You are on page 1of 4

RAJKUMAR NAIK

Sl.No Description Amount


1 Belpahar Drain 78299.35
2 RE Wall & Toe Wall 32900.55
3 Kankhinda CC Road 33568.70
TOTAL 144768.60
Name of the Road- Belpahar
Name of the wok- Construction of concrete drain
Name of contractor- RAJKUMAR
Bill No -
Sl.No Items Unit Rate Nos L B D Qty Amount
1 PCC cum 150 1 108 1.2 0.10 12.96 1944.00
2 RAFT cum 150 1 108 1.2 0.10 12.96 1944.00
3 Wall cum 150 2 108 0.9 0.15 29.16 4374.00
4 Formwork sqm 100 4 108 0.9 388.8 38880.00
5 Main Bars 1423.54 7117.71
Kg 5
6 Distribution Bars 682.56 3412.80
Drain Slab
1 Concrete cum 150 1 108 1.2 0.15 19.44 2916.00
2 Formwork sqm 100 1 108 0.9 97.2 9720.00
3 Main Bars 1000.93 5004.64
Kg 5
4 Distribution Bars 597.24 2986.20
Total Amount 78299.35

CUTTING TOTAL UNIT


SL NO BAR MARK DIA OF BAR SHAPE OF BAR SPACE NO'S TOTAL WEIGHT
LENGTH LENGTH WEIGHT
1075
1075

1 U Bar 10 0.15 721 3.2 2307.2 0.617 1423.54


1050

2 Disrtibution Bar 8 0.15 144 12 1728 0.395 682.56


12000
1050
3 Ring for Slab 10 0.15 721 2.25 1622.25 0.617 1000.93
75

75

1050

4 Disrtibution Bar 8 0.15 126 12 1512 0.395 597.24


12000

TOTAL 3704.27
Name of the Road- Belpahar
Name of the wok-
Name of contractor- RAJKUMAR
Bill No -
Sl.No Items Unit Rate Nos L B D Qty Amount

1 WING WALL
a Wing Wall concrete Cum 150 1 2 0.8 2.70 4.32 648.00
2 RETAINING WALL Concrete
a Cum 150 1 12.1 0.5 0.5 3.03 453.75
b Cum 150 1 3.6 0.5 1.7 3.06 459.00
c Cum 150 1 7.8 0.55 2.4 10.30 1544.40
d Cum 150 1 10.5 0.55 3.4 19.64 2945.25
e Return Wall of Culvert Cum 150 2 1.25 0.3 0.5 0.38 56.25
f Cum 150 1 5 0.55 2.9 7.98 1196.25
g Cum 150 1 3.7 0.55 1.6 3.26 488.40
h Head Wall Of Old Culvert Cum 150 2 10.5 0.35 0.5 3.68 551.25
3 TOE WALL
a Toe Wall Concrete Cum 150 4 7.2 0.6 2.1 36.29 5443.20
4 APPROACH SLAB
a Cum 150 1 7.4 3.6 0.3 7.99 1198.80
5 Floor Appron PCC
Cum 150 2 6 3 0.1 3.60 540.00
6 Wing Wall Shuttering
a Wing Wall Shuttering Sqm 100 2 2 2.7 10.8 1080.00
7 RETAINING WALL Shuttering
a Sqm 100 1 12.1 0.5 6.05 605.00
b Sqm 100 1 3.6 1.7 6.12 612.00
c Sqm 100 1 7.8 2.4 18.72 1872.00
d Sqm 100 1 10.5 3.4 35.7 3570.00
e Sqm 100 2 1.25 0.5 1.25 125.00
f Sqm 100 1 5 2.9 14.5 1450.00
g Sqm 100 1 3.7 1.6 5.92 592.00
h Sqm 100 2 10.5 0.5 10.5 1050.00
8 TOE WALL Shuttering
a Sqm 100 4 7.2 2.1 60.48 6048.00
9 APPROACH SLAB Shuttering
Sqm 100 1 12.4 0.3 3.72 372.00
10 APPROACH SLAB Steel
Kg 5 379.46 1897.28
Total Amount 32900.55

DIA OF SHAPE OF CUTTING TOTAL UNIT


SL NO BAR MARK SPACE NO'S TOTAL WEIGHT
BAR BAR LENGTH LENGTH WEIGHT

APPROACH SLAB TOP & BOTTOM


1 10 0.15 82 3.75 307.5 0.617 189.73
150

150

Main Bar 3450


APPROACH SLAB TOP & BOTTOM
150
150

1 0.15 50 6.15 307.5 0.617 189.73


Distribution Bar 5850
TOTAL 379.46
Name of the Road- KANKHINDA
Name of the wok-
Name of contractor- RAJKUMAR
Bill No -
Sl.No Items Unit Rate Qty Amount
CONCRETE
1 Mandap-1 Cum 150 39.21 5881.95
2 Mandap-2 Cum 150 25.74 3860.25
3 CC Road Cum 150 89.47 13420.50
4 Approach Roads Cum 150 15.56 2334.00
SHUTTERING
1 Approach Road Shuttering towards Primary School Sqm 100 12.80 1280.00
2 Mandap-1 Sqm 100 5.52 552.00
3 CC Road Sqm 100 62.40 6240.00
TOTAL 33568.70