Professional Documents
Culture Documents
Span 6 x 18.75
FOUNDATION
Excavation upto 3.0m depth
Abutment-1 cum 1 9.70 6.100 2.300 136.09
1(i) Pier cum 5 9.70 6.100 2.300 680.46
Abutment-2 cum 1 9.70 6.100 2.300 136.09
Total 952.64
Steel Reinforcement
4(I)
BBS
t 126.03
Total= 126.03
SUBSTRUCTURE
RCC M30
Abutment-1 cum 1 6.40 0.800 1.050 5.38
Abutment cap cum 1 7.50 1.400 0.500 5.25
Pier cum 5 3.70 3.550 65.68
Piercap cum 5 9.73 0.500 24.33
5(i) Piercap cum 5 7.50 2.100 0.500 39.38
Abutment-2 cum 1 6.40 0.800 1.050 5.38
Abutment cap cum 1 7.50 1.400 0.500 5.25
Dirt Wall cum 2 6.40 0.300 2.450 9.41
Bracket cum 2 6.40 0.135 1.73
Return Wall part 1 cum 4 2.15 0.500 3.700 15.91
Return Wall part 2 cum 4 1.02 0.500 2.04
Return Wall part 3 cum 4 0.30 0.500 1.816 1.09
Corner portion of abutment cum 4 0.15 0.300 1.050 0.19
Total= 177.70
Steel Reinforcement
6
BBS t 32.96
Total= 32.96
Weep holes
Spacing for weep holes = 2 m in horizontal and 1 m in vertical direction
No of weep holes in horizontal direction per abutment = 6.4/2+1 = 5
No of weep holes in vertical direction per abutment = 1.15+1 = 3
7 No of weep holes in horizontal direction per return wall =3.5/2+1 = 3
No of weep holes in vertical direction per return wall =3.6/1+1 = 5
Total no of Weep holes per abutment = 5 x 3 15
Total no of Weep holes per return wall = 3 x 5 15
Total no of weep holes = 15 x 2 + 15 x 4 Total 90.00
ESTIMATE OF QUANTITY OF BRIDGE ONLY
Span 6 x 18.75
Filter media
9 Behind Abutment cum 2 5.400 0.60 3.450 22.36
Behind Return wall cum 4 3.500 0.60 3.450 28.98
Total 51.34
Mettalic Bearing
10(i) POT No 18 240.00 4320.00
POT cum PTFE No 18 240.00 4320.00
Total 0.00
SUPERSTRUCTURE
RCC M30 T Beam
Deck Slab
(i) Slab Portion cum 1 19.310 6.45 0.300 37.36
(ii)Haunch Portion cum 4 18.750 0.150 0.150 1.69
Long Girder
(i) At span cum 3 16.110 0.325 1.575 24.74
(ii) At support cum 3 1.400 0.625 1.575 4.13
11 (iii) At intermediate cum 3 1.800 0.475 1.575 4.04
Cross Girder
(i) Middle cross girder cum 1 4.725 0.300 1.375 1.95
(ii) End cross girder cum 2 5.025 0.300 1.375 4.15
Total 14.78
ESTIMATE OF QUANTITY OF BRIDGE ONLY
Span 6 x 18.75
PROTECTION WORK
19 Boulder Pitching (cum)
1 2.0 60.000 8.00 0.30 288.00
1 2 60.000 8.000 0.30 288.00
Total 576.00
Total 192.00
Fe-500 REINFORCEMENT
Fe-500 REINFORCEMENT
Fe-500 REINFORCEMENT
Fe-500 REINFORCEMENT
Fe-500 REINFORCEMENT
Fe-500 REINFORCEMENT
Fe-500 REINFORCEMENT
Fe-500 REINFORCEMENT
Fe-500 REINFORCEMENT
Fe-500 REINFORCEMENT
2 SUPERSTRUCTURE
DECK SLAB
Fe-500 REINFORCEMENT
CROSS-GIRDER
Fe-500 REINFORCEMENT
Fe-500 REINFORCEMENT
Fe-500 REINFORCEMENT
Fe-500 REINFORCEMENT
Fe-500 REINFORCEMENT