Abstract of Dismantling

Dismantling including disposal of unservicable material and stacking the serviceable


1.02 material complete as per Technical Specifications Clause 202 Qty
a) Brick/Stone structures Cum
b) Plain concrete/reinforced concrete structures upto M20, including cleaning,straightening
& cutting of bars and separating them out from RCC/PSC.
Cum
c) reinforced concrete/Prestressed concrete structures, above M20, including
cleaning,straightening & cutting of bars and separating them out from RCC/PSC.
Cum
d) Stone/Brick pitching Cum
e) 5th km stone including foundation stone if any Nr. 38
f) Km stone including foundation stone if any Nr. 148
g) Hect./Boundary stone including foundation concrete if any Nr. 776
h) Hume pipes m.
upto 600mm dia m.
600 mm to 900 mm dia m.
above 900 mm dia m.
i)Pipe/guard rail,edging kerb,masonry parapet,gutters and fencing m.
j) Pavement cutting edge Sqm
k) Pavement bituminous course Cum 45,349
l) Non bituminous base/sub base course Cum 143,191
Rigid Pavement Cum
m)Sign boards/bill boards (all type of sign boards) Nr.
n)Removal of existing drainage spouts Nr.
o)Guard post Nr.
p) Removal of existing metal crash barrier and stacking for reuse m.
q)Dismantling of existing concrete kerb in stretches where new construction is proposed
m.
r) Dismantling of Existing Drains (lined/Grouted Stone Masonry) m.

s) Dismantiling of exg. Wing walls / Return walls & head wall for culverts /Minor
bridges in brick masonary Cum
t)Dismantiling of exg. Footpaths Sq.m
u)Dismantling of exg. Handrail / Parapet RM
m.
v) Removal of existing Pedestrian Guard rail and stacking for reuse