No of Truck laybys 8
UNIT QTY
S.NO DESCRIPTION UNIT TOTAL QUANTITY
Truck Layby
1 Clearing & Grubbing Sqm 1.80 0.22
6 WMM Cum 0 0
9 DLC Cum 0 0
10 PQC Cum 0 0
16 Grating Nr 128 16
24 Litter bins Nr 16 2
sriniv
25 Water Kiosks Nr 16 2 consid
27 Lighting Nr 0
28 Highmast Lighting Nr
29 Pedestrain guard rail m 1280 160
QUANTITY CALCULATION FOR TRUCK LAY BYE
Truck Laybyes 1
Description No Length Width Area Depth Qty No. Quantity
Area of Paving sqm 1 100 7.500 750.00
1 35 7.500 262.50
1 25 7.500 187.50
1 70 3.750 262.50
1 105 3.750 393.75
1856.25
Median Fill
Verge cum 1 390.00 390.00
Footpath Cum 1 160.00 1.67 267.20
657.20 0.355 233.31 1 233.306
Kerb
Footparth m 2 160.00 320.00
Verge 2 160.00 320.00
640.00 640.00 1 640
Grating Nr 16 16 1 16
Page 2 of 3
Median Cuts Lim 10 3.000 30 1 30
4 1.500 6 1 6
3 1.500 4.5 1 5
41
PVC Pipe for discharge of drain
water Lim 32 32 1 32
Water Kiosks Nr 2 1 2
Liter Bins Nr 2 1 2
Lighting Nr. 10 1 10
Page 3 of 3