3.00 13.50

First floor plan


Total columns(500x500) 18 0.50 0.50 3.00 13.50

Second floor plan


Total columns(500x500) 18 0.50 0.50 3.00 13.50

Top Floor Plan


Total columns(500x500) 6 0.50 0.50 2.63 3.94

Column below Plinth level


Total columns(500x500) 18 0.50 0.50 1.05 4.73

D Slab
First floor level (+3.00m Lvl) 1 305.15 Area 0.13 38.14
Deduction
Column deduction -18 0.50 0.50 0.13 -0.56
Void deduction -1 4.78 4.20 0.13 -2.61
Projections
At Back 2 11.50 0.70 0.13 2.01
At Front 1 6.20 1.00 0.13 0.78

Slab(second floor level) 1 305.15 Area 0.13 38.14


Deduction
Column deduction -18 0.50 0.50 0.13 -0.56
Void deduction -1 4.78 4.20 0.13 -2.61
Projections
At Back 2 11.50 0.70 0.13 2.01

Slab(Third floor level) 1 305.15 Area 0.13 38.14


Cantilevered portion(back) 2 13.35 1.1 0.15 4.41
Cantievered portion(side) 2 9.7 1.1 0.15 3.20
Cantilevered portion(front) 1 31 1.1 0.15 5.12
Cantilever front(projection) 1 7 0.5 0.15 0.53

Roof floor level (+11.625m Lvl) 1 11.50 6.50 0.13 9.34


Column deduction -6 0.50 0.50 0.13 -0.19

E Staircase
Ground floor level
Bottom 1 2.07 2.00 0.20 0.83
Landing 1 2.20 2.00 0.20 0.88
1 2.00 2.10 0.20 0.84
Waist Slab 1 6.75 2.00 0.20 2.70
Steps 20 0.03 Area 2.00 1.20
Landing Beam 1 4.00 0.25 0.38 0.38

First floor level


Landing 1 2.20 2.00 0.20 0.88
1 2.00 2.10 0.20 0.84
External Slab 1 4.05 0.73 0.13 0.37
Waist Slab 1 6.75 2.00 0.21 2.77
Steps 20 0.03 Area 2.00 1.20
Landing Beam 1 4.05 0.25 0.38 0.38

Second floor level


Landing 1 2.20 2.00 0.20 0.88
1 2.00 2.10 0.20 0.84
External Slab 1 4.05 0.73 0.13 0.37
Waist Slab 1 6.75 2.00 0.21 2.77
Steps 20 0.03 Area 2.00 1.20

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Breadth Height
S. No. Description No. Length (m) Quantity Unit Remarks
(m) (m)
Landing Beam 1 4.05 0.25 0.38 0.38
Projections 3 4.00 0.70 0.13 1.05

F Vertical support bands


Ground Floor level
Along Grid 2 7.00 0.08 0.23 2.48 0.30
First floor level
Along Grid 2 6.00 0.08 0.23 2.48 0.26
Second floor level
Along Grid 2 8.00 0.08 0.23 2.48 0.34

G Lintel Bands
Ground floor level
Short Span
Along grid A,C,D,E,F 5 6.50 0.23 0.08 0.56
Between B,C 1 4.70 0.125 0.08 0.04
1 2.05 0.23 0.08 0.04
Long Span
Along grid 1 1 22.20 0.23 0.08 0.38
Along grid 2 1 21.68 0.23 0.08 0.37

First floor level


Short Span
Along grid A,C,D,E,F 5 6.50 0.23 0.08 0.56
Between B,C 1 5.03 0.125 0.08 0.05
1 1.73 0.23 0.08 0.03
Long Span
Along grid 1 1 22.20 0.23 0.08 0.38
Along grid 2 1 21.75 0.23 0.08 0.38

Second floor level


Short Span
Along grid A,C,D,E,F 5 6.50 0.23 0.08 0.56
Between B,C 1 5.03 0.125 0.08 0.05
1 1.73 0.23 0.08 0.03
Long Span
Along grid 1 1 22.20 0.23 0.08 0.38
Along grid 2 1 21.75 0.23 0.08 0.38

Between Principal/Admin 1.00 1.50 0.23 0.08 0.03


1.00 4.25 0.13 0.08 0.04

Deduction of Doors/Windows for Lintels


Ground floor level
D1 -6 1.10 0.23 0.08 -0.11
D3 -1 1.00 0.23 0.08 -0.02
First floor level
D1 -6 1.10 0.23 0.08 -0.11
D3 -1 1.00 0.23 0.08 -0.02
Second floor level
D1 -8 1.10 0.23 0.08 -0.15
D3 -1 1.00 0.23 0.08 -0.02
G Sill Bands
Ground floor level
Short Span
Along grid A,C,D,E,F 5 6.50 0.23 0.08 0.56
Between B,C 1 2.05 0.23 0.08 0.04
1 4.70 0.125 0.08 0.04
Long Span
Along grid 1 1 26.20 0.23 0.08 0.45
Along grid 2 1 21.68 0.23 0.08 0.37

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Breadth Height
S. No. Description No. Length (m) Quantity Unit Remarks
(m) (m)
Below staircase 1 4.23 0.125 0.08 0.04

First floor level


Short Span
Along grid A,C,D,E,F 5 6.50 0.23 0.08 0.56
Between B,C 1 5.03 0.125 0.08 0.05
1 1.73 0.23 0.08 0.03
Long Span
Along grid 1 1 26.20 0.23 0.08 0.45
Along grid 2 1 21.75 0.23 0.08 0.38

Second floor level


Short Span
Along grid A,C,D,E,F 5 6.50 0.23 0.08 0.56
Between B,C 1 5.03 0.125 0.08 0.05
1 1.73 0.23 0.08 0.03
Long Span
Along grid 1 1 26.20 0.23 0.08 0.45
Along grid 2 1 21.75 0.23 0.08 0.38

Between Principal/Admin 1.00 1.50 0.23 0.08 0.03


1.00 4.25 0.13 0.08 0.04
Top floor level
Along grid C,D 2.00 8.50 0.23 0.08 0.29
Along grid 1,3 2.00 4.00 0.23 0.08 0.14

Deduction of Doors For Sill


Ground floor level
D1 -6 1.10 0.23 0.08 -0.11
D3 -1 1.00 0.23 0.08 -0.02
D4 -1 1.00 0.125 0.08 -0.01
First floor level
D1 -6 1.10 0.23 0.08 -0.11
D3 -1 1.00 0.23 0.08 -0.02
Second floor level
D1 -8 1.10 0.23 0.08 -0.15
D3 -1 1.00 0.23 0.08 -0.02
Top floor level
D2 -2 1.10 0.23 0.08 -0.04

H Soak Pit
RCC slab 1 2.27 Area 0.15 0.34

I Pedestal
Base Block 14 0.50 0.25 0.25 0.44

J Parapet Wall
Top Floor 2.00 36.53 0.35 0.10 2.56
1.00 7.50 0.35 0.10 0.26
Roof Level 1.00 33.00 0.35 0.10 1.16

K Bench
Bench Top Slab 2 2.40 0.50 0.08 0.18
L Slab for In-built Furniture
Furniture Slab for Lab 4 1.80 0.90 0.10 0.65
Sink slab type-1 1 9.43 0.50 0.10 0.47
Sink slab type-2 1 5.75 0.50 0.10 0.29
Sink slab type-3 1 3.60 0.90 0.10 0.32
Furniture slab in preparation room 1 6.75 0.60 0.10 0.41
Sink Deduction
Sink slab type-1 -2 0.70 0.35 0.10 -0.05
Sink slab type-2 -2 0.70 0.35 0.10 -0.05

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Breadth Height
S. No. Description No. Length (m) Quantity Unit Remarks
(m) (m)
Sink slab type-3 -1 0.70 0.35 0.10 -0.02
Total 374.40 cu.m

2.3 Silica Cement Admixture


10 Kg per cu.m. of R.C.C. M20 10 374.40 3,744.04
Total 3,744.04 Kg

2.5 Formworks
Formworks for RCC
A Foundation
Isolated footing
Isolated F1 2 10.00 0.25 5.00
Isolated F2 4 12.00 0.25 12.00
Combined footing
Combined CF1 3 13.60 0.60 24.48
Combined CF2 1 16.00 0.60 9.60
Combined CF3 2 15.60 0.60 18.72

B Beam
Foundation beam (300x400)
Along Grid A & F 2 3.50 0.80 5.60
Along Grid B 1 3.30 0.80 2.64
Grid C & D 2 3.55 0.80 5.68
Along Grid E 1 3.25 0.80 2.60
Along Grid 1 1 12.50 0.80 10.00
Along Grid 2,3 2 15.10 0.80 24.16
Along Grid 1 1 26.00 0.80 20.80
Along Grid 2,3 2 26.00 0.80 41.60

Plinth Tie beam(300x450)


Along grid 1,2,3 3 26.00 0.90 70.20
Along Grid A,B,C,D,E,F 6 8.50 0.90 45.90
Deduction
Along grid 2 -1 2.00 0.20 -0.40
First floor level (+3.00m Lvl)
Main beam(300x525)
Along grid 1 1 22.00 1.23 26.95
1 4.00 1.45 5.80
Along grid 2 1 26.00 1.10 28.60
Along grid 3 1 20.80 1.23 25.48
1 5.20 1.10 5.72
Along Grid A & F 2 8.50 1.23 20.83
Along Grid B & E 2 8.50 1.10 18.70
Along Grid C,D 2 4.50 1.10 9.90
2 4.75 1.23 11.64

Secondary beam(250x425)
Grid 1a 4 5.45 0.85 18.53
Grid 1b 1 4.20 0.70 2.94
Grid A1,B1,D1,E1 4 8.90 0.85 30.26

Edge Beam(125x525)
Grid B,C 1 7.90 1.05 8.30

Second floor level (+6.00m Lvl)


Main beam(300x525)
Along grid 1 1 22.00 1.23 26.95
1 4.00 1.45 5.80
Along grid 2 1 26.00 1.10 28.60
Along grid 3 1 26.00 1.23 31.85
Along Grid A & F 2 8.50 1.23 20.83
Along Grid B & E 2 8.50 1.10 18.70

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Breadth Height
S. No. Description No. Length (m) Quantity Unit Remarks
(m) (m)
Along Grid C,D 2 3.75 1.10 8.25
2 4.75 1.23 11.64

Secondary beam(250x425)
Grid 1a 4 5.45 0.85 18.53
Grid 1b 1 4.20 0.70 2.94
Grid A1,B1,D1,E1 4 8.90 0.85 30.26

Top floor level (+9.00m Lvl)


Main beam(300x525)
Along grid 1 1 22.00 1.08 23.65
1 4.00 1.45 5.80
Along grid 2 1 26.00 1.10 28.60
Along grid 3 1 26.00 1.08 27.95
Along Grid A & F 2 8.50 1.08 18.28
Along Grid B & E 2 8.50 1.10 18.70
Along Grid C,D 2 3.75 1.10 8.25
2 4.75 1.23 11.64
Secondary beam(250x425)
Grid 1a 4 5.45 0.85 18.53
Grid 1b 1 4.20 0.70 2.94
Grid A1,B1,D1,E1 4 8.90 0.85 30.26

Roof floor level (+11.625m Lvl)


Main beam(300x525)
Along grid 1,2,3 3 4.00 1.10 13.20
Along Grid C,D 2 8.50 1.10 18.70

Secondary beam(250x425)
Grid 1a 1 4.20 0.85 3.57
Landing beam 3 0.85 4.00 10.20

C Column
Ground floor plan
Total columns(500x500) 18 2.00 2.88 103.50

First floor plan


Total columns(500x500) 18 2.00 2.88 103.50

Second floor plan


Total columns(500x500) 18 2.00 2.88 103.50

Top Floor Plan


Total columns(500x500) 6 2.00 2.50 30.00

Column below Plinth level


Total columns(500x500) 18 2.00 1.05 37.80

D Slab
First floor level (+3.00m Lvl) 1 28.80 9.80 282.24
Cantilever slab back side 2 11.75 0.70 16.45
Cantilever slab front side 1 6.15 1.00 6.15
Deduction
Void deduction -1 4.75 4.20 -19.95

Main beam(300x500)
Along grid 1,2,3 -3 26.00 0.30 -23.40
Along Grid A,B,E,F -4 8.50 0.30 -10.20
Along Grid C,D -2 9.25 0.30 -5.55

Secondary beam(250x425)
Grid 1a -4 5.45 0.25 -5.45

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Breadth Height
S. No. Description No. Length (m) Quantity Unit Remarks
(m) (m)
Grid 1b -1 4.20 0.25 -1.05
Grid A1,B1,D1,E1 -4 8.90 0.25 -8.90

Edge Beam(125x525)
Grid B,C -1 7.90 0.13 -0.99

Second floor level (+6.00m Lvl) 1 28.80 9.80 282.24


Cantilever slab 2 11.75 0.70 16.45
Deduction
Void deduction -1 4.75 4.20 -19.95

Main beam(300x525)
Along grid 1,2,3 -3 26.00 0.30 -23.40
Along Grid A,B,E,F -4 8.50 0.30 -10.20
Along Grid C,D -2 8.50 0.30 -5.10

Secondary beam(250x425)
Grid 1a -4 5.45 0.25 -5.45
Grid 1b -1 4.20 0.25 -1.05
Grid A1,B1,D1,E1 -4 8.90 0.25 -8.90

Top floor level (+9.00m Lvl) 1 370.45 Area 370.45


Edge around slab 1 84.70 0.15 12.71
Deduction
Void deduction -1 4.75 4.20 -19.95

Main beam(300x525)
Along grid 1,2,3 -3 26.00 0.30 -23.40
Along Grid A,B,E,F -4 8.50 0.30 -10.20
Along Grid C,D -2 8.50 0.30 -5.10

Secondary beam(250x425)
Grid 1a -4 5.45 0.25 -5.45
Grid 1b -1 4.20 0.25 -1.05
Grid A1,B1,D1,E1 -4 8.90 0.25 -8.90

Roof floor level (+11.625m Lvl) 1 6.50 11.50 74.75


Slab Edge 1 36.00 0.13 4.50
Deduction
Main beam(300x525)
Along grid 1,2,3 -3 4.00 0.30 -3.60
Along Grid C,D -2 8.50 0.30 -5.10

Secondary beam(250x425)
Grid 1a -1 4.20 0.25 -1.05
E Staircase
Ground floor level
Bottom 1 2.07 0.20 0.41
Waist Slab 1 6.75 2.00 13.50
Side 1 6.75 0.20 1.35
Landing 1 2.20 1.65 3.64
1 2.00 2.15 4.29
Side 1 3.80 0.15 0.57
Riser 20 2.00 0.15 6.00
Landing Beam 1 4.00 0.86 3.44

First floor level


External Slab 1 4.25 0.83 3.51
Waist Slab 1 6.75 2.00 13.50
Side 1 6.75 0.20 1.35

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Breadth Height
S. No. Description No. Length (m) Quantity Unit Remarks
(m) (m)
Landing 1 2.20 1.65 3.64
1 2.00 2.15 4.29
Side 1 3.80 0.15 0.57
Riser 20 2.00 0.15 6.00
Landing Beam 1 4.00 0.71 2.82

Second floor level


Top Floor Passage 1 2.20 0.13 0.28
Waist Slab 1 6.75 2.00 13.50
Side 1 6.75 0.20 1.35
Landing 1 2.20 1.65 3.64
1 2.00 2.15 4.29
Side 1 3.80 0.15 0.57
Riser 20 2.00 0.15 6.00
Landing Beam 1 4.00 0.71 2.82

F Vertical support bands


Ground Floor level
Along Grid 2 7.00 0.40 2.48 6.93
First floor level
Along Grid 2 6.00 0.40 2.48 5.94
Second floor level
Along Grid 2 8.00 0.40 2.48 7.92

G Lintel Bands
Ground floor level
Along grid A,C,D,E,F 5.00 6.50 0.15 4.88
Along grid 1 1.00 22.20 0.15 3.33
Along grid 2 1.00 21.68 0.15 3.25
Between B,C 1.00 4.70 0.15 0.71
1.00 2.05 0.15 0.31
First floor level
Along grid A,C,D,E,F 5.00 6.50 0.15 4.88
Along grid 1 1.00 22.20 0.15 3.33
Along grid 2 1.00 21.75 0.15 3.26
Between B,C 1.00 5.03 0.15 0.75
1.00 1.73 0.15 0.26
Second floor level
Along grid A,B,C,D,E,F 6.00 6.50 0.15 5.85
Along grid 1 1.00 22.20 0.15 3.33
Along grid 2 1.00 21.60 0.15 3.24
Between Principal/Admin 1.00 1.50 0.15 0.23
1.00 4.25 0.15 0.64

Deduction of Doors/Windows for Lintels


Ground floor level
D1 -6 1.10 0.15 -0.99
D3 -1 1.00 0.15 -0.15
First floor level
D1 -6 1.10 0.15 -0.99
D3 -1 1.00 0.15 -0.15
Second floor level
D1 -8 1.10 0.15 -1.32
D3 -1 1.00 0.15 -0.15
H Sill Bands
Ground floor level
Along grid A,C,D,E,F 5.00 6.50 0.15 4.88
Along grid 1 1.00 26.20 0.15 3.93
Along grid 2 1.00 21.68 0.15 3.25
Between B,C 1.00 2.05 0.15 0.31
1.00 4.70 0.15 0.71

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Breadth Height
S. No. Description No. Length (m) Quantity Unit Remarks
(m) (m)
Below staircase 1.00 4.23 0.15 0.63
First floor level
Along grid A,C,D,E,F 5.00 6.50 0.15 4.88
Along grid 1 1.00 26.20 0.15 3.93
Along grid 2 1.00 21.75 0.15 3.26
Between B,C 1.00 5.03 0.15 0.75
1.00 1.73 0.15 0.26
Second floor level
Along grid A,B,C,D,E,F 6.00 6.50 0.15 5.85
Along grid 1 1.00 26.20 0.15 3.93
Along grid 2 1.00 21.60 0.15 3.24
Between Principal/Admin 1.00 1.50 0.15 0.23
1.00 4.25 0.15 0.64
Top floor level
Along grid C,D 2.00 8.50 0.15 2.55
Along grid 1,3 2.00 4.00 0.15 1.20

Deduction of Doors For Sill


Ground floor level
D1 -6 1.10 0.15 -0.99
D3 -1 1.00 0.15 -0.15
D4 -1 1.00 0.15 -0.15
First floor level
D1 -6 1.10 0.15 -0.99
D3 -1 1.00 0.15 -0.15
Second floor level
D1 -8 1.10 0.15 -1.32
D3 -1 1.00 0.15 -0.15
Top floor level
D2 -2 1.10 0.15 -0.33

I Pedestal
Base Block 14 1.25 0.25 4.38

J Parapet Wall
Top Floor 2.00 36.53 0.25 18.27
1.00 7.50 0.25 1.88
Roof Level 1.00 33.00 0.25 8.25
K Bench
Bench Top Slab 2 5.80 Perimeter 0.075 0.87
Bottom 2 5.80 0.60 6.96
Deduction -4 0.13 0.50 -0.25
L Slab For In-built Furniture
Furniture Slab for Lab 4 1.80 0.90 6.48
4 5.40 0.10 2.16
Sink slab type-1 1 9.43 0.50 4.71
1 10.43 0.10 1.04
2 2.10 0.10 0.42
Sink deduction -2 0.70 0.35 -0.49
Sink slab type-2 1 5.75 0.50 2.88
1 6.75 0.10 0.68
2 2.10 0.10 0.42
Sink Deduction -2 0.70 0.35 -0.49
Sink slab type-3 1 3.60 0.90 3.24
1 9.00 0.10 0.90
1 2.10 0.10 0.21
Sink deduction -1 0.70 0.35 -0.25
Furniture slab in preparation room 1 6.75 0.60 4.05
1 6.75 0.10 0.68

M Soak Pit
RCC slab 1.00 1.13 Area 1.13

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Breadth Height
S. No. Description No. Length (m) Quantity Unit Remarks
(m) (m)
Along Sides 1.00 5.34 0.15 0.80
Total 2,433.42 sq.m

3.2 BRICK MASONRY WORKS ( 1 : 4 c/s )


Brick Works upto Plinth Beam
Along grid A,B,C,D,E,F 6 8.50 0.23 0.20 2.35
Along grid 1, 2, 3/A-F 3 26.20 0.23 0.20 3.62

Brick Works above Plinth Beam


Ground floor level
Short Span
Along grid A,C,D,E,F 6 6.50 0.23 2.33 20.86
Long Span
Along grid 1 1 26.20 0.23 2.33 14.01
Along grid 2 1 22.20 0.23 2.33 11.87
Below staircase 1 4.23 0.23 1.82 1.77

First floor level


Short Span
Along grid A,C,D,E,F 6 6.50 0.23 2.33 20.86
Long Span
Along grid 1 1 26.20 0.23 2.33 14.01
Along grid 2 1 22.20 0.23 2.33 11.87

Second floor level


Short Span
Along grid A,C,D,E,F 6 6.50 0.23 2.33 20.86
Long Span
Along grid 1 1 26.20 0.23 2.33 14.01
Along grid 2 1 22.20 0.23 2.33 11.87

Between Principal/Admin 1 1.50 0.23 2.73 0.94


Computer Lab 2 3.60 0.23 1.20 1.99
Deduction
D3 -1 1.00 0.23 1.95 -0.45

Top floor level


Along grid C,D 2 8.50 0.23 2.03 7.92
Along grid 1 1 4.00 0.23 2.03 1.86
Along grid 3 1 4.00 0.23 2.03 1.86

Parapet Wall
Top Floor 2.00 36.53 0.23 0.80 13.44
1.00 7.50 0.23 1.40 2.42
Roof Level 1.00 33.00 0.23 0.90 6.83

Outside
Steps 1 28.58 0.60 0.15 2.57
1 28.58 0.30 0.15 1.29
Ramp
Wall Along -B 1 1.33 0.25 Area 0.33
1 6.91 0.17 Area 1.19

Deduction for doors and windows


Ground floor level
W1 -18 1.10 0.23 1.13 -5.12
V1 -18 1.10 0.23 0.53 -2.39
W3 -1 1.50 0.23 0.37 -0.13
D1 -6 1.10 0.23 2.33 -3.53
First floor level
W1 -17 1.10 0.23 1.13 -4.84
V1 -17 1.10 0.23 0.53 -2.26

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Breadth Height
S. No. Description No. Length (m) Quantity Unit Remarks
(m) (m)
W2 -1 1.50 0.23 1.00 -0.35
D1 -7 1.10 0.23 2.33 -4.12

Second floor level


W1 -16 1.10 0.23 1.13 -4.55
V1 -16 1.10 0.23 0.53 -2.13
W2 -1 1.50 0.23 1.00 -0.35
D1 -8 1.10 0.23 2.33 -4.71
Top floor level
W2 -1 1.50 0.23 1.00 -0.35
D2 -2 1.10 0.23 1.83 -0.92
Total 154.40 cu.m

3.3 Half Brick (125 mm) Works (1:4c/s)


Ground floor
Partition Wall 1 4.70 2.73 12.81
Below Staircase(Store)
1 1.57 Area 1.57
1 1.42 Area 1.42
1 2.00 1.59 3.18
Deductions D4 -1 1.00 1.55 -1.55
First floor 1 5.03 2.73 13.69
Second floor 1 4.25 2.73 11.58
Ramp
Grid 3AB
1 1.40 0.22 0.31
1 5.12 0.22 1.13
Bench
Below external bench 8 0.50 0.43 1.70

For In-built Furniture


Below Sink slab type-1 1 2.98 0.65 1.93
1 0.33 0.65 0.21
Below Sink slab type-2 1 2.98 0.65 1.93
Below Sink slab type-3 1 0.75 0.65 0.49
Furniture slab in preparation room 1 1.58 0.65 1.02
Total 51.43 Sq.m

3.4 Honey Comb Brick (350 mm) Works (1:3c/s)


Soak Pit Brick work 1 1.71 1.88 3.21
Total 3.21 cu.m

4 DOORS & WINDOWS


4.1 Metal Frame
4.1.1 Doors Frame
Ground floor
D1 6 7.07 Perimeter 42.42
D3 1 5.20 Perimeter 5.20
D4 1 4.10 Perimeter 4.10
First floor
D1 7 7.07 Perimeter 49.49
D3 1 5.20 Perimeter 5.20
Second floor
D1 8 7.07 Perimeter 56.56
D3 1 5.20 Perimeter 5.20
Top floor
D2 2 4.90 Perimeter 9.80
Total 177.97 r.m

4.1.2 Windows Frame


Ground floor
W1 18 5.58 Perimeter 100.35

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Breadth Height
S. No. Description No. Length (m) Quantity Unit Remarks
(m) (m)
V1 18 3.25 Perimeter 58.50
First Floor
W1 17 5.58 Perimeter 94.78
W2 1 6.00 Perimeter 6.00
V1 17 3.25 Perimeter 55.25
Second Floor
W1 16 5.58 Perimeter 89.20
W2 1 6.00 Perimeter 6.00
V1 16 3.25 Perimeter 52.00
Top floor
W2 1 6.00 Perimeter 6.00
Total 468.08 r.m

4.2 Metal Shutter


4.2.1 Windows shutter
W1 51 1.10 1.13 63.11
W2 3 1.50 1.00 4.50
V1 51 1.10 0.53 29.45
Total 97.07 sq.m

4.3 Wooden Shutter


4.3.1 Door Shutter
D1 21 1.10 2.44 56.25
D2 2 1.10 1.90 4.18
D3 3 1.00 2.10 6.30
D4 1 1.00 1.55 1.55
Total 68.28 sq.m
4.4 Window Grill
Shutter Area of Window
W1 51 1.10 1.13 63.11
W2 3 1.50 1.00 4.50
W3 1 1.50 0.37 0.56
V1 51 1.10 0.53 29.45
Total 97.62 sq.m
4.5 Collapsable Gate
1.00 4.00 2.48 9.90
Total 9.90 Sq.m

5 FLOORING WORKS
5.1 Hardened Cement Concrete Flooring (40mm) With Neat Cement Punning
Ground floor plan
Laboratory 1.00 9.43 6.75 63.62
Store 1.00 2.23 6.75 15.02
Class Room/Store,Pantry 2.00 5.75 6.75 77.63
Corridor 1.00 28.80 2.37 68.26
1.00 4.20 2.37 9.95
Staircase Below 1.00 6.625 4.2 27.83

Staircase
Staircase Tread 18.00 0.30 2.00 10.80
Riser 20.00 0.15 2.00 6.00
Staircase landing 1.00 2.00 2.20 4.40
1.00 2.13 2.00 4.25

Ramp 1 6.52 1.30 8.48


Exterior Steps 1 28.58 1.05 30.00

First floor plan


Library 1.00 9.43 6.75 63.62

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Breadth Height
S. No. Description No. Length (m) Quantity Unit Remarks
(m) (m)
Store 1.00 2.23 6.75 15.02
Class Rooms 2.00 5.78 6.75 77.96
Corridor 1.00 28.80 2.37 68.26
1.00 4.20 2.37 9.95
Staircase
Staircase Tread 18.00 0.30 2.00 10.80
Riser 20.00 0.15 2.00 6.00
Staircase landing 1.00 2.00 2.20 4.40
1.00 2.13 2.00 4.25
Second floor plan
Computer lab 1.00 5.75 6.75 38.81
Class Room/Teacher's Room 2.00 5.78 6.75 77.96
Principal 1.00 5.75 3.55 20.41
Admin 1.00 5.75 3.25 18.69
Corridor 1.00 28.80 2.37 68.26
1.00 4.20 2.37 9.95
Staircase
Staircase Tread 18.00 0.30 2.00 10.80
Riser 20.00 0.15 2.00 6.00
Staircase landing 1.00 2.00 2.20 4.40
1.00 2.13 2.00 4.25
Top floor plan
Corridor 1.00 4.45 4.20 18.69
Top Floor Slab 1.00 283.86 Area 283.86

Roof plan
Roof Floor Slab 1.00 5.50 10.50 57.75
Total 1206.32 sq.m

5.2 Neat Cement Skirting works


Ground floor plan
Laboratory 1.00 32.75 32.75
Store 1.00 17.95 17.95
Store/Pantry/ECD 2.00 25.35 50.70
Column 6.00 2.00 12.00
Corridor 1.00 30.23 30.23
Store Below Landing 1.00 17.00 17.00
1.00 4.00 4.00
Staircase/Landing 1.00 14.25 14.25
Staircase Waist Slab 1.00 3.00 3.00
Deduction
D1 -12.00 1.10 -13.20
D3 -2.00 1.00 -2.00
D4 -2.00 1.00 -2.00
First floor plan
Library 1.00 32.75
Store 1.00 17.95 17.95
Class Room 2.00 25.35 50.70
Corridor 1.00 30.23 30.23
Column 2.00 0.80 1.60
4.00 1.30 5.20
Staircase/Landing 1.00 14.25 14.25
Staircase Waist Slab 1.00 3.00 3.00
Deduction
D1 -14.00 1.10 -15.40
D3 -2.00 1.00 -2.00
Second floor plan
Computer lab 1.00 25.30 25.30
Class Room/Teacher's Room 2.00 25.35 50.70
Principal 1.00 18.60 18.60
Admin 1.00 17.65 17.65
Column 2.00 0.80 1.60

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Breadth Height
S. No. Description No. Length (m) Quantity Unit Remarks
(m) (m)
4.00 1.30 5.20
Corridor 1.00 30.23 30.23
Staircase/Landing 1.00 14.25 14.25
Staircase Waist Slab 1.00 3.00 3.00
Deduction
D1 -16.00 1.10 -17.60
D3 -2.00 1.00 -2.00
Top floor Plan
Corridor 1.00 13.80 13.80
Top Floor Outer wall 1.00 106.35 106.35
Deduction
D2 -4.00 1.10 -4.40
Roof Plan
Along Wall 1.00 32.00 32.00
Total 564.86 r.m

5.3 25mm Terrazo Finishing


For In-built Furniture
Furniture Slab for Lab 4 2.00 1.10 8.80
Sink slab type-1 1 9.43 0.60 5.66
Sink slab type-2 1 5.95 0.60 3.57
Sink slab type-3 1 3.80 1.10 4.18
Furniture slab in preparation room 1 6.75 0.60 4.05
Bench 2 2.40 0.50 2.40
Total 28.66 sq.m

7 PLASTER WORKS
7.1 Internal Cement Plaster
7.1.1 Internal Plaster on Wall (1:6)
Ground Floor
Laboratory 1 32.75 2.88 94.16
Store 1 17.95 2.88 51.61
Store/Pantry/ECD 2 25.35 2.88 145.76

Staircase 1.00 17.45 2.88 50.17


Store Below Landing 2.00 1.57 Area 3.13
2.00 0.45 1.30 1.17
1.00 1.42 Area 1.42
2.00 1.96 1.59 6.23
Column
Grid 1A, 1F 2.00 0.15 2.88 0.86
Grid 1B,1E 2.00 0.80 2.88 4.61
Grid 1C,1D 2.00 0.45 2.88 2.60
Grid 2A,2F 2.00 1.25 2.88 7.19
Grid 2C,2D 2.00 1.54 2.88 8.86
Grid 2B,2E 2.00 1.31 2.88 7.53

Deductions
W1 -18 1.10 1.13 -11.14
V1 -18 1.10 0.53 -5.20
W3 -1 1.50 0.37 -0.28
D1 -6 1.10 2.44 -8.04
D3 -2 1.00 2.10 -2.10
D4 -2 1.00 1.55 -1.55

For In-built Furniture


Furniture Slab for Bottom 4 1.80 0.90 6.48
-8 0.60 0.25 -1.20
Wall 8 1.70 0.65 8.84
Sink slab type-1 Bottom 1 9.43 0.60 5.66

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Breadth Height
S. No. Description No. Length (m) Quantity Unit Remarks
(m) (m)
Deduct Sink -2 0.95 0.43 -0.81
-4 0.43 0.13 -0.21
Wall 6 0.98 0.65 3.80
2 0.55 0.65 0.72
Sink slab type-2 1 6.75 0.10 0.68
Bottom 1 5.75 0.50 2.88
Deduct Sink -2 0.95 0.43 -0.81
-3 0.43 0.13 -0.16
Wall 7 0.98 0.65 4.44
Sink slab type-3 1 9.00 0.10 0.90
Bottom 1 3.60 0.90 3.24
Deduct Sink -1 0.75 0.35 -0.26
-2 0.75 0.25 -0.38
-1 0.75 0.13 -0.09
Wall 1 5.75 0.65 3.74
Furniture slab in Store room 1 6.75 0.70 4.73
Deduct Wall -3 0.53 0.13 -0.20
Wall 3 1.18 0.65 2.29

First floor plan


Library 1 32.75 2.88 94.16
Store 1 17.95 2.88 51.61
Class Room 2 25.35 2.88 145.76
Staircase 1.00 17.45 2.88 50.17
Column
Grid 2C,2D 2.00 1.23 2.88 7.04
Grid 2B,2E 2.00 0.75 2.88 4.31
Grid 1A, 1F 2.00 0.15 2.88 0.86
Grid 1B,1E 2.00 0.80 2.88 4.61
Grid 1C,1D 2.00 0.45 2.88 2.60
Grid 2A,2F 2.00 1.25 2.88 7.19
Grid 2C,2D 2.00 1.54 2.88 8.86
Grid 2B,2E 2.00 1.31 2.88 7.53
Deductions
W1 -18 1.10 1.13 -11.14
V1 -18 1.10 0.53 -5.20
W2 -1 1.50 1.00 -0.75
D1 -6 1.10 2.44 -8.04
D3 -2 1.00 2.10 -2.10
Second Floor
Computer lab 1 25.30 2.88 72.74
1200mm High Brick Wall 2 7.45 1.20 17.88
2 3.60 0.25 1.80
Class Room/Teacher's Room 2 25.05 2.88 144.04
Principal 1 18.25 2.88 52.47
Admin 1 18.25 2.88 52.47
Staircase 1.00 17.45 2.88 50.17
Column
Grid 1A, 1F 2.00 0.15 2.88 0.86
Grid 1B,1E 2.00 0.60 2.88 3.46
Grid 1C,1D 2.00 0.45 2.88 2.60
Grid 2A,2F 2.00 1.25 2.88 7.19
Grid 2C,2D 2.00 1.54 2.88 8.86
Grid 2B,2E 2.00 1.31 2.88 7.53
Deductions
W1 -16 1.10 1.13 -9.90
V1 -16 1.10 0.53 -4.62
W2 -1 1.50 1.00 -0.75
D1 -8 1.10 2.44 -10.71
D3 -2 1.00 2.10 -2.10
Top Floor
Along Grid 1&3/ C-D 2.00 4.00 2.10 8.40

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Breadth Height
S. No. Description No. Length (m) Quantity Unit Remarks
(m) (m)
Along Grid C&D/ 1-3 2.00 9.65 2.10 20.27
Deductions
W2 -1 1.50 1.00 -0.75
D2 -2 1.10 1.90 -2.09
Total 1,178.52 sq.m

7.1.2 Internal Plaster on Ceiling (1:4)


First Floor Level (+3.00m Lvl)
Laboratory 1 9.425 6.75 63.62
Store 1 2.225 6.75 15.02
Class Room/Store,Pantry 2 5.78 6.75 38.98
Corridor 1 28.80 2.63 37.80
1 2.07 4.20 4.35
Staircase 1 6.75 2.00 6.75
Staircase Landing 1 1.90 4.20 3.99

Main Beam (300x525)


Grid 1 4 5.50 0.95 20.90
1 4.00 0.95 3.80
Grid 2 4 5.50 0.95 20.90
1 4.00 1.10 2.20
Grid 3/A-F 4 5.55 1.23 13.60
1 4.00 1.23 2.45
Grid A,B,C,D,E,F /2-3 6 2.00 1.10 6.60
Grid B,C,D,E /1-2 4 6.50 1.10 14.30
Grid A,F /1-2 2 6.50 0.48 3.09
Canopy With Edge Beam 1 6.15 1.93 5.92
2 0.88 1.05 0.92
1 6.15 0.98 3.00
Secondary Beam (250x425)
Grid A1,B1,D1,E1 1 8.90 0.60 2.67
Grid 1a 1 18.20 0.60 5.46
Grid 1b 1 4.20 0.60 1.26

Second Floor Level (+6.00m Lvl)


Library 1 9.43 6.75 31.81
Store 1 2.23 6.75 7.51
Class Rooms 2 5.78 6.75 38.98
Corridor 1 28.80 2.63 37.80
1 2.07 4.20 4.35
Staircase 1 6.75 2.00 6.75
Staircase Landing 1 1.90 4.20 3.99

Main Beam (300x525)


Grid 1 4 5.50 0.95 20.90
1 4.00 0.95 3.80
Grid 2 4 5.50 0.95 20.90
1 4.00 1.10 2.20
Grid 3/A-F 4 5.55 1.23 13.60
1 4.00 1.23 2.45
Grid A,B,C,D,E,F /2-3 6 2.00 1.10 6.60
Grid B,C,D,E /1-2 4 6.50 1.10 14.30
Grid A,F /1-2 2 6.50 0.48 3.09
Secondary Beam (250x425)
Grid A1,B1,D1,E1 1 8.90 0.60 2.67
Grid 1a 1 18.20 0.60 5.46
Grid 1b 1 4.20 0.60 1.26

Top Floor Level (+9.00m Lvl)


Computer lab 1 5.75 6.75 38.81
Class Room/Teacher's Room 2 5.78 6.75 77.96
Principal 1 5.75 3.55 20.41

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Breadth Height
S. No. Description No. Length (m) Quantity Unit Remarks
(m) (m)
Admin 1 5.75 3.075 17.68
Corridor 1 28.80 2.63 37.80
1 2.07 4.20 4.35
Staircase 1 6.75 2.00 6.75
Staircase Landing 1 1.90 4.20 3.99

Main Beam (300x525)


Grid 1 4 5.50 0.95 20.90
1 4.00 0.95 3.80
Grid 2 4 5.50 0.95 20.90
1 4.00 1.10 2.20
Grid 3/A-F 4 5.55 1.23 13.60
1 4.00 1.23 2.45
Grid A,B,C,D,E,F /2-3 6 2.00 1.10 6.60
Grid B,C,D,E /1-2 4 6.50 1.10 14.30
Grid A,F /1-2 2 6.50 0.48 3.09

Secondary Beam (250x425)


Grid A1,B1,D1,E1 1 8.90 0.60 2.67
Grid 1a 1 18.20 0.60 5.46
Grid 1b 1 4.20 0.60 1.26

Roof Floor Level (+11.625m Lvl)


Staircase with Corridor 1 4.20 9.25 19.43

Main Beam (300x525)


Grid 2/C-D 1 4.00 0.95 1.90

Secondary Beam (250x425)


Grid 1a/C-D 1 4.20 0.60 1.26
Total 833.56 sq.m

7.1.3 External Plaster


Beam Plaster
First Floor Level
Main Beam (300x525)
Along grid 1 1.00 26.20 0.53 13.76
Slab Extension 1.00 23.50 1.23 28.79
Landing Beam 1.00 4.00 0.56 2.24
Along grid A,F 2.00 6.50 0.53 6.83

Second Floor Level


Main Beam (300x525)
Along grid 1 1.00 26.20 0.53 13.76
Slab Extension 1.00 23.50 1.23 28.79
Landing Beam 1.00 4.00 0.81 3.24
Landing Beam Extension 1.00 4.00 1.23 4.90
Along grid A and F 2.00 6.50 0.53 6.83

Third Floor Level


Main Beam (300x525)
Along grid 1 1.00 26.20 0.53 13.76
Slab Extension (All Sides) 1.00 88.77 Area 88.77
Slab Extension (Top Side) 1.00 20.45 Area 20.45
Landing Beam 1.00 4.00 0.81 3.24
Landing Beam Extension 1.00 4.00 1.23 4.90
Along grid A and F 2.00 6.50 0.53 6.83

Roof Floor Level


Main Beam (300x525)
Along Perimeter 1.00 25.00 0.53 13.13
Slab Extension (All Sides) 1.00 28.30 Area 28.30

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Breadth Height
S. No. Description No. Length (m) Quantity Unit Remarks
(m) (m)
Slab Extension (Top Side) 1.00 8.75 Area 8.75

Column Plaster
Ground Floor
Along grid 1
Grid 1A,1F 2.00 1.25 3.00 7.50
Grid 1B,1C,1D,1E 4.00 0.75 3.00 9.00
Along grid 3
Grid 3A,3B,3C,3D,3E,3F 6.00 1.50 2.48 22.28
6.00 0.50 3.00 9.00
First Floor
Along grid 1
Grid 1A,1F 2.00 1.25 3.00 7.50
Grid 1B,1C,1D,1E 4.00 0.75 3.00 9.00
Along grid 3
Grid 3A,3B,3C,3D,3E,3F 6.00 1.50 2.48 22.28
6.00 0.50 3.00 9.00
Second Floor
Along grid 1
Grid 1A,1F 2.00 1.25 3.00 7.50
Grid 1B,1C,1D,1E 4.00 0.75 3.00 9.00
Along grid 3
Grid 3A,3B,3C,3D,3E,3F 6.00 1.50 2.48 22.28
6.00 0.50 3.00 9.00
Parapet Wall
Top Floor 2 35.90 0.80 57.44
1 7.50 1.40 10.50
Roof 1 32.00 0.90 28.80

On Outer walls
Ground floor level
Along grid A,F/1-2 2 6.50 2.48 32.18
Along grid 1 4 5.55 2.48 54.95
1 4.00 2.10 8.38
Along grid 2 4 5.55 2.48 54.95
First floor level
Along grid A,F/1-2 2 6.50 2.48 32.18
Along grid 1 4 5.55 2.48 54.95
1 4.00 2.10 8.38
Along grid 2 4 5.55 2.48 54.95
Second floor level
Along grid A,F/1-2 2 6.50 2.48 32.18
Along grid 1 4 5.55 2.48 54.95
1 4.00 2.10 8.38
Along grid 2 4 5.55 2.48 54.95
Top floor level
Along grid C,D/1-3 2 8.50 2.10 35.70
Along grid 1 1 4.00 2.10 8.40
Along grid 3 1 4.00 2.10 8.40

Deduction for doors and windows


Ground floor level
W1 -12 1.10 1.13 -14.85
V1 -12 1.10 0.53 -6.93
W3 -1 1.50 0.37 -0.56
First floor level
W1 -12 1.10 1.13 -14.85
V1 -12 1.10 0.53 -6.93
W2 -1 1.50 1.00 -1.50
Second floor level
W1 -12 1.10 1.13 -14.85

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Breadth Height
S. No. Description No. Length (m) Quantity Unit Remarks
(m) (m)
V1 -12 1.10 0.53 -6.93
W2 -1 1.50 1.00 -1.50
Top floor level
W2 -1 1.50 1.00 -1.50
D2 -2 1.10 1.83 -4.02
Total 966.72 sq.m

7.2 Painting Works


7.2.1 Distemper Painting Works
As per Internal plaster on wall 1.00 1178.52 Area 1,178.52
As per Internal plaster on ceiling 1.00 833.56 Area 833.56
Total 2,012.08 sq.m

7.2.2 Exterior Weather Coat Paint


External Plaster 1.00 966.72 Area 966.72
Total 966.72 sq.m

7.2.4 Enamel Painting


Doors Factor
Collapsable Gate 1.00 4.00 2.48 2.00 19.80
D1 21 1.10 2.44 2.00 112.50
D2 2 1.10 1.90 2.00 8.36
D3 3 1.00 2.10 2.00 12.60
D4 1 1.00 1.55 2.00 3.10
Window
W1 51 1.10 1.13 2.00 126.23
W2 3 1.50 1.00 2.00 9.00
V1 51 1.10 0.53 2.00 58.91
Window Grill
W1 51 1.10 1.13 2.00 126.23
W2 3 1.50 1.00 2.00 9.00
W3 1 1.50 0.37 2.00 1.11
V1 51 1.10 0.53 2.00 58.91
Total 545.73 sq.m

8 MISCELLANOUS
8.4 Railing
Total
Staircase Railing length Kg/m
Length
Horizontal ISNB 40M 1 22.818 22.82 3.56 81.23
Horizontal ISNB 40M (Top Floor) 1 2.125 2.13 3.56 7.57
Vertical 38mm Square Pipe 6 0.92 5.52 2.82 15.57
Vertical 38mm Square Pipe 20 0.95 19.00 2.82 53.58
Horizontal 25mm Square Pipe 4 22.818 91.27 0.85 77.58
Horizontal 25mm Square Pipe (Top Floor) 4 2.125 8.50 0.85 7.23
Balcony Railing
First Floor
Horizontal ISNB 40M 1 30.2 30.20 3.56 107.51
Horizontal ISNB 32M 2 30.2 60.40 3.10 187.24
Vertical ISNB 32M 23 1.14 26.22 3.10 81.28
Inclined ISNB 32M 23 0.134 3.08 3.10 9.55
Vertical 25mm Square Pipe 208 0.82 170.56 0.85 144.98

Second Floor
Horizontal ISNB 40M 1 30.2 30.20 3.56 107.51
Horizontal ISNB 32M 2 30.2 60.40 3.10 187.24
Vertical ISNB 32M 23 1.14 26.22 3.10 81.28
Inclined ISNB 32M 23 0.134 3.08 3.10 9.55
Vertical 25mm Square Pipe 208 0.82 170.56 0.85 144.98

Parapet Wall
ISNB 40M(Horizontal Bars) 2 36.53 73.06 3.56 260.09

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Breadth Height
S. No. Description No. Length (m) Quantity Unit Remarks
(m) (m)
ISNB 32M(Horizontal Bars) 2 36.53 73.06 3.10 226.49
Vertical ISNB 32M 60 0.40 24.00 3.10 74.40
Inclined ISNB 32M 60 0.134 8.04 3.10 24.92
Vertical 25mm Square Pipe 492 0.30 147.60 0.85 125.46

Pedestal
ISNB 40M Pedestal Bars 14 1.54 21.57 3.56 76.80
14 1.20 16.80 3.56 59.81
28 0.40 11.20 3.56 39.87
Base plate 185 0.00009375 0.02 7850 136.15
12 mm dia. Anchor Bolt, Nut 740 0.13 96.20
Total 2,424.07 k.g

8.5 Sewer, Rain and Waste Water Installation


- 110 mm 4 9.00 36.00
2 2.90 5.80
Total 41.80 R.m

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-LaliEACCr(F)-A
School Name : Shree Gyanjyoti Secondary School
Location : Hunsapur, Gorkha
BAR BENDING SCHEDULE
Dia. of Cut
No. of Total Wt/m Weight
S. No. Description No. Bar Length Bar Shape
Bars Length (m) (Kg) (Kg)
(mm) (m)
1 For Footing
1.1 Footing (F1) 2
X- direction 16 17 2.60 88.40 1.59 140.56 0.1 2.4 0.1

Y- direction 16 17 2.60 88.40 1.59 140.56 0.1 2.4 0.1

1.2 Footing (F2) 4


X- direction 16 20 3.10 248.00 1.59 394.32 0.1 2..9 0.1

Y- direction 16 20 3.10 248.00 1.59 394.32 0.1 2.9 0.1

1.3 Combine Footing (CF1) 3


(BLL) 12 33 2.10 207.90 0.89 185.03 0.2 1.7 0.2

(BUL) 16 12 5.30 190.80 1.59 303.37 0.2 4.9 0.2

(TUL) 12 33 2.10 207.90 0.89 185.03 0.2 1.7 0.2

(TLL) 12 12 5.30 190.80 0.89 169.81 0.2 4.9 0.2

1.4 Stirrups 10 98 3.95 1161.30 0.62 720.01 1.375


0.1
0.5

1.5 Combine Footing (CF2) 1


(BLL) 12 33 3.30 108.90 0.89 96.92 0.2 2.9 0.2

(BUL) 16 20 5.30 106.00 1.59 168.54 0.2 4.9 0.2

(TLL) 16 20 5.30 106.00 1.59 168.54 0.2 4.9 0.2

(TUL) 12 33 3.30 108.90 0.89 96.92 0.2 2.9 0.2

1.6 Stirrups 10 98 5.15 504.70 0.62 312.91 1.975


0.1
0.5

1.7 Combine Footing (CF3) 2


(BLL) 12 33 3.10 204.60 0.89 182.09 0.2 2.7 0.2

(BUL) 16 19 5.30 201.40 1.59 320.23 0.2 4.9 0.2

(TLL) 12 19 5.30 201.40 0.89 179.25 0.2 2.7 0.2

(TUL) 12 33 3.10 102.30 0.89 91.05 0.2 4.9 0.2

1.8 Stirrups 10 98 5.10 999.60 0.62 619.75 0.1


0.5
1.95

2 Column
2.1 Grid 1 (A ,B,E &F) 4
Main Bar 16 6 3.59 86.11 1.59 136.92 16mm
16 6 6.59 158.11 1.59 251.40 6.18 3.18 16mm

0.10 0.1
0.31 0.31
2.2 Grid 1 ( C ) 1
Main Bar 20 4 4.07 16.27 2.47 40.19
16 2 3.59 7.18 1.59 11.41 20mm 16mm
16 6 6.59 39.53 1.59 62.85 16mm 6.18
3.42 3.18

0.12 0.1 0.1


0.53 0.31 0.31

2.3 Grid 1 ( D ) 1
Main Bar 20 6 4.07 24.42 2.47 60.32
20 6 7.07 42.41 2.47 104.75 20mm 20mm
6.42 3.42

0.12 0.12

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-LaliEACCr(F)-A
School Name : Shree Gyanjyoti Secondary School
Location : Hunsapur, Gorkha
BAR BENDING SCHEDULE
Dia. of Cut
No. of Total Wt/m Weight
S. No. Description No. Bar Length Bar Shape
Bars Length (m) (Kg) (Kg)
(mm) (m)
0.53 0.53

2.4 Grid 2(A,B,E & F) 4


Main Bar 20 4 4.07 65.12 2.47 160.85
16 2 3.59 28.72 1.59 45.66 16mm
16 6 6.59 158.16 1.59 251.47 20mm 16mm 6.18
3.42 3.18

0.12 0.10 0.1


0.53 0.53 0.53

2.5 Grid 2 ( C &D) 2


20 6 4.07 48.84 2.47 120.63
20 6 7.07 84.82 2.47 209.50 20mm 20mm
3.42 6.42

0.12 0.12
0.53 0.53
2.6 Grid 3 (A,B,C,D,E & F) 6
Main Bar 20 6 4.07 146.52 2.47 361.90
20 6 7.26 261.23 2.47 645.23 20mm 20mm
3.42 6.42

0.12 0.12
0.53 0.53

2.7 Stirrups 18
For 18 columns 8 12 1.84 397.44 0.40 158.98 0.08
8 24 1.28 552.96 0.40 221.18 0.42 0.14 0.08
0.42
0.42
3 For Lower Tie Beam
3.1 Grid 1,2 & 3 3 8.73
Top Bar 16 2 10.04 60.24 1.59 95.78 0.96
0.35
End bar from both
direction
16 2 11.46 68.76 1.59 109.33 11.46
8.73
16 2 10.04 60.24 1.59 95.78 0.96
0.35
2.94
Middle bar 16 1 4.25 12.75 1.59 20.27 0.96
0.35

16 1 12.00 36.00 1.59 57.24


12

16 1 12.00 36.00 1.59 57.24


12
2.94
16 1 4.25 12.75 1.59 20.27 0.96
0.35
Bottom Bar
End bar from both direction 16 2 3.33 19.98 1.59 31.77
0.66
1.71 0.96

16 2 9.00 54.00 1.59 85.86 9

16 2 11.46 68.76 1.59 109.33 0.96 10.5

16 2 9.33 55.98 1.59 89.01


0.66
0.96 7.1

Middle Bar 16 1 5.37 16.11 1.59 25.61


0.66
3.75 0.96

16 1 11.84 35.51 1.59 56.45 11.835

16 1 10.55 31.64 1.59 50.30 9.585


0.96
0.66
16 1 5.37 16.11 1.59 25.61

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-LaliEACCr(F)-A
School Name : Shree Gyanjyoti Secondary School
Location : Hunsapur, Gorkha
BAR BENDING SCHEDULE
Dia. of Cut
No. of Total Wt/m Weight
S. No. Description No. Bar Length Bar Shape
Bars Length (m) (Kg) (Kg)
(mm) (m)
0.96 3.75

3.2 Grid A,B,C, D,E & F 6


Top Bar 16 3 8.12 146.16 1.59 232.39 7.42
0.35 0.35

Bottom Bar 16 3 8.74 157.32 1.59 250.14


0.35 0.35
7.42

3.3 Stirrups (LTB)


1 8 1113 1.36 1513.68 0.40 605.47 0.8
0.35

0.25

4 Plinth tie beam


4.1 Grid 1,2 & 3 3 8.61 1.2
Top Bar 20 2 10.24 61.41 2.47 151.68
0.425
End bar from both
direction 20 2 11.70 70.20 2.47 173.39 11.7

8.61
20 2 10.24 61.41 2.47 151.68 1.2
0.425
2.94
Middle bar 16 1 4.33 12.98 1.59 20.63 0.96
0.425
16 1 12.00 36.00 1.59 57.24 12

16 1 12.00 36.00 1.59 57.24 12

2.94
16 1 4.33 12.98 1.59 20.63 0.96
0.425

Bottom Bar
End bar from both 20 2 11.65 69.90 2.47 172.65
0.94
direction 9.51 1.2

20 2 11.70 70.20 2.47 173.39 11.7

20 2 9.85 59.10 2.47 145.98


0.94
1.2 7.71

Middle Bar 16 1 9.33 27.99 1.59 44.50


0.66
7.71 0.96

16 1 11.46 34.38 1.59 54.66 11.46

0.66
16 1 11.37 34.11 1.59 54.23 0.96 9.75

4.2 Grid A,B,C,D,E & F 6


Top bar 20 2 11.17 134.04 2.47 331.08
9.92
0.625 0.625

16 1 11.17 67.02 1.59 106.56 9.92


0.625 0.625

Bottom bar 20 2 11.80 141.60 2.47 349.75


0.94 0.94
9.92

16 1 11.24 67.44 1.59 107.23


0.66 0.66
9.92

4.3 Stirrups 1 12 126 1.54 194.04 0.89 172.70 0.12 0.1


10 1113 1.50 1669.50 0.62 1035.09 0.4 0.4

0.25 0.25
5 Column ( Up To 1st Floor Level)
5.1 Grid 1 (A ,B,E & F) 4

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-LaliEACCr(F)-A
School Name : Shree Gyanjyoti Secondary School
Location : Hunsapur, Gorkha
BAR BENDING SCHEDULE
Dia. of Cut
No. of Total Wt/m Weight
S. No. Description No. Bar Length Bar Shape
Bars Length (m) (Kg) (Kg)
(mm) (m)
Main Bar 16 6 6.96 167.04 1.59 265.59 16mm
6

0.96

5.2 Grid 1 ( C ) 1
Main Bar 20 4 7.20 28.80 2.47 71.14
16 2 6.96 13.92 1.59 22.13 20mm 16mm

0.12 0.96

5.3 Grid 1 ( D ) 1
Main Bar 20 6 7.20 43.20 2.47 106.70
6 20mm
2.47

1.2

5.4 Grid 2(A,B,E & F) 4


Main Bar 20 4 7.20 115.20 2.47 284.54
16 2 6.96 55.68 1.59 88.53 6 6.00 16mm
20mm

1.20 0.96

5.5 Grid 2 ( C &D) 2


20 6 7.20 86.40 2.47 213.41
20mm
6

1.2

5.6 Grid 3 (A,B,C,D,E & F) 6


Main Bar 20 6 7.20 259.20 2.47 640.22
20mm
6

1.20

5.7 Stirrups 18
For 18 columns 8 31 1.84 1026.72 0.40 410.69 0.08
8 62 1.28 1428.48 0.40 571.39 0.42 0.14 0.08
1.59 0.42
0.42
6 For Staircase
(Plinth level to 1st floor level)
1.703
Main Bar (top bar) 1 16 21 8.23 172.81 1.59 274.77 0.3

3.354
2.472
0.4

Bottom Bar 1 16 21 3.27 68.71 1.59 109.25

2.042 1.03
0.2

1
Extra Bar 1 16 21 2.00 42.00 1.59 66.78
1

1.853
Landing bottom bar 1 16 21 3.00 63.06 1.59 100.27 1 0.15

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-LaliEACCr(F)-A
School Name : Shree Gyanjyoti Secondary School
Location : Hunsapur, Gorkha
BAR BENDING SCHEDULE
Dia. of Cut
No. of Total Wt/m Weight
S. No. Description No. Bar Length Bar Shape
Bars Length (m) (Kg) (Kg)
(mm) (m)

1.2
Landing Extra bar 1 16 21 2.20 46.20 1.59 73.46 1

Distribution Bar 1 10 23 4.16 95.68 0.62 59.32 4.16

Bar in middle of landing 1 16 4 1.84 7.34 1.59 11.67 1.8


(20cm gap)
1 10 65 1.96 127.40 0.62 78.99 1.96

Top Bar 1 16 21 8.13 170.81 1.59 271.59


1.54
0.4
3.397
2.497
0.3
Bottom Bar 1 16 21 3.30 69.24 1.59 110.09

1
2.147 0.15

1
Extra Bar 1 16 21 2.20 46.20 1.59 73.46 1.2

1.82
Bottom bar( Slab level) 1 16 21 3.02 63.42 1.59 100.84 0.2 1

Extra Bar 1 16 21 2.00 42.00 1.59 66.78 1


1

Distribution Bar 1 10 100 1.96 196.00 0.62 121.52 1.96

1 10 42 4.16 174.72 0.62 108.33 4.16


0.15 0.565 0.15
Nosing Ties(Plinth Level To 0.112 0.162 0.112
First Floor Level ) 0.15 0.15
First type 8 35 0.674 23.59 0.40 9.44 0.565 0.15
Second type 8 7 0.977 6.84 0.40 2.74 0.412
Third type 8 14 1.13 15.86 0.40 6.34 0.268 0.112
Forth type 8 7 0.83 5.81 0.40 2.32 0.15
Fifth type 8 7 0.674 4.72 0.40 1.89 0.268 0.15 0.15
0.262
0.15
Nosing Bar 2 10 10 1.96 39.20 0.62 24.30 1.96

4.92
6.1 Landing Beam 1 20 3 5.62 16.86 2.47 41.64 0.35 0.35

1 20 3 5.62 16.86 2.47 41.64 0.35 0.35


4.92
6.2 Sturriups 1 8 35 1.22 42.70 0.40 17.08
0.08
0.375

7 Main Beam (First Floor Level) 0.2

7.1 Grid A,B,C,D,E & F


Bottom bar (End Bar) 6 25 2 7.25 87.00 2.47 214.89 1.29

4.46 1.5

1.29
6 25 2 6.75 81.00 3.86 312.66 5.46

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-LaliEACCr(F)-A
School Name : Shree Gyanjyoti Secondary School
Location : Hunsapur, Gorkha
BAR BENDING SCHEDULE
Dia. of Cut
No. of Total Wt/m Weight
S. No. Description No. Bar Length Bar Shape
Bars Length (m) (Kg) (Kg)
(mm) (m)

Bottom Bar (mid-bars) 6 20 2 11.80 141.60 2.47 349.75


0.94
0.94
9.92

Top Bar 6 20 3 11.80 212.40 2.47 524.63 9.92


0.94
0.94

Extra Bar 6 25 2 6.50 78.00 3.86 301.08 5.06 0.15


1.29

6 25 2 4.00 48.00 3.86 185.28 2.56 0.15


1.29

Torsion Bars (T/O) 6 16 2 9.80 117.60 1.59 186.98 9.8

7.2 Grid 1
0.94
Bottom Bar (end bar) 1 20 2 5.65 11.30 2.47 27.91 1.2
3.51

20 2 11.40 22.80 2.47 56.32 10.2 1.2

20 2 7.50 15.00 2.47 37.05 7.5

0.94
20 2 9.85 19.70 2.47 48.66
1.2 7.71

Middle Bar 16 2 3.33 6.66 1.59 10.59


0.66
1.71 0.96
16 2 9.00 18.00 1.59 28.62
9

16 2 11.46 22.92 1.59 36.44 10.5


0.96

16 2 9.33 18.66 1.59 29.67


0.66
0.96 7.71

Top Bar (End Bar) 16 2 10.35 20.70 1.59 32.91 8.73 0.96
0.66

16 2 11.46 22.92 1.59 36.44 11.46

0.96 8.73
16 2 10.35 20.70 1.59 32.91
0.66
2.94 0.96
Middle Bar 16 1 4.56 4.56 1.59 7.25
0.66
16 1 12.00 12.00 1.59 19.08 12

0.96
16 1 12.00 12.00 1.59 19.08 11.04
0.66
16 1 4.56 4.56 1.59 7.25 2.94
0.96

7.3 Grid 2 & 3


Bottom Bar 2 20 4 5.65 22.60 2.47 55.82
0.94
3.51 1.2

20 4 11.40 45.60 2.47 112.63 10.2


1.2

20 4 7.50 30.00 2.47 74.10 7.5

0.94

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-LaliEACCr(F)-A
School Name : Shree Gyanjyoti Secondary School
Location : Hunsapur, Gorkha
BAR BENDING SCHEDULE
Dia. of Cut
No. of Total Wt/m Weight
S. No. Description No. Bar Length Bar Shape
Bars Length (m) (Kg) (Kg)
(mm) (m)
0.94
20 4 9.85 39.40 2.47 97.32
1.2 7.71
0.94
Middle Bar 20 4 3.85 15.40 2.47 38.04
1.2 1.71
20 4 9.00 36.00 2.47 88.92
9

20 4 9.90 39.60 2.47 97.81 8.7


1.2
0.94
20 4 11.65 46.60 2.47 115.10
1.2 9.51
1.2
Top Bar 20 4 10.75 43.00 2.47 106.21 8.61
0.94

20 4 11.70 46.80 2.47 115.60 11.7

20 4 10.75 43.00 2.47 106.21 1.2 8.61


0.94
3.06
20 2 5.20 10.40 2.47 25.69 .1.2
0.94

20 2 12.00 24.00 2.47 59.28 10.8


1.2
20 2 12.00 24.00 2.47 59.28
12
1.2
20 2 5.20 10.40 2.47 25.69 3.06
0.94
2.21
7.4 Extra Bar Along Grid 1,2 &3 3 25 4 3.65 43.80 3.86 169.07 0.15
1.29
4
3 25 4 4.30 51.60 3.86 199.18 0.15 0.15

3.5
3 25 4 3.80 45.60 3.86 176.02 0.15 0.15

7.5 Torision bars along grid 1,2 &3


1st arrangement 3 16 1 3.69 11.07 1.59 17.60 3.69

3 16 1 12.00 36.00 1.59 57.24 12

3 16 1 12.00 36.00 1.59 57.24 12

3 16 1 4.11 12.33 1.59 19.60 4.11

2nd arrangement 3 16 1 12.00 36.00 1.59 57.24 12

3 16 1 12.00 36.00 1.59 57.24 12

3 16 1 6.84 20.52 1.59 32.63 6.84

7.6 Secondry Beam


Along Grid A1,B1,D1 & E1
0.35 0.35
Bottom Bar 4 16 3 10.45 125.40 1.59 199.39
9.75

Top Bar 4 16 3 10.45 125.40 1.59 199.39 9.75


0.35 0.35

Grid 1a (end bottom bar) 2 16 2 2.94 11.74 1.59 18.67


0.35
1.625 0.96
0.35
2 16 2 10.85 43.40 1.59 69.01
10.5

middle bar 2 16 1 8.81 17.62 1.59 28.02


0.35
7.5 0.96

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-LaliEACCr(F)-A
School Name : Shree Gyanjyoti Secondary School
Location : Hunsapur, Gorkha
BAR BENDING SCHEDULE
Dia. of Cut
No. of Total Wt/m Weight
S. No. Description No. Bar Length Bar Shape
Bars Length (m) (Kg) (Kg)
(mm) (m)

0.35
2 16 1 4.98 9.95 1.59 15.82
4.625
top bar (end bar) 2 16 2 4.06 16.22 1.59 25.79
2.645 0.96
0.45

2 16 2 10.55 42.20 1.59 67.10 9.605


0.45

middle bar 2 16 1 4.06 8.11 1.59 12.89 2.645 0.96


0.45

2 16 1 10.06 20.11 1.59 31.97 9.605


0.45
grid 1b
bottom bar 1 12 4 5.45 21.80 0.89 19.40 0.35
0.35
4.75

4.75
top bar 1 12 3 5.65 16.95 0.89 15.09 0.45 0.45

7.7 Conceal Beam 2 20 6 1.61 19.32 0.89 17.19 1.21


0.4

7.8 Bent up Bar (hunch bar) 1 16 36 3.02 108.72 1.59 172.86


0.96 0.425 0.425 0.96

250

7.9 Stirriups( For Main Beam) 1 10 1125 1.65 1856.25 0.62 1150.88 0.10
0.425

0.25
7.10 For Secondry Beam 1 8 540 1.31 707.40 0.40 282.96
0.8
0.375

0.2

8 For Slab (First Floor)


8.1 Main Bars 0.375
Along short span 0.07
straight bar 1 8 76 10.93 830.30 0.40 332.12 10.48
0.375 1.5 1.75 1.705
Cranked bar 1 8 76 11.09 842.46 0.40 336.98 0.05
1.975 1.75 1.75
0.525
Along Long Span (grid 1 to grid2)
Straight bar 1 8 45 12.00 540.00 0.40 216.00 11.475
1 8 45 2.22 99.90 0.40 39.96 1.695 0.525
0.525 1.5 1.9
cranked bar 1 8 44 11.03 485.10 0.40 194.04 0.07 1.5
2.25 0.525
1 8 44 4.75 208.78 0.40 83.51 1.9 0.07
2.25
along long span Grid 2 to 3 0.525
Straight bar 1 8 7 12.00 84.00 0.40 33.60 11.475

1 8 7 12.00 84.00 0.40 33.60 12


0.525
1 8 7 7.20 50.40 0.40 20.16 6.675
0.525 1.5 1.15
cranked bar 1 8 7 10.38 72.63 0.40 29.05 1.5 1.5
2.35 1.5
1.15 1.875 1.875 1.15
1 8 7 11.72 82.04 0.40 32.82 1.5 2.25
1.5
1.15 1.5 0.525
1 8 7 10.38 72.63 0.40 29.05 1.5 1.5 1.5
2.35

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-LaliEACCr(F)-A
School Name : Shree Gyanjyoti Secondary School
Location : Hunsapur, Gorkha
BAR BENDING SCHEDULE
Dia. of Cut
No. of Total Wt/m Weight
S. No. Description No. Bar Length Bar Shape
Bars Length (m) (Kg) (Kg)
(mm) (m)

Infront of stair case


Straight bar 1 8 15 5.69 85.35 0.40 34.14 6.33
1.875 1.095 0.75
Cranked bar 1 8 13 5.97 77.61 0.40 31.04 1.125 0.845 0.07

8.2 Distribution bars


Between Grid 1 &1a
along x-axis 1 8 96 2.72 261.12 0.40 104.45 2.72
along y- axis 1 8 80 3.20 256.00 0.40 102.40 3.2

Between grid 1a & 2


along x axis 1 8 96 2.72 261.12 0.40 104.45 2.72
along y axis 1 8 84 3.20 268.80 0.40 107.52 3.2

Between grid 2 & 3


except infront of staircas 2.72
along x axis 1 8 64 2.72 174.08 0.40 69.63 2.2
along y axis 1 8 88 2.20 193.60 0.40 77.44
Between grid 1b & 2 infront of
staicase
along x axis 1 8 6 4.20 25.20 0.40 10.08 4.2
along y axis 1 8 18 1.29 23.22 0.40 9.29 1.29

between 2 & 3
along x axis 1 8 6 4.20 25.20 0.40 10.08 4.2
along y axis 1 8 18 2.20 39.60 0.40 15.84 2.2

Cantilever Slab beyond grid 1


bottom bar 1 10 3 11.46 34.38 0.62 21.32 11.46
top bar 1 10 3 11.46 34.38 0.62 21.32 11.46

Cantilever slab at the front


top bar ( horizontal portion) 1 10 3 7.10 21.30 0.62 13.21 7.1
bottom bar 1 10 3 7.10 21.30 0.62 13.21 7.1

Vertical portion 1 10 4 7.86 31.44 0.62 19.49 7.86


1 10 4 7.86 31.44 0.62 19.49 7.86

8.3 Negative Bars


along Grid 1 2 8 35 2.05 143.50 0.40 57.40 2.05
along grid 1a 2 8 35 2.35 164.50 0.40 65.80 2.35
along grid 1b 1 8 7 1.08 7.56 0.40 3.02 1.08
along grid 2 (except infront of
stair case) 2 8 35 2.10 147.00 0.40 58.80 2.1
along grid 2 in front of
staircase 1 8 14 1.38 19.32 0.40 7.73 1.38
along grid a1 1 8 28 2.05 57.40 0.40 22.96 2.05
along grid b 1 8 28 2.10 58.80 0.40 23.52 2.1
along b1 1 8 28 2.05 57.40 0.40 22.96 2.05
along grid c&d 2 8 9 2.55 45.90 0.40 18.36 2.55
along grid d1 1 8 28 2.05 57.40 0.40 22.96 2.05
along grid e 1 8 28 2.10 58.80 0.40 23.52 2.1
along grid e1 1 8 28 2.05 57.40 0.40 22.96 2.05

9 Bands
Ground Floor
9.1 Sill Bands 0.75 0.75
Grid 1 4 10 2 7.15 57.20 0.62 35.464 0.075 5.5 0.075
1 10 2 4.50 9.00 0.62 5.58 4.5
0.75 0.75
1 10 2 5.65 11.30 0.62 7.006 0.075 4 0.075

Grid 2 4 10 2 1.81 14.48 0.62 8.9776 1.81

Grid A,,C,D,E&F 5 10 2 8.15 81.50 0.62 50.53 0.75 6.5 0.75


0.075 0.075
Partition wall in Laoratory 1 10 2 0.75 1.50 0.62 0.93 0.75
1 10 2 5.00 10.00 0.62 6.2 5

9.2 Lintel Band 0.75 5.5 0.75


Grid 1 4 10 2 7.15 57.20 0.62 35.464 0.075 0.075

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-LaliEACCr(F)-A
School Name : Shree Gyanjyoti Secondary School
Location : Hunsapur, Gorkha
BAR BENDING SCHEDULE
Dia. of Cut
No. of Total Wt/m Weight
S. No. Description No. Bar Length Bar Shape
Bars Length (m) (Kg) (Kg)
(mm) (m)
Grid 2 4 10 2 1.81 14.48 0.62 8.9776 0.75 1.81 0.75
Grid A,C,D,E&F 5 10 2 8.15 81.50 0.62 50.53 0.075 6.5 0.075
Partition wall in Laoratory 1 10 2 6.75 13.50 0.62 8.37
6.75

9.3 Vertical Band 6 10 2 4.13 49.50 0.62 30.69 0.75 0.75


0.075 2.475 0.075
9.4 Sturriups 1 8 950 0.30 285.00 0.40 34.20 0.06 0.06
0.18
9.5 Laboratary In -Built Furniture
Type 1 1 8 5 3.25 16.25 0.40 6.50
Main Bar 1 8 2 2.60 5.20 0.40 2.08 0.06 3.15 0.06

0.7
0.95 0.95
Distribution Bar 1 8 63 0.82 51.66 0.40 20.66 0.06 0.7 0.06

1 8 18 0.18 3.24 0.40 1.30 0.06 0.06 0.06


Type 2
Main Bar 4 8 6 1.82 10.92 0.40 4.37 0.06 1.7 0.06

Distribution Bar 1 8 12 0.92 11.04 0.40 4.42 0.06 0.8 0.06

Type3
Main Bar 1 8 5 6.82 34.10 0.40 13.64 0.06 6.7 0.06

Distribution Bar 1 8 46 0.62 28.52 0.40 11.41 0.06 0.5 0.06

Type 4
Main Bar 1 8 5 0.45 2.25 0.40 0.90 0.06 0.45 0.06

1 8 5 3.15 15.75 0.40 6.30 0.06 3.1 0.06

1 8 5 4.23 21.13 0.40 8.45 0.06 4.225 0.06

Distribution Bar 1 8 55 0.57 31.35 0.40 12.54 0.06 0.45 0.06

Type 5
Main Bar 1 8 5 0.86 4.30 0.40 1.72 0.06 0.74 0.06

1 8 5 1.39 6.93 0.40 2.77 0.06 1.265 0.06

1 8 5 3.19 15.93 0.40 6.37 0.06 3.065 0.06

Distribution Bar 1 8 37 0.57 21.09 0.40 8.44 0.06 0.45 0.06


10 Column ( Up To 2nd Floor Level)

10.1 Grid 1 (A ,B,E & F) 4


Main Bar 16 6 6.96 167.04 1.59 265.59 16mm
6

0.96

10.2 Grid 1 ( C ) 1
Main Bar 20 4 7.20 28.80 2.47 71.14
16 2 6.96 13.92 1.59 22.13 20mm 16mm

0.12 0.96

10.3 Grid 1 ( D ) 1
Main Bar 20 6 7.20 43.20 2.47 106.70
6 20mm
2.47

1.2

10.4 Grid 2(A,B,E & F) 4


Main Bar 20 4 7.20 115.20 2.47 284.54
16 2 6.96 55.68 1.59 88.53 6 6.00 16mm

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-LaliEACCr(F)-A
School Name : Shree Gyanjyoti Secondary School
Location : Hunsapur, Gorkha
BAR BENDING SCHEDULE
Dia. of Cut
No. of Total Wt/m Weight
S. No. Description No. Bar Length Bar Shape
Bars Length (m) (Kg) (Kg)
(mm) (m)
20mm

1.20 0.96

10.5 Grid 2 ( C &D) 2


20 6 7.20 86.40 2.47 213.41
20mm
6

1.2

10.6 Grid 3 (A,B,C,D,E & F) 6


Main Bar 20 6 7.20 259.20 2.47 640.22
20mm
6

1.20

10.7 Stirrups 18
For 18 columns 8 31 1.84 1026.72 0.40 410.69 0.08
8 62 1.28 1428.48 0.40 571.39 0.42 0.14 0.08
1.59 0.42
0.42

10.8 Band (First Floor)


Sill Bands 0.75 0.75
Grid 1 4 10 2 7.15 57.20 0.62 35.464 0.075 5.5 0.075
1 10 2 4.50 9.00 0.62 5.58 4.5
0.75 0.75
1 10 2 5.65 11.30 0.62 7.006 0.075 4 0.075

Grid 2 4 10 2 1.81 14.48 0.62 8.9776 1.81

Grid A,C,D,E&F 5 10 2 8.15 81.50 0.62 50.53 0.75 6.5 0.75


0.075 0.075
Partition wall in Library 1 10 2 0.75 1.50 0.62 0.93 0.75
1 10 2 5.00 10.00 0.62 6.2 5
Lintel Band 0.75 5.5 0.75
Grid 1 4 10 2 7.15 57.20 0.62 35.464 0.075 0.075
Grid 2 4 10 2 1.81 14.48 0.62 8.9776 0.75 1.81 0.75
Grid A,C,D,E&F 5 10 2 8.15 81.50 0.62 50.53 0.075 6.5 0.075
Partition wall in Library 1 10 2 6.75 13.50 0.62 8.37
6.75
Vertical Band 7 10 2 4.13 57.75 0.62 35.805 0.75 0.75
0.075 2.475 0.075

Sturriups 1 8 958 0.30 287.40 0.40 34.49 0.06 0.06


0.18

11 For Staircase
(1st Floor level to 2nd Floor Level)
1.703
Main Bar (top bar) 1 16 21 8.23 172.81 1.59 274.77 0.3

3.354
2.472
0.4

Bottom Bar 1 16 21 3.27 68.71 1.59 109.25

2.042 1.03
0.2

1
Extra Bar 1 16 21 2.00 42.00 1.59 66.78
1

1.853
Landing bottom bar 1 16 21 3.00 63.06 1.59 100.27 1 0.15

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-LaliEACCr(F)-A
School Name : Shree Gyanjyoti Secondary School
Location : Hunsapur, Gorkha
BAR BENDING SCHEDULE
Dia. of Cut
No. of Total Wt/m Weight
S. No. Description No. Bar Length Bar Shape
Bars Length (m) (Kg) (Kg)
(mm) (m)

1.2
Landing Extra bar 1 16 21 2.20 46.20 1.59 73.46 1

Distribution Bar 1 10 23 4.16 95.68 0.62 59.32 4.16

Bar in middle of landing 1 16 4 1.84 7.34 1.59 11.67 1.8


(20cm gap)
1 10 65 1.96 127.40 0.62 78.99 1.96

Landing Level to First Floor level


Top Bar 1 16 21 8.13 170.81 1.59 271.59
1.54
0.4
3.397
2.497
0.3
Bottom Bar 1 16 21 3.30 69.24 1.59 110.09

1
2.147 0.15

1
Extra Bar 1 16 21 2.20 46.20 1.59 73.46 1.2

1.82
Bottom bar( Slab level) 1 16 21 3.02 63.42 1.59 100.84 0.2 1

Extra Bar 1 16 21 2.00 42.00 1.59 66.78 1


1

Distribution Bar 1 10 100 1.96 196.00 0.62 121.52 1.96

1 10 42 4.16 174.72 0.62 108.33 4.16


0.15 0.565 0.15
Nosing Ties(Plinth Level To 0.112 0.162 0.112
First Floor Level ) 0.15 0.15
First type 8 35 0.674 23.59 0.40 9.44 0.565 0.15
Second type 8 7 0.977 6.84 0.40 2.74 0.412
Third type 8 14 1.13 15.86 0.40 6.34 0.268 0.112
Forth type 8 7 0.83 5.81 0.40 2.32 0.15
Fifth type 8 7 0.674 4.72 0.40 1.89 0.268 0.15 0.15
0.262
0.15
Nosing Bar 2 10 10 1.96 39.20 0.62 24.30 1.96

11.1 Beam 4.92


Landing Beam 1 20 3 5.62 16.86 2.47 41.64 0.35 0.35

1 20 3 5.62 16.86 2.47 41.64 0.35 0.35


4.92
Sturriups 1 8 35 1.22 42.70 0.40 17.08
0.08
0.375

0.2
12 Main Beam(Second Floor Level)
12.1 Grid A,B,C,D,E & F
Bottom bar (End Bar) 6 25 2 7.25 87.00 2.47 214.89 1.29

4.46 1.5

1.29
6 25 2 6.75 81.00 3.86 312.66 5.46

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-LaliEACCr(F)-A
School Name : Shree Gyanjyoti Secondary School
Location : Hunsapur, Gorkha
BAR BENDING SCHEDULE
Dia. of Cut
No. of Total Wt/m Weight
S. No. Description No. Bar Length Bar Shape
Bars Length (m) (Kg) (Kg)
(mm) (m)

Bottom Bar (mid-bars) 6 20 2 11.80 141.60 2.47 349.75


0.94
0.94
9.92

Top Bar 6 20 3 11.80 212.40 2.47 524.63 9.92


0.94
0.94

Extra Bar 6 25 2 6.50 78.00 3.86 301.08 5.06 0.15


1.29

6 25 2 4.00 48.00 3.86 185.28 2.56 0.15


1.29

Torsion Bars (T/O) 6 16 2 9.80 117.60 1.59 186.98 9.8

12.2 Grid 1
0.94
Bottom Bar (end bar) 1 20 2 5.65 11.30 2.47 27.91 1.2
3.51

20 2 11.40 22.80 2.47 56.32 10.2 1.2

20 2 7.50 15.00 2.47 37.05 7.5

0.94
20 2 9.85 19.70 2.47 48.66
1.2 7.71

Middle Bar 16 2 3.33 6.66 1.59 10.59


0.66
1.71 0.96
16 2 9.00 18.00 1.59 28.62
9

16 2 11.46 22.92 1.59 36.44 10.5


0.96

16 2 9.33 18.66 1.59 29.67


0.66
0.96 7.71

Top Bar (End Bar) 16 2 10.35 20.70 1.59 32.91 8.73 0.96
0.66

16 2 11.46 22.92 1.59 36.44 11.46

0.96 8.73
16 2 10.35 20.70 1.59 32.91
0.66
2.94 0.96
Middle Bar 16 1 4.56 4.56 1.59 7.25
0.66
16 1 12.00 12.00 1.59 19.08 12

0.96
16 1 12.00 12.00 1.59 19.08 11.04
0.66
16 1 4.56 4.56 1.59 7.25 2.94
0.96

12.3 Grid 2 & 3


Bottom Bar 2 20 4 5.65 22.60 2.47 55.82
0.94
3.51 1.2

20 4 11.40 45.60 2.47 112.63 10.2


1.2

20 4 7.50 30.00 2.47 74.10 7.5

0.94

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-LaliEACCr(F)-A
School Name : Shree Gyanjyoti Secondary School
Location : Hunsapur, Gorkha
BAR BENDING SCHEDULE
Dia. of Cut
No. of Total Wt/m Weight
S. No. Description No. Bar Length Bar Shape
Bars Length (m) (Kg) (Kg)
(mm) (m)
0.94
20 4 9.85 39.40 2.47 97.32
1.2 7.71
0.94
Middle Bar 20 4 3.85 15.40 2.47 38.04
1.2 1.71
20 4 9.00 36.00 2.47 88.92
9

20 4 9.90 39.60 2.47 97.81 8.7


1.2
0.94
20 4 11.65 46.60 2.47 115.10
1.2 9.51
1.2
Top Bar 20 4 10.75 43.00 2.47 106.21 8.61
0.94

20 4 11.70 46.80 2.47 115.60 11.7

20 4 10.75 43.00 2.47 106.21 1.2 8.61


0.94
3.06
20 2 5.20 10.40 2.47 25.69 .1.2
0.94

20 2 12.00 24.00 2.47 59.28 10.8


1.2
20 2 12.00 24.00 2.47 59.28
12
1.2
20 2 5.20 10.40 2.47 25.69 3.06
0.94
2.21
12.4 Extra Bar Along Grid 1,2 &3 3 25 4 3.65 43.80 3.86 169.07 0.15
1.29
4
3 25 4 4.30 51.60 3.86 199.18 0.15 0.15

3.5
3 25 4 3.80 45.60 3.86 176.02 0.15 0.15

12.5 Torision bars along grid 1,2 &3


1st arrangement 3 16 1 3.69 11.07 1.59 17.60 3.69

3 16 1 12.00 36.00 1.59 57.24 12

3 16 1 12.00 36.00 1.59 57.24 12

3 16 1 4.11 12.33 1.59 19.60 4.11

2nd arrangement 3 16 1 12.00 36.00 1.59 57.24 12

3 16 1 12.00 36.00 1.59 57.24 12

3 16 1 6.84 20.52 1.59 32.63 6.84

12.6 Secondry Beam


Along Grid A1,B1,D1 & E1
0.35 0.35
Bottom Bar 4 16 3 10.45 125.40 1.59 199.39
9.75

Top Bar 4 16 3 10.45 125.40 1.59 199.39 9.75


0.35 0.35

Grid 1a (end bottom bar) 2 16 2 2.94 11.74 1.59 18.67


0.35
1.625 0.96
0.35
2 16 2 10.85 43.40 1.59 69.01
10.5

middle bar 2 16 1 8.81 17.62 1.59 28.02


0.35
7.5 0.96

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-LaliEACCr(F)-A
School Name : Shree Gyanjyoti Secondary School
Location : Hunsapur, Gorkha
BAR BENDING SCHEDULE
Dia. of Cut
No. of Total Wt/m Weight
S. No. Description No. Bar Length Bar Shape
Bars Length (m) (Kg) (Kg)
(mm) (m)

0.35
2 16 1 4.98 9.95 1.59 15.82
4.625
top bar (end bar) 2 16 2 4.06 16.22 1.59 25.79
2.645 0.96
0.45

2 16 2 10.55 42.20 1.59 67.10 9.605


0.45

middle bar 2 16 1 4.06 8.11 1.59 12.89 2.645 0.96


0.45

2 16 1 10.06 20.11 1.59 31.97 9.605


0.45
grid 1b
bottom bar 1 12 4 5.45 21.80 0.89 19.40 0.35
0.35
4.75

4.75
top bar 1 12 3 5.65 16.95 0.89 15.09 0.45 0.45

12.7 Bent up Bar (hunch bar) 1 16 36 3.02 108.72 1.59 172.86


0.96 0.425 0.425 0.96

250

12.8 Stirrups( For Main Beam) 1 10 1125 1.65 1856.25 0.62 1150.88 0.10
0.425

0.25
12.9 Stirrups ( For Secondry Beam) 1 8 540 1.31 707.40 0.40 282.96
0.8
0.375

0.2

13 For Slab (2nd Floor Level)


Main Bars 0.375
Along short span 0.07
straight bar 1 8 76 10.93 830.30 0.40 332.12 10.48
0.375 1.5 1.75 1.705
Cranked bar 1 8 76 11.09 842.46 0.40 336.98 0.05
1.975 1.75 1.75
0.525
Along Long Span (grid 1 to grid2)
Straight bar 1 8 45 12.00 540.00 0.40 216.00 11.475
1 8 45 2.22 99.90 0.40 39.96 1.695 0.525
0.525 1.5 1.9
cranked bar 1 8 44 11.03 485.10 0.40 194.04 0.07 1.5
2.25 0.525
1 8 44 4.75 208.78 0.40 83.51 1.9 0.07
2.25
along long span Grid 2 to 3 0.525
Straight bar 1 8 7 12.00 84.00 0.40 33.60 11.475

1 8 7 12.00 84.00 0.40 33.60 12


0.525
1 8 7 7.20 50.40 0.40 20.16 6.675
0.525 1.5 1.15
cranked bar 1 8 7 10.38 72.63 0.40 29.05 1.5 1.5
2.35 1.5
1.15 1.875 1.875 1.15
1 8 7 11.72 82.04 0.40 32.82 1.5 2.25
1.5
1.15 1.5 0.525
1 8 7 10.38 72.63 0.40 29.05 1.5 1.5 1.5
2.35

0.375
Infront of stair case
Straight bar 1 8 15 4.92 73.80 0.40 29.52 4.92

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-LaliEACCr(F)-A
School Name : Shree Gyanjyoti Secondary School
Location : Hunsapur, Gorkha
BAR BENDING SCHEDULE
Dia. of Cut
No. of Total Wt/m Weight
S. No. Description No. Bar Length Bar Shape
Bars Length (m) (Kg) (Kg)
(mm) (m)
0.375 1.065 0.75
Cranked bar 1 8 13 5.12 66.56 0.40 26.62 1.875 0.845 0.07

Distribution bars
Between Grid 1 &1a
along x-axis 1 8 96 2.72 261.12 0.40 104.45 2.72
along y- axis 1 8 80 3.20 256.00 0.40 102.40 3.2

Between grid 1a & 2


along x axis 1 8 96 2.72 261.12 0.40 104.45 2.72
along y axis 1 8 84 3.20 268.80 0.40 107.52 3.2

Between grid 2 & 3


except infront of staircas 2.72
along x axis 1 8 64 2.72 174.08 0.40 69.63 2.2
along y axis 1 8 88 2.20 193.60 0.40 77.44
Between grid 1b & 2 infront of
staicase
along x axis 1 8 6 4.20 25.20 0.40 10.08 4.2
along y axis 1 8 18 1.29 23.22 0.40 9.29 1.29

between 2 & 3
along x axis 1 8 6 4.20 25.20 0.40 10.08 4.2
along y axis 1 8 18 2.20 39.60 0.40 15.84 2.2

Cantilever Slab beyond grid 1


bottom bar 1 10 3 11.46 34.38 0.62 21.32 11.46
top bar 1 10 3 11.46 34.38 0.62 21.32 11.46

Negative Bars
along Grid 1 2 8 35 2.05 143.50 0.40 57.40 2.05
along grid 1a 2 8 35 2.35 164.50 0.40 65.80 2.35
along grid 1b 1 8 7 1.08 7.56 0.40 3.02 1.08
along grid 2 (except infront of
stair case) 2 8 35 2.10 147.00 0.40 58.80 2.1
along grid 2 in front of
staircase 1 8 14 1.38 19.32 0.40 7.73 1.38
along grid a1 1 8 28 2.05 57.40 0.40 22.96 2.05
along grid b 1 8 28 2.10 58.80 0.40 23.52 2.1
along b1 1 8 28 2.05 57.40 0.40 22.96 2.05
along grid c&d 2 8 9 2.55 45.90 0.40 18.36 2.55
along grid d1 1 8 28 2.05 57.40 0.40 22.96 2.05
along grid e 1 8 28 2.10 58.80 0.40 23.52 2.1
along grid e1 1 8 28 2.05 57.40 0.40 22.96 2.05

14 Column ( Up to 3rd Floor Level)


14.1 Grid 1 (A ,B,E & F) 4
Main Bar 16 6 3.34 80.19 1.59 127.50 16mm
2.38

0.96

14.2 Grid 1 (C ) 1 16 6 5.97 35.82 1.59 56.95


5.00625 16mm

0.96

14.3 Grid 1 ( D ) 1
Main Bar 20 2 6.21 12.41 2.47 30.66
16 4 5.97 23.87 1.59 37.95 6 20mm 16mm
5.00625 5.00625

1.2 0.96

14.4 Grid 2(A,B,E & F) 4


Main bar 16 6 3.34 80.16 1.59 127.45 16mm
2.38

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-LaliEACCr(F)-A
School Name : Shree Gyanjyoti Secondary School
Location : Hunsapur, Gorkha
BAR BENDING SCHEDULE
Dia. of Cut
No. of Total Wt/m Weight
S. No. Description No. Bar Length Bar Shape
Bars Length (m) (Kg) (Kg)
(mm) (m)

0.96

14.5 Grid 2 ( C &D) 2


20 2 6.21 24.83 2.47 61.32
16 4 5.97 47.73 1.59 75.89 20mm 5.00625 16mm
5.00625

1.2 0.96

14.6 Grid 3 (A,B,C,D,E & F) 6


Main Bar 20 2 3.58 42.98 2.47 106.15
16 4 3.34 80.16 1.59 127.45 2.38 20mm 2.38
16mm

1.20 0.96

14.7 Stirrups 18
For 18 columns 8 31 1.84 1026.72 0.40 410.69 0.08
8 62 1.28 1428.48 0.40 571.39 0.42 0.14 0.08
0.42
0.42
14.8 Band (Second Floor)
Sill Bands 0.75 0.75
Grid 1 4 10 2 7.15 57.20 0.62 35.464 0.075 5.5 0.075
1 10 2 4.50 9.00 0.62 5.58 4.5
0.75 0.75
1 10 2 5.65 11.30 0.62 7.006 0.075 4 0.075

Grid 2 4 10 2 1.81 14.48 0.62 8.9776 1.81


Partition wall between principal 1 10 2 4.50 9.00 0.62 5.58 4.5
and administration
Grid A,B,C,D,E&F 6 10 2 8.15 97.80 0.62 60.636 0.75 6.5 0.75
0.075 0.075
Lintel Band 0.75 5.5 0.75
Grid 1 4 10 2 7.15 57.20 0.62 35.464 0.075 0.075
Grid 2 4 10 2 1.81 14.48 0.62 8.9776 0.75 1.81 0.75
Partition wall between principal 1 10 2 4.50 9.00 0.62 5.58 4.5
and administration
Wall in computer Lab 2 10 2 3.60 14.40 0.62 8.928 3.6

Grid A,B,C,D,E&F 5 10 2 8.15 81.50 0.62 50.53 0.075 6.5 0.075


Vertical Band 8 10 2 4.13 66.00 0.62 40.92 0.75 0.75
0.075 2.475 0.075

Sturriups 1 8 1128 0.30 338.40 0.40 40.61 0.06 0.06


0.18

15 For Staircase
(2nd Floor to Top Foor)
1.703
Main Bar (top bar) 1 16 21 8.23 172.81 1.59 274.77 0.3

3.354
2.472
0.4

Bottom Bar 1 16 21 3.27 68.71 1.59 109.25

2.042 1.03
0.2

1
Extra Bar 1 16 21 2.00 42.00 1.59 66.78
1

1.853
Landing bottom bar 1 16 21 3.00 63.06 1.59 100.27 1 0.15

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-LaliEACCr(F)-A
School Name : Shree Gyanjyoti Secondary School
Location : Hunsapur, Gorkha
BAR BENDING SCHEDULE
Dia. of Cut
No. of Total Wt/m Weight
S. No. Description No. Bar Length Bar Shape
Bars Length (m) (Kg) (Kg)
(mm) (m)

1.2
Landing Extra bar 1 16 21 2.20 46.20 1.59 73.46 1

Distribution Bar 1 10 23 4.16 95.68 0.62 59.32 4.16

Bar in middle of landing 1 16 4 1.84 7.34 1.59 11.67 1.8


(20cm gap)
1 10 65 1.96 127.40 0.62 78.99 1.96

Landing Level to +9000 level


Top Bar 1 16 21 8.13 170.81 1.59 271.59
1.54
0.4
3.397
2.497
0.3
Bottom Bar 1 16 21 3.30 69.24 1.59 110.09

1
2.147 0.15

1
Extra Bar 1 16 21 2.20 46.20 1.59 73.46 1.2

1.82
Bottom bar( Slab level) 1 16 21 3.02 63.42 1.59 100.84 0.2 1

Extra Bar 1 16 21 2.00 42.00 1.59 66.78 1


1

Distribution Bar 1 10 100 1.96 196.00 0.62 121.52 1.96

1 10 42 4.16 174.72 0.62 108.33 4.16


0.15 0.565 0.15
Nosing Ties(Plinth Level To 0.112 0.162 0.112
First Floor Level ) 0.15 0.15
First type 8 35 0.674 23.59 0.40 9.44 0.565 0.15
Second type 8 7 0.977 6.84 0.40 2.74 0.412
Third type 8 14 1.13 15.86 0.40 6.34 0.268 0.112
Forth type 8 7 0.83 5.81 0.40 2.32 0.15
Fifth type 8 7 0.674 4.72 0.40 1.89 0.268 0.15 0.15
0.262
0.15
Nosing Bar 2 10 10 1.96 39.20 0.62 24.30 1.96

4.92
15.1 Landing Beam 1 20 3 5.62 16.86 2.47 41.64 0.35 0.35

1 20 3 5.62 16.86 2.47 41.64 0.35 0.35


4.92
15.2 Sturriups 1 8 35 1.22 42.70 0.40 17.08
0.08
0.375

0.2
16 Main Beam (Top Floor Level))
16.1 Grid A,B,E & F
Bottom bar (mid bar) 4 20 2 10.87 86.96 2.47 214.79 0.475 0.475

9.92

0.475
0.475
End Bar 4 25 2 10.87 86.96 3.86 335.67 9.92

Bottom bar along C & D 2 25 2 7.25 29.00 3.86 111.94


1.29

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-LaliEACCr(F)-A
School Name : Shree Gyanjyoti Secondary School
Location : Hunsapur, Gorkha
BAR BENDING SCHEDULE
Dia. of Cut
No. of Total Wt/m Weight
S. No. Description No. Bar Length Bar Shape
Bars Length (m) (Kg) (Kg)
(mm) (m)
1.29
4.46 1.5

2 20 2 6.75 27.00 3.86 104.22


5.46 1.29

0.94 0.94
Bottom Bar along C & D 2 20 2 11.80 47.20 2.47 116.58 0.92

6 20 3 11.80 212.40 2.47 524.63 0.94 9.92 0.94

16.2 Extra Bar 6 25 2 6.50 78.00 3.86 301.08 5.06 0.15


1.29

6 25 2 4.00 48.00 3.86 185.28 2.56 0.15


1.29

16.3 Torsion Bars (T/O) 6 16 2 9.80 117.60 1.59 186.98 9.8

16.4 Grid 1
0.475
Bottom Bar (end bar) 1 20 2 3.39 6.77 2.47 16.72 1.2
1.71

20 2 9.00 18.00 2.47 44.46 9

20 2 11.70 23.40 2.47 57.80 1.2 10.5

0.475
20 2 9.39 18.77 2.47 46.36
1.2 7.71

Middle Bar 16 2 3.15 6.29 1.59 10.00


0.475
1.71 0.96
16 2 9.00 18.00 1.59 28.62
9

16 2 11.46 22.92 1.59 36.44 10.5


0.96

16 2 9.15 18.29 1.59 29.08


0.475
0.96 7.71

Top Bar (End Bar) 16 2 10.35 20.70 1.59 32.91 8.73 0.96
0.66

16 2 11.46 22.92 1.59 36.44 11.46

0.96 8.73
16 2 10.35 20.70 1.59 32.91
0.66
2.94 0.96
Middle Bar 16 1 4.56 4.56 1.59 7.25
0.66
16 1 12.00 12.00 1.59 19.08 12

0.96
16 1 12.00 12.00 1.59 19.08 11.04
0.66
16 1 4.56 4.56 1.59 7.25 2.94
0.96

16.5 Extra Bar Along Grid 1 1 25 4 3.65 14.60 3.86 56.36 0.15
1.29
4
1 25 4 4.30 17.20 3.86 66.39 0.15 0.15

3.5

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-LaliEACCr(F)-A
School Name : Shree Gyanjyoti Secondary School
Location : Hunsapur, Gorkha
BAR BENDING SCHEDULE
Dia. of Cut
No. of Total Wt/m Weight
S. No. Description No. Bar Length Bar Shape
Bars Length (m) (Kg) (Kg)
(mm) (m)
1 25 4 3.80 15.20 3.86 58.67 0.15 0.15

16.6 Grid 2 & 3


Bottom Bar 2 20 4 3.39 27.08 2.47 66.89
0.475
1.71 1.2

20 4 9.00 72.00 2.47 177.84 9

20 4 11.70 93.60 2.47 231.19 1.2 10.5

0.475
20 4 9.39 75.08 2.47 185.45
1.2 7.71
0.94
1.2
Top Bar (end Bar) 20 4 10.75 43.00 2.47 106.21 8.61
0.94

20 4 11.70 46.80 2.47 115.60 11.7

20 4 10.75 43.00 2.47 106.21 1.2 8.61


0.94
3.06
middle bar 20 2 5.20 10.40 2.47 25.69 .1.2
0.94

20 2 12.00 24.00 2.47 59.28 10.8


1.2
20 2 12.00 24.00 2.47 59.28
12
1.2
20 2 5.20 10.40 2.47 25.69 3.06
0.94
2.21
16.7 Extra Bar Along Grid 1,2 &3 2 20 4 3.65 29.20 2.47 72.12 0.15
1.29
4
2 20 4 4.30 34.40 2.47 84.97 0.15 0.15

3.5
2 20 4 3.80 30.40 2.47 75.09 0.15 0.15

16.8 Torision bars along grid 1,2 &3


1st arrangement 3 16 1 3.69 11.07 1.59 17.60 3.69

3 16 1 12.00 36.00 1.59 57.24 12

3 16 1 12.00 36.00 1.59 57.24 12

3 16 1 4.11 12.33 1.59 19.60 4.11

2nd arrangement 3 16 1 12.00 36.00 1.59 57.24 12

3 16 1 12.00 36.00 1.59 57.24 12

3 16 1 6.84 20.52 1.59 32.63 6.84

16.9 Secondry Beam


Along Grid A1,B1,D1 & E1
0.35 0.35
Bottom Bar 4 16 3 10.45 125.40 1.59 199.39
9.75

Top Bar 4 16 3 10.45 125.40 1.59 199.39 9.75


0.35 0.35

Grid 1a (end bottom bar) 2 16 2 2.94 11.74 1.59 18.67


0.35
1.625 0.96
0.35
2 16 2 10.85 43.40 1.59 69.01
10.5

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-LaliEACCr(F)-A
School Name : Shree Gyanjyoti Secondary School
Location : Hunsapur, Gorkha
BAR BENDING SCHEDULE
Dia. of Cut
No. of Total Wt/m Weight
S. No. Description No. Bar Length Bar Shape
Bars Length (m) (Kg) (Kg)
(mm) (m)

middle bar 2 16 1 8.81 17.62 1.59 28.02


0.35
7.5 0.96
0.35
2 16 1 4.98 9.95 1.59 15.82
4.625
top bar (end bar) 2 16 2 4.06 16.22 1.59 25.79
2.645 0.96
0.45

2 16 2 10.55 42.20 1.59 67.10 9.605


0.45

middle bar 2 16 1 4.06 8.11 1.59 12.89 2.645 0.96


0.45

2 16 1 10.06 20.11 1.59 31.97 9.605


0.45
grid 1b
bottom bar 1 12 4 5.45 21.80 0.89 19.40 0.35
0.35
4.75

4.75
top bar 1 12 3 5.65 16.95 0.89 15.09 0.45 0.45

16.10 Bent up Bar (hunch bar) 1 16 36 3.02 108.72 1.59 172.86 0.96 0.96

0.425 0.425
0.25

16.11 Stirriups( For Main Beam) 1 10 1125 1.65 1856.25 0.62 1150.88 0.10
0.425

0.25
16.12 For Secondry Beam 1 8 540 1.31 707.40 0.40 282.96
0.8
0.375

0.2

16.13 Beam under slab (250*150) 7.195


Near grid 1 2 12 4 9.09 72.68 0.89 64.69
1.89

7.215
2 12 4 8.41 67.28 0.89 59.88
1.64

7.195
2 12 4 9.09 72.68 0.89 64.69 1.89

6.325
2 12 4 7.97 63.72 0.89 56.71
1.64
10.15
Infront of Grid A & F 2 12 4 10.15 81.20 0.89 72.27

2 12 4 9.90 79.20 0.89 70.49 9.9

Infront of Grid 3 2 12 4 7.53 60.24 0.89 53.61 0.89

6.64
2 12 2 8.17 32.68 0.89 29.09 0.89
7.28

2 12 4 7.14 57.12 0.89 50.84 5.75


0.5
0.89

2 12 2 6.50 13.00 0.89 11.57 6.5

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-LaliEACCr(F)-A
School Name : Shree Gyanjyoti Secondary School
Location : Hunsapur, Gorkha
BAR BENDING SCHEDULE
Dia. of Cut
No. of Total Wt/m Weight
S. No. Description No. Bar Length Bar Shape
Bars Length (m) (Kg) (Kg)
(mm) (m)

2 12 2 6.00 12.00 0.89 10.68 6

16.14 Stirriups( beam 250*150 ) 1 8 546 0.76 414.96 0.40 165.98 0.0 0.1
8
0.2

17 For Slab (Top Floor)


17.1 Main Bars
Along short span
straight bar 1 8 76 12.00 912.00 0.40 364.80 12

2.025 1.5 1.75


Cranked bar 1 8 76 11.66 886.16 0.40 354.46 0.08 0.08 0.08 0.08 0.08
1.25 1.075 1.75
0.08 0.08
1.75 1.45
1 8 76 1.45 110.20 0.40 44.08 0.08

17.2 Along Long Span (grid 1 to grid2) 0.525


Straight bar 1 8 37 9.96 368.34 0.40 147.33 0.08 9.35

1 8 37 4.53 167.61 0.40 67.04 4.45 0.08

0.525 0.95
cranked bar 1 8 36 4.04 145.26 0.40 58.10 0.08 0.08
2.4

0.95 1.5 1.5


1 8 36 4.75 170.82 0.40 68.33 0.08 1.5 0.08 0.08 0.08
1.5
0.08 0.08 2 0.08
1.5
17.3 along long span Grid 2 to 3
Straight bar 1 8 26 10.45 271.70 0.40 108.68 0.08 10.45

1 8 26 10.90 283.40 0.40 113.36 10.9


0.08
1 8 26 10.45 271.70 0.40 108.68 10.45

2 1.5 1.5
cranked bar 1 8 24 11.01 264.24 0.40 105.70 0.08 0.08 0.08 0.08 0.08
1.5 1.5
0.08 0.08 0.95
1.5
0.95 1.875 1.875
1 8 24 11.38 273.12 0.40 109.25 0.08 0.08 0.08 2.25 0.08
1.5
0.08 0.08 0.95
1.5
0.95 1.5 1.5
1 8 24 11.01 264.24 0.40 105.70 0.08 0.08 0.08 1.5 0.08
1.5 2
0.08 1.5 0.08 0.08

17.4 Infront of stair case 0.08 6.11 0.08


Straight bar 1 8 15 6.27 94.05 0.40 37.62
2.405 1.095 0.91
Cranked bar 1 8 13 6.69 86.91 0.40 34.76 0.08 0.08 0.08 0.08 0.08
1.1 0.695
17.5 Distribution bars
Between Grid 1 &1a
along x-axis 1 8 80 2.70 216.00 0.40 86.40 2.7
along y- axis 1 8 74 3.20 236.80 0.40 94.72 3.2

Between grid 1a & 2


along x axis 1 8 80 2.70 216.00 0.40 86.40 2.7
along y axis 1 8 80 3.20 256.00 0.40 102.40 3.2

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-LaliEACCr(F)-A
School Name : Shree Gyanjyoti Secondary School
Location : Hunsapur, Gorkha
BAR BENDING SCHEDULE
Dia. of Cut
No. of Total Wt/m Weight
S. No. Description No. Bar Length Bar Shape
Bars Length (m) (Kg) (Kg)
(mm) (m)
Between grid 2 & 3
except infront of staircas 2.7
along x axis 1 8 64 2.70 172.80 0.40 69.12 2.2
along y axis 1 8 68 2.20 149.60 0.40 59.84
Between grid 1b & 2 infront of
staicase
along x axis 1 8 6 4.20 25.20 0.40 10.08 4.2
along y axis 1 8 18 1.28 23.04 0.40 9.22 1.29

between 2 & 3
along x axis 1 8 8 4.20 33.60 0.40 13.44 4.2
along y axis 1 8 18 2.20 39.60 0.40 15.84 2.2

Top near Grid 1( in bottom) 2 10 5 12.00 120.00 0.62 74.40 12


2 10 5 2.20 22.00 0.62 13.64 2.2

Top near Grid 1( on Top) 2 10 4 12.00 96.00 0.62 59.52 12


2 10 4 2.20 17.60 0.62 10.91 2.2

Top near grid A & F (in bottom) 2 10 5 12.00 120.00 0.62 74.40 12
Top near grid A & F (on top) 2 10 4 12.00 96.00 0.62 59.52 12

Top infront of grid 3 (in bottom) 2 10 5 11.98 119.80 0.62 74.28 11.98
Top infront of grid 3 (on top) 2 10 4 11.98 95.84 0.62 59.42 11.98

Top infront of staircase (in bottom) 1 10 6 8.24 49.44 0.62 30.65 8.24
1 10 5 8.24 41.20 0.62 25.54 8.24

17.6 Negative Bars


along Grid 1 2 8 36 2.43 174.96 0.40 69.98 2.43
along grid 1a 2 8 36 2.35 169.20 0.40 67.68 2.35
along grid 1b 1 8 14 1.08 15.12 0.40 6.05 1.08
along grid 2 (except infront of
stair case) 2 8 36 2.10 151.20 0.40 60.48 2.1
along grid 2 in front of
staircase 1 8 14 1.37 19.18 0.40 7.67 1.38
Along grid 3 (except infront of
stair case) 1 8 72 2.13 153.36 0.40 61.34 2.13
Along grid 3 ( infront of
stair case) 1 8 14 2.53 35.42 0.40 14.17 2.53

Along grid A & F 2 8 28 2.28 127.68 0.40 51.07 2.28


along grid a1 1 8 28 2.05 57.40 0.40 22.96 2.05
along grid b 1 8 28 2.10 58.80 0.40 23.52 2.1
along b1 1 8 28 2.05 57.40 0.40 22.96 2.05
along grid c&d 2 8 10 2.55 51.00 0.40 20.40 2.55
along grid d1 1 8 28 2.05 57.40 0.40 22.96 2.05
along grid e 1 8 28 2.10 58.80 0.40 23.52 2.1
along grid e1 1 8 28 2.05 57.40 0.40 22.96 2.05

Band Parapet Wall Top Floor 7.195


Near grid 1 2 10 2 9.09 36.34 0.62 22.53
1.89

7.215
2 10 2 8.41 33.64 0.62 20.86
1.64

7.195
2 10 2 9.09 36.34 0.62 22.53 1.89

6.325
2 10 2 7.97 31.86 0.62 19.75
1.64
10.15
Infront of Grid A & F 2 10 2 10.15 40.60 0.62 25.17

2 10 2 9.90 39.60 0.62 24.55 9.9

Infront of Grid 3 2 10 2 7.53 30.12 0.62 18.67 0.89

6.64

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-LaliEACCr(F)-A
School Name : Shree Gyanjyoti Secondary School
Location : Hunsapur, Gorkha
BAR BENDING SCHEDULE
Dia. of Cut
No. of Total Wt/m Weight
S. No. Description No. Bar Length Bar Shape
Bars Length (m) (Kg) (Kg)
(mm) (m)
2 10 2 8.17 32.68 0.62 20.26 0.89
7.28

2 10 2 7.14 28.56 0.62 17.71 5.75


0.5
0.89

2 10 2 6.50 13.00 0.62 8.06 6.5

2 10 2 6.00 12.00 0.62 7.44 6

Stirrups 2 8 540 0.30 162.00 0.40 64.80 0.06 0.06


0.18

18 Column ( Up to Roof Floor Level)


18.1 Grid 1 C 1
Main Bar 16 6 2.96 17.76 1.59 28.24 16mm
2.00

0.96

18.2 Grid 1 ( D ) 1
Main Bar 20 2 3.20 6.40 2.47 15.81
16 4 2.96 11.84 1.59 18.83 20mm 16mm
2 2

1.2 0.96

18.3 Grid 2 & 3 ( C &D) 4


20 2 3.20 25.60 2.47 63.23
16 4 2.96 47.36 1.59 75.30 2 20mm 2 16mm

1.2 0.96

18.4 Stirrups 6
For 6 columns 8 26 1.84 287.04 0.40 114.82 0.08
8 52 1.28 399.36 0.40 159.74 0.42 0.14 0.08
0.42
0.42
18.5 Band under wall (Grid C&D) 2 10 2 6.50 26.00 0.62 16.12 6.5
1 10 2 4.50 9.00 0.62 5.58 4.5
0.06 0.06
1 8 30 0.30 9.00 0.40 3.60 0.18
Stirrups 2 8 44 0.30 13.20 0.40 5.28 0.06 0.06
19 Slab Beam 0.18
19.1 Grid C & D
Bottom bar 2 20 2 10.87 43.48 2.47 107.40 0.475 0.475

9.92

0.475
0.475
2 16 1 10.87 21.74 1.59 34.57 9.92

Top Bar 2 20 2 11.80 47.20 2.47 116.58 0.94 9.92 0.94

2 16 1 11.24 22.48 1.59 35.74 0.66 9.92 0.66

19.2 Grid 1,2& 3 bottom bar


3 20 2 5.82 34.92 2.47 86.25 0.45 0.45
4.92

3 16 1 5.82 17.46 1.59 27.76 0.45 0.45

4.92
Top Bar

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-LaliEACCr(F)-A
School Name : Shree Gyanjyoti Secondary School
Location : Hunsapur, Gorkha
BAR BENDING SCHEDULE
Dia. of Cut
No. of Total Wt/m Weight
S. No. Description No. Bar Length Bar Shape
Bars Length (m) (Kg) (Kg)
(mm) (m)
3 20 2 6.80 40.80 2.47 100.78 0.94 4.92 0.94

3 16 1 6.24 18.72 1.59 29.76 0.66 4.92 0.66

19.3 Secondry beam


Bottom bar along grid 1a 1 16 3 5.45 16.35 1.59 26.00 0.35 0.35
4.75

Top bar along grid 1a 1 16 3 5.65 16.95 1.59 26.95 0.35 4.75 0.45

19.4 Stirriups( For Main Beam) 1 10 180 1.65 297.00 0.62 184.14 0.10
0.425

0.25
19.5 For Secondry Beam 1 8 35 1.31 45.85 0.40 18.34
0.8
0.375

0.2

20 For Slab (Roof Floor)


20.1 Main Bars
Along long span
straight bar 1 8 14 11.62 162.68 0.40 65.07 0.08 11.46 0.08

1.605 1.5 1.75


Cranked bar 1 8 13 11.94 155.22 0.40 62.09 0.08 0.08 0.08 0.08
1.25 1.855 1.75
0.08 0.08
1.75
Along Short Span
straight bar 1 8 29 6.62 191.98 0.40 76.79 0.08 6.46 0.08

2.105 2.105
Cranked bar 1 8 28 6.48 181.44 0.40 72.58 0.08 0.08 0.08 0.08
1.95

20.2 Distribution bars


Between Grid 1 &1a
along x-axis 1 8 12 4.20 50.40 0.40 20.16 4.2
along y- axis 1 8 18 3.23 58.05 0.40 23.22 3.23

Between Grid 1a & 2


along x-axis 1 8 12 4.20 50.40 0.40 20.16 4.2
along y- axis 1 8 18 3.23 58.14 0.40 23.26 3.23

Between Grid 2 & 3


along x-axis 1 8 8 4.20 33.60 0.40 13.44 4.2
along y- axis 1 8 18 2.20 39.60 0.40 15.84 2.2

Top near grid 1 &3


bottom bar 2 8 5 6.46 64.60 0.40 25.84 6.46

Top Bar 2 8 4 6.46 51.68 0.40 20.67 6.46

Top in front of grid C & D


bottom bar 2 8 5 11.46 114.60 0.40 45.84 11.46

Top Bar 2 8 4 11.46 91.68 0.40 36.67 11.46

20.3 Negative Bars


along Grid 1 1 8 13 2.08 27.04 0.40 10.82 2.08
along grid 1a 1 8 13 2.35 30.55 0.40 12.22 2.35
along grid 2 1 8 13 2.10 27.30 0.40 10.92 2.1
along Grid 3 1 8 13 1.78 23.14 0.40 9.26 1.78
along grid C & D 2 8 26 2.48 128.96 0.40 51.58 2.48

21 Band (Roof Floor ) 5.95


Parapet Wall 2 10 2 7.15 28.6 0.62 17.732 0.6 0.6
2 10 2 11.95 47.8 0.62 29.636

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block,3-LaliEACCr(F)-A
School Name : Shree Gyanjyoti Secondary School
Location : Hunsapur, Gorkha
BAR BENDING SCHEDULE
Dia. of Cut
No. of Total Wt/m Weight
S. No. Description No. Bar Length Bar Shape
Bars Length (m) (Kg) (Kg)
(mm) (m)
11.95
Stirrups 2 8 238 0.30 71.40 0.40 28.56 0.06 0.06
Total 58147.14 kgs 0.18
58.15 MT

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: 3LaLiEACCr(F)-A
School Name : Shree Gyanjyoti Secondary School
Location : Hunsapur, Gorkha

Site
S. No. Description G.F F.F S.F TF Quantity Unit Remarks
Development
A. Common Installation
1.1 Stand Alone 40 A DP MCB with Enclosure 1 1.00 nos.
2 CABLES & WIRES
2 Nos 10 Sq.mm + 1 No 6 Sq.mm mutistranded
2.1 53.00 r.m
copper conductor wires

2.2 2 Nos 2.5 Sq.mm mutistranded copper conductor 64.00 r.m


wires + 1 Nos. 1.5sq mm multistranded Cu wire
B School Blocks
1 DISTRIBUTION BOARDS 1 1 1 3.00 nos.
1.4 Stand Alone 6 A DP MCB with Enclosure 0.00 nos.
2 CABLES & WIRES
2 Nos 6 Sq mm Multistranded Cu Wire + 1 No 4
2.1 10.50 r.m
Sq mm Multistranded Cu wire
2 Nos 4 Sq mm Multistranded Cu Wire + 1 No 2.5
2.2 16.00 r.m
Sq mm Multistranded Cu wire
2 Nos 2.5 Sq mm Multistranded Cu Wire + 1 No
2.3 28.00 r.m
1.5 Sq mm Multistranded Cu wire
3 General Service Light Point Wiring
3.1 One Way Light Point 3 23 22 22 2 72.00 pts.
3.2 Two Way Light Point 1 1 1 3.00 pts.
3.3 Ceiling/Exhaust Fan Point wiring 2 2.00 pts.
4 6A Universal Pin Light Power Socket Wiring 22 20 55 97.00 pts.
5 Switch Socket Outlets
5.1 6A Universal Power Switch Socket 22 20 55 97.00 nos.
7 Light Fixtures/Luminaires & Accessories
7.1 18 W LED Surface Mounted Square type 14.00 14.00 16.00 44.00 no.
7.3 12 W LED Surface Mounted Cylindrical type 8.00 9.00 7.00 3.00 27.00 no.
7.4 LED Wall Light 1.00 1.00 no.
9 External Post Top Light Pole 3 3.00 nos.
10 Post Top External Light Fixtures 3 3.00 nos.
11 Earthing & Lighting Protection
11.1 Chemical Earthing 3 3.00 no.
11.2 Earthing Bar 3 3.00 no.
12 Earthing Strip/Wires
12.3.1 25 x 3 mm GI strip 65 65.00 r.m
12.3.2 12 SWG Cu wire 15 15.00 r.m
13 Earth Test link 1 1.00 nos.
14 Lightning Arrester 1 1.00 nos.
C Solar PV System
1 Solar PV Panel 8 8.00 nos.
2 Tubular Deep Cycle Battery 4 4.00 nos.
3 Hybrid Inverter 1 1.00 no.
D Fire Extinguisher
5.0kg Size ABC Stored Pressure Type Fire
A. 2 5 7.00 nos.
Extinguisher
B. Dry Powder Fire Extinguisher 1 1.00 nos.

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: 3LaLiEACCr(F)-A
School Name : Shree Gyanjyoti Secondary School
Location : Hunsapur, Gorkha

S.N Furniture Description Symbol Qty Unit Remarks


Classroom
1 ECD Student Desk (6 Seater) D-03 3 nos.
2 Student Desk G6-12 (3 Seater) D-02C 22 nos.
3 Student Bench G6-12 (3 Seater) B-02C 36 nos.
4 Soft Board F-01 1 nos.
5 Book Shelf F-02 3 nos.
6 Teacher's Table T-01 5 nos.
7 Teacher's Chair C-01 5 nos.
8 White Board F-03 5 nos.
Library
9 Library Table T-02 7 nos.
10 Library Shelf F-04 5 nos.
Computer nos.
11 Computer Table T-04 12 nos.
12 Computer Shelf C-02 24 nos.
13 White Board with Stand F-05 1 nos.
Laboratory
14 Equipment Shelf F-07 3
15 Lab Stool F-08 31
Office
16 Cabinet F-06 10 nos.
17 Office Table (2 sides Drawe Unit) T-05 1 nos.
18 Office Table (1 sides Drawe Unit) T-06 2 nos.
19 Office Table T-07 24 nos.
20 Office Chair C-03 28 nos.
21 Office Chair- Headmaster C-04 1 nos.
22 Office Visitor Chair C-05 19 nos.
23 Dinning Table T-09 2 nos.
Miscellaneous
24 Equipment Cabinet F-09 5 nos.
25 Cusions F-16 18 nos.
26 Carpet 27.43 sq.m
27 File Cabinet F-10 2 nos.
28 Notice Board F-14 1 nos.
Total 276 nos.

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Toilet Block,T(S)F
School Name : Shree Gyanjyoti Secondary School
Location : Hunsapur, Gorkha

Length Breadth Height


S. No. Description No. Quantity Unit Remarks
(m) (m) (m)
1 Earthworks
1.1 Site Clearance
Toilets ( Female)
Toilet block 1 8.34 6.35 52.91
Septic tank 1 5.00 3.95 19.75
Soak Pit 1 1.50 1.50 2.25
Sewer Manhole 1 1.00 1.00 1.00
Waste water Chamber 2 2.00 2.00 8.00
Total 83.91 Sq.m

1.2 Earth Work Excavation


For Footing
Footing F1 6 1.30 1.30 1.20 12.17

For Lower Tie Beam


Along grid 1 1 3.70 0.60 0.70 1.55
Along grid 2 1 3.70 0.50 0.70 1.30
Along grid 3 1 3.70 0.60 0.70 1.55
Along grid A 1 3.40 0.60 0.70 1.43
Along grid B/1-2 1 2.20 0.60 0.70 0.92
Along grid B/2-3 1 1.20 0.50 0.70 0.42
Between Grid AB & 2-3 1 4.50 0.60 0.45 1.20

Along the incinerator 1 1.90 1.15 0.15 0.33


For ramp 1 0.50 Area 1.03 0.51
From exterior wall to drain 1 3.00 1.30 0.05 0.20
1 2.80 0.60 0.05 0.08
Drain 1 6.50 0.60 0.05 0.20
External Steps 1 1.20 0.60 0.15 0.11
For Septic Tank 1 5.80 2.55 2.60 38.45
1 1.10 1.85 1.20 2.44
Soak Pit 1 4.15 Area 1.50 6.23
For Sewer Manhole 1 1.00 Area 0.70 0.70
Waste Water Chamber 2 1.00 1.00 0.70 1.40
Total 71.19 Cu.m

1.3 Earth Back filling


Excavated earthwork 71.19
Boulder soling -2.40
PCC -1.20
RCC -5.49

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Length Breadth Height
S. No. Description No. Quantity Unit Remarks
(m) (m) (m)
Brick masonry work below plinth tie
-3.62
beam
Room 1 5.00 3.20 0.18 2.80
Corridoor 1 5.00 2.20 0.18 1.93
Total 63.21 Cu.m

1.4 Boulder Soling


For Footing
Along the isolated foundation 6 1.00 1.00 0.20 1.20

Along the plinth beam


Along grid 1 1 4.50 0.45 0.10 0.20
Along grid 2 1 4.50 0.35 0.10 0.16
Along grid 3 1 4.50 0.45 0.10 0.20
Along grid A 1 5.00 0.45 0.10 0.23
Along grid B/1-2 1 3.00 0.45 0.10 0.14
Along grid B/2-3 1 2.00 0.35 0.10 0.07
Between Grid AB & 2-3 1 4.50 0.45 0.10 0.20

Below the ground floor.


1 2.00 3.23 0.20 1.29
1 2.50 3.25 0.20 1.63
Below the corridor. 1 5.00 2.25 0.20 2.25

Along the incinerator 1 1.90 1.15 0.90 1.97


For the ramp 1 6.00 1.00 0.20 1.20
From exterior wall to drain 1 3.00 1.33 0.05 0.00
1 2.70 0.60 0.05 0.00

Septic Tank 1 5.50 2.25 0.06 0.68


1 0.80 1.55 0.06 0.07
Inside of soak Pit 1 1.20 2.00 2.40
Sewer Manhole 1 1.00 1.00 0.20 0.20
Waste Water Chamber 2 1.00 1.00 0.20 0.40
Total 14.48 Cu.m

1.5 Sand Filling


Periphery ot Soak pit 1 1.80 Area 1.20 2.16
Total 2.16 cu.m

2 Concrete Works
2.1 PCC
2.1.1 P.C.C.(1:3:6) Works
For Footing 1
P.C.C. for isolated footing(F1) 6 1.00 1.00 0.10 0.60

For Tie Beam

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Length Breadth Height
S. No. Description No. Quantity Unit Remarks
(m) (m) (m)
Along grid 1 1 4.50 0.45 0.05 0.10
Along grid 2 1 4.50 0.35 0.05 0.08
Along grid 3 1 4.50 0.45 0.05 0.10
Along grid A 1 5.00 0.45 0.05 0.11
Along grid B/1-2 1 3.00 0.45 0.05 0.07
Along grid B/2-3 1 2.00 0.35 0.05 0.04
Between Grid AB & 2-3 1 4.50 0.45 0.05 0.10

Septic Tank
1 5.50 2.25 0.08 0.99
Sewer Manhole
Bottom 1 1.00 Area 0.10 0.10
Waste water Chamber 0.00
Bottom 2 1.00 1.00 0.10 0.20
Total 2.49 Cu.m

2.1.2 P.C.C.(1:2:4) Works


Toilets ( Female) 1
For the ramp 1 6.00 1.00 0.08 0.45
Bellow the ground floor.
1 2.00 3.23 0.08 0.00
1 2.50 3.25 0.08 0.00
Below the corridor. 1 5.00 2.25 0.08 0.00
Along the incinerator 1 1.90 1.15 0.05 0.11
From exterior wall to drain 1 3.00 1.20 0.05 0.00
1 2.70 0.60 0.05 0.00
Total 0.56 cu.m

2.2 P.C.C For R.C.C. Works (1:1.5:3)


Foundation
Inclined Part 6 Area 0.63 0.15 0.56
Rectangular Base 6 1.00 1.00 0.20 1.20

Beam
Foundation Beam
Along grid 1 1 4.70 0.25 0.30 0.35
Along grid 2 1 4.70 0.25 0.30 0.35
Along grid 3 1 4.70 0.25 0.30 0.35
Along grid A 1 5.40 0.25 0.30 0.41
Along grid B/(1,2) 1 3.20 0.25 0.30 0.24

Tie Beam
Along grid 1 1 4.70 0.25 0.30 0.35
Along grid 2 1 4.70 0.25 0.30 0.35
Along grid 3 1 4.70 0.25 0.30 0.35
Along grid A 1 5.40 0.25 0.30 0.41

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Length Breadth Height
S. No. Description No. Quantity Unit Remarks
(m) (m) (m)
Along grid B(1,2) 1 3.20 0.25 0.30 0.24
Along grid B/(2,3) 1 2.20 0.25 0.59 0.32

For first floor Beam


Main beam
Along grid 1 1 4.70 0.25 0.40 0.47
Along grid 2 1 4.70 0.25 0.45 0.53
Along grid 3 1 4.70 0.25 0.45 0.53
Along grid A/1-2 1 3.20 0.25 0.40 0.32
Along grid A/2-3 1 2.20 0.25 0.45 0.25
Along grid B/1-2 1 3.20 0.25 0.40 0.32
Along grid B/2-3 1 2.20 0.25 0.45 0.25

Column
Column up to plinth level 6 0.30 0.30 1.00 0.54
Column from plinth to top 6 0.30 0.30 3.00 1.62

Slab
Slab of first floor 1 4.75 2.25 0.15 1.60

Lintel Bands
For first floor
Along grid 1 1 4.70 0.125 0.25 0.15
Along grid 2 1 4.70 0.125 0.25 0.15
Along grid 3 1 4.70 0.125 0.25 0.15
Along grid A 1 5.40 0.125 0.25 0.17
Along grid B 1 3.20 0.125 0.25 0.10
Along the partition wall 1 3.25 0.125 0.25 0.10
For the partition wall 1 2.77 0.125 0.13 0.04

Sill Bands
For first floor
Along grid 1 1 4.70 0.075 0.43 0.15
Along grid 2 1 4.70 0.075 0.43 0.15
Along grid 3 1 4.70 0.075 0.43 0.15
Along grid A 1 5.40 0.075 0.43 0.17
Along grid B 1 3.20 0.075 0.43 0.10
Along the partition wall 1 3.25 0.075 0.25 0.06
For the partition wall 1 2.77 0.075 0.13 0.03
Deduction 0.00
D1 -1 1.00 0.075 0.43 -0.03
D2 -1 0.90 0.075 0.43 -0.03

Along the Slab of incinirator 1 0.80 1.000 0.08 0.06


Along the water trough
1 1.80 0.500 0.100 0.00

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Length Breadth Height
S. No. Description No. Quantity Unit Remarks
(m) (m) (m)
1 1.80 0.500 0.100 0.00
3 0.58 0.300 0.100 0.00
Septic Tank
At Bottom 1 5.20 1.95 0.12 1.22
Conceal Beam 1 1.20 0.25 0.15 0.05
Top Cover 1 5.20 1.95 0.12 1.22
Deduction Cap -2 0.30 0.30 0.12 -0.02
-1 0.30 0.30 0.12 -0.01

Soak Pit
RCC slab 1 1.13 Area 0.12 0.14
Sewer Manhole
Top Cover 1 1.00 1.00 0.10 0.10
Waste Water Chamber
Top Cover 2 1.00 1.00 0.10 0.20
Total 16.46 Cu.m

2.3 Silica Cement Admixture


10 Kg per cu.m. of R.C.C. M20 10 16.46 164.63
Total 164.63 Kg.

2.5 Formworks
Foundation
Isolated footing (F1) 6 4.00 0.20 4.80

Beam
Foundation Beam
Along grid 1 1 4.70 0.50 2.35
Along grid 2 1 4.70 0.50 2.35
Along grid 3 1 4.70 0.50 2.35
Along grid A 1 5.40 0.50 2.70
Along grid B/(1,2) 1 3.20 0.50 1.60

Tie Beam
Along grid 1 1 4.70 0.60 2.82
Along grid 2 1 4.70 0.60 2.82
Along grid 3 1 4.70 0.60 2.82
Along grid A 1 5.40 0.60 3.24
Along grid B/(2,3) 1 2.20 1.18 2.60

Truss level Beam


Main beam
Along grid 1 1 4.70 1.05 4.94
Along grid 2 1 4.70 1.15 5.41
Along grid 3 1 4.70 1.15 5.41
Along grid A/1-2 1 3.20 1.05 3.36

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Length Breadth Height
S. No. Description No. Quantity Unit Remarks
(m) (m) (m)
Along grid A/2-3 1 2.20 1.15 2.53
Along grid B/1-2 1 3.20 1.05 3.36
Along grid B/2-3 1 2.20 1.15 2.53

Column
Column up to plinth level 6 1.00 1.20 7.20
Column from plinth to top 6 3.00 1.20 21.60

Slab
Along corridor 1 4.75 2.25 10.69

Lintel Bands
Along grid 1 2 4.70 0.125 1.18
Along grid 2 2 4.70 0.125 1.18
Along grid 3 2 4.70 0.125 1.18
Along grid A 2 5.40 0.125 1.35
Along grid B 2 3.20 0.125 0.80
Along partition walls 1 2.77 0.125 0.35

Sill Bands 0.00


Along grid 1 1 4.70 0.150 0.71
Along grid 2 1 4.70 0.150 0.71
Along grid 3 1 4.70 0.150 0.71
Along grid A 1 5.40 0.150 0.81
Along grid B 1 3.20 0.150 0.48

For the partition wall 1 2.77 0.150 0.42


subtraction 0.00
D1 -1 1.00 0.150 -0.15
D2 -1 0.90 0.150 -0.14

Along the water trough 2 3.75 0.875 6.56


6 0.50 0.300 0.90
For Septic Tank
For cover Slab 1 5.20 1.95 10.14
Conceal Beam 1 0.55 Perimeter 1.20 0.66

For Soak Pit


RCC slab
Base Area 1 1.13 1.13

Sewer Manhole
Top Cover 1 0.60 Area 0.60

Waste Water Chamber


Top Cover 2 0.75 0.75 1.13

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Length Breadth Height
S. No. Description No. Quantity Unit Remarks
(m) (m) (m)
Total 128.13 Sq.m

3 Brick Works
3.2 Full Brick (230 mm) Works (1:4c/s)
Brick Works under Plinth beam
Along grid 1 1 4.70 0.23 0.45 0.49
Along grid 2 1 4.70 0.23 0.45 0.49
Between Grid 2 and 3 1 4.50 0.23 0.68 0.70
Along grid 3 1 4.70 0.23 0.45 0.49
Along grid A 1 5.40 0.23 0.45 0.56
Along grid B 1 3.20 0.23 0.45 0.33

Internal Partition Walls


Along grid 1 1 4.70 0.23 2.03 2.19
1 0.25 0.23 0.38 0.02
Along grid 2 1 4.70 0.23 2.03 2.19
1 0.25 0.23 0.38 0.02
Deduction -1 1.00 0.23 2.03 -0.47
-1 0.90 0.23 2.03 -0.42
Along grid 3 1 4.70 0.23 1.00 1.08
Along grid B 1 3.20 0.23 1.78 1.31
Along grid A 1 3.20 0.23 2.40 1.77
1 2.20 0.23 2.40 1.21
Middle Wall 1 3.25 2.80 0.25 2.28

Below Water Trough 1 0.58 0.23 0.30 0.04


1 0.58 0.23 0.45 0.06
At outside Drain 1 0.93 area 1.20 1.11
For Septic Tank
Inlet wall (250 mm ) 1 1.20 0.23 0.60 0.17
1 1.20 0.23 0.20 0.06
Outer Wall (375 mm) 2 4.20 0.38 2.25 7.09
2 1.20 0.38 2.25 2.03

Soak Pit Brick work 1 0.20 0.50 0.10


Total 24.88 cu.m

3.3 Half Brick (125 mm) Works (1:4c/s)


Long wall 1 1.72 2.80 4.82
Short wall 1 0.43 2.80 1.19

Sewer Man Hole


Outer Wall 1 3.20 0.45 1.44
Waste Water Chamber
Outer Wall 2 3.50 0.45 3.15

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Length Breadth Height
S. No. Description No. Quantity Unit Remarks
(m) (m) (m)
Total 10.61 sq.m

3.4 Honey Comb Brick (350 mm) Works (1:3c/s)


Soak Pit Brick work 1 0.20 1.20 0.24
Total 0.24 cu.m

4 DOORS & WINDOWS


4.4 UPVC Door
4.4.1 UPVC Door Shutter
Toilets (Female) 1
D1 1 1.00 2.10 2.10
D2 1 0.90 2.10 1.89
D3 2 0.75 2.10 3.15
Total 7.14 sq.m

4.5 Window Grill


Toilets ( Female) 1
Ventilation FrameV1 1 2.48 0.38 1.86
V2 1 2.48 0.33 1.61
V3 1 1.98 0.38 1.48
V4 1 1.98 0.33 1.28
Total 6.23 sq.m

5 FLOORING WORKS
5.1 Cement Concrete Flooring (40mm) With Neat Cement Punning
Toilets ( Female) 1
At corridor 1 5.30 1.20 6.36
At Ramp 1 5.60 1.20 6.72
Along the terrace 1 4.75 2.25 10.69
step 1 0.30 1.20 0.36
Inside the room 1 3.23 2.00 6.45
1 3.23 2.50 8.06
At Doors 1 1.90 0.25 0.48
Along the water trough 1 3.45 0.7 2.42
Total 41.53 sq.m

5.2 Neat cement Skirting


1 11.5 11.50
Total 11.50 r.m

5.3 Terrazo Cast In-Situ Dado


Toilets (Male & Female) 1
Along grid A & B 2 3.20 1.20 7.68
Along grid 1 1 4.50 1.20 5.40
Along grid 2 1 2.60 1.20 3.12

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Length Breadth Height
S. No. Description No. Quantity Unit Remarks
(m) (m) (m)
Along the water trough 1 3.45 0.80 2.76
Along the partition wall 1 5.10 1.20 6.12
2 3.25 1.20 7.80
Total 32.88 sq.m

6 Roofing/ Terracing Works


6.1 Metal Works
Total
Description Nos length Kg/m Total
Length
Truss 699.65
Total 699.65 kg

6.2 CGI Sheet Roofing


Toilets (Female) 1
1.00 6.95 2.71 area 18.82
1.00 6.95 2.12 area 14.71
Total 33.54 sq.m

6.3 CGI Ridge


Toilets (Female) 1
1.00 6.95 6.95
Total 6.95 r.m
6.4 Eves Board
Toilets (Female) 1
23.32 0.288 1.20 7.85 63.27
Total 63.27 k.g

6.5 Cement Board For False Ceiling


Inside the room 1 1.00 2.00 3.25 6.50
Inside the room 2 1.00 2.50 3.25 8.13
Slopped Roof 1.00 6.95 0.64 4.42
1.00 4.82 0.98 4.70
Total 23.75 sq.m

7 PLASTER/PAINTING WORKS
7.1 Internal Plaster
7.1.1 Internal Plaster on Wall (1:6)
Toilets ( Female) 1
Along grid A & B 2 3.20 1.80 11.52
Along A 1 2.20 3.00 6.60
Along grid 1 1 4.70 1.80 8.46
Along grid 2 1 2.55 1.80 4.59
On partition wall 2 3.25 1.80 11.70
Long wall 1 1.63 1.80 2.93
1 1.88 1.80 3.38
Short wall 2 0.43 1.80 1.53
Deduction

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Length Breadth Height
S. No. Description No. Quantity Unit Remarks
(m) (m) (m)
V1 -1 3.48 0.38 -0.65
V2 -1 3.48 0.33 -0.56
V3 -1 1.98 0.38 -0.37
V4 -1 1.98 0.33 -0.32
D1 -1 1.00 0.90 -0.45
D2 -1 0.90 0.90 -0.41
Along grid 3 1 4.70 1.95 4.57
Total 52.52 sq.m

7.1.2 Internal Plaster on Ceiling (1:4)


Toilets ( Female) 1
slab
Along corridor 1 2.24 2.24
Beam Along 1 1 4.45 0.40 1.78
Beam Along 2 1 4.45 0.90 4.01
Beam Along A 1 3.2 0.40 1.28
1 2.2 0.45 0.99
Beam Along B 1 3.2 0.40 1.28
1 2.2 0.45 0.99
Along Corridor 1 5.03 2.20 11.04
Total 23.60 sq.m

7.1.3 External Plaster


External Plaster on Beam/Column
Toilets (Female) 1
Along grid 1 1 4.70 0.40 1.88
Along grid 3 1 4.70 0.45 2.12
Along grid A 1 3.20 0.40 1.28
2.20 0.45 0.99
Along grid B 1 3.20 0.40 1.28
1 2.20 0.45 0.99
slab
Along side edge of the slab 2 2.25 0.15 0.68
Along the column 6 3.00 0.60 10.80
0.00
External Plaster on Walls
Along Grid 1 1 4.70 2.23 10.46
Along Grid 2 1 4.70 2.23 10.46
Along Grid 3 1 4.70 1.20 5.64
Along Grid A 1 5.40 2.60 14.04
Along Grid B 1 3.20 2.60 8.32
Total 68.93 sq.m

7.1.4 Internal Plaster on Wall (1:4) with Cement Punning


Inside Septic Tank Wall
Long Wall 2.00 5.20 2.25 23.40

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Length Breadth Height
S. No. Description No. Quantity Unit Remarks
(m) (m) (m)
Short Wall 2.00 1.95 2.25 8.78
Baffle wall 2.00 1.20 1.45 3.48
Total 35.66 Sq.m

7.2 Painting works


7.2.1 Distemper painting Works
As Per Internal Plaster on Ceilings 1 23.60 23.60
As per internal plaster on wall 1 52.52 52.52
False Ceiling Works 1 23.75 23.75
Total 99.87 sq.m

7.2.2 Exterior Weather Coat Paint


AS per External Plaster 1 68.93 68.93
Total 68.93 sq.m

7.2.4 Enamel Paint


Window grill
Ventilation FrameV1 1 2.48 0.38 2.00 1.86
V2 1 2.48 0.33 2.00 1.61
V3 1 1.98 0.38 2.00 1.48
V4 1 1.98 0.33 2.00 1.28
Total 6.23 sq.m

8 MISCELLANOUS
8.2 Cement Board
For Partition
2.00 1.69 Area 3.37
Total 3.38 sq.m

8.4 Pump Shed


1 1 1.00
Total 1.00 Nos.

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Toilet Block,T(S)F
School Name : Shree Gyanjyoti Secondary School
Location : Hunsapur, Gorkha
BAR BENDING SCHEDULE
Spacing c/c Structure Length/pc. Total Weight Per Total
SN Description Shape Size (mm) Rebar Nos Remarks
(mm) Nos (mm) Length (m) Meter (Kg) Weight (Kg)
A. Foundation Mesh
Footing F1

900
a. Along Y-axis 100 12 150 6 7 1100 46.2 0.889 41.07
100

900
b. Along X-axis 100 12 150 6 7 1100 46.2 0.889 41.07
100

B. Column-MAIN BAR
465

4251
a. Longitudinal bar upto full height 12 - 6 8 5160 247.68 0.889 220.16

100 344
STIRRUPS FOR COLUMN SIZE 300 x 300 upto Plinth Height-

220
80

b Stirrups 220 8 100 6 9 1040 56.16 0.395 22.19

1
160 6
80 0
c Stirrups 8 100 6 11 800 52.8 0.395 20.86
1
6 160
0

C Column (300*300)

Prepared and Submitted By: Checked by: Verified by:


Sharma-AM J/V Consultant, SE DLPIU Engineer
Spacing c/c Structure Length/pc. Total Weight Per Total
SN Description Shape Size (mm) Rebar Nos Remarks
(mm) Nos (mm) Length (m) Meter (Kg) Weight (Kg)

220
80
a Stirrups for Column upto floor Height 220 8 125 6 25 1040 156 0.395 61.63

1
160 6
80 0
b " 8 125 6 25 800 120 0.395 47.41
1
6 160
0

D BEAM
1 Foundation Beam (250*250)

5000
a Along Grid-1,2 & 3- Top Bar 720 720 12 3 3 6440 57.96 0.889 51.52

b Along Grid--1,2 & 3-Bottom Bar 720 12 3 3 6440 57.96 0.889 51.52
5000 720

6000
c Along Grid-A & B-Top Bar 720 12 3 3 7440 66.96 0.889 59.52
720

d Along Grid-Bottom Bar 720 12 3 3 7440 66.96 0.889 59.52


6000 720

200
80
e Stirrups Along Grid 1, 2 & 3 8 150 3 34 960 97.92 0.395 38.69
200

Prepared and Submitted By: Checked by: Verified by:


Sharma-AM J/V Consultant, SE DLPIU Engineer
Spacing c/c Structure Length/pc. Total Weight Per Total
SN Description Shape Size (mm) Rebar Nos Remarks
(mm) Nos (mm) Length (m) Meter (Kg) Weight (Kg)

200
80
f Stirrups Along A & B 8 150 2 40 960 76.8 0.395 30.35
200

2 Plinth Beam (250*300)

5000
a. Along Grid-1 -Top Bar 960 16 1 2 6920 13.84 1.580 21.88
960

5000
b 720 12 1 1 6440 6.44 0.889 5.73
720

5000
c Along Grid-1 -Bottom Bar 960 16 1 2 6920 13.84 1.580 21.88
960

5000
d 720 12 1 1 6440 6.44 0.889 5.73
720

e Along Grid-2 & 3-Top Bar 960 16 2 2 6920 27.68 1.580 43.75
5000 960

f 720 12 2 1 6920 13.84 0.889 12.31


5000 720

g Along Grid-2 & 3-Bottom Bar 960 16 2 2 6920 27.68 1.580 43.75
5000 960

h 720 12 2 1 6920 13.84 0.889 12.31


5000 720

Prepared and Submitted By: Checked by: Verified by:


Sharma-AM J/V Consultant, SE DLPIU Engineer
Spacing c/c Structure Length/pc. Total Weight Per Total
SN Description Shape Size (mm) Rebar Nos Remarks
(mm) Nos (mm) Length (m) Meter (Kg) Weight (Kg)

6000
i Along Grid-A & B-Top Bar 12 2 3 7440 44.64 0.889 39.68
720 720

j Along Grid-A & B-Bottom Bar 720 12 2 4 7440 59.52 0.889 52.91
6000 720

200
80

k Stirrups Along Grid 1, 2 & 3 8 150 3 42 1360 171.36 0.395 67.70


400

200
80

l Stirrups Along Grid A & B 8 150 2 35 1360 95.2 0.395 37.61


400

3 FLOOR BEAM
LONGITUDINAL BARS
Along Grid 1,2&3

5200
a Top Bars 870 16 3 2 6940 41.64 1.580 65.81
870

5200
b Top Bars 12 3 1 6380 19.14 0.889 17.02
590 590

c Bottom Bars 350 16 3 2 5900 35.4 1.580 55.95


5200 350

d Bottom Bars 350 350 12 3 2 5900 35.4 0.889 31.47


5200

Along Grid A&B

Prepared and Submitted By: Checked by: Verified by:


Sharma-AM J/V Consultant, SE DLPIU Engineer
Spacing c/c Structure Length/pc. Total Weight Per Total
SN Description Shape Size (mm) Rebar Nos Remarks
(mm) Nos (mm) Length (m) Meter (Kg) Weight (Kg)

6200
e Top Bars 12 2 3 7380 44.28 0.889 39.36
590 590

f Bottom Bars 350 12 2 4 6900 55.2 0.889 49.07


6200 350

STIRRUPS

200
8
0
g Stirrups for Beam Size 250*400 350 8 125 1 93 1260 117.18 0.395 46.30

200
80

h Stirrups for Beam Size 250*450 400 8 125 1 124 1360 168.64 0.395 66.63

E SLAB

850 850
a Main Bars Short Span 100 10 150 1 33 4600 151.8 0.617 93.71
100 2700

1475 1475
b Main Bars Long Span 100 10 150 1 16 8350 133.6 0.617 82.47
5200 100

c Distribution Bars Short Span 8 150 1 18 2700 48.6 0.395 19.20


2700

d Distribution Bars Long Span 8 150 1 10 5200 52 0.395 20.55


5200

Prepared and Submitted By: Checked by: Verified by:


Sharma-AM J/V Consultant, SE DLPIU Engineer
Spacing c/c Structure Length/pc. Total Weight Per Total
SN Description Shape Size (mm) Rebar Nos Remarks
(mm) Nos (mm) Length (m) Meter (Kg) Weight (Kg)
F STIRRUPS FOR COLUMN SIZE 300 x 300 ( From Plinth Level to Beam Bottom Level)

220
80

a Stirrups 220 8 125 6 21 1040 131.04 0.395 51.77

1
160 6
80 0
b Stirrups 8 125 6 21 800 100.8 0.395 39.83
1
6 160
0

G SOAKPIT

d=1850+Ld

a Middle Ring 8 200 1 1 6289 6.289 0.395 2.49 L=Pi*d

d=1450+Ld

b Inner Ring 8 200 1 1 5033 5.033 0.395 1.99 L=Pi*d

c Main Bar Along both Direction 8 200 1 2 1650 3.3 0.395 1.31
1650

d " 8 200 1 4 1600 6.4 0.395 2.53


1600
e " 8 200 1 4 1440 5.76 0.395 2.28
1440

f " 8 200 1 4 1130 4.52 0.395 1.79


1130

g " 8 200 1 4 400 1.6 0.395 0.64


400

Prepared and Submitted By: Checked by: Verified by:


Sharma-AM J/V Consultant, SE DLPIU Engineer
Spacing c/c Structure Length/pc. Total Weight Per Total
SN Description Shape Size (mm) Rebar Nos Remarks
400 (mm) Nos (mm) Length (m) Meter (Kg) Weight (Kg)

h Top Bar Along Radial Direction 8 200 1 8 425 3.4 0.395 1.35
425
H SEPTIC TANK

200
6
a Stirrups for Concealed Beam 5 8 150 1 13 670 8.71 0.395 3.45
70

1850
b 10Ø Longitudional Bar for CB-Top Bar 10 1 2 1970 3.94 0.617 2.44

60
60

c 10Ø Longitudional Bar for CB-Bottom Bar 10 1 2 1970 3.94 0.617 2.44
60 1850
60
Bed RCC Bars

d Bottom Mesh Bar-Along Length Wise 8 200 1 12 5550 66.6 0.395 26.32
50 5450
50

e Bottom Mesh Bar-Along WIdth Wise 8 200 1 28 2300 64.4 0.395 25.45
50 2200 50
f Septic Tank Slab Cover

g 8Ø Bottom bar along Width wise 8 1 23 1970 45.31 0.395 17.91


60 1850 60

h 8 1 8 1050 8.4 0.395 3.32


60 930 60

i 8 1 8 450 3.6 0.395 1.43


60 330 60

Prepared and Submitted By: Checked by: Verified by:


Sharma-AM J/V Consultant, SE DLPIU Engineer
Spacing c/c Structure Length/pc. Total Weight Per Total
SN Description Shape Size (mm) Rebar Nos Remarks
(mm) Nos (mm) Length (m) Meter (Kg) Weight (Kg)

1215 1475
j 8Ø Bottom bar along Length wise 8 1 9 7650 68.85 0.395 27.20
60 4840 60

1215
k 8 1 4 3780 15.12 0.395 5.98
60 2445 60

l 8 1 4 920 3.68 0.395 1.46


60 800 60

m 8 1 4 445 1.78 0.395 0.71


60 325 60

1
n Top Bars-Along Width Wise 0 8 1 8 620 4.96 0.395 1.96
0 520

o 100 8 1 8 620 4.96 0.395 1.96


520

p Top Bars-Along Length Wise 7 8 1 9 1250 11.25 0.395 4.45


5 1175

q 75 8 1 9 1250 11.25 0.395 4.45


1175

r Corner Bars 500 10 1 30 500 15 0.617 9.26

I SILL BAND
Longitudinal Bars

3400 75
800
800
a Grid 1/A-B ,Grid 3/A-B 75 10 2 2 6350 25.4 0.617 15.68
75 600 600

1175 75
1700
b Grid 2/A-B 10 1 2 2950 5.9 0.617 3.65
75

Prepared and Submitted By: Checked by: Verified by:


Sharma-AM J/V Consultant, SE DLPIU Engineer
Spacing c/c Structure Length/pc. Total Weight Per Total
SN Description Shape Size (mm) Rebar Nos Remarks
75 (mm) Nos (mm) Length (m) Meter (Kg) Weight (Kg)

2650 75
425
425
c Grid A/1-2, B/1-2 10 2 2 4950 19.8 0.617 12.23
75
75 600 600

2150 75
175
175
d Grid A/2-3 10 1 2 3850 7.7 0.617 4.76
75
75 600 600

e Partition Wall between Grid A & Grid B 10 1 2 3600 7.2 0.617 4.45
3600

f Partition Wall between Incinerator Holes 10 1 2 1400 2.8 0.617 1.73


1400

g Partition Wall between along D3 10 1 2 900 1.8 0.617 1.12


525 375

h Partion Wall for Urinal 10 1 2 700 1.4 0.617 0.87


700

Ties

65 65
i Grid 1/A-B ,Grid 3/A-B 8 150 2 33 320 21.12 0.395 8.35
190

65 65
j Grid 2/A-B 8 150 1 20 320 6.4 0.395 2.53
190

65 65
k Grid A/1-2, B/1-2 8 150 2 23 320 14.72 0.395 5.82
190

65 65
l Grid A/2-3 8 150 1 16 320 5.12 0.395 2.03
190

65 65
m Partition Wall between Grid A & Grid B 8 150 1 23 320 7.36 0.395 2.91
190

Prepared and Submitted By: Checked by: Verified by:


Sharma-AM J/V Consultant, SE DLPIU Engineer
Spacing c/c Structure Length/pc. Total Weight Per Total
SN Description Shape Size (mm) Rebar Nos Remarks
(mm) Nos (mm) Length (m) Meter (Kg) Weight (Kg)

50 50
n Partition Wall between Incinerator Holes 8 150 1 9 170 1.53 0.395 0.61
70

50 50
o Partition Wall between along D3 8 150 1 7 170 1.19 0.395 0.48
70

50 50
p Partion Wall for Urinal 8 150 1 5 170 0.85 0.395 0.34
70

J Lintel Band
Longitudinal Bars

3400 75
800
800

a Grid 1/A-B ,Grid 3/A-B 75 10 2 2 6350 25.4 0.617 15.68


75 600 600

3400 75
800
800

b Grid 2/A-B 75 10 1 2 6350 12.7 0.617 7.84


75 600 600

2650 75
425
425

c Grid A/1-2, B/1-2 75 10 2 2 4950 19.8 0.617 12.23


75 600 600

2150 75
175
175

d Grid A/2-3 75 10 1 2 3850 7.7 0.617 4.76


75 600 600

e Partition Wall between Grid A & Grid B 10 1 2 3700 7.4 0.617 4.57
3600

f Partition Wall between Incinerator Holes 1400 10 1 2 1500 3 0.617 1.86

g Partition Wall between along D3 10 1 2 2950 5.9 0.617 3.65


2950

Prepared and Submitted By: Checked by: Verified by:


Sharma-AM J/V Consultant, SE DLPIU Engineer
Spacing c/c Structure Length/pc. Total Weight Per Total
SN Description Shape Size (mm) Rebar Nos Remarks
(mm) Nos (mm) Length (m) Meter (Kg) Weight (Kg)

h Partion Wall for Urinal 10 1 2 700 1.4 0.617 0.87


700
Ties

65 65
i Grid 1/A-B ,Grid 3/A-B 8 150 2 33 320 21.12 0.395 8.35
190

65 65
j Grid 2/A-B 8 150 1 33 320 10.56 0.395 4.18
190

65 65
k Grid A/1-2, B/1-2 8 150 2 23 320 14.72 0.395 5.82
190

65 65
l Grid A/2-3 8 150 1 16 320 5.12 0.395 2.03
190

65 65
m Partition Wall between Grid A & Grid B 8 150 1 23 320 7.36 0.395 2.91
190

50 50
n Partition Wall between Incinerator Holes 8 150 1 10 170 1.7 0.395 0.68
70

50 50
o Partition Wall between along D3 8 150 1 21 170 3.57 0.395 1.42
70

50 50
p Partion Wall for Urinal 8 150 1 5 170 0.85 0.395 0.34
70

K Wash Basin Slab


Left Portion

a At Long Side 250 8 150 1 5 2175 10.875 0.395 4.3


1825 100

b At Short Side 8 150 1 13 775 10.075 0.395 3.99


540 235

Prepared and Submitted By: Checked by: Verified by:


Sharma-AM J/V Consultant, SE DLPIU Engineer
Spacing c/c Structure Length/pc. Total Weight Per Total
SN Description Shape Size (mm) Rebar Nos Remarks
(mm) Nos (mm) Length (m) Meter (Kg) Weight (Kg)
Right Side Portion

c At Long Side 8 150 1 5 2325 11.625 0.395 4.6


250 1825 250

d At Short Side 8 150 1 13 775 10.075 0.395 3.99


540 235

L Manhole Cover Slab- Septic Tank ( 2 Nos )

a Along Long and Short Direction 8 150 2 10 750 15 0.395 5.93


50 650 50

M INCINERATOR
a 630*505 Grill Mesh

b 8 mm dia bar of length 630 8 25 1 21 630 13.23 0.395 5.23


630

c 8 mm dia bar of length 505 8 25 1 26 505 13.13 0.395 5.19


505

d Precast Cover Slab-Long Bar 8 150 1 5 1000 5 0.395 1.98


1000

e Precast Cover Slab-Short Bar 700 8 150 1 7 1000 7 0.395 2.77

Total of Reinforcement Work 2127.19 Kg


2.12719 Mt.

Prepared and Submitted By: Checked by: Verified by:


Sharma-AM J/V Consultant, SE DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Toilet Block,T(S)F
School Name : Shree Gyanjyoti Secondary School
Location : Hunsapur, Gorkha

Truss Calculation Details-T(S)-F


Total Total Wt.
S.N Description Notation Nos Length Breadth Thickness Wt/m Wt/m3
Length (Kg)
1 Top Chord TP dia 40 M 3 4.665 13.995 5.03 70.4
2 Bottom Chord BC dia 40 M 3 3.75 11.25 3.56 40.05
3 Vertical Strut VS dia 40 M 3 0.561 1.683 3.56 6.00
4 Diagonal Strut DS dia 32 M 6 0.912 5.472 3.1 16.97
5 Purlin P dia 50 1 47.6 47.6 5.06 240.86
6 Truss Base Plate TBP 10 mm 12 0.25 3 0.25 0.01 7850 58.88
7 Truss Cleat for Purlin TCP 10 mm 140 0.2 28 0.09 0.01 7850 197.82
8 Purlin Eves Plate PEP 3 mm 12 0.125 1.5 0.075 0.003 7850 2.65
9 Truss Eves Plate TEP 3 mm 6 0.125 0.75 0.06 0.003 7850 1.06
10 Anchor Bolt AB 16 dia 16 0.45 7.2 1.58 11.38
11 Truss Base Plate Support SC 10 mm 12 0.114 1.368 0.025 0.01 7850 2.69
12 Runner Purlin Cleat RPC 10 mm 4 0.175 0.7 0.07 0.01 7850 3.85
13 Purlin Cleat 10 mm 16 0.175 2.8 0.075 0.01 7850 16.49
14 Truss Support Cleat 10 mm 32 0.063 2.016 0.04 0.01 7850 6.34
15 Runner Pipe NB 40 1 6.8 6.8 3.56 7850 24.21
Total of Truss Work 699.65

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Toilet Block,T(S)F
School Name : Shree Gyanjyoti Secondary School
Location : Hunsapur, Gorkha

Toilet
S. No. Description Quantity Unit Remarks
Block
A. Common Installation
1.2 Stand Alone 6 A DP MCB with Enclosure 1 1.00 nos.
B School Blocks
1 DISTRIBUTION BOARDS nos.
1.4 Stand Alone 6 A DP MCB with Enclosure 1.00 1.00 nos.
3.1 One Way Light Point 6.00 6.00 pts.
6 Sweep Ceiling/Exhaust Fans/ Wall Fan
6.1 225mm dia M/D Exhaust Fan 2 2.00 no.
7 Light Fixtures/Luminaires & Accessories
7.5 7W LED Wall Light 1.00 1.00 no.
7.6 9W LED Surface Mounted Cylindrical type 1.00 1.00 no.
7.7 6W LED Recessed Mounted Circular type 3.00 3.00 no.
7.8 7W LED T5 Slim Mirror Light 1.00 1.00 no.

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Toilet Block,Ts(F)
School Name : Shree Gyanjyoti Secondary School
Location : Hunsapur, Gorkha
Length
S. No. Description No. Quantity Unit Remarks
(m)
1 WATER SUPPLY INSTALLATION
a CPVC pipes SDR-11
40 mm 1 120 120.00 r.m
25mm 1 30 30.00 r.m
20mm 1 57 57.00 r.m
15mm 1 2 2.00 r.m
c CPVC Ball Valve
40 mm 6 6.00 nos.
25 mm 2 2.00 nos.
20mm 2 2.00 nos.
d 40mm dia Gun Metal Check Valve 1 1.00 nos.
e Electrical Centrifugal Water Pump 1 1.00 nos.
f 1000 litres Capacity Water Storage Tank 1 1.00 nos.
2 Sewer, Rain and Waste Water Installation
110 mm 1 72 72.00 r.m
75mm 1 40 40.00 r.m
50mm 1 33 33.00 r.m
B School Blocks
1 Sanitary Installation
a Kitchen Sink of size 750*450*225mm 5 5.00 set
b Kitchen Sink of size 900*450*225mm 1 1.00 set
c PVC Multi Floor Trap 2 2.00 no.
2 Sanitary Installation
a Water Closet Set 1 1.00 set
b Orissa Pan 2 2.00 set
c Hand Wash Basin 1 1.00 set
d Ladies Urinal 2 2.00 set
e Self Closing Bib Cock 6 6.00 nos.
f CP Spreader in Urinal 2 2.00 set
g Toilet Paper Holder 1 1.00 nos.
h Commode Spray 1 1.00 nos.
i PVC Multi Floor Trap 5 5.00 nos.
j Waste Coupling and PVC Bottle Trap 2 2.00 nos.
k 40mm SS Grab Bar-Side 1 1.00 nos.
l 40mm SS Grab Bar-Rear 1 1.00 nos.
m CP Foldable Hinge 2 2.00 nos.

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Job: Site Development
School Name : Shree Gyanjyoti Secondary School
Location : Hunsapur, Gorkha

Length Breadth
S.No Description No. Height (m) Qty. Unit Remarks
(m) (m)
1 Site Clearance
Concrete Pavement
Infront of Bldg 1.00 6.70 1.50 10.05
1.00 13.20 2.50 33.00
Side of Bldg 1.00 5.60 1.60 8.96
Infront of Toilet 1.00 6.40 1.20 7.68
Gate to Bldg 1.00 1.07 3.87 4.14
1.00 11.60 5.55 64.38
Total 128.21 sq.m
2 Earth Work Excavation
Concrete Pavement
Infront of Bldg 1.00 6.70 1.50 0.15 1.51
1.00 13.20 2.50 0.15 4.95
Side of Bldg 1.00 5.60 1.60 0.15 1.34
Infront of Toilet 1.00 6.40 1.20 0.15 1.15
Gate to Bldg 1.00 1.07 3.87 0.15 0.62
1.00 11.60 5.55 0.15 9.66
Around Gate Column 1 12.70 Area 0.15 1.91
Excavation For Flag Pole
Flag Pole 2 0.60 0.60 1.00 0.72
2 1.10 0.50 0.15 0.17
2 1.60 0.25 0.15 0.12
1 0.60 0.40 0.15 0.04
Total 22.18 cu.m
3 Boulder Soling
Concrete Pavement
Infront of Bldg 1.00 6.70 1.50 0.15 1.51
1.00 13.20 2.50 0.15 4.95
Side of Bldg 1.00 5.60 1.60 0.15 1.34
Infront of Toilet 1.00 6.40 1.20 0.15 1.15
Gate to Bldg 1.00 1.07 3.87 0.15 0.62
1.00 11.60 5.55 0.15 9.66
Soling For Gate Column
Column 2 0.90 0.90 0.20 0.32
Stone Soling for Flag Pole 1 0.70 0.80 0.35 0.20
Total 19.75 cu.m
5 P.C.C.(1:2:4) Works
Concrete Pavement
Infront of Bldg 1.00 6.70 1.50 0.08 0.75
1.00 13.20 2.50 0.08 2.48
Side of Bldg 1.00 5.60 1.60 0.08 0.67
Infront of Toilet 1.00 6.40 1.20 0.08 0.58
Gate to Bldg 1.00 1.07 3.87 0.08 0.31
1.00 11.60 5.55 0.08 4.83
Total 9.62 cu.m
6 Full Brick (230 mm) Works (1:4c/s)
Flag Pole Base 2 0.80 0.23 0.55 0.20
Total 0.20 cu.m
7 Flag Pole
75 Dia GI Pipe 2.00 1 2.00
Total 2.00 nos

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Job : Reservoir Water Tank
School Name : Shree Basuki Lower Secondary School
Location : Aaruarbang, Gorkha

Length Breadth Height


S. No. Description No. Quantity Unit Remarks
(m) (m) (m)
1 Earthworks
Site Clearance & Mobilization
For Water Tank 1 4.85 4.6 22.31
Total 22.31 sq.m

1.2 Earthwork in excavation


For Water Tank 1 3.65 3.40 1.98 24.57
Total 24.57 Cu.m.

1.3 Earthback Filling


Total Earthwork Excavated 24.57
Water Tank Volume -1 3.35 3.1 1.98 -20.56
Total 4.01 Cu.m.

1.4 Boulder soling


Below Water Tank 1 3.35 3.1 0.2 2.077
Total 2.08 Cu.m.

2 Concrete Works
2.1 PCC
2.1.1 PCC Work (1:3:6)
Below Water Tank 1 3.35 3.1 0.075 0.78
Total 0.78 Cu.m.

2.2 PCC for RCC Work 1:1.5:3


For Base Slab 1 3.35 3.10 0.18 1.82
For Water Tank Wall
Long Wall 2 3.35 0.18 1.68 1.96
Short Wall 2 2.75 0.18 1.68 1.61
Trianagle Portion
Long Wall 2 3.00 0.05 Area 0.27
Short Wall 2 2.75 0.05 Area 0.25
Slab 1 3.35 3.1 0.15 1.56
Manhole openings -1 0.6 0.6 0.15 -0.05
Total 7.41 Cu.m.

2.3 Silica Admixture


10 Kg per cu.m. of R.C.C. M20 10 7.41 74.15
Total 74.15 kg

2.5 Form works


For Base Slab 1 12.9 0.18 2.26
For Water Tank Wall
Outer Side
Long Wall 2 3.35 1.83 12.23
Short Wall 2 3.10 1.83 11.32
Inside wall

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Length Breadth Height
S. No. Description No. Quantity Unit Remarks
(m) (m) (m)
Long Wall 2 3.00 1.53 9.15
Short Wall 2 2.75 1.53 8.39
Trianagle Portion
Long Wall 2 3.00 0.42 2.54
Short Wall 2 2.75 0.42 2.33
Slab 1 3 2.75 8.25
Side for Manhole openings 1 2.4 0.15 0.36
Deduct Manhole openings -1 0.6 0.60 -0.36
Total 56.46 Sq.m.

3 PLASTERING WALL FINISHING WORKS


3.1.1 CEMENT PLASTER WORKS WITH
PUNNING
Base Slab 1 2.40 2.15 5.16
For Water Tank Wall
Long Wall 2 3.00 1.53 9.15
Short Wall 2 2.75 1.53 8.39
Triangle Portion
Long Wall 2 3.00 0.42 2.54
Short Wall 2 2.75 0.42 2.33
Top Slab 1 3.00 2.75 8.25
Deduct Manhole openings -1 0.6 0.60 -0.36
Total 35.46 Sq.m.

4 Water Proof Coating


Inside Water tank 1 35.46
Total 35.46 sq.m

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Project Name : Emergency School Reconstruction Project (ESRP)
Job : Reservoir Water Tank
School Name : Shree Basuki Lower Secondary School
Location : Aaruarbang, Gorkha
Bar Bending Schedule
Cut Total
Dia. of No. of Wt/m Weight
S. No. Description No. Length Length Bar Shape
Bar (mm) Bars (Kg) (Kg)
(m) (m)
A Outer Vertical Bars 1
1 Shorter Span 10 35 7.01 245.35 0.62 152.12 0.083 0.083

1.915 1.915

3.02

2 Longer span 10 32 7.286 233.152 0.62 144.55


0.083 0.083

1.915 1.915

3.29

B Inner Vertical Bars 2


1 Shorter Span 10 35 2.503 175.21 0.62 108.63 0.079 0.079

1.884 1.884

0.05
0.49 0.49

2 Longer Span 10 32 2.503 170.204 0.62 105.527 0.079 0.079

1.884 1.884

0.05
0.49 0.49

C. Extra Bars 2 10 67 1.79 239.86 0.62 148.71 0.6 0.6

0.592
0.592 0.6 0.6

D. Horizontal Bars(outer 4
0.3 0.3
1 Shorter Span 10 21 3.62 304.08 0.62 188.53

3.02 3.02

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer
Cut Total
Dia. of No. of Wt/m Weight
S. No. Description No. Length Length Bar Shape
Bar (mm) Bars (Kg) (Kg)
(m) (m)

0.3 0.3

2 Longer Span 10 21 3.87 325.08 0.62 201.55 0.3 0.3

3.27 3.27

0.3 0.3
E. Base Slab bar 4
1 Shorter Span 10 35 3.14 439.6 0.62 272.55 3.045
0.05 0.05

2 Longer Span 10 31 3.42 424.08 0.62 262.93 3.32


0.05 0.05
F Man Hole Rebar
1 horizontal Rebar -2 10 6 1.2 -14.4 0.62 -8.93 0.9 0.3
Total 1576.17 Kg
1.58 Mt.

Prepared and Submitted By: Checked By: Approved By:


Sharma-AM J/V Consultant Engineer DLPIU Engineer