RCC PILES
1
Abutment A1-A2
PILE CAP
2
Abutment A1-A2
1 20 125 7.1 8.7 71 504.1 2.47 1.24
2 20 125 10.7 5.1 42 449.4 2.47 1.11
3 16 125 7.1 8.7 71 504.1 1.58 0.80
4 16 125 10.7 5.1 42 449.4 1.58 0.71
5 16 250 28.2 1.7 8 225.6 1.58 0.36
6 10 150 32 5.1 35 1120.0 0.62 0.69 4.91 9.82 10.79969
3 Abutment Shaft
9 12 150 7.05 2.05 15 105.8 0.89 0.09
10 12 150 7.05 2.05 15 105.8 0.89 0.09
11 20 150 4.80 6.45 44 211.2 2.47 0.52
12 25 150 4.80 6.45 44 211.2 3.86 0.81
13 12 4.80 6 28.8 0.89 0.03 1.55 3.10 3.409772
4 Abutment Cap
15 20 6.65 16 106.4 2.47 0.26
16 12 6.65 6 39.9 0.89 0.04
17 10 150 6.4 6.45 44 281.6 0.62 0.17 0.47 0.94 1.038422
Dirt Wall with
5
Bracket
18 10 150 3.25 6.45 44 143.0 0.62 0.09
19 16 150 3.95 6.45 44 173.8 1.58 0.27
20 10 150 6.75 2.25 16 108.0 0.62 0.07
21 10 150 6.75 2.25 16 108.0 0.62 0.07
33 12 6.45 7 45.2 0.89 0.04
34 10 150 0.8 0.6 10 8.0 0.62 0.005
35 12 150 2.1 6.45 44 92.4 0.89 0.08
36 12 6.75 3 20.3 0.89 0.02 0.64 1.28 1.411205
6 Seismic Block
41 12 150 2.4 0.9 14 33.6 0.89 0.03
38 16 150 2.3 0.75 12 27.6 1.58 0.04 0.07 0.15 0.161659
Return Wall
7
22 10 150 6.00 2.25 32 192.0 0.62 0.12
23 12 150 6.00 2.25 32 192.0 0.89 0.17
24 12 150 3.05 2.05 30 91.5 0.89 0.08
25 10 150 3.05 2.05 30 91.5 0.62 0.06
26 10 150 3 5.00 70 210.0 0.62 0.13
27 12 5.00 6 30.0 0.89 0.03
28 12 150 2.15 2.95 42 90.3 0.89 0.08
29 10 150 2.15 2.95 42 90.3 0.62 0.06
30 10 150 1.16 1.25 20 23.2 0.62 0.01
31 12 150 1.16 1.25 20 23.2 0.89 0.02
32 16 3.9 6 23.4 1.58 0.04
37 12 3.85 6 23.1 0.89 0.02
39 10 150 1.41 1.72 26 36.6 0.62 0.02
40 12 150 1.41 1.72 26 36.6 0.89 0.03 0.87 1.73 1.907171
11 Haunch b/w return wall & abut. Shaft 4 0.3 0.15 4.50 0.81
Total
Bar Mark Total Wt. of wt Total wt Total wt
as per Dia. of bar Spacing Length Width No. of Length bar Total Wt. single of all with
Drawing (mm) (mm) (m) (m) bar (m) (kg/m) (t) pier piers wastage
PILE CAP
TOTAL = 249
1. Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification
(Granular material) :
2. Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements
laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size
towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall
and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification
:
3. Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of
toe of embankment complete as per drawing and Technical specifications :
4. Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical
specification :