UPPER GANGA CANAL

Estimate for Box Cell Bridge at Left Basera Fedar Located at Km 69.140 of UGC
BILL OF QUANTITES
S.No. Item Of Work No. Length Width Height Quantity Unit
1 Earthwork in Excavation 1 517.40 517.40 Cum

2 PCC M-15
Base Concrete under Box Culvert 1 7.70 12.00 0.20 18.48 Cum
Base Concrete under U/S transition wall 2 4.69 2.85 0.30 8.02 Cum
Base Concrete under D/S transition wall 2 6.53 2.85 0.30 11.16 Cum
U/S Toe Wall 1 0.45 6.00 1.50 4.05 Cum
U/S Toe wall base concrete 1 0.85 6.00 0.30 1.53 Cum
D/S Toe Wall 1 0.45 6.00 1.50 4.05 Cum
D/S Toe wall base concrete 1 0.85 6.00 0.30 1.53 Cum
TOTAL 48.82 Cum
3 R.C.C. M-20
U/S Transition Wall 2 4.69 2.25 1.50 31.66 Cum
2 4.69 3.00 2.45 68.99 Cum
D/S Transition Wall 2 6.53 2.25 1.50 44.05 Cum
2 6.53 3.00 2.45 95.98 Cum
TOTAL 240.69 Cum

4 R.C.C. M-25
Bottom Slab 1 7.40 12.00 0.45 39.96 Cum
Vertical End Beams 2 6.80 0.40 2.00 10.88 Cum
Vertical Middle Beam 1 6.80 0.30 2.00 4.08 Cum
Haunch 8 6.80 0.15 0.15 1.22 Cum
Top Slab 1 6.80 12.00 0.53 42.84 Cum
Parapet 2 6.80 0.55 0.91 6.81 Cum
Outside Corebell 2 6.80 0.14 1.84 Cum
Cut off Trench 1 6.80 1.03 1.05 7.32 Cum
Approach Slab 2 3.50 12.00 0.38 31.50 Cum
Wearing Coat 1 13.80 12.00 0.08 12.42 Cum
TOTAL 158.87 Cum

5 Reinforcement Steel
0.75 % of R.C.C M-20 240.69 0.0075 1.81 7.843 14.16 MT
1.5 % of R.C.C M-25 158.87 0.015 2.38 7.843 18.69 MT
TOTAL 32.85 MT

6 U/S Protection Works


Apron Boulder (wire crate) 1 4.00 6.00 0.75 18.00 Cum

7 D/S Protection Works


Apron Boulder (wire crate) 1 6.00 6.00 0.75 27.00 Cum

8 Water Stop for Construction Joints 2 10.59 21.17 m

Dewatering for executing work (1 Diesel


9 1 (90X24X30) 64800 Kwh
Pump, 90 Days, 24 Hrs, 30 Kwh)

10 Boulder Pitching on Slopes 4 20.00 3.47 0.45 124.74 Cum

11 Earthwork in Filling 1 296.384 296.38 Cum