You are on page 1of 3

DPR-BRIDGE

ESTIMATING STEEL QUANTITY OF SUPERSTRUCTURE

Span Arrangement : 2 x 18.75

Bar Mark Dia. of Total Wt. of


as per bar Spacing Length Width No. of Length bar Total Wt.
Sr.No. Particulars Drawing (mm) (mm) (m) (m) bar (m) (kg/m) (t)
1 MAIN GIRDER
1 32 19.75 3 59.3 6.32 0.37
1a 32 19.75 2 39.5 6.32 0.25
2 32 19.75 3 59.3 6.32 0.37
3 32 19.75 3 59.3 6.32 0.37
4 32 19.75 3 59.3 6.32 0.37
5 32 19.75 2 39.5 6.32 0.25
6 32 19.75 2 39.5 6.32 0.25
6a 32 12.75 2 25.5 6.32 0.16
7 16 18.75 2 37.5 1.58 0.06
8 16 2.2 4 8.8 1.58 0.01
9 10 16.55 6 99.3 0.62 0.06
10 10 2.6 6 15.6 0.62 0.01
11 16 125 4.4 15.25 123 541.2 1.58 0.86
12 16 100 4.4 3.20 33 145.2 1.58 0.23
total = 3.64

2 CROSS GIRDER
13 16 6.33 3 19.0 1.58 0.03
14 16 6.33 2 12.7 1.58 0.02
15 20 8.75 3 26.3 2.47 0.06
16 20 7.63 2 15.3 2.47 0.04
17 10 6.33 5 31.7 0.62 0.02
18 16 125 3.95 3.75 31 122.5 1.58 0.19
19 20 8.75 2 17.5 2.47 0.04
20 16 7.33 3 22.0 1.58 0.03
21 16 6.33 3 19.0 1.58 0.03
22 20 6.33 3 19.0 2.47 0.05
23 20 7.63 3 22.9 2.47 0.06
24 10 6.33 5 31.7 0.62 0.02
25 16 115 3.95 4.35 39 153.4 1.58 0.24
0.84

Total wt. of main girders = 10.91 t


Total wt. of cross girders = 2.52 t
= 13.43 t
Total with wastage = 14.7701 t
Total wt. of all spans = 29.54 t
DPR -BRIDGE
ESTIMATING CONCRETE QUANTITY OF SUPERSTRUCTURE
Span Arrangement : 2 x 18.75

Length Height Quantity


Sr.No. Description No. Width (m)
(m) (m) (m3)
1 MAIN GIRDER
At span 3 15.55 0.325 1.675 25.40
At Suport 3 1.4 0.625 1.675 4.40

At Intermediate 3 1.8 0.475 1.675 4.30

2 CROSS GIRDER

Middle Cross Girder 3 4.35 0.3 1.475 5.77

End Cross Girder 3 3.75 0.3 1.475 4.98

3 DECK SLAB

Slab portion 1 18.75 6.45 0.250 30.23

Haunch portion 4 18.75 0.15 0.15 1.69

Total = 76.76

Total with wastage = = 80.60112


Total concrete quantity of all spans = 161.20
DPR-BRIDGE
ESTIMATING STEEL QUANTITY OF SUPERSTRUCTURE

Span Arrangement : 2 x 18.75

Bar Mark Total Wt. of


as per Dia. of Spacing Length Width No. of Length bar Total Wt.
Particulars Drawing bar (mm) (mm) (m) (m) bar (m) (kg/m) (t)
3. DECK
SLAB
1 12 100 5.325 18.45 186 990.5 0.89 0.88
2 10 200 18.75 2.175 24 450.0 0.62 0.28
3 12 200 2.35 15.55 158 371 0.89 0.33
4 10 200 18.75 1.725 20 375.0 0.62 0.23
5 8 200 2.1 18.75 95 199.5 0.40 0.08
6 8 200 1.35 18.75 190 256.5 0.40 0.10
7 10 18.75 8 150.0 0.62 0.09
8 12 8.45 2 16.9 0.89 0.02
9 10 200 0.4 4.35 46 18.4 0.62 0.01
10 12 200 2.05 1.6 36 73.8 0.89 0.07
11 10 200 1.6 1.725 40 64 0.62 0.04
12 12 200 9.05 17.775 90 814.5 0.89 0.72
13 12 200 5 17.775 90 450.0 0.89 0.40
14 10 200 18.75 5.8 30 562.5 0.62 0.35
15 12 200 2.5 2.175 96 240 0.89 0.21
16 16 200 2.625 19.36 196 514.5 1.58 0.81
4.62 t
Total with wastage = 5.08368 t
Total wt. of all spans = 10.17 t