Project Brief
4
VARIOUS STRUCTURAL SYSTEMS
5
OPTIONS
SYSTEMS CONSIDERED :
8
Flat Plate with Edge Beams Arrangement
9
Flat Plate Arrangement with Additional Column
10
Internal & External Mivan 160 mm / 100 mm walls
11
EXTERNAL MIVAN 160 mm WALLS & INTERNAL AAC BLOCK WORK
12
OPTION-II
SEVEN STUB COLUMNS FROM SECOND FLOOR LVL
13
BEAM & SLAB ARRANGEMENT
14
FLAT PLATE WITH EDGE BEAMS ARRANGEMENT
15
FLAT PLATE ARRANGEMENT WITH ADDITIONAL COLUMN
16
INTERNAL & EXTERNAL MIVAN 160 mm/100mm WALLS
17
EXTERNAL MIVAN 160 mm WALLS & INTERNAL AAC BLOCK WORK
18
OPTION-III
TWO STUB COLUMNS FROM SECOND FLOOR LVL
19
BEAM & SLAB ARRANGEMENT
20
FLAT PLATE WITH EDGE BEAMS ARRANGEMENT
21
FLAT PLATE ARRANGEMENT WITH ADDITIONAL COLUMN
22
INTERNAL & EXTERNAL MIVAN 160 mm/100mm WALLS
23
EXTERNAL MIVAN 160 mm WALLS & INTERNAL AAC BLOCK WORK
24
EXPANSION JOINT
(No Expansion Joint required)
Wind load and Earthquake Parameters
Zone II
Importance factor 1.2
Type of structure SMRF with ordinary shear walls
(i) Living rooms, bed room kitchen & toilets etc. = 2 KN/m2
(ii) Corridors, passages & stairs = 3 KN/m2
iii) Balconies = 3 KN/m2
(iv) Lobby = 4 KN/m2
(v) Live load on terrace = 1.5 KN/m2
(vi) Parking Slabs (basement) = 2.5 KN/m2
(vii) Machine Room = as applicable
(viii) 600mm earth fill for non tower = 12 KN/m2
ix) Light weight of max. Density 750kg/m3 fill for sunken
As per depth of sunken.
(x) Fire tender =45 MT
FOUNDATION SYSTEM
WATER PROOFING
Options considered-
1. Crystalline
2.Injection grouting
3.Membrane based EPDM/PVC
32
EXCAVATION STRATEGY
Excavation Strategy
Excavation
Process
34
Shoring systems - Soil Nailing
Consists of reinforcing the soil mass by introducing a series of thin elements called ‘ nail’ to resist
tension, bending and shear forces
Reinforcing elements are made of round cross section steel bars called Nails.
35
Shoring systems- Soldier/H- Pile
Soldier piles or soldier beams using H beam installed in predrilled holes around the periphery of an
excavation.
These piles in boreholes shall be backfilled in place with find sand
Lagging is the timber shall be placed horizontally between the soldier piles to retain the soil behind the
excavated area.
The spacing between the two solider piles shall be generally 1.20m- 1.5m c/c
36
Shoring systems- Sheet Pile
Long structural sections available in various shapes U type, Z type, flat web type, pan type etc with
a vertical interlocking system that creates a continuous wall.
Two types of sheet piles i) Hot rolled and ii) cold formed.
37
Shoring systems-Contiguous Pile
Contiguous pile walls are constructed with small gaps between adjacent piles.
The use of low-cost augers and, more particularly MAIT (Hydraulic rigs), TMR
to drill successive unconnected piles provides an economical wall.
38
Shoring systems- Secant Pile
39
THANK YOU