You are on page 1of 1

contractor-TRAUMFORMER & CO.

Add:- F-349,FIRST FLOOR,SECTOR-63 NOIDA-201301


Item of Work
REMARK

EARTH WORK
Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan)
1 including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed.
All kinds of soil

2 Extra for every additional lift of 1.5 m or part thereof in.


All kinds of soil.

3 Supplying and filling in plinth with Locally availble malwa under floors including, watering, ramming consolidating and dressing complete.

Diluting and injecting chemical emulsion (Chlorpyriphos/Lindane E.C. 20% with 1% concentration), at the rate of one litre per hole at 300 mm c/c to all the horizontal and vertical surfaces
4 of the excavations made for the undation of the building, soil under floors, apron, back fill material and along all the faces of the walls for PRE-CONSTRUCTIONAL anti-termite treatment
(including the cost of chemical emulsion) as per IS:6313 Part-II. Plinth area of Building shall be measured for Payment.

CONCRETE WORK

5 Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level :
1:5:10 (1 Cement : 5 coarse sand : 10 graded stone aggregate 20 mm nominal size).
TOTAL C O N C R E T E W O R K

REINFORCED CEMENT CONCRETE

Centring and shuttering including strutting, propping etc. and removal of form for :
6 Foundations, footings, bases of columns, etc. for mass concrete.
7 Suspended floors, roofs, landings, balconies and access platform.
8 Lintels, beams, plinth beams, girders, bressumers and cantilevers.
9 Columns, Pillars, Piers, Abutments, Posts and Struts.
10 Stairs, (excluding landings) except spiral-staircases.
11 Weather shade chajja in edges (extera item)

12 Suspended floors, roofs, landing, beams and balconies (Plan area to be measured).

13 Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete.
Thermo-Mechanically Treated bars. Fe-500(column steel-10mm,12mm)(BeaM STEEL-12,16)

14 Providing and laying in position mixed and machine vibrated design mix cement concrete of specified grade for reinforced cement concrete work including pumping of
concrete to site of laying but excluding the cost of centring, shuttering, finishing and reinforcement. including Admixtures in recommended proportions as per IS 9103 to
accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. M-25 grade reinforced cement
concrete by using 320kg. of cement per cum of concrete.
All work upto floor V level.

BRICK WORK

15 Brick work with F.P.S. bricks of class designation 75 in foundation and plinth in:
Cement mortar 1:6 (1 cement : 6 coarse sand)

16 Brick work with F.P.S. bricks of class designation 75 in superstructure above plinth level upto floor V level in all shapes and sizes in :
Cement mortar 1:6 (1 cement : 6 coarse sand)

17 Half brick masonry with F.P.S. bricks of class designation 75 in superstructure above plinth level upto floor V level.
Cement mortar 1:4 (1 cement :4 coarse sand)

STEEL WORK

Providing and fixing circular/ Hexagonal cast iron or M.S. sheet box for ceiling fan clamp of internal dia 140mm, 73mm height, top lid of 1.5mm thick M.S. sheet with its top surface hacked
for proper bonding, top lid shall be screwed into the cast iron/ M.S. sheet box by means of 3.3mm dia. round headed screws, one lock at the corners. Clamp shall be made of 12mm dia
M.S. bar bent to shape as per standard drawing.
18

FINISHING

19 12 mm cement plaster of mix :


1:6 (1 cement : 6 fine sand)

20 15 mm cement plaster of mix :


1:6 (1 cement : 6 fine sand)

21 6 mm cement plaster of mix :


1:3 (1 cement : 3 fine sand)

22 plumbing work
providing and fixing internal plumbing without cp and chinaware fitting-

23 Electrical work-
providing and fixing pvc conduit .

DDF/Doon Hospital Medical College Project 1 of 1 OT - Emergency / Civil