Professional Documents
Culture Documents
75
1050
TOTAL 3704.27
Name of the Road- Belpahar
Name of the wok-
Name of contractor- RAJKUMAR
Bill No -
Sl.No Items Unit Rate Nos L B D Qty Amount
1 WING WALL
a Wing Wall concrete Cum 150 1 2 0.8 2.70 4.32 648.00
2 RETAINING WALL Concrete
a Cum 150 1 12.1 0.5 0.5 3.03 453.75
b Cum 150 1 3.6 0.5 1.7 3.06 459.00
c Cum 150 1 7.8 0.55 2.4 10.30 1544.40
d Cum 150 1 10.5 0.55 3.4 19.64 2945.25
e Return Wall of Culvert Cum 150 2 1.25 0.3 0.5 0.38 56.25
f Cum 150 1 5 0.55 2.9 7.98 1196.25
g Cum 150 1 3.7 0.55 1.6 3.26 488.40
h Head Wall Of Old Culvert Cum 150 2 10.5 0.35 0.5 3.68 551.25
3 TOE WALL
a Toe Wall Concrete Cum 150 4 7.2 0.6 2.1 36.29 5443.20
4 APPROACH SLAB
a Cum 150 1 7.4 3.6 0.3 7.99 1198.80
5 Floor Appron PCC
Cum 150 2 6 3 0.1 3.60 540.00
6 Wing Wall Shuttering
a Wing Wall Shuttering Sqm 100 2 2 2.7 10.8 1080.00
7 RETAINING WALL Shuttering
a Sqm 100 1 12.1 0.5 6.05 605.00
b Sqm 100 1 3.6 1.7 6.12 612.00
c Sqm 100 1 7.8 2.4 18.72 1872.00
d Sqm 100 1 10.5 3.4 35.7 3570.00
e Sqm 100 2 1.25 0.5 1.25 125.00
f Sqm 100 1 5 2.9 14.5 1450.00
g Sqm 100 1 3.7 1.6 5.92 592.00
h Sqm 100 2 10.5 0.5 10.5 1050.00
8 TOE WALL Shuttering
a Sqm 100 4 7.2 2.1 60.48 6048.00
9 APPROACH SLAB Shuttering
Sqm 100 1 12.4 0.3 3.72 372.00
10 APPROACH SLAB Steel
Kg 5 379.46 1897.28
Total Amount 32900.55
150