BAR BENDING SCHEDULE

Dimensi Balok (m) Uraian Besi Tulangan Panjang


No. Sket Tulangan sb (m)
b h Dia (mm) kg/m' kg/12m' balok (m)
8 T. BEAM 2/2-X (AS: 2 ~ 9"' / H")
(300x500) = 27 m'
Utama 19.00 2.225 26.70 29.00

Tumpuan 19.00 2.225 26.70 5.25

Lapangan 19.00 2.225 26.70 5.25

Tumpuan 19.00 2.225 26.70 11.25

Lapangan 19.00 2.225 26.70 6.00

Tumpuan 19.00 2.225 26.70 11.25

Lapangan 19.00 2.225 26.70 5.25

Tumpuan 19.00 2.225 26.70 10.50


0.3 0.5 0.05
Lapangan 19.00 2.225 26.70 5.25
D.10-100
D.10-200 Tumpuan 19.00 2.225 26.70 10.50

Lapangan 19.00 2.225 26.70 5.25

Tumpuan 19.00 2.225 26.70 8.25

Sengkang 10.00 0.617 7.398 29.00


BAR BENDING SCHEDULE
NDING SCHEDULE

Jml Balok Qty pot Pjg Tul (m) Pjg Total Jml Pot Berat
Keterangan
(bh) (bh) Kait Ovrlp ki ka Ext/Smb Besi (m) Btg (kg)

2 8 0.30 0.80 11.70 7.20 12.00 31.20 16 1,110.72

2 3 0.30 0.40 1.31 2.01 6 26.87

2 3 0.80 2.63 3.43 6 45.72

2 3 0.80 2.81 3.61 6 48.23


Besi D. 19 :
2 3 0.80 3.00 3.80 6 50.73 Berat Total = 1626.03 kg
Jumlah Besi = 65 btg
2 3 0.80 2.81 3.61 6 48.23

2 3 0.80 2.63 3.43 6 45.72 Besi D. 10 :


Berat Total = 299.74 kg
2 3 0.80 2.63 3.43 6 45.72 Jumlah Besi = 46 btg

2 3 0.80 2.63 3.43 6 45.72

2 3 0.80 2.63 3.43 6 45.72

2 3 0.80 2.63 3.43 6 45.72

2 3 0.30 0.40 4.31 5.01 6 66.92

2 194 0.10 1.30 388 310.96


NDING SCHEDULE
LANTAI SB

Besi Tulangan Pjg Total Berat


No. Sket Tulangan Jml Pot Btg Keterangan
Dia (mm) Besi (m) (kg)
1 PLAT SLAB
( S.4B ) 225 mm
13.00 1.91 12.00 23.86
Tul Bawah :
13.00 1.91 12.00 23.86

TOWER BAHAMA
D 13-200

1m
Besi D. 13 :
D 13-200 Berat Total = 184,608.77 kg
Jumlah Besi = 15,518.00 btg
1m

TOWER IBIZA
Tul Atas :
Besi D. 13 :
Berat Total = 166,210.92 kg
D 13-200
Jumlah Besi = 13,972.00 btg
D 13-200

1m

TOWER BELIZE

Besi D. 13 :
Berat Total = 64,446.82 kg
1m
Jumlah Besi = 5,418.00 btg
kg 47.72 415,266.51
btg 5.00 34,906.00
riil 4.00 33,243.00
% 1.00 1,663.00

Besi Plat Sb (kg) 414,717.13

Besi BOQ
198,029.44
BAHAMA 3,868.63 153,650.89
IBIZA 3,483.09 97,616.13
BELIZE 1,350.54 449,296.46
SUM 8,702.25
PLAT 5,881.70
8690737506
RIIL % btg ckr ayam
BAHAMA 184,608.77 14,779.00 739.00 15,518.00 17160.8706
IBIZA 166,210.92 13,306.00 666.00 13,972.00 13,315.11
BELIZE 64,446.82 5,160.00 258.00 5,418.00 6149.81604
415,266.51 33,243.00 1,663.00 34,906.00
Dimensi Balok (m) Uraian Besi Tulangan
No. Sket Tulangan sb (m)
b h Dia (mm)
3 T. BEAM 2/2-X (AS: F"' ~ 6"')
(300x650) = 6 m'
Utama 19.00

Tumpuan 19.00

Lapangan 19.00

Tumpuan 19.00

Sengkang 10.00

Peminggang 10.00
D.10-100
2 D 10 D.10-200 0.3 0.65 0.05

D.19

D.10

Dimensi Balok (m) Uraian Besi Tulangan


No. Sket Tulangan sb (m)
No. Sket Tulangan sb (m)
b h Dia (mm)
4 T. BEAM 2/2-X (AS: F" ~ 6")
(300x650) = 16,5 m'
Utama 19.00

Tumpuan 19.00

Lapangan 19.00

Tumpuan 19.00

Lapangan 19.00

Tumpuan 19.00

0.3 0.65 0.05 Lapangan 19.00


D.10-100
2 D 10 D.10-200 Tumpuan 19.00

Sengkang 10.00

Peminggang 10.00

D.19

D.10
Besi Tulangan Jml Pjg Tul (m)
Panjang Qty pot
Balok
kg/m' kg/12m' balok (m) (bh) Kait Ovlp ki ka Ext
(bh)

2.225 26.70 6.00 2 8 0.23 0.76 5.77 1.22

2.225 26.70 6.00 2 3 0.23 0.38 1.50

2.225 26.70 6.00 2 3 0.76 3.00

2.225 26.70 6.00 2 3 0.23 0.38 1.50

0.617 7.398 6.00 2 40 0.10

0.617 7.398 6.00 2 2 0.24

D.19

D.10

Besi Tulangan Jml Pjg Tul (m)


Panjang Qty pot
Balok
balok (m) (bh)
(bh)
Jml
Panjang Qty pot
Balok
kg/m' kg/12m' balok (m) (bh) Kait Ovlp ki ka Ext
(bh)

2.225 26.70 16.50 2 8 0.23 0.76 11.77 5.72

2.225 26.70 5.20 2 3 0.23 0.38 1.30

2.225 26.70 5.20 2 3 0.76 2.60

2.225 26.70 11.20 2 3 0.76 2.80

2.225 26.70 6.00 2 3 0.76 3.00

2.225 26.70 12.00 2 3 0.76 3.00

2.225 26.70 6.00 2 3 0.76 3.00

2.225 26.70 6.00 2 3 0.23 0.38 1.50

0.617 7.398 16.50 2 110 0.10

0.617 7.398 16.50 2 2 0.12 0.40 11.88 5.14

D.19

D.10
Pjg Total Jml Pot Berat
Keteranga
Besi (m) Btg (kg) Tabel Berat Besi
n Besi
kg/m' kg/12m'

7.22 16 256.89 D.10 0.6165 7.398


D.12 0.887 10.644
2.11 6 28.14 Besi D. 19 : D.13 1.041 12.492
Berat Total = 363.37 kg D.16 1.578 18.936
3.76 6 50.20 Jumlah Besi = 15 btg D.19 2.225 26.70
D.22 2.983 35.796
2.11 6 28.14 D.25 3.853 46.236
Besi D. 10 :
1.60 80 78.91 Berat Total = 94.30 kg
Jumlah Besi = 14 btg
6.24 4 15.39

Berat Total (kg) 363.37


Jumlah Besi (btg) 15
btg 14
5% 1
Berat Total (kg) 94.30
Jumlah Besi (btg) 14
btg 13
5% 1

Pjg Total Jml Pot Berat


Keteranga
Besi (m) Btg
n
Pjg Total Jml Pot
Keteranga
Besi (m) Btg (kg) Tabel Berat Besi
n Besi
kg/m' kg/12m'

17.72 16 630.69 D.10 0.6165 7.398


D.12 0.887 10.644
1.91 6 25.47 Besi D. 19 : D.13 1.041 12.492
Berat Total = 927.27 kg D.16 1.578 18.936
3.36 6 44.86 Jumlah Besi = 37 btg D.19 2.225 26.70
D.22 2.983 35.796
3.56 6 47.53 D.25 3.853 46.236
Besi D. 10 :
3.76 6 50.20 Berat Total = 259.28 kg
Jumlah Besi = 38 btg
3.76 6 50.20

3.76 6 50.20

2.11 6 28.14

1.60 220 217.01

17.14 4 42.27

Berat Total (kg) 927.27


Jumlah Besi (btg) 37
btg 35
5% 2
Berat Total (kg) 259.28
Jumlah Besi (btg) 38
btg 36
5% 2
Proyek Pluit S

No Jml BLK Uraian Pekerjaan Panjang (m) Lebar (m) Tinggi (m) Luas-void (m2)

Tie Beam Belize


1 12.00 TB 300x400 15.39 0.30 0.40
2 55.00 TB 300x500 240.86 0.30 0.50
3 43.00 TB 300x650 177.01 0.30 0.65

110.00

Tie Beam Ibiza


1 20.00 TB 300x400 IBIZA 66.66 0.30 0.40
2 102.00 TB 300x500 IBIZA 578.09 0.30 0.50
3 100.00 TB 300x650 IBIZA 603.64 0.30 0.65
4 27.00 TB 300x650 134.83 0.30 0.65

249.00

Tie Beam Bahama


1 17.00 TB 300x400 BHM 56.49 0.30 0.40
2 173.00 TB 300x500 BHM 770.31 0.30 0.50
3 7.00 TB 300x600 BHM 36.55 0.30 0.60
4 127.00 TB 300x650 BHM 649.48 0.30 0.65

324.00

GRAND TOTAL
Proyek Pluit Sea View
D19 D10
Plat (m) Nos (bh) Beton (m3) Bekisting (m2) Ratio Besi (kg/m3) Ratio Besi (kg/m3)

0.225 0.81 5.39 393.49 80.18


0.225 19.87 132.47 212.45 47.16
0.225 22.57 150.46 163.44 49.68

43.25 288.31 190.26


UP 10%

0.225 3.50 23.33 252.44 77.12


0.225 47.69 317.95 203.21 68.18
0.225 76.96 513.09 152.98 69.04
0.225 17.19 114.61 184.26 68.76

145.35 968.97 175.56

0.225 2.97 19.77 230.80 77.34


0.225 63.55 423.67 211.78 46.39
0.225 4.11 27.41 170.09 64.31
0.225 82.81 552.06 157.03 69.66

153.44 1,022.91 181.48

342.03 2,280.20 180.07

UP 10%
D19 D10
Besi (kg) Besi (kg)

317.87 64.77
4,221.62 937.17
3,688.52 1,121.12

8,228.01 2,123.05

883.39 269.86
9,691.68 3,251.78
11,774.14 5,313.73
3,167.49 1,182.01

25,516.71 10,017.38

684.51 229.38
13,459.02 2,947.82
699.38 264.45
13,003.07 5,768.55

27,845.99 9,210.20

61,590.71 21,350.63 82,941.33

67,749.78 23,485.69 91,235.47


No. Uraian Lokasi Diameter (mm) b balok (m) h balok (m) Selimut beton (m)

Tie Beam Belize


1 TB 300x400
Utama Lantai SB 19.00 1.28
Utama sabuk 10.00 1.28
Tumpuan 19.00 0.32
Lapangan 19.00 0.64
Sengkang 10.00 0.30 0.40 0.03
Sengkang 10.00 0.30 0.40 0.03
Pengaku 10.00 0.30 0.40 0.03
Pengaku 10.00 0.30 0.40 0.03

2 TB 300x500
Utama Lantai SB 19.00 4.38
Utama sabuk 10.00 4.38
Tumpuan 19.00 1.09
Lapangan 19.00 2.19
Sengkang 10.00 0.30 0.50 0.03
Sengkang 10.00 0.30 0.50 0.03
Pengaku 10.00 0.30 0.50 0.03
Pengaku 10.00 0.30 0.50 0.03

3 TB 300x650
Utama Lantai SB 19.00 4.12
Utama sabuk 10.00 4.12
Tumpuan 19.00 1.03
Lapangan 19.00 2.06
Sengkang 10.00 0.30 0.65 0.03
Sengkang 10.00 0.30 0.65 0.03
Pengaku 10.00 0.30 0.65 0.03
Pengaku 10.00 0.30 0.65 0.03

Tie Beam Ibiza

1 TB 300x400 IBIZA
Utama Lantai SB 19.00 3.33
Utama sabuk 10.00 3.33
Tumpuan 19.00 0.83
Lapangan 19.00 1.67
Sengkang 10.00 0.30 0.40 0.03
Sengkang 10.00 0.30 0.40 0.03
Pengaku 10.00 0.30 0.40 0.03
Pengaku 10.00 0.30 0.40 0.03

2 TB 300x500 IBIZA
Utama Lantai SB 19.00 5.67
Utama sabuk 10.00 5.67
Tumpuan 19.00 1.42
Lapangan 19.00 2.83
Sengkang 10.00 0.30 0.50 0.03
Sengkang 10.00 0.30 0.50 0.03
Pengaku 10.00 0.30 0.50 0.03
Pengaku 10.00 0.30 0.50 0.03

3 TB 300x650 IBIZA
Utama Lantai SB 19.00 6.04
Utama sabuk 10.00 6.04
Tumpuan 19.00 1.51
Lapangan 19.00 3.02
Sengkang 10.00 0.30 0.65 0.03
Sengkang 10.00 0.30 0.65 0.03
Pengaku 10.00 0.30 0.65 0.03
Pengaku 10.00 0.30 0.65 0.03

4 TB 300x650
Utama Lantai SB 19.00 4.99
Utama sabuk 10.00 4.99
Tumpuan 19.00 1.25
Lapangan 19.00 2.50
Sengkang 10.00 0.30 0.65 0.03
Sengkang 10.00 0.30 0.65 0.03
Pengaku 10.00 0.30 0.65 0.03
Pengaku 10.00 0.30 0.65 0.03
Tie Beam Bahama

1 TB 300x400 BHM
Utama Lantai SB 19.00 3.32
Utama sabuk 10.00 3.32
Tumpuan 19.00 0.83
Lapangan 19.00 1.66
Sengkang 10.00 0.30 0.40 0.03
Sengkang 10.00 0.30 0.40 0.03
Pengaku 10.00 0.30 0.40 0.03
Pengaku 10.00 0.30 0.40 0.03

2 TB 300x500 BHM
Utama Lantai SB 19.00 4.45
Utama sabuk 10.00 4.45
Tumpuan 19.00 1.11
Lapangan 19.00 2.23
Sengkang 10.00 0.30 0.50 0.03
Sengkang 10.00 0.30 0.50 0.03
Pengaku 10.00 0.30 0.50 0.03
Pengaku 10.00 0.30 0.50 0.03

3 TB 300x600 BHM
Utama Lantai SB 19.00 5.22
Utama sabuk 10.00 5.22
Tumpuan 19.00 1.31
Lapangan 19.00 2.61
Sengkang 10.00 0.30 0.60 0.03
Sengkang 10.00 0.30 0.60 0.03
Pengaku 10.00 0.30 0.60 0.03
Pengaku 10.00 0.30 0.60 0.03

4 TB 300x650 BHM
Utama Lantai SB 19.00 5.11
Utama sabuk 10.00 5.11
Tumpuan 19.00 1.28
Lapangan 19.00 2.56
Sengkang 10.00 0.30 0.65 0.03
Sengkang 10.00 0.30 0.65 0.03
Pengaku 10.00 0.30 0.65 0.03
Pengaku 10.00 0.30 0.65 0.03
D19 D10
Kait (m) Panjang (m) Unit (bh) Qty (nos) Berat (kg) Berat (kg)

0.60 1.88 8.00 1.00 33.51


0.30 1.58 - 1.00 -
0.70 1.02 6.00 1.00 13.63
0.80 1.44 3.00 1.00 9.62
0.14 1.34 14.00 1.00 11.57
0.12 1.32 - 1.00 -
0.12 0.47 - 1.00 -
0.12 0.47 - 1.00 -

Besi 56.76 11.57


Beton 0.14 0.14
Ratio 393.49 80.18

0.60 4.98 8.00 1.00 88.65


0.30 4.68 - 1.00 -
0.70 1.79 6.00 1.00 23.97
0.80 2.99 3.00 1.00 19.96
0.14 1.54 31.00 1.00 29.43
0.12 1.52 - 1.00 -
0.12 0.57 - 1.00 -
0.12 0.57 - 1.00 -

Besi 132.58 29.43


Beton 0.62 0.62
Ratio 212.45 47.16

0.60 4.72 8.00 1.00 83.97


0.30 4.42 2.00 1.00 5.45
0.70 1.73 6.00 1.00 23.09
0.80 2.86 3.00 1.00 19.08
0.14 1.84 29.00 1.00 32.90
0.12 1.82 - 1.00 -
0.12 0.72 - 1.00 -
0.12 0.72 - 1.00 -

Besi 126.15 38.34


Beton 0.77 0.77
Ratio 163.44 49.68

0.60 3.93 8.00 1.00 70.02


0.30 3.63 - 1.00 -
0.70 1.53 4.00 1.00 13.65
0.80 2.47 2.00 1.00 10.98
0.14 1.34 35.00 1.00 28.91
0.12 1.32 - 1.00 -
0.12 0.47 - 1.00 -
0.12 0.47 - 1.00 -

Besi 94.65 28.91


Beton 0.37 0.37
Ratio 252.44 77.12

0.60 6.27 8.00 1.00 111.59


0.30 5.97 - 1.00 -
0.70 2.12 6.00 1.00 28.27
0.80 3.63 3.00 1.00 24.26
0.14 1.54 58.00 1.00 55.07
0.12 1.52 - 1.00 -
0.12 0.57 - 1.00 -
0.12 0.57 - 1.00 -

Besi 164.12 55.07


Beton 0.81 0.81
Ratio 203.21 68.18

0.60 6.64 8.00 1.00 118.16


0.30 6.34 2.00 1.00 7.81
0.70 2.21 6.00 1.00 29.50
0.80 3.82 3.00 1.00 25.49
0.14 1.84 62.00 1.00 70.33
0.12 1.82 - 1.00 -
0.12 0.72 - 1.00 -
0.12 0.72 - 1.00 -

Besi 173.15 78.14


Beton 1.13 1.13
Ratio 152.98 69.04

0.60 5.59 10.00 1.00 124.49


0.30 5.29 2.00 1.00 6.53
0.70 1.95 6.00 1.00 26.02
0.80 3.30 3.00 1.00 22.01
0.14 1.84 51.00 1.00 57.85
0.12 1.82 - 1.00 -
0.12 0.72 - 1.00 -
0.12 0.72 - 1.00 -

Besi 172.52 64.38


Beton 0.94 0.94
Ratio 184.26 68.76
0.60 3.92 8.00 1.00 69.85
0.30 3.62 - 1.00 -
0.70 1.53 - 1.00 -
0.80 2.46 3.00 1.00 16.43
0.14 1.34 35.00 1.00 28.91
0.12 1.32 - 1.00 -
0.12 0.47 - 1.00 -
0.12 0.47 - 1.00 -

Besi 86.28 28.91


Beton 0.37 0.37
Ratio 230.80 77.34

0.60 5.05 8.00 1.00 89.96


0.30 4.75 - 1.00 -
0.70 1.81 6.00 1.00 24.21
0.80 3.03 3.00 1.00 20.21
0.14 1.54 31.00 1.00 29.43
0.12 1.52 - 1.00 -
0.12 0.57 - 1.00 -
0.12 0.57 - 1.00 -

Besi 134.38 29.43


Beton 0.63 0.63
Ratio 211.78 46.39

0.60 5.82 8.00 1.00 103.65


0.30 5.52 - 1.00 -
0.70 2.01 6.00 1.00 26.78
0.80 3.41 3.00 1.00 22.77
0.14 1.74 54.00 1.00 57.93
0.12 1.72 - 1.00 -
0.12 0.67 - 1.00 -
0.12 0.67 - 1.00 -

Besi 153.20 57.93


Beton 0.90 0.90
Ratio 170.09 64.31

0.60 5.71 8.00 1.00 101.73


0.30 5.41 2.00 1.00 6.68
0.70 1.98 6.00 1.00 26.42
0.80 3.36 3.00 1.00 22.41
0.14 1.84 53.00 1.00 60.12
0.12 1.82 - 1.00 -
0.12 0.72 - 1.00 -
0.12 0.72 - 1.00 -

Besi 150.57 66.80


Beton 0.96 0.96
Ratio 157.03 69.66
TGL 21-08-kg btg SPB (btg)
TIE BEAM SB D19 67749.78 2537.445 1777
D10 23485.69 3174.6 2223
SUDAH DI SPB (btg) SISA SPB (btg)
PLAT SB D13 449296.5 35966.74 9418 26548.74 21239