IPC Shree Dharmawati SS, Chhoprak
IPC Shree Dharmawati SS, Chhoprak
Bill of Quantities Up to Date of work till now Previous Bill Currently Accomplished work
Pay Item
Description Unit % completion Remarks
No.
Quantity As per
Rate Amount Quantity Amount Quantity Amount Quantity Amount
BOQ
GENERAL
MOBILIZATION AND DEMOBILIZATION
1 Mobilization of the construction by constructing temporary L.S. 1.00 500,000.00 500,000.00 1.00 500,000.00 0.50 250,000.00 0.50 250,000.00 100.00%
acomodation for labours and site staff with required suitable
SITE OFFICE
facilities and keepingESTABLISHMENT
the same in good hygenic condition for
Providing and completion
Maintainingtime. Site Office of two Per
2 entire project Demolition of Rooms
the same having
and Month 21.00 25,000.00 525,000.00 21.00 525,000.00 22.00 550,000.00 (1.00) (25,000.00) 100.00%
total Area 20 sq.m for
cleaning the site after completion the useofoftheClient and Consultant
construction activities
including
all complete. office[Note:
chair, Table,
50% Lockable
payment file cabinet, Stationery
PROJECT INFORMATION BOARD shall be made after
3 Items (Ink, Paper,
completion Pen, Pencils etc.),
of Fixing
mobilization and 1Information
Computer
remaining and 50% 1 Printer
after nos. 1.00 10,000.00 10,000.00 1.00 10,000.00 1.00 10,000.00 - - 100.00%
Providing and of Project board with
with all necessary
completionText
approved of works set up. all complete
as per contract]
in appropriate as per instruction
location including all requiredof
engineer. The
SAFETY SIGN Specification
BOARD of computer shall not be less than
4 fixing accessories as per drawing all complete. nos. 1.00 10,000.00 10,000.00 1.00 10,000.00 1.00 10,000.00 - - 100.00%
(19.5"
Providingled and
monitor
Fixing with Core i5,
of Safety Sign7thBoard
Generation, 500 gb Hdd,
with approved Text
8gb ddr
and 4 ram),
Sinage Printerrequired
including should functionfixing ataccessories
least of Printing,
as per
BARRICADING
Scanningall WORKS
and Photocopy of A4 size documents. Providing and R.m
5 drawing
Barricading complete. 110.00 2,000.00 220,000.00 110.00 220,000.00 110.00 220,000.00 - - 100.00%
Maintaining allbetween
above items the onSchool
Rental BasisAcademicfor entire areaproject
and
Construction
completionMATERIALSarea with 1.8 m high CGI Sheet fixed to Bamboo
time.
SAFETY
support frame all complete&asSITE SAFETYof Engineer.
per instruction
6 Providing and Maintaining Construction Safety Measures in L.S. 1.00 100,000.00 100,000.00 1.00 100,000.00 1.17 117,000.00 (0.17) (17,000.00) 100.00%
Construction
LAB TEST(WATER Site withTEST) proper Safety measures to person and
7 work
Testingareaand (Helmet,
ProvidingShoes, Lab Test First Aid for
Report Kit,Quality
Clothing, Glove,
of Water in job 1.00 - - - 0.00 - - - 0.00%
Guard
Water Stream (Up and DownSafety
Rail for edge protection, streem) Net, located
Safety rope, near Fall
by
Protection etc.)site
TEMPORARY
Construction asTOILET
required
before by the Contract
Starting and after Clause GCC 24 and
completion of
8 Specification
Construction work.
construction ofdivision
temporary
This Test 1 toilet
"GENERAL
has to with
be done CGItoREQUIREMENT
Sheet
mark the fixed to
affect nos. 2.00 150,000.00 300,000.00 2.00 300,000.00 2.00 300,000.00 - - 100.00%
CLAUSE
Bamboo 8(C)".
support
of construction Thein and
frame
work number of Safety
waterallstream.
necesary itemsMaterials
including Personal
Septic
ROAD
Protecting
pit, REPAIR
Pipeline,Equipments
Toilet AND MAINTENANCE
Pan(PPE)
etc. forshall be minimum
entire but not limited
project completion time
9 Providing
to
all 35 sets. and
complete as Maintaining
Payment shall be the
per Instruction ofroads
made Engineer.as necessary
in Prorata RateBasis
shall avoid Km.
toinclude
for entire 2.00 50,000.00 100,000.00 2.00 100,000.00 1.86 93,000.00 0.14 7,000.00 100.00%
blockage
duration by
of Landslides
project. and Rockfall
all Material cost with fixing, construction charges and for regular transport of
construction
demolition &materials cleaning and of the sitesame
inspection during overall
after completion of the -
construction
CIVIL WORKS-
construction period.
activities Rate
BUILDING shall
all complete. include all Material cost with -
1 demolition
EARTH WORKS charges, cleaning, fixing & construction charges of -
the same after completion of the construction activities all
SITE CLEARANCE & MOBILIZATION:
complete.
1.1 Clearing and grubbing the site for construction by removing sq.m 1,076.98 100.00 107,698.00 1,141.90 114,190.12 1209.74 120,974.25 (67.84) (6,784.14) 106.03%
150mm
EARTHWORK thick top IN soilEXCAVATION
including bushes,: small trees, leveling of
1.2 undulated ground,
Excavation shortinginand
in foundations all stacking/storing
type of soils forselected top cu.m
foundation, 566.02 400.00 226,408.00 536.53 214,610.94 543.18 217,271.37 (6.65) (2,660.43) 94.79%
soil for reuse in landscaping
trenches, footing, pits etc. to the works,
requireddisposing
depth unsuitable
including
materials
dewatering from site,
by manual etc., all complete as
or :mechanical means etc. as per per drawings,
EARTH BACK FILLING
specifications and
specifications instructions of the Engineer. machinery and
1.3 Back filling inwith all contractor’s
foundation and sidesown of foundation with cu.m 340.79 300.00 102,237.00 349.92 104,976.82 297.88 89,364.00 52.04 15,612.82 102.68%
equipment's,
approved soil providing
obtained from crossing of track, at
the excavation shoring,
site andstrutting,
stacked
timbering
at and buttressing
site or brought from outsidewith in appropriate
layer not materials
exceeding and 15 cmall
BOULDER
such measures
thick (compactedSOLING
necessary : to retain
thickness) in position
including the sidesofofsoil,
transportation the
1.4 Providing
foundation and
spreading pit and
in laying
required uncoursed
including and hand
line refilling thepacked
level, excavated Dry material
sprinkling Rubble
water, cu.m 167.88 6,000.00 1,007,280.00 190.85 1,145,101.40 152.64 915,860.94 38.21 229,240.46 113.68%
Stone
ramming, soling
with watering, inramming,
compactingfoundation, under
leveling
with thefloor
mechanical plinth
siterammers,
and with
disposing out
testing, any
offetc.,
the
special dressing
surplus/unusable
all complete as per of drawing,
earth stone including
to outside the filling andinterstices
construction with
premises,
SAND
suitable FILLING
quarry : or stonespecification
waste chips or quarry
instructions
sand, watering,
of
etc. Engineer.
the all complete as per drawings, specifications and
1.5 Providing and
compacting usingfilling sand in mechanical
appropriate soak pit. allcompaction
complete as per cu.m
means 7.40 6,000.00 44,400.00 4.91 29,435.40 0.00 - 4.91 29,435.40 66.30%
instructions of the Engineer.
drawings, specifications and instruction
with all contractors materials, handling, placing etc. all of the Engineer.
complete as per drawings, specifications and instruction of the
Engineer. The complete item including all lead & lift.
Prepared by contractor Checked by Consultant, DSC Verified by (Engineer), DLPIU Recommended by DLPIU Chief Checked and forwarded by CLPIU DPD Approved by CLPIU, project Director
Bill of Quantities Up to Date of work till now Previous Bill Currently Accomplished work
Pay Item
Description Unit % completion Remarks
No.
Quantity As per
Rate Amount Quantity Amount Quantity Amount Quantity Amount
BOQ
CONCRETE WORKS
2.1 2.1 P.C.C cu.m 28.81 14,000.00 403,340.00 29.39 411,428.06 29.79 417,056.06 (0.40) (5,628.00) 102.01%
2.1.1 P.C.C (1:3:6)
Providing and laying machine mixed Plain Cement Concrete of
P.C.C
nominal(1:2:4)
mix 1:3:6WORKS (1 cement : 3 sand : 6 coarse aggregate ) for
2.1.2 Providing and laying
leveling course machine mixed
in foundations and under Plainfloor
Cement Concreteetc.
of building, of cu.m 48.15 16,000.00 770,400.00 46.42 742,685.74 36.31 580,940.16 10.11 161,745.58 96.40%
nominal mix 1:2:4
in all level with broken (1 cementstone: aggregate
2 sand : 4 of coarse
size aggregate
not more )than for
leveling
25 mmFOR course
of approvedin foundations and
quality including under floor of building,
formwork wherever etc.
P.C.C.
in R.C.C.
all level dewatering,
with broken WORKS :
stone aggregate of size not more than
2.2 necessary,
Providing laying inbatching, mixing,
machinetransporting, placing,
25 mm ofand
compacting, approved
curing,
position
quality
including allincluding
mixed and wherever
lead and(1formwork
lift,
machine
etc. all complete
cu.m 665.02 20,000.00 13,300,400.00 684.62 13,692,491.32 614.41 12,288,233.43 70.21 1,404,257.90 102.95%
vibrated
necessary, cement concrete
dewatering, of mix
batching, 1:1.5:3
mixing, cement:1.5
transporting, sand: 3
placing,
as per aggregate)
coarse drawings, specifications and the instructionsconcrete of the
SILICA
compacting,
Engineer.
CEMENTcuring,M20 gradeallforlead
ADMIXTURE
including reinforced
and lift, cement
etc. all complete
2.3 work kg 6,650.20 300.00 1,995,060.00 6,846.25 2,053,876.27 6144.15 1,843,245.82 702.10 210,630.45 102.95%
as perusing
Providing andapproved
drawings, mixing cement
Silica
specifications Cementwith 20themm
andAdmixture graded machine
of in structural
instructions of the
crushed stone aggregate of approved
concrete at the rate of 2.50% by weight of the cement for
Engineer. quality in various
STEEL
locationsREINFORCEMENT
promoting andworkability,
heights including improvingtransportation
strength, of concrete
achieving to
2.4 Providing and fixing
site of placing, compaction, in position Fe 500 steel
finished toprevention, reinforcement
required lineetc. and Silicaof
level, Mt. 106.42 130,000.00 13,834,600.00 107.73 14,004,637.71 113.70 14,781,592.04 (5.98) (776,954.34) 101.23%
waterproofing properties, bleeding
various
protection diameter
and confirming
curing, etc. to
all relevant
complete
Cement Admixture shall be the product of Silica Japan or IS as code
per in R.C.C.
drawings,
FORM
works WORKS
including
specifications straightening,
and the instructions cutting,ofbending, binding with
theas Engineer, but
superior and shall meet the requirements mentioned in
2.5 Supplying
20 SWG annealedandcostlaying
wire centering,
for tying shuttering
the of various
reinforcement pattern
bars at sq.m 4,399.99 800.00 3,519,992.00 4,656.76 3,725,410.41 4180.14 3,344,113.14 476.62 381,297.28 105.84%
excluding
specification the of centering,
of materials shuttering,
and Workmanship, and –each
reinforcement,
Division 4:
formworks
junctions
all complete with
(binding
as 19/12
per wire mmshall
drawings, thick water
not be
specifications proof
measured plyinstructions
and wood & steel
separately) of
Concrete Works, Article 2.4
adjustable
including
3.
theBRICK
Engineer. props
all for all
waste
MASONRY kinds
andWORKScut of RCC provision
pieces, works for for foundations,
adequate
3.1 columns,
numbers
3.1 BRICK ofshear walls,chairs,
spacers,
MASONRY beams,
WORKS slab,( 1staircase,
providing and
: 4 c/s lintel,
placing
) ONE sill,
cement
SIDE cu.m 184.75 20,000.00 3,695,000.00 - - - - 0.00%
pergola,
mortar (1:1)
FAIRFACE including
cover blocks nails,to keep
proppingthe barsscaffolding, staging,
in intended position
supporting
at all levels
Providing andand bracing
alllaying
completefirstinas proper
perselected
class lines and
drawings, level,pressed
sealingwire
specifications
factory the
and
CLEAR
joints
cut Fairwith
instructionsFaceSILICON
heavy
of brick duty
the Engineer. WATER-REPELLANT
brown
(machine self adhesive
(Authorized
made brick)
lapone tape,
length COATNG
aligning
or more
and for to
brick
the
7.2.3 sq.m 919.15 550.00 505,532.50 - - - - 0.00%
Providing
line wall and
and
bar length
thick levels Applying
exceeding
in cement including
10 Water
mortar
meter 1:4inRepellant
Ties,(1
length
cement Coating
PVCshall Spacer,
: 4coarse onProviding
be measuredExposed
sand)for in
Brick
POINTING
openings/ Surface
the payment,
,superstructure WORK
cutouts/ using IN
and pockets,
except to
other Silicone
BRICK
column). Base
MASONRY
applyingplaces
specified MC-Nisiwa
De-shuttering Providing
in all heights SH
chemical, or
and
and
8.1.1 equivalent
applying at or superior
allaslevels including
Pointing Works cleaning brick
in Cement surface
Mortar using
1:2 (1 sq.m 919.15 400.00 367,660.00 - - - - 0.00%
De-shuttering
level including approved
the cost ofby the
single Engineer
or multi etc.,
stagecomplete at all
self standing
brick
cement
levels cleaning
as:2perfine
scaffolding, chemical,
sand)
drawing,
soaking single
on the & or
specifications
bricks, curing, multi-stage
face of
andbrick
raking joints,scaffolding,
masonry
instructions
provision etc.
ofwall
the
for
BOQ Total of items 3.1., 7.2.3 8.1.1:
all complete
including mixing as per
mortar, manufacturer's
laying in instruction,
perfect
Engineer.openings, toothing etc., all complete as per drawing,
recesses, line, project
level and - - - -
specification
plumb
specifications and
andinstruction
and finishing in regular
instructions ofof the
and
theEngineer.
even surface ,all complete
Engineer.
as per drawing , specification and instruction of the Engineer.
Replaced items 3.1, 7.2.3 and 8.1.1 with following items for
- - - -
3-LaLiEACCr(F). 3-9C(SF) and Tc(S)
Prepared by contractor Checked by Consultant, DSC Verified by (Engineer), DLPIU Recommended by DLPIU Chief Checked and forwarded by CLPIU DPD Approved by CLPIU, project Director
Bill of Quantities Up to Date of work till now Previous Bill Currently Accomplished work
Pay Item
Description Unit % completion Remarks
No.
Quantity As per
Rate Amount Quantity Amount Quantity Amount Quantity Amount
BOQ
2 Nos 10 Sq.mm + 1 No 6 Sq.mm mutistranded copper
2.1 rm 100 800.00 80,000.00 101.00 80,800.00 101.00 80,800.00 - - 101.00%
conductor wires
2 Nos 2.5 Sq.mm + 1 No 1.5 Sq.mm mutistranded copper
2.2 rm 95 250.00 23,750.00 100.00 25,000.00 100.00 25,000.00 - - 105.26%
conductor wires
B School Blocks - -
1 DISTRIBUTION BOARDS - -
1.1 DB (DB-1) nos. 1 30,000.00 30,000.00 1.00 30,000.00 1.00 30,000.00 - - 100.00%
1.2 DB (DB-1) nos. 1 32,000.00 32,000.00 1.00 32,000.00 1.00 32,000.00 - - 100.00%
1.3 DB (DB-2) & DB (DB-3) nos. 2 22,000.00 44,000.00 2.00 44,000.00 2.00 44,000.00 - - 100.00%
1.4 DB (DB-2) nos. 1 22,000.00 22,000.00 1.00 22,000.00 1.00 22,000.00 - - 100.00%
1.5 DB (DB-3) nos. 1 30,000.00 30,000.00 1.00 30,000.00 1.00 30,000.00 - - 100.00%
1.6 6A DP MCB with Enclosure nos. 2 8,500.00 17,000.00 2.00 17,000.00 2.00 17,000.00 - - 100.00%
2 CABLES & WIRES - -
2 Nos 6 Sq mm Multistranded Cu Wire + 1 No 4 Sq mm
2.1 r.m. 20 600.00 12,000.00 23.00 13,800.00 23.00 13,800.00 - - 115.00%
Multistranded Cu wire
2 Nos 4 Sq mm Multistranded Cu Wire + 1 No 2.5 Sq mm
2.2 r.m. 15 500.00 7,500.00 14.00 7,000.00 14.00 7,000.00 - - 93.33%
Multistranded Cu wire
2 Nos 2.5 Sq mm Multistranded Cu Wire + 1 No 1.5 Sq mm
2.3 r.m. 30 250.00 7,500.00 28.00 7,000.00 28.00 7,000.00 - - 93.33%
Multistranded Cu wire
3 General Service Light Point Wiring - -
3.1 One Way Light Point pts. 143 700.00 100,100.00 142.00 99,400.00 142.00 99,400.00 - - 99.30%
3.2 Two Way Light Point pts. 4 900.00 3,600.00 4.00 3,600.00 4.00 3,600.00 - - 100.00%
3.3 Ceiling and Exhaust Fan Point pts. 4 900.00 3,600.00 4.00 3,600.00 4.00 3,600.00 - - 100.00%
4 6A Universal Pin Light Power Socket Wiring pts. 151 900.00 135,900.00 151.00 135,900.00 151.00 135,900.00 - - 100.00%
5 Switch Socket Outlets - -
5.1 6A Universal Power Switch Socket nos. 151 700.00 105,700.00 151.00 105,700.00 151.00 105,700.00 - - 100.00%
6 Sweep Ceiling/ Exhaust Fan/Wall Fan - -
6.1 400mm wall Fan nos. 78 3,500.00 273,000.00 78.00 273,000.00 76.00 266,000.00 2.00 7,000.00 100.00%
6.2 225mm dia M/D exhaust Fan nos. 4 6,000.00 24,000.00 4.00 24,000.00 4.00 24,000.00 - - 100.00%
7 Light Fixtures/Luminaires & Accessories - -
7.1 24 W LED Recessed Mounted Square type nos. 12 4,500.00 54,000.00 12.00 54,000.00 12.00 54,000.00 - - 100.00%
7.2 18 W LED Surface Mounted Square type nos. 68 2,700.00 183,600.00 68.00 183,600.00 68.00 183,600.00 - - 100.00%
7.3 12 W LED Surface Mounted Cylindrical type nos. 47 2,400.00 112,800.00 47.00 112,800.00 47.00 112,800.00 - - 100.00%
7.4 LED Wall Light nos. 4 1,800.00 7,200.00 4.00 7,200.00 4.00 7,200.00 - - 100.00%
7.5 9 W LED Surface Mounted Cylindrical type nos. 2 2,000.00 4,000.00 2.00 4,000.00 2.00 4,000.00 - - 100.00%
7.6 6 W LED Recessed Circular type nos. 6 1,800.00 10,800.00 6.00 10,800.00 6.00 10,800.00 - - 100.00%
7.7 7 W LED T5 Slim Mirror Light nos. 2 2,000.00 4,000.00 2.00 4,000.00 2.00 4,000.00 - - 100.00%
8 Pull Box - - - -
Junction Box At External Post Top Light nos. 6 700.00 4,200.00 6.00 4,200.00 6.00 4,200.00 - - 100.00%
9 External Post Top Light Pole nos. 6 7,500.00 45,000.00 6.00 45,000.00 6.00 45,000.00 - - 100.00%
10 Post Top External Light Fixtures nos. 6 9,800.00 58,800.00 6.00 58,800.00 6.00 58,800.00 - - 100.00%
11 Earthing & Lighting Protection - -
11.1 Chemical Earthing nos. 6 45,000.00 270,000.00 6.00 270,000.00 6.00 270,000.00 - - 100.00%
11.2 Earthing Bar nos. 6 2,200.00 13,200.00 6.00 13,200.00 6.00 13,200.00 - - 100.00%
12 Earthing Strip/Wires - -
12.3.1 25 x 3 mm GI strip Mtr. 130 300.00 39,000.00 132.00 39,600.00 132.00 39,600.00 - - 101.54%
12.3.2 12 SWG Cu wire Mtr. 30 200.00 6,000.00 28.00 5,600.00 28.00 5,600.00 - - 93.33%
13 Earth Test link nos. 2 1,500.00 3,000.00 2.00 3,000.00 2.00 3,000.00 - - 100.00%
14 Lightning Arrester nos. 2 7,500.00 15,000.00 2.00 15,000.00 2.00 15,000.00 - - 100.00%
C Solar PV System - -
1 Solar PV Panel nos. 8 26,000.00 208,000.00 8.00 208,000.00 8.00 208,000.00 - - 100.00%
2 Tubular Deep Cycle Battery nos. 4 30,000.00 120,000.00 4.00 120,000.00 4.00 120,000.00 - - 100.00%
3 Hybrid Inverter nos. 1 100,000.00 100,000.00 1.00 100,000.00 1.00 100,000.00 - - 100.00%
D Fire Extinguisher - -
a ABC Stored Pressure 5.0kg size nos. 6 8,000.00 48,000.00 6.00 48,000.00 6.00 48,000.00 - - 100.00%
b Dry Powder Fire Extinguisher nos. 1 8,000.00 8,000.00 1.00 8,000.00 1.00 8,000.00 - - 100.00%
- -
D SANITARY WORKS - -
1 WATER SUPPLY INSTALLATION - -
a CPVC pipes SDR-11 - -
40 mm r.m 180.00 1,600.00 288,000.00 185.00 296,000.00 185.00 296,000.00 - - 102.78%
20mm r.m 30.00 700.00 21,000.00 29.00 20,300.00 29.00 20,300.00 - - 96.67%
Prepared by contractor Checked by Consultant, DSC Verified by (Engineer), DLPIU Recommended by DLPIU Chief Checked and forwarded by CLPIU DPD Approved by CLPIU, project Director
Bill of Quantities Up to Date of work till now Previous Bill Currently Accomplished work
Pay Item
Description Unit % completion Remarks
No.
Quantity As per
Rate Amount Quantity Amount Quantity Amount Quantity Amount
BOQ
15mm r.m 8.00 500.00 4,000.00 7.50 3,750.00 7.50 3,750.00 - - 93.75%
c CPVC Ball Valve - -
40 mm nos. 4.00 2,000.00 8,000.00 3.00 6,000.00 3.00 6,000.00 - - 75.00%
25 mm nos. 2.00 900.00 1,800.00 2.00 1,800.00 2.00 1,800.00 - - 100.00%
20mm nos. 2.00 400.00 800.00 2.00 800.00 2.00 800.00 - - 100.00%
d 40mm dia Gun Metal Check Valve nos. 1.00 4,500.00 4,500.00 1.00 4,500.00 1.00 4,500.00 - - 100.00%
e Electrical Centrifugal Water Pump nos. 1.00 12,500.00 12,500.00 1.00 12,500.00 1.00 12,500.00 - - 100.00%
f 2000 litres Capacity Water Storage Tank nos. 1.00 34,000.00 34,000.00 1.00 34,000.00 1.00 34,000.00 - - 100.00%
2 Sewer, Rain and Waste Water Installation - -
110 mm r.m 42.00 1,400.00 58,800.00 41.00 57,400.00 41.00 57,400.00 - - 97.62%
75mm r.m 69.00 1,200.00 82,800.00 70.00 84,000.00 70.00 84,000.00 - - 101.45%
50mm r.m 22.00 350.00 7,700.00 21.00 7,350.00 21.00 7,350.00 - - 95.45%
B School Blocks - -
1 Sanitary Installation - -
a Lab Sink set 5.00 30,000.00 150,000.00 5.00 150,000.00 5.00 150,000.00 - - 100.00%
b Kitchen Sink set 1.00 35,000.00 35,000.00 1.00 35,000.00 1.00 35,000.00 - - 100.00%
c PVC Multi Floor Trap nos. 2.00 600.00 1,200.00 2.00 1,200.00 2.00 1,200.00 - - 100.00%
2 Sanitary Installation - -
a Water Closet Set set 2.00 34,000.00 68,000.00 2.00 68,000.00 2.00 68,000.00 - - 100.00%
b Orissa Pan set 4.00 3,100.00 12,400.00 4.00 12,400.00 4.00 12,400.00 - - 100.00%
c Hand Wash Basin set 2.00 8,000.00 16,000.00 2.00 16,000.00 2.00 16,000.00 - - 100.00%
d Ladies Urinal set 2.00 110,000.00 220,000.00 2.00 220,000.00 2.00 220,000.00 - - 100.00%
e Self Closing Bib Cock nos. 12.00 4,000.00 48,000.00 12.00 48,000.00 12.00 48,000.00 - - 100.00%
f CP Spreader in Urinal set 4.00 2,500.00 10,000.00 4.00 10,000.00 4.00 10,000.00 - - 100.00%
g Toilet Paper Holder nos. 2.00 2,600.00 5,200.00 2.00 5,200.00 2.00 5,200.00 - - 100.00%
h Commode Spray nos. 2.00 2,000.00 4,000.00 2.00 4,000.00 2.00 4,000.00 - - 100.00%
i PVC Multi Floor Trap nos. 10.00 600.00 6,000.00 10.00 6,000.00 10.00 6,000.00 - - 100.00%
j Waste Coupling and PVC Bottle Trap nos. 4.00 1,500.00 6,000.00 4.00 6,000.00 4.00 6,000.00 - - 100.00%
k 40mm SS Grab Bar-Side nos. 2.00 4,500.00 9,000.00 2.00 9,000.00 2.00 9,000.00 - - 100.00%
l 40mm SS Grab Bar-Rear nos. 2.00 4,500.00 9,000.00 2.00 9,000.00 2.00 9,000.00 - - 100.00%
m CP Foldable Hinge nos. 4.00 5,500.00 22,000.00 4.00 22,000.00 4.00 22,000.00 - - 100.00%
- -
- -
E CIVIL WORKS : SITE DEVELOPMENT - -
1 EARTHWORKS - -
1 SITE CLEARANCE AND MOBILIZATION Sq.m 453.13 100.00 45,313.00 499.95 49,995.00 499.95 49,995.00 - - 110.33%
2 EARTHWORK IN EXCAVATION Cu.m 96.77 400.00 38,708.00 439.03 175,613.40 439.03 175,613.40 - - 453.69%
3 EARTHBACK FILLING Cu.m 10.38 300.00 3,114.00 98.34 29,502.00 98.34 29,502.00 - - 947.40% For Additional
Retaining Wall
4 BOULDER SOLING Cu.m 49.83 6,000.00 298,980.00 65.58 393,507.00 65.58 393,507.00 - - 131.62% Works
5 P.C.C (1:3:6) Cu.m 1.09 14,000.00 15,260.00 15.44 216,202.00 15.44 216,202.00 - - 1416.79%
6 P.C.C (1:2:4) Cu.m 25.89 16,000.00 414,240.00 28.43 454,956.00 28.43 454,956.00 - - 109.83%
7 P.C.C FOR R.C.C WORK cu.m 0.99 20,000.00 19,800.00 0.99 19,766.20 0.99 19,766.20 - - 99.83%
8 SILICA CEMENT ADMIXTURE Kg 300 9.90 2,970.00 9.88 97.84 9.88 97.84 - - 3.29%
9 STEEL REINFORCEMENT Mt. 0.1 130,000.00 13,000.00 0.11 13,897.00 0.10 13,343.25 0.00 553.75 106.90%
10 FORM WORKS Sq.m 9.12 800.00 7,296.00 11.33 9,064.00 9.12 7,292.80 2.21 1,771.20 124.23%
13 BRICKS MASONRY WORKS (1:4 c/s) Cu.m 0.22 18,000.00 3,960.00 0.72 13,032.72 0.72 13,032.72 - - 329.11%
14 NEAT CEMENT SKIRTING r.m 4.72 100.00 472.00 4.40 440.00 4.40 440.00 - - 93.22%
15 METAL WORKS FOR FENCE k.g 2666.14 220.00 586,550.80 2,024.64 445,420.80 1982.36 436,119.20 42.28 9,301.60 75.94%
16 METAL WORKS FOR GATE k.g 130.78 220.00 28,771.60 123.31 27,128.20 118.89 26,155.45 4.42 972.75 94.29%
17 PLASTER ON OUTER WALL Sq.m 7.92 600.00 4,752.00 7.80 4,679.04 7.80 4,679.04 - - 98.46%
18 EXTERIOR WEATHER COAT PAINT Sq.m 8.87 350.00 3,104.50 8.27 2,895.20 8.27 2,895.20 - - 93.26%
19 CHAIN LINK FENCE Sq.m 295.46 1,000.00 295,460.00 294.00 294,000.00 294.00 294,000.00 - - 99.51%
20 FLAG POLE nos. 2 25,000.00 50,000.00 2.00 50,000.00 2.00 50,000.00 - - 100.00%
21 STONE MASONARY WORKS Cu.m 10,000.00 - 254.05 2,540,450.00 254.05 2,540,450.00
22 50MM DIA WEEP PIPE r.m 100.00 - 166.10 16,610.00 166.10 16,610.00
23 GEOTEXTILE Sq.m 200.00 - 149.00 29,800.00 149.00 29,800.00
- -
CIVIL WORKS-RESERVIOR TANK - -
SITE CLEARANCE & MOBILIZATION:
1.1 sq.m 22.31 50.00 2,231.00 22.31 1,115.50 22.31 1,115.50 - - 100.00%
Clearing and grubbing the site for construction by removing
150mm thick top soil including bushes, small trees, leveling of
undulated ground, shorting and stacking/storing selected top
soil for reuse in landscaping works, disposing unsuitable
materials from site, etc., all complete as per drawings,
specifications and instructions of the Engineer.
Prepared by contractor Checked by Consultant, DSC Verified by (Engineer), DLPIU Recommended by DLPIU Chief Checked and forwarded by CLPIU DPD Approved by CLPIU, project Director
Bill of Quantities Up to Date of work till now Previous Bill Currently Accomplished work
Pay Item
Description Unit % completion Remarks
No.
Quantity As per
Rate Amount Quantity Amount Quantity Amount Quantity Amount
BOQ
EARTHWORK IN EXCAVATION :
1.2 Excavation in foundations in all type of soils for foundation, cu.m 24.58 400.00 19,657.44 24.57 9,828.72 24.57 9,828.72 - - 99.97%
trenches, footing, pits etc. to the required depth including
dewatering by manual or mechanical means etc. as per
EARTH BACK
specifications withFILLING
all contractor’s: own machinery and
1.3 Back filling inproviding
equipment's, foundation and sides
crossing of foundation
of track, with
shoring, strutting, cu.m 4.02 300.00 2,405.70 4.01 1,202.85 4.01 1,202.85 - - 99.74%
approved
timbering soil and obtained
buttressing fromwiththeappropriate
excavationmaterials
at site andand stacked
all
at sitemeasures
such or brought from outside
necessary to retainin layer not exceeding
in position the sides15 ofcm
the
BOULDER
thick (compacted SOLING :
thickness) including transportation
foundation pit and including refilling the excavated material of soil,
1.4 Providing
spreading
with watering, andrequired
in laying
ramming, uncoursed
lineleveling
and level, hand packedand Dry
thesprinkling
site Rubbleoff the
water,
disposing cu.m 2.08 6,000.00 24,924.00 2.08 12,462.00 2.08 12,462.00 - - 99.86%
Stone
ramming, soling in foundation,
compacting
surplus/unusable earth with underthe
mechanical
to outside floor plinth
rammers,
construction withtesting,
out anyetc.,
premises,
special
all dressing
complete
etc.CONCRETE
2. all complete as per of
as stone
drawing, including
per drawings,
WORKS filling interstices
specification and with of
and instructions
specifications
suitable
the
2.1 quarry
Engineer.
instructions
P.C.C of the waste or stone chips or quarry sand, watering,
Engineer.
2.1.1 compacting
2.1.1 P.C.C using(1:3:6) appropriate mechanical compaction means cu.m 0.78 14,000.00 21,808.50 0.78 10,904.25 0.78 10,904.25 - - 99.86%
with all contractors
Providing and layingmaterials,
machine handling,
mixed Plain placing
Cement etc.Concrete
all of
completemix
nominal as per1:3:6 drawings,
(1 cement specifications
: 3 sand : 6 and coarse instruction
aggregate of)the
for
P.C.C.
leveling FOR
Engineer.course R.C.C.
The complete WORKS :
item including
in foundations and underallfloor leadof &building,
lift. etc.
Providing
in all leveland withlayingbroken in stone
position machine
aggregate ofmixed
size not and machine
more than
2.2 vibrated cu.m 7.42 20,000.00 296,590.00 7.41 148,295.00 7.41 148,295.00 - - 99.93%
25 mm ofcement approved concrete
quality ofincluding
mix 1:1.5:3 (1 cement:1.5
formwork wherever sand: 3
coarse aggregate) M20 grade for reinforced
necessary, dewatering, batching, mixing, transporting, placing, cement concrete
work
SILICA using
compacting, approved
CEMENT cement with
ADMIXTURE
curing, including 20 mm
all lead and graded
lift, etc.machine
all complete
2.3 crushed
Providing
as stone
and aggregate
per drawings, mixing of approved
Silica
specifications Cement
and the quality
Admixture in various
instructions of in
of structural
the kg 74.2 300.00 44,488.50 74.15 22,244.25 74.15 22,244.25 - - 99.93%
locations
concrete and heights including transportation
Engineer.at the rate of 2.50% by weight of the cement of concretefor to
site
promoting workability, improving strength, achieving level,
STEELof placing, compaction,
REINFORCEMENT finished to required line and
2.4 protection and and fixing
curing,inetc. all complete Mt. 1.46 130,000.00 396,477.53 1.47 191,574.92 1.58 204,902.61 (0.10) (13,327.69) 100.94%
Providing
waterproofing properties, position
bleeding 500 as
Feprevention, perreinforcement
steel drawings,
etc. Silica of
specifications
various
Cement diameter
FORM WORKS
Admixture andconfirming
the instructions
shall be the of theof
to relevant
product Engineer,
IS but or
code inJapan
Silica R.C.C.
excluding
works
superior and
Supplying the
including
and cost
shall of
laying centering,
straightening,
meetcentering, shuttering,
cutting,
the requirements
shuttering asofand
bending, reinforcement,
binding
mentioned
various inwith
pattern
2.5 all complete as sq.m 54.93 800.00 88,908.80 54.67 43,738.00 56.46 45,170.80 (1.79) (1,432.80) 99.53%
20 SWG annealed
formworks
specification of per
with drawings,
wire
19/12
materials mmforand specifications
tying
thick water
Workmanship, proofand
the reinforcement ply instructions
bars–&at
wood
Division of
each
4:steel
the Engineer.
junctions Works,
adjustable
Concrete (binding
props for wire shall
2.4 not
all kinds
Article of RCCbe measured
works for separately)
foundations,
3.1.1 INTERNAL
including all CEMENT
waste and cutPLASTER
pieces, (1:4) WITH
provision for PUNNING
adequate sq.m 33.66 700.00 48,389.70 33.66 23,565.25 35.46 24,824.45 (1.80) (1,259.20) 100.01%
columns, shear walls, beams, slab, staircase, lintel, sill,
4 WATERincluding
numbers
pergola, ofPROOF COATING
spacers,nails,chairs, providing
propping and placing
scaffolding, cement
staging, sq.m 33.66 550.00 38,020.48 33.66 18,515.55 35.46 19,504.93 (1.80) (989.37) 100.01%
mortar (1:1)and
supporting cover blocksintoproper
bracing keep the bars
lines andinlevel,
intended position
sealing the -
at all levels
Furniture
joints heavy duty brown self adhesive tape, aligningand
all
with Works complete as per drawings, specifications to Lot 1 5,500,000.00 5,500,000.00 1.00 5,500,000.00 1.00 5,500,000.00 - - 100.00%
instructions
line and levels of the Engineer.
including (Authorized
Ties,
TotalPVC Spacer, lap length
Providing and for the 67,664,499.34 70,539,377.91 63,304,730.40 7,234,647.52
bar length cutouts/
openings/ exceeding 10 meter
pockets, in length
applying shall be measured
De-shuttering chemical, for
the payment, except to column).
De-shuttering as approved by the Engineer etc., complete at all
levels as per drawing, specifications and instructions of the
Engineer.
Prepared by contractor Checked by Consultant, DSC Verified by (Engineer), DLPIU Recommended by DLPIU Chief Checked and forwarded by CLPIU DPD Approved by CLPIU, project Director
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block 3-LaLiEACCr(F), Tc(S)
School Name : Shree Dharmawati SS
Location : Choprak,Gorkha
Abstract of Cost
Type Design
Pay Item Quantity Total
Description of Works Unit Rate (NRs.) Site Amount Remarks
No. in BOQ 3-LaLiEACCr(F)-A Qty-3-9C(SF). Tc(S) Water Tank Quantity
Development
GENERAL
1 MOBILIZATION AND DEMOBILIZATION L.S. 1.00 500,000.00 1.00 500,000.00
2 SITE OFFICE ESTABLISHMENT Per Month 21.00 25,000.00 21.00 525,000.00
3 PROJECT INFORMATION BOARD nos. 1.00 10,000.00 1.00 10,000.00
4 SAFETY SIGN BOARD nos. 1.00 10,000.00 1.00 10,000.00
5 BARRICADING WORKS R.m 110.00 2,000.00 110.00 220,000.00
6 SAFETY MATERIALS & SITE SAFETY L.S. 1.00 100,000.00 1.00 100,000.00
7 LAB TEST(WATER TEST) job 1.00 0.00 -
8 TEMPORARY TOILET nos. 2.00 150,000.00 2.00 300,000.00
9 ROAD REPAIR AND MAINTENANCE Km. 2.00 50,000.00 2.00 100,000.00
Breadth Height
S. No. Description No. Length (m) Quantity Unit Remarks
(m) (m)
1 EARTH WORKS
1.1 Site Clearance
Building 1 34.50 15.50 534.75
Soak Pit 1 15.90 Area 15.90
Total 550.65 sq.m
Ramp
For Slope 1 1.30 0.52 Area 0.67
Wall Along Grid B 1 0.50 0.45 0.45 0.10
Wall Parallel to Ramp 1 6.80 0.45 0.41 1.25
Total 249.69 cu.m
2 CONCRETE WORKS
2.1 P.C.C.
2.1.1 P.C.C.(1:3:6) Works
Footing
Isolated F1 2 2.50 2.50 0.10 1.25
Isolated F2 4 3.00 3.00 0.10 3.60
Combined CF1 3 1.80 5.00 0.10 2.70
Combined CF2 1 3.00 5.00 0.10 1.50
Combined CF3 2 2.80 5.00 0.10 2.80
Ramp
Sloped 1 1.30 0.51 Area 0.66
Wall Top 1 1.33 0.25 0.05 0.02
1 6.80 0.13 0.05 0.04
Lab/ECD/Store/Pantry 4 5.70 6.70 0.08 11.46
Corridor 4 5.70 2.20 0.08 3.76
1 4.20 2.20 0.08 0.69
Below Staircase 1 4.20 6.70 0.08 2.11
Total 22.41 cu.m
B Beam
Foundation beam (300x400)
Along Grid A & F 2 3.50 0.30 0.40 0.84
Along Grid B 1 3.30 0.30 0.40 0.40
Grid C & D 2 3.55 0.30 0.40 0.85
Along Grid E 1 3.25 0.30 0.40 0.39
Along Grid 1 1 12.50 0.30 0.40 1.50
Along Grid 2,3 2 15.10 0.30 0.40 3.62
Secondary beam
Along grid 1a 2 10.9 0.25 0.3 1.64
Along grid 1b 1 4.2 0.25 0.3 0.32
Along grid A1,B1,D1 & E1 4 8.9 0.25 0.3 2.67
Edge Beam(125x525)
Grid B,C 1 7.90 0.13 0.3 0.30
Secondary beam
Along grid 1a 2 10.9 0.25 0.3 1.64
Along grid 1b 1 4.2 0.25 0.3 0.32
Along grid A1,B1,D1 & E1 4 8.9 0.25 0.3 2.67
Secondary beam
Along grid 1a 2 10.9 0.25 0.3 1.64
Along grid 1b 1 4.2 0.25 0.3 0.32
Along grid A1,B1,D1 & E1 4 8.9 0.25 0.3 2.67
Beam(Roof level)
Main beam
Along grid 1,2 & 3 3 4 0.3 0.4 1.44
Along grid C & D 2 8.5 0.3 0.4 2.04
Secondary beam
Along grid 1a 1 4.2 0.25 0.3 0.32
C Column
Ground floor plan
D Slab
First floor level (+3.00m Lvl) 1 305.15 Area 0.13 38.14
Deduction
Column deduction -18 0.50 0.50 0.13 -0.56
Void deduction -1 4.78 4.20 0.13 -2.61
Projections
At Back 2 11.50 0.70 0.13 2.01
At Front 1 6.20 1.00 0.13 0.78
E Staircase
Ground floor level
Bottom 1 2.07 2.00 0.20 0.83
Landing 1 2.20 2.00 0.20 0.88
1 2.00 2.10 0.20 0.84
Waist Slab 1 6.75 2.00 0.20 2.70
Steps 20 0.03 Area 2.00 1.20
Landing Beam 1 4.00 0.25 0.38 0.38
G Lintel Bands
Ground floor level
Short Span
Along grid A,C,D,E,F 5 6.50 0.23 0.08 0.56
Between B,C 1 4.70 0.125 0.08 0.04
1 2.05 0.23 0.08 0.04
Long Span
Along grid 1 1 22.20 0.23 0.08 0.38
Along grid 2 1 21.68 0.23 0.08 0.37
H Soak Pit
RCC slab 1 2.27 Area 0.15 0.34
I Pedestal
Base Block 14 0.50 0.25 0.25 0.44
J Parapet Wall
Top Floor 2.00 36.53 0.35 0.10 2.56
1.00 7.50 0.35 0.10 0.26
Roof Level 1.00 33.00 0.35 0.10 1.16
K Bench
Bench Top Slab 2 2.40 0.50 0.08 0.18
L Slab for In-built Furniture
Furniture Slab for Lab 4 1.80 0.90 0.10 0.65
Sink slab type-1 1 9.43 0.50 0.10 0.47
Sink slab type-2 1 5.75 0.50 0.10 0.29
Sink slab type-3 1 3.60 0.90 0.10 0.32
Furniture slab in preparation room 1 6.75 0.60 0.10 0.41
Sink Deduction
Sink slab type-1 -2 0.70 0.35 0.10 -0.05
Sink slab type-2 -2 0.70 0.35 0.10 -0.05
2.5 Formworks
Formworks for RCC
A Foundation
Isolated footing
Isolated F1 2 10.00 0.25 5.00
Isolated F2 4 12.00 0.25 12.00
Combined footing
Combined CF1 3 13.60 0.60 24.48
Combined CF2 1 16.00 0.60 9.60
Combined CF3 2 15.60 0.60 18.72
B Beam
Foundation beam (300x400)
Along Grid A & F 2 3.50 0.80 5.60
Along Grid B 1 3.30 0.80 2.64
Grid C & D 2 3.55 0.80 5.68
Along Grid E 1 3.25 0.80 2.60
Along Grid 1 1 12.50 0.80 10.00
Along Grid 2,3 2 15.10 0.80 24.16
Along Grid 1 1 26.00 0.80 20.80
Along Grid 2,3 2 26.00 0.80 41.60
Secondary beam(250x425)
Grid 1a 4 5.45 0.85 18.53
Grid 1b 1 4.20 0.70 2.94
Grid A1,B1,D1,E1 4 8.90 0.85 30.26
Edge Beam(125x525)
Grid B,C 1 7.90 1.05 8.30
Secondary beam(250x425)
Grid 1a 4 5.45 0.85 18.53
Grid 1b 1 4.20 0.70 2.94
Grid A1,B1,D1,E1 4 8.90 0.85 30.26
Secondary beam(250x425)
Grid 1a 1 4.20 0.85 3.57
Landing beam 3 0.85 4.00 10.20
C Column
Ground floor plan
Total columns(500x500) 18 2.00 2.88 103.50
D Slab
First floor level (+3.00m Lvl) 1 28.80 9.80 282.24
Cantilever slab back side 2 11.75 0.70 16.45
Cantilever slab front side 1 6.15 1.00 6.15
Deduction
Void deduction -1 4.75 4.20 -19.95
Main beam(300x500)
Along grid 1,2,3 -3 26.00 0.30 -23.40
Along Grid A,B,E,F -4 8.50 0.30 -10.20
Along Grid C,D -2 9.25 0.30 -5.55
Secondary beam(250x425)
Grid 1a -4 5.45 0.25 -5.45
Edge Beam(125x525)
Grid B,C -1 7.90 0.13 -0.99
Main beam(300x525)
Along grid 1,2,3 -3 26.00 0.30 -23.40
Along Grid A,B,E,F -4 8.50 0.30 -10.20
Along Grid C,D -2 8.50 0.30 -5.10
Secondary beam(250x425)
Grid 1a -4 5.45 0.25 -5.45
Grid 1b -1 4.20 0.25 -1.05
Grid A1,B1,D1,E1 -4 8.90 0.25 -8.90
Main beam(300x525)
Along grid 1,2,3 -3 26.00 0.30 -23.40
Along Grid A,B,E,F -4 8.50 0.30 -10.20
Along Grid C,D -2 8.50 0.30 -5.10
Secondary beam(250x425)
Grid 1a -4 5.45 0.25 -5.45
Grid 1b -1 4.20 0.25 -1.05
Grid A1,B1,D1,E1 -4 8.90 0.25 -8.90
Secondary beam(250x425)
Grid 1a -1 4.20 0.25 -1.05
E Staircase
Ground floor level
Bottom 1 2.07 0.20 0.41
Waist Slab 1 6.75 2.00 13.50
Side 1 6.75 0.20 1.35
Landing 1 2.20 1.65 3.64
1 2.00 2.15 4.29
Side 1 3.80 0.15 0.57
Riser 20 2.00 0.15 6.00
Landing Beam 1 4.00 0.86 3.44
G Lintel Bands
Ground floor level
Along grid A,C,D,E,F 5.00 6.50 0.15 4.88
Along grid 1 1.00 22.20 0.15 3.33
Along grid 2 1.00 21.68 0.15 3.25
Between B,C 1.00 4.70 0.15 0.71
1.00 2.05 0.15 0.31
First floor level
Along grid A,C,D,E,F 5.00 6.50 0.15 4.88
Along grid 1 1.00 22.20 0.15 3.33
Along grid 2 1.00 21.75 0.15 3.26
Between B,C 1.00 5.03 0.15 0.75
1.00 1.73 0.15 0.26
Second floor level
Along grid A,B,C,D,E,F 6.00 6.50 0.15 5.85
Along grid 1 1.00 22.20 0.15 3.33
Along grid 2 1.00 21.60 0.15 3.24
Between Principal/Admin 1.00 1.50 0.15 0.23
1.00 4.25 0.15 0.64
I Pedestal
Base Block 14 1.25 0.25 4.38
J Parapet Wall
Top Floor 2.00 36.53 0.25 18.27
1.00 7.50 0.25 1.88
Roof Level 1.00 33.00 0.25 8.25
K Bench
Bench Top Slab 2 5.80 Perimeter 0.075 0.87
Bottom 2 5.80 0.60 6.96
Deduction -4 0.13 0.50 -0.25
L Slab For In-built Furniture
Furniture Slab for Lab 4 1.80 0.90 6.48
4 5.40 0.10 2.16
Sink slab type-1 1 9.43 0.50 4.71
1 10.43 0.10 1.04
2 2.10 0.10 0.42
Sink deduction -2 0.70 0.35 -0.49
Sink slab type-2 1 5.75 0.50 2.88
1 6.75 0.10 0.68
2 2.10 0.10 0.42
Sink Deduction -2 0.70 0.35 -0.49
Sink slab type-3 1 3.60 0.90 3.24
1 9.00 0.10 0.90
1 2.10 0.10 0.21
Sink deduction -1 0.70 0.35 -0.25
Furniture slab in preparation room 1 6.75 0.60 4.05
1 6.75 0.10 0.68
M Soak Pit
RCC slab 1.00 1.13 Area 1.13
Parapet Wall
Top Floor 2.00 36.53 0.23 0.80 13.44
1.00 7.50 0.23 1.40 2.42
Roof Level 1.00 33.00 0.23 0.90 6.83
Outside
Steps 1 28.58 0.60 0.15 2.57
1 28.58 0.30 0.15 1.29
Ramp
Wall Along -B 1 1.33 0.25 Area 0.33
1 6.91 0.17 Area 1.19
5 FLOORING WORKS
5.1 Hardened Cement Concrete Flooring (40mm) With Neat Cement Punning
Ground floor plan
Laboratory 1.00 9.43 6.75 63.62
Store 1.00 2.23 6.75 15.02
Class Room/Store,Pantry 2.00 5.75 6.75 77.63
Corridor 1.00 28.80 2.37 68.26
1.00 4.20 2.37 9.95
Staircase Below 1.00 6.625 4.2 27.83
Staircase
Staircase Tread 18.00 0.30 2.00 10.80
Riser 20.00 0.15 2.00 6.00
Staircase landing 1.00 2.00 2.20 4.40
1.00 2.13 2.00 4.25
Roof plan
Roof Floor Slab 1.00 5.50 10.50 57.75
Total 1206.32 sq.m
7 PLASTER WORKS
7.1 Internal Cement Plaster
7.1.1 Internal Plaster on Wall (1:6)
Ground Floor
Laboratory 1 32.75 2.88 94.16
Store 1 17.95 2.88 51.61
Store/Pantry/ECD 2 25.35 2.88 145.76
Deductions
W1 -18 1.10 1.13 -11.14
V1 -18 1.10 0.53 -5.20
W3 -1 1.50 0.37 -0.28
D1 -6 1.10 2.44 -8.04
D3 -2 1.00 2.10 -2.10
D4 -2 1.00 1.55 -1.55
Column Plaster
Ground Floor
Along grid 1
Grid 1A,1F 2.00 1.25 3.00 7.50
Grid 1B,1C,1D,1E 4.00 0.75 3.00 9.00
Along grid 3
Grid 3A,3B,3C,3D,3E,3F 6.00 1.50 2.48 22.28
6.00 0.50 3.00 9.00
First Floor
Along grid 1
Grid 1A,1F 2.00 1.25 3.00 7.50
Grid 1B,1C,1D,1E 4.00 0.75 3.00 9.00
Along grid 3
Grid 3A,3B,3C,3D,3E,3F 6.00 1.50 2.48 22.28
6.00 0.50 3.00 9.00
Second Floor
Along grid 1
Grid 1A,1F 2.00 1.25 3.00 7.50
Grid 1B,1C,1D,1E 4.00 0.75 3.00 9.00
Along grid 3
Grid 3A,3B,3C,3D,3E,3F 6.00 1.50 2.48 22.28
6.00 0.50 3.00 9.00
Parapet Wall
Top Floor 2 35.90 0.80 57.44
1 7.50 1.40 10.50
Roof 1 32.00 0.90 28.80
On Outer walls
Ground floor level
Along grid A,F/1-2 2 6.50 2.48 32.18
Along grid 1 4 5.55 2.48 54.95
1 4.00 2.10 8.38
Along grid 2 4 5.55 2.48 54.95
First floor level
Along grid A,F/1-2 2 6.50 2.48 32.18
Along grid 1 4 5.55 2.48 54.95
1 4.00 2.10 8.38
Along grid 2 4 5.55 2.48 54.95
Second floor level
Along grid A,F/1-2 2 6.50 2.48 32.18
Along grid 1 4 5.55 2.48 54.95
1 4.00 2.10 8.38
Along grid 2 4 5.55 2.48 54.95
Top floor level
Along grid C,D/1-3 2 8.50 2.10 35.70
Along grid 1 1 4.00 2.10 8.40
Along grid 3 1 4.00 2.10 8.40
8 MISCELLANOUS
8.4 Railing
Total
Staircase Railing length Kg/m
Length
Horizontal ISNB 40M 1 22.818 22.82 3.56 81.23
Horizontal ISNB 40M (Top Floor) 1 2.125 2.13 3.56 7.57
Vertical 38mm Square Pipe 6 0.92 5.52 2.82 15.57
Vertical 38mm Square Pipe 20 0.95 19.00 2.82 53.58
Horizontal 25mm Square Pipe 4 22.818 91.27 0.85 77.58
Horizontal 25mm Square Pipe (Top Floor) 4 2.125 8.50 0.85 7.23
Balcony Railing
First Floor
Horizontal ISNB 40M 1 30.2 30.20 3.56 107.51
Horizontal ISNB 32M 2 30.2 60.40 3.10 187.24
Vertical ISNB 32M 23 1.14 26.22 3.10 81.28
Inclined ISNB 32M 23 0.134 3.08 3.10 9.55
Vertical 25mm Square Pipe 208 0.82 170.56 0.85 144.98
Second Floor
Horizontal ISNB 40M 1 30.2 30.20 3.56 107.51
Horizontal ISNB 32M 2 30.2 60.40 3.10 187.24
Vertical ISNB 32M 23 1.14 26.22 3.10 81.28
Inclined ISNB 32M 23 0.134 3.08 3.10 9.55
Vertical 25mm Square Pipe 208 0.82 170.56 0.85 144.98
Parapet Wall
ISNB 40M(Horizontal Bars) 2 36.53 73.06 3.56 260.09
Pedestal
ISNB 40M Pedestal Bars 14 1.54 21.57 3.56 76.80
14 1.20 16.80 3.56 59.81
28 0.40 11.20 3.56 39.87
Base plate 185 0.00009375 0.02 7850 136.15
12 mm dia. Anchor Bolt, Nut 740 0.13 96.20
Total 2,424.07 k.g
2 Column
2.1 Grid 1 (A ,B,E &F) 4
Main Bar 16 6 3.59 86.11 1.59 136.92 16mm
16 6 6.59 158.11 1.59 251.40 6.18 3.18 16mm
0.10 0.1
0.31 0.31
2.2 Grid 1 ( C ) 1
Main Bar 20 4 4.07 16.27 2.47 40.19
16 2 3.59 7.18 1.59 11.41 20mm 16mm
16 6 6.59 39.53 1.59 62.85 16mm 6.18
3.42 3.18
2.3 Grid 1 ( D ) 1
Main Bar 20 6 4.07 24.42 2.47 60.32
20 6 7.07 42.41 2.47 104.75 20mm 20mm
6.42 3.42
0.12 0.12
0.12 0.12
0.53 0.53
2.6 Grid 3 (A,B,C,D,E & F) 6
Main Bar 20 6 4.07 146.52 2.47 361.90
20 6 7.26 261.23 2.47 645.23 20mm 20mm
3.42 6.42
0.12 0.12
0.53 0.53
2.7 Stirrups 18
For 18 columns 8 12 1.84 397.44 0.40 158.98 0.08
8 24 1.28 552.96 0.40 221.18 0.42 0.14 0.08
0.42
0.42
3 For Lower Tie Beam
3.1 Grid 1,2 & 3 3 8.73
Top Bar 16 2 10.04 60.24 1.59 95.78 0.96
0.35
End bar from both
direction
16 2 11.46 68.76 1.59 109.33 11.46
8.73
16 2 10.04 60.24 1.59 95.78 0.96
0.35
2.94
Middle bar 16 1 4.25 12.75 1.59 20.27 0.96
0.35
0.25
8.61
20 2 10.24 61.41 2.47 151.68 1.2
0.425
2.94
Middle bar 16 1 4.33 12.98 1.59 20.63 0.96
0.425
16 1 12.00 36.00 1.59 57.24 12
2.94
16 1 4.33 12.98 1.59 20.63 0.96
0.425
Bottom Bar
End bar from both 20 2 11.65 69.90 2.47 172.65
0.94
direction 9.51 1.2
0.66
16 1 11.37 34.11 1.59 54.23 0.96 9.75
0.25 0.25
5 Column ( Up To 1st Floor Level)
5.1 Grid 1 (A ,B,E & F) 4
0.96
5.2 Grid 1 ( C ) 1
Main Bar 20 4 7.20 28.80 2.47 71.14
16 2 6.96 13.92 1.59 22.13 20mm 16mm
0.12 0.96
5.3 Grid 1 ( D ) 1
Main Bar 20 6 7.20 43.20 2.47 106.70
6 20mm
2.47
1.2
1.20 0.96
1.2
1.20
5.7 Stirrups 18
For 18 columns 8 31 1.84 1026.72 0.40 410.69 0.08
8 62 1.28 1428.48 0.40 571.39 0.42 0.14 0.08
1.59 0.42
0.42
6 For Staircase
(Plinth level to 1st floor level)
1.703
Main Bar (top bar) 1 16 21 8.23 172.81 1.59 274.77 0.3
3.354
2.472
0.4
2.042 1.03
0.2
1
Extra Bar 1 16 21 2.00 42.00 1.59 66.78
1
1.853
Landing bottom bar 1 16 21 3.00 63.06 1.59 100.27 1 0.15
1.2
Landing Extra bar 1 16 21 2.20 46.20 1.59 73.46 1
1
2.147 0.15
1
Extra Bar 1 16 21 2.20 46.20 1.59 73.46 1.2
1.82
Bottom bar( Slab level) 1 16 21 3.02 63.42 1.59 100.84 0.2 1
4.92
6.1 Landing Beam 1 20 3 5.62 16.86 2.47 41.64 0.35 0.35
4.46 1.5
1.29
6 25 2 6.75 81.00 3.86 312.66 5.46
7.2 Grid 1
0.94
Bottom Bar (end bar) 1 20 2 5.65 11.30 2.47 27.91 1.2
3.51
0.94
20 2 9.85 19.70 2.47 48.66
1.2 7.71
Top Bar (End Bar) 16 2 10.35 20.70 1.59 32.91 8.73 0.96
0.66
0.96 8.73
16 2 10.35 20.70 1.59 32.91
0.66
2.94 0.96
Middle Bar 16 1 4.56 4.56 1.59 7.25
0.66
16 1 12.00 12.00 1.59 19.08 12
0.96
16 1 12.00 12.00 1.59 19.08 11.04
0.66
16 1 4.56 4.56 1.59 7.25 2.94
0.96
0.94
3.5
3 25 4 3.80 45.60 3.86 176.02 0.15 0.15
0.35
2 16 1 4.98 9.95 1.59 15.82
4.625
top bar (end bar) 2 16 2 4.06 16.22 1.59 25.79
2.645 0.96
0.45
4.75
top bar 1 12 3 5.65 16.95 0.89 15.09 0.45 0.45
250
7.9 Stirriups( For Main Beam) 1 10 1125 1.65 1856.25 0.62 1150.88 0.10
0.425
0.25
7.10 For Secondry Beam 1 8 540 1.31 707.40 0.40 282.96
0.8
0.375
0.2
between 2 & 3
along x axis 1 8 6 4.20 25.20 0.40 10.08 4.2
along y axis 1 8 18 2.20 39.60 0.40 15.84 2.2
9 Bands
Ground Floor
9.1 Sill Bands 0.75 0.75
Grid 1 4 10 2 7.15 57.20 0.62 35.464 0.075 5.5 0.075
1 10 2 4.50 9.00 0.62 5.58 4.5
0.75 0.75
1 10 2 5.65 11.30 0.62 7.006 0.075 4 0.075
0.7
0.95 0.95
Distribution Bar 1 8 63 0.82 51.66 0.40 20.66 0.06 0.7 0.06
Type3
Main Bar 1 8 5 6.82 34.10 0.40 13.64 0.06 6.7 0.06
Type 4
Main Bar 1 8 5 0.45 2.25 0.40 0.90 0.06 0.45 0.06
Type 5
Main Bar 1 8 5 0.86 4.30 0.40 1.72 0.06 0.74 0.06
0.96
10.2 Grid 1 ( C ) 1
Main Bar 20 4 7.20 28.80 2.47 71.14
16 2 6.96 13.92 1.59 22.13 20mm 16mm
0.12 0.96
10.3 Grid 1 ( D ) 1
Main Bar 20 6 7.20 43.20 2.47 106.70
6 20mm
2.47
1.2
1.20 0.96
1.2
1.20
10.7 Stirrups 18
For 18 columns 8 31 1.84 1026.72 0.40 410.69 0.08
8 62 1.28 1428.48 0.40 571.39 0.42 0.14 0.08
1.59 0.42
0.42
11 For Staircase
(1st Floor level to 2nd Floor Level)
1.703
Main Bar (top bar) 1 16 21 8.23 172.81 1.59 274.77 0.3
3.354
2.472
0.4
2.042 1.03
0.2
1
Extra Bar 1 16 21 2.00 42.00 1.59 66.78
1
1.853
Landing bottom bar 1 16 21 3.00 63.06 1.59 100.27 1 0.15
1.2
Landing Extra bar 1 16 21 2.20 46.20 1.59 73.46 1
1
2.147 0.15
1
Extra Bar 1 16 21 2.20 46.20 1.59 73.46 1.2
1.82
Bottom bar( Slab level) 1 16 21 3.02 63.42 1.59 100.84 0.2 1
0.2
12 Main Beam(Second Floor Level)
12.1 Grid A,B,C,D,E & F
Bottom bar (End Bar) 6 25 2 7.25 87.00 2.47 214.89 1.29
4.46 1.5
1.29
6 25 2 6.75 81.00 3.86 312.66 5.46
12.2 Grid 1
0.94
Bottom Bar (end bar) 1 20 2 5.65 11.30 2.47 27.91 1.2
3.51
0.94
20 2 9.85 19.70 2.47 48.66
1.2 7.71
Top Bar (End Bar) 16 2 10.35 20.70 1.59 32.91 8.73 0.96
0.66
0.96 8.73
16 2 10.35 20.70 1.59 32.91
0.66
2.94 0.96
Middle Bar 16 1 4.56 4.56 1.59 7.25
0.66
16 1 12.00 12.00 1.59 19.08 12
0.96
16 1 12.00 12.00 1.59 19.08 11.04
0.66
16 1 4.56 4.56 1.59 7.25 2.94
0.96
0.94
3.5
3 25 4 3.80 45.60 3.86 176.02 0.15 0.15
0.35
2 16 1 4.98 9.95 1.59 15.82
4.625
top bar (end bar) 2 16 2 4.06 16.22 1.59 25.79
2.645 0.96
0.45
4.75
top bar 1 12 3 5.65 16.95 0.89 15.09 0.45 0.45
250
12.8 Stirrups( For Main Beam) 1 10 1125 1.65 1856.25 0.62 1150.88 0.10
0.425
0.25
12.9 Stirrups ( For Secondry Beam) 1 8 540 1.31 707.40 0.40 282.96
0.8
0.375
0.2
0.375
Infront of stair case
Straight bar 1 8 15 4.92 73.80 0.40 29.52 4.92
Distribution bars
Between Grid 1 &1a
along x-axis 1 8 96 2.72 261.12 0.40 104.45 2.72
along y- axis 1 8 80 3.20 256.00 0.40 102.40 3.2
between 2 & 3
along x axis 1 8 6 4.20 25.20 0.40 10.08 4.2
along y axis 1 8 18 2.20 39.60 0.40 15.84 2.2
Negative Bars
along Grid 1 2 8 35 2.05 143.50 0.40 57.40 2.05
along grid 1a 2 8 35 2.35 164.50 0.40 65.80 2.35
along grid 1b 1 8 7 1.08 7.56 0.40 3.02 1.08
along grid 2 (except infront of
stair case) 2 8 35 2.10 147.00 0.40 58.80 2.1
along grid 2 in front of
staircase 1 8 14 1.38 19.32 0.40 7.73 1.38
along grid a1 1 8 28 2.05 57.40 0.40 22.96 2.05
along grid b 1 8 28 2.10 58.80 0.40 23.52 2.1
along b1 1 8 28 2.05 57.40 0.40 22.96 2.05
along grid c&d 2 8 9 2.55 45.90 0.40 18.36 2.55
along grid d1 1 8 28 2.05 57.40 0.40 22.96 2.05
along grid e 1 8 28 2.10 58.80 0.40 23.52 2.1
along grid e1 1 8 28 2.05 57.40 0.40 22.96 2.05
0.96
0.96
14.3 Grid 1 ( D ) 1
Main Bar 20 2 6.21 12.41 2.47 30.66
16 4 5.97 23.87 1.59 37.95 6 20mm 16mm
5.00625 5.00625
1.2 0.96
0.96
1.2 0.96
1.20 0.96
14.7 Stirrups 18
For 18 columns 8 31 1.84 1026.72 0.40 410.69 0.08
8 62 1.28 1428.48 0.40 571.39 0.42 0.14 0.08
0.42
0.42
14.8 Band (Second Floor)
Sill Bands 0.75 0.75
Grid 1 4 10 2 7.15 57.20 0.62 35.464 0.075 5.5 0.075
1 10 2 4.50 9.00 0.62 5.58 4.5
0.75 0.75
1 10 2 5.65 11.30 0.62 7.006 0.075 4 0.075
15 For Staircase
(2nd Floor to Top Foor)
1.703
Main Bar (top bar) 1 16 21 8.23 172.81 1.59 274.77 0.3
3.354
2.472
0.4
2.042 1.03
0.2
1
Extra Bar 1 16 21 2.00 42.00 1.59 66.78
1
1.853
Landing bottom bar 1 16 21 3.00 63.06 1.59 100.27 1 0.15
1.2
Landing Extra bar 1 16 21 2.20 46.20 1.59 73.46 1
1
2.147 0.15
1
Extra Bar 1 16 21 2.20 46.20 1.59 73.46 1.2
1.82
Bottom bar( Slab level) 1 16 21 3.02 63.42 1.59 100.84 0.2 1
4.92
15.1 Landing Beam 1 20 3 5.62 16.86 2.47 41.64 0.35 0.35
0.2
16 Main Beam (Top Floor Level))
16.1 Grid A,B,E & F
Bottom bar (mid bar) 4 20 2 10.87 86.96 2.47 214.79 0.475 0.475
9.92
0.475
0.475
End Bar 4 25 2 10.87 86.96 3.86 335.67 9.92
0.94 0.94
Bottom Bar along C & D 2 20 2 11.80 47.20 2.47 116.58 0.92
16.4 Grid 1
0.475
Bottom Bar (end bar) 1 20 2 3.39 6.77 2.47 16.72 1.2
1.71
0.475
20 2 9.39 18.77 2.47 46.36
1.2 7.71
Top Bar (End Bar) 16 2 10.35 20.70 1.59 32.91 8.73 0.96
0.66
0.96 8.73
16 2 10.35 20.70 1.59 32.91
0.66
2.94 0.96
Middle Bar 16 1 4.56 4.56 1.59 7.25
0.66
16 1 12.00 12.00 1.59 19.08 12
0.96
16 1 12.00 12.00 1.59 19.08 11.04
0.66
16 1 4.56 4.56 1.59 7.25 2.94
0.96
16.5 Extra Bar Along Grid 1 1 25 4 3.65 14.60 3.86 56.36 0.15
1.29
4
1 25 4 4.30 17.20 3.86 66.39 0.15 0.15
3.5
0.475
20 4 9.39 75.08 2.47 185.45
1.2 7.71
0.94
1.2
Top Bar (end Bar) 20 4 10.75 43.00 2.47 106.21 8.61
0.94
3.5
2 20 4 3.80 30.40 2.47 75.09 0.15 0.15
4.75
top bar 1 12 3 5.65 16.95 0.89 15.09 0.45 0.45
16.10 Bent up Bar (hunch bar) 1 16 36 3.02 108.72 1.59 172.86 0.96 0.96
0.425 0.425
0.25
16.11 Stirriups( For Main Beam) 1 10 1125 1.65 1856.25 0.62 1150.88 0.10
0.425
0.25
16.12 For Secondry Beam 1 8 540 1.31 707.40 0.40 282.96
0.8
0.375
0.2
7.215
2 12 4 8.41 67.28 0.89 59.88
1.64
7.195
2 12 4 9.09 72.68 0.89 64.69 1.89
6.325
2 12 4 7.97 63.72 0.89 56.71
1.64
10.15
Infront of Grid A & F 2 12 4 10.15 81.20 0.89 72.27
6.64
2 12 2 8.17 32.68 0.89 29.09 0.89
7.28
16.14 Stirriups( beam 250*150 ) 1 8 546 0.76 414.96 0.40 165.98 0.0 0.1
8
0.2
0.525 0.95
cranked bar 1 8 36 4.04 145.26 0.40 58.10 0.08 0.08
2.4
2 1.5 1.5
cranked bar 1 8 24 11.01 264.24 0.40 105.70 0.08 0.08 0.08 0.08 0.08
1.5 1.5
0.08 0.08 0.95
1.5
0.95 1.875 1.875
1 8 24 11.38 273.12 0.40 109.25 0.08 0.08 0.08 2.25 0.08
1.5
0.08 0.08 0.95
1.5
0.95 1.5 1.5
1 8 24 11.01 264.24 0.40 105.70 0.08 0.08 0.08 1.5 0.08
1.5 2
0.08 1.5 0.08 0.08
between 2 & 3
along x axis 1 8 8 4.20 33.60 0.40 13.44 4.2
along y axis 1 8 18 2.20 39.60 0.40 15.84 2.2
Top near grid A & F (in bottom) 2 10 5 12.00 120.00 0.62 74.40 12
Top near grid A & F (on top) 2 10 4 12.00 96.00 0.62 59.52 12
Top infront of grid 3 (in bottom) 2 10 5 11.98 119.80 0.62 74.28 11.98
Top infront of grid 3 (on top) 2 10 4 11.98 95.84 0.62 59.42 11.98
Top infront of staircase (in bottom) 1 10 6 8.24 49.44 0.62 30.65 8.24
1 10 5 8.24 41.20 0.62 25.54 8.24
7.215
2 10 2 8.41 33.64 0.62 20.86
1.64
7.195
2 10 2 9.09 36.34 0.62 22.53 1.89
6.325
2 10 2 7.97 31.86 0.62 19.75
1.64
10.15
Infront of Grid A & F 2 10 2 10.15 40.60 0.62 25.17
6.64
0.96
18.2 Grid 1 ( D ) 1
Main Bar 20 2 3.20 6.40 2.47 15.81
16 4 2.96 11.84 1.59 18.83 20mm 16mm
2 2
1.2 0.96
1.2 0.96
18.4 Stirrups 6
For 6 columns 8 26 1.84 287.04 0.40 114.82 0.08
8 52 1.28 399.36 0.40 159.74 0.42 0.14 0.08
0.42
0.42
18.5 Band under wall (Grid C&D) 2 10 2 6.50 26.00 0.62 16.12 6.5
1 10 2 4.50 9.00 0.62 5.58 4.5
0.06 0.06
1 8 30 0.30 9.00 0.40 3.60 0.18
Stirrups 2 8 44 0.30 13.20 0.40 5.28 0.06 0.06
19 Slab Beam 0.18
19.1 Grid C & D
Bottom bar 2 20 2 10.87 43.48 2.47 107.40 0.475 0.475
9.92
0.475
0.475
2 16 1 10.87 21.74 1.59 34.57 9.92
4.92
Top Bar
Top bar along grid 1a 1 16 3 5.65 16.95 1.59 26.95 0.35 4.75 0.45
19.4 Stirriups( For Main Beam) 1 10 180 1.65 297.00 0.62 184.14 0.10
0.425
0.25
19.5 For Secondry Beam 1 8 35 1.31 45.85 0.40 18.34
0.8
0.375
0.2
2.105 2.105
Cranked bar 1 8 28 6.48 181.44 0.40 72.58 0.08 0.08 0.08 0.08
1.95
Site
S. No. Description G.F F.F S.F TF Quantity Unit Remarks
Development
A. Common Installation
1.1 Stand Alone 40 A DP MCB with Enclosure 1 1.00 nos.
2 CABLES & WIRES
2 Nos 10 Sq.mm + 1 No 6 Sq.mm mutistranded
2.1 49.00 r.m
copper conductor wires
Building: 3LaLiEACCr(F)-A
S.N Furniture Description Symbol Qty Unit Remarks
Classroom
1 ECD Student Desk (6 Seater) D-03 3 nos.
2 Student Desk G1-2 (3 Seater) D-02A 22 nos.
3 Student Bench G1-2 (3 Seater) B-02A 22 nos.
4 Student Desk G3-5 (3 Seater) D-02B 11 nos.
5 Student Bench G3-5 (3 Seater) B-02B 11 nos.
6 Teacher's Table T-01 6 nos.
7 Soft Board F-01 1 nos.
8 Book Shelf F-02 3 nos.
9 Teacher's Chair C-01 6 nos.
10 White Board F-03 6 nos.
Library
11 Student Bench 6-12 (3 Seater) B-02C 14 nos.
12 Library Table T-02 7 nos.
13 Library Shelf F-04 5 nos.
Computer nos.
14 Computer Table T-04 12 nos.
15 Computer Shelf C-02 24 nos.
16 White Board with Stand F-05 1 nos.
Laboratory
17 Equipment Shelf F-07 3
18 Lab Stool F-08 31
Office
19 Cabinet F-06 7 nos.
20 Office Table (2 sides Drawe Unit) T-05 1 nos.
21 Office Table (1 sides Drawe Unit) T-06 2 nos.
22 Office Table T-07 12 nos.
23 Office Chair C-03 16 nos.
24 Office Chair- Headmaster C-04 1 nos.
25 Office Visitor Chair C-05 19 nos.
26 Dinning Table T-09 2 nos.
Miscellaneous
27 Cusions F-16 18 nos.
28 Carpet 27.43 sq.m
29 Equipment Cabinet F-09 5 nos.
30 File Cabinet F-10 2 nos.
31 Notice Board F-14 1 nos.
Total 274 nos.
Building: 3-9C(SF)
S.N Furniture Description Symbol Qty Unit Remarks
Classroom
1 Student Desk G3-5 (2 Seater) D-01B 30 nos.
2 Student Desk G6-12 (2 Seater) D-01C 105
3 Student Bench G3-5 (2 Seater) B-01B 30 nos.
4 Student Desk G6-12 (2 Seater) B-01C 105 nos.
5 Teacher's Table T-01 9 nos.
6 Teacher's Chair C-01 9 nos.
7 White Board F-03 9 nos.
Total 297 nos.
Breadth Height
S. No. Description No. Length (m) Quantity Unit Remarks
(m) (m)
1 EARTH WORKS
1.1 Site Clearance 1 28.50 12.50 356.25
Total 356.25 sq.m
Ramp
For Slope 1 3.50 1.03 0.28 0.99
Wall Along Grid B 1 0.70 0.45 0.45 0.14
Wall Parallel to Ramp 1 6.70 0.45 0.41 1.24
Outside Staircase 1 18.95 0.60 0.15 1.71
Total 202.45 cu.m
2 CONCRETE WORKS
2.1 P.C.C. Works
2.1.1 P.C.C.(1:3:6) Works
Isolated footing
F1 2 2.50 2.50 0.10 1.25
F2 3 3.00 3.00 0.10 2.70
Combined Footings
CF1 2 5.00 1.80 0.10 1.80
CF2 1 5.00 3.00 0.10 1.50
CF3 2 5.00 2.80 0.10 2.80
Ramp
Wall Along Grid B 1 0.50 0.45 0.05 0.01
Wall Parallel to Ramp 1 6.80 0.45 0.05 0.15
Total 11.39 cu.m
B Beam
Foundation Tie Beam(300X400)
Along grid 1,2,3 3 20.70 0.30 0.40 7.45
Along grid A,B,C,D,E 5 5.55 0.30 0.40 3.33
Plinth Beam(300x450)
Along grid 1,2,3 3 20.70 0.30 0.45 8.38
Along grid A,B,C,D,E 5 7.60 0.30 0.45 5.13
Secondary beam(250x425)
Along 1a 3 16.35 0.25 0.30 3.68
Along A1,B1,D1 9 7.60 0.25 0.30 5.13
C Columns
Foundation to Plinth 15 0.45 0.45 1.05 3.19
Ground Floor 15 0.45 0.45 3.00 9.11
First Floor 15 0.45 0.45 3.00 9.11
Second Floor 15 0.45 0.45 3.00 9.11
D Slab
First Floor Level Slab 1 22.95 8.95 0.13 25.68
Projections at Back 1 11.55 0.60 0.13 0.87
1 5.55 0.60 0.13 0.42
Projections at Front 1 12.15 0.98 0.13 1.48
Second floor level slab 1 22.95 8.95 0.13 25.68
Projections 1 11.55 0.60 0.13 0.87
1 5.55 0.60 0.13 0.42
Projection at Staircase 2 4.05 0.60 0.13 0.61
Third floor level slab 1 22.95 8.95 0.13 25.68
Projections
Back of Bldg 1 13.38 1.00 0.13 1.74
1 7.38 1.00 0.13 0.96
Side of Bldg 2 8.95 1.00 0.13 2.33
Front of Bldg 2 6.00 1.08 0.13 1.68
1 12.95 1.58 0.13 2.65
Top Floor Slab(Staircase Cover) 1 10.45 6.45 0.15 10.11
Deduction
Staircase void -3 4.20 5.55 0.13 -8.74
Bench slab 2 2.40 0.50 0.08 0.18
E Staircase
Ground Floor to First Floor
Steps 20 0.023 Area 2.00 0.90
Waist Slab 1 3.35 2.00 0.20 1.34
1 3.35 2.00 0.20 1.34
Landing 1 4.20 1.95 0.20 1.64
1 4.05 1.03 0.30 1.25
Landing Beam 1 4.05 0.25 0.38 0.38
F Lintel Band
Ground Floor
Along grid 1 1 16.50 0.23 0.08 0.28
Along grid 2 1 9.90 0.23 0.08 0.17
Along grid A,B,C,D,E 5 5.55 0.23 0.08 0.48
First Floor
Second Floor
Along grid 1 1 16.50 0.23 0.08 0.28
Along grid 2 1 9.90 0.23 0.08 0.17
Along grid A,B,C,D,E 5 5.55 0.23 0.08 0.48
G Sill band
Ground Floor
Along grid 1 1 20.55 0.23 0.08 0.35
Along grid 2 1 9.90 0.23 0.08 0.17
Along grid A,B,C,D,E 5 5.55 0.23 0.08 0.48
First Floor
Along grid 1 1 20.55 0.23 0.08 0.35
Along grid 2 1 9.90 0.23 0.08 0.17
Along grid A,B,C,D,E 5 5.55 0.23 0.08 0.48
Second Floor
Along grid 1 1 20.55 0.23 0.08 0.35
Along grid 2 1 9.90 0.23 0.08 0.17
Along grid A,B,C,D,E 5 5.55 0.23 0.08 0.48
Band at Parapet
1 49.46 0.35 0.10 1.73
1 13.75 0.35 0.10 0.48
1 30.16 0.36 0.10 1.09
Vertical band 18 2.48 0.23 0.08 0.77
H Pedestal
Base Block 11 0.50 0.25 0.25 0.34
Total 282.33 cu.m
2.5 Formworks
A Foundation
F1 2 10.00 0.25 5.00
F2 3 12.00 0.25 9.00
CF1 2 13.60 0.60 16.32
CF2 1 16.00 0.60 9.60
CF3 2 15.60 0.60 18.72
Plinth Beam(300x450)
Along grid 1,2 2 20.70 1.20 49.68
Along grid 3 1 20.70 1.20 24.84
Along grid A,B,C,D,E 5 7.60 1.20 45.60
Secondary Beam(250x425)
Along A1,B1,D1 9 7.60 0.85 58.14
Along 1a 3 16.35 0.85 41.69
C Column
Foundation to Plinth 15 1.80 1.05 28.35
Ground Floor 15 1.80 3.00 81.00
First Floor 15 1.80 3.00 81.00
Second Floor 15 1.80 3.00 81.00
Roof floor 6 1.80 2.62 28.30
D Slab
First Floor Level Slab 1 23.20 9.20 213.44
Projections at Back 1 11.80 0.73 8.56
1 5.55 0.60 3.33
Projections at Front 1 12.28 1.10 13.50
Second floor level slab 1 23.20 9.20 213.44
Projections 1 11.80 0.73 8.56
1 5.68 0.73 4.11
Projection at Staircase 2 4.18 0.73 6.05
Third floor level slab 1 23.20 9.20 213.44
Projections
Back of Bldg 1 13.50 1.13 15.19
1 7.50 1.13 8.44
Side of Bldg 2 9.20 1.13 20.70
Front of Bldg 2 6.13 1.20 14.70
1 13.08 1.70 22.23
Top Floor Slab(Staircase Cover) 1 10.70 6.70 71.69
E Staircase
Upto first floor level
Steps 40 0.023 Area 0.90
Waist slab 1 3.35 2 6.71
1 3.35 2 6.71
Side formwork for waist slab 2 3.35 0.2 1.34
2 3.35 0.2 1.34
Landing 1 4.20 1.67 7.01
Side formwork for landing 1 3.34 0.21 0.68
Riser 20 2.00 0.15 6.00
Landing Beam 1 4.05 1.07 4.31
F Lintel Band
Ground Floor
Along grid 1 1 16.50 0.15 2.48
Along grid 2 1 9.90 0.15 1.49
Along grid A,B,C,D,E 5 5.55 0.15 4.16
First Floor
Along grid 1 1 16.50 0.15 2.48
Along grid 2 1 9.90 0.15 1.49
Along grid A,B,C,D,E 5 5.55 0.15 4.16
G Sill band
Ground Floor
Along grid 1 1 20.55 0.15 3.08
Along grid 2 1 9.90 0.15 1.49
Along grid A,B,C,D,E 5 5.55 0.15 4.16
First Floor
Along grid 1 1 20.55 0.15 3.08
Along grid 2 1 9.90 0.15 1.49
Along grid A,B,C,D,E 5 5.55 0.15 4.16
Second Floor
Along grid 1 1 20.55 0.15 3.08
Along grid 2 1 9.90 0.15 1.49
Along grid A,B,C,D,E 5 5.55 0.15 4.16
3 BRICK WORKS
3.2 Full Brick (230 mm) Works (1:4c/s)
Below Plinth Level
Along Grid 1,2,3 3 20.70 0.23 0.20 2.86
Along Grid A,B,C,D,E 5 7.60 0.23 0.20 1.75
Ground floor
Ground Floor
Along grid 1 1 16.65 0.23 2.35 9.00
1 4.05 0.23 2.12 1.97
Along grid 2 1 16.65 0.23 2.35 9.00
Along Grid A,B,C,D,E 5 5.55 0.23 2.29 14.58
Deduction
D1 -6 1.10 0.23 2.33 -3.53
W1 -12 1.10 0.23 1.65 -5.01
W3 -2 1.50 0.23 0.37 -0.26
First Floor
Along grid 1 1 16.65 0.23 2.35 9.00
Deduction
D1 -6 1.10 0.23 2.33 -3.53
W1 -12 1.10 0.23 1.65 -5.01
W2 -1 1.50 0.23 0.93 -0.32
Second Floor
Along grid 1 1 20.80 0.23 2.43 11.60
1 4.08 0.23 2.05 1.92
Along grid 2 1 20.80 0.23 2.43 11.60
Along Grid A,B,C,D,E 5 5.55 0.23 2.29 14.58
Deduction
D1 -6 1.10 0.23 2.33 -3.53
W1 -12 1.10 0.23 1.65 -5.01
W2 -1 1.50 0.23 0.93 -0.32
Top Floor
Along Grid 1 1 4.05 0.23 2.03 -1.89
Along grid 3 1 4.05 0.23 2.03 -1.89
Along C and D 2 7.60 0.23 2.03 -7.08
Deduction
D2 -2 1.10 0.23 1.08 -0.55
W2 -1 1.50 0.23 1.00 -0.35
Parapet Wall 1 63.00 0.23 0.80 11.59
1 30.00 0.23 0.90 6.21
Outside
Steps 1 19.00 0.30 0.10 0.57
1 18.50 0.30 0.25 1.39
1 0.60 0.50 0.30 0.09
1 0.50 0.50 0.30 0.08
Ramp
Wall Along -B 1 1.33 0.25 Area 0.33
1 6.91 0.23 Area 1.59
Total 96.95 cu.m
5 FLOORING WORKS
5.1 Hardened Cement Concrete Flooring (40mm) With Neat Cement Punning
Ground floor
Classroom 3.00 5.75 5.75 99.19
Below staircase 1.00 5.65 4.20 23.73
Corridor 1.00 22.80 2.38 54.15
Staircase
Landing 1.00 4.20 2.00 8.40
Tread 19.00 2.00 0.30 11.40
Riser 20.00 2.00 0.15 6.00
First floor
Classroom 3.00 5.75 5.75 99.19
Corridor 1.00 22.80 2.38 54.15
Staircase
Landing 1.00 4.20 2.00 8.40
Tread 19.00 2.00 0.30 11.40
Riser 20.00 2.00 0.15 6.00
Second floor
Classroom 3.00 5.75 5.75 99.19
Corridor 1.00 22.80 2.38 54.15
Outside
Outer steps 1 18.50 0.9 16.65
Ramp 1 8.2 Area 8.20
Roof Plan
Along Wall 1 29.80 29.80
Total 480.86 r.m
7 PLASTER/PAINTING WORKS
7.1 Cement Plaster
7.1.1 Internal Plaster on Wall (1:6)
Ground floor
Classrooms 3 23.15 2.91 202.10
Staircase Area 1 15.67 3.04 47.56
Storage room below staircase 2 2.70 1.35 3.65
2 0.20 1.35 0.54
2 0.90 1.50 2.70
2 2.00 1.65 6.60
Deduction
D1 -6 1.10 2.50 -8.25
W1 -12 1.10 1.75 -11.55
W3 -1 1.50 0.33 -0.24
V1 -6 1.10 0.53 -1.73
First floor
Classrooms 3 23.15 2.91 202.10
Staircase Area 1 15.67 3.04 47.56
Deduction
D1 -6 1.10 2.50 -8.25
W1 -12 1.10 1.75 -11.55
W2 -1 1.50 1.08 -0.81
V1 -6 1.10 0.53 -1.73
Second floor
Classrooms 3 23.15 2.91 202.10
Staircase Area 1 15.67 3.04 47.56
Deduction
D1 -6 1.10 2.50 -8.25
W1 -12 1.10 1.75 -11.55
W2 -2 1.50 1.08 -1.61
V1 -6 1.10 0.53 -1.73
Top Floor
1 23.74 2.40 56.93
Deduction
W2 -1 1.50 1.08 -0.81
D2 -2 1.10 2.10 -2.31
Total 749.01 sq.m
Secondary Beam
Along Grid A1,B1 & D1 3 7.65 0.85 19.51
Along Grid 1a 3 5.77 0.85 14.71
Below staircase
Waist slab 1 3.35 2.00 6.71
Landing 1 2.00 2.00 4.00
1 2.10 2.20 4.62
First floor
Classroom 4 4 2.73 2.73 29.70
Classroom 5 4 2.73 2.73 29.70
Classroom 6 4 2.73 2.73 29.70
Corridor 4 2.73 2.20 23.98
1 4.20 2.20 9.24
Staircase Area 1 4.20 0.88 3.68
Main Beam
Classroom 4 4 5.55 0.40 8.88
Classroom 5 4 5.55 0.40 8.88
Classroom 6 4 5.55 0.40 8.88
Corridor; Along grid 2 , ( A-B) ,(B-C) & (D-E) 3 5.55 0.40 6.66
Corridor; Along grid 2 , ( C-D) 1 4.05 1.10 4.46
Corridor; Along grid 3 , ( A-B), (B-C) ,(C-D) & 1 20.70 0.70 14.49
Corridor; Along grid A, B, C,D and E; (2-3) 5 2.20 1.10 12.10
Staircase Area;Along grid C and D; (1-2) 2 5.30 0.40 4.24
Staircase Area ; Along grid 1 , ( C-D) 1 4.05 0.40 1.62
Secondary Beam
Along Grid A1,B1 & D1 3 7.65 0.85 19.51
Along Grid 1a 3 5.77 0.85 14.71
Below staircase
Waist slab 1 3.35 2.00 6.71
Landing 1 2.00 2.00 4.00
1 2.10 2.20 4.62
Second floor
Classroom 7 4 2.73 2.73 29.70
Classroom 8 4 2.73 2.73 29.70
Classroom 9 4 2.73 2.73 29.70
Corridor 4 2.73 2.20 23.98
1 4.20 2.20 9.24
Staircase Area 1 4.20 0.88 3.68
Secondary Beam
Along Grid A1,B1 & D1 3 7.65 0.85 19.51
Along Grid 1a 3 5.77 0.85 14.71
Below staircase
Waist slab 1 3.35 2.00 6.71
Landing 1 2.00 2.00 4.00
At Staircase Cover
Slab 1.00 67.20 Area 67.20
Total 836.63 sq.m
Outer Beam
First floor level beam
Along grid 1 1 20.70 0.55 11.39
Along grid A and E 2 5.55 0.55 6.11
Landing beam 1 4.05 0.60 2.41
Outer column
First Floor
Class Room Corner 4 1.18 3.00 14.10
Intermediate Corner 6 0.70 3.00 12.60
Corridor Column 5 1.90 3.00 28.50
Second Floor
Class Room Corner 4 1.18 3.00 14.10
Intermediate Corner 6 0.70 3.00 12.60
Corridor Column 5 1.90 3.00 28.50
Deduction
D1 -6 1.10 2.48 -16.34
W1 -12 1.10 1.73 -22.77
W3 -2 1.50 0.37 -1.11
First Floor
Along grid 1 1 16.65 2.50 41.63
1 4.05 2.12 8.59
Along grid 2 1 16.65 2.50 41.63
Along grid A and E 2 5.55 2.50 27.75
Deduction
D1 -6 1.10 2.48 -16.34
W1 -12 1.10 1.73 -22.77
W2 -1 1.50 1.00 -1.50
Second Floor
Along grid 1 1 20.80 2.50 52.00
1 4.08 2.12 8.64
Along grid 2 1 20.80 2.50 52.00
Along grid A and E 2 4.48 2.50 22.38
Deduction
D1 -6 1.10 2.48 -16.34
W1 -12 1.10 1.73 -22.77
W2 -1 1.50 1.00 -1.50
Top Floor
Along Grid 1 1 4.05 2.10 -8.51
Along grid 3 1 4.05 2.10 -8.51
Deduction
D2 -2 1.10 1.08 -2.38
W2 -1 1.50 1.00 -1.50
Total 655.50 sq.m
8 MISCELLANEOUS
Total
8.3 Railling Length kg/m
Length
A Staircase Railing
Ground Floor Lvl to First Floor Level
ISNB 40M(Horizontal Handrail) 1 6.70 6.70 3.56 23.85
25mm Square Pipe(Horizontal Bars) 4 6.58 26.32 0.85 22.37
Vertical 38mm Square Pipe 7 0.9 6.30 2.82 17.77
B Parapet Railing
For First and Second Floor
For Terrace
ISNB 40M(Horizontal Bars) 1 50.26 50.26 3.56 178.92
ISNB 32M(Horizontal Bars) 1 50.26 50.26 3.10 155.80
ISNB 32M(Vertical Bars) 32 0.26 8.26 3.10 25.59
25mm Square Pipe(Vertical Bars) 294 0.16 46.45 0.85 39.48
Base plate 46 0.00009375 0.00 7850 33.85
12 mm dia Anchor Bolts and Nuts,Screw 184 0.13 23.92
C Pedestal
ISNB 40M Pedestal Bars 11 1.61 17.71 3.56 63.05
11 1.20 13.20 3.56 46.99
22 0.35 7.70 3.56 27.41
Base plate 33 0.00009375 0.00 7850 24.29
12 mm dia Anchor Bolts and Nuts,Screw 132 0.13 17.16
Total 1,705.76 Kg
1.375
1.975
1.975
6 Column
Column 1-1
Ground Floor
Grid A,E
16mm through bar
16 2 12.00 5.01 120.24 1.58 189.98
3
2.01
0.15 0.37
Grid D
20mm through bar & 25mm through bar
Grid C
20mm through bar
20 1 12.00 5.25 63.00 2.47 155.55
3
2.25
Grid B
16mm through bar & 20mm through bar
Column 2-2
Ground Floor
Grid A,B,C,D,E
20mm & 16 mm through bar
3 3
16 5 8.00 5.01 200.40 1.58 316.63
0.08 0.08
8 5 47.50 1.64 389.50 0.40 153.85
0.37
0.15 0.37 8 5 95.00 1.20 570.00 0.40 225.15
Column 3-3
Ground Floor
Grid B,C,D
16mm & 20mm through bar
0.08 0.08
8 3 47.50 1.64 233.70 0.40 92.31
0.37
0.15 0.37 8 3 95.00 1.20 342.00 0.40 135.09
Grid A,E
20mm through bar
2.25
0.96
0.15 0.37
Grid D
20mm through bar & 25mm through bar
Grid C
20mm through bar
20 1 12.00 4.20 50.40 2.47 124.44
3
Grid B
16mm through bar & 20mm through bar
Column 2-2
Ground Floor
Grid A,B,C,D,E
20mm & 16 mm through bar
0.08 0.08
8 5 30.00 1.64 246.00 0.40 97.17
0.37
0.15 0.37 8 5 60.00 1.20 360.00 0.40 142.20
Column 3-3
Ground Floor
Grid B,C,D
16mm & 20mm through bar
0.08 0.08
8 3 30.00 1.64 147.60 0.40 58.30
0.37
0.15 0.37 8 3 60.00 1.20 216.00 0.40 85.32
Grid A,E
20mm through bar
1.2
0.96 1.2
Grid B
16mm through bar
1.12
16 1 12.00 4.56 0.96 1.00 54.66 1.58 86.36
2.475
0.96
Grid C & D
16mm through bar
0.96
2.475
0.96
Column 1-1
Grid A,B& E
16mm through bar
2.475
0.96
Grid C
16mm & 20 mm bar
3 3
16 1 4.00 3.96 0.96 1.00 15.84 1.58 25.03
0.96 1.12
20 1 8.00 4.20 1.20 1.00 33.60 2.47 82.96
Grid D
20mm through bar
1.2
0.96 1.2
Column 2-2
Grid C & D
16mm dia bar
1.12
16 2 12.00 4.18 100.32 1.58 158.51
2.1
0.96
Column 3-3
Grid C & D
16mm & 20mm dia bar
1.12
0.96
7 Foundation Beam
Grid 1-1,2-2,3-3
16mm through bar
1.12 1.12
23.97 16 3 3.00 26.21 0.96 2.00 235.89 1.58 372.71
1.12 23.97 1.12 16 3 3.00 26.21 0.96 2.00 235.89 1.58 372.71
Grid AA,BB,CC,DD,EE
16mm through bar
1.12 1.12
8.05 16 5 3.00 10.29 154.35 1.58 243.87
8 Plinth Beam
Grid 1-1,2-2,3-3
20mm through bar( top 2+bottom 2)
1.4 1.4
27.4
20 3 4.00 27.25 1.20 2.00 327.00 2.47 807.36
1.4 27.4 1.4
0.12
12 3 177.00 1.54 817.74 0.89 726.97
0.4
0.25
Grid AA,BB,CC,DD,EE
20mm through bar( top 2+bottom 2)
1.4 1.4
9 20 5 4.00 10.85 217.00 2.47 535.77
1.4 9 1.4
0.12
12 5 67.00 1.54 515.90 0.89 458.64
0.4
0.25
9 Main Beam
Ground Floor
Grid 1-1,2-2,3-3
20mm through bar( bottom 2)
20 3 2.00 27.25 1.20 2.00 163.50 2.47 403.68
1.4 27.4 1.4
0.10
10 3 177.00 1.65 876.15 0.62 540.59
0.475
0.25
Grid AA & EE
25mm through bar( bottom 2)
25 2 2.00 11.55 46.20 3.86 178.24
1.75 8.05 1.75
20MM ( 5 no.)
1.4 1.4
8.05 20 2 5.00 10.85 108.50 2.47 267.89
0.10
10 2 67.00 1.65 221.10 0.62 136.42
0.475
0.25
Grid BB,CC,DD
25mm through bar( bottom 2)
1.75 10.5 0.5 25 3 2.00 15.21 1.50 1.00 91.23 3.86 351.97
20MM ( 5 no.)
1.4 0.5
9 20 3 5.00 14.55 1.20 1.00 218.25 2.47 538.86
1.12 9 0.5
0.10
10 3 76.00 1.65 376.20 0.62 232.12
0.475
0.25
10 Secondary Beam
Ground Floor
Grid 1a
From A-C 16mm dia bar
0.5 13.26 0.5 16 1 7.00 14.26 0.96 1.00 99.82 1.58 157.72
0.08
8 1 94.00 1.31 123.14 0.40 48.64
0.375
0.2
0.08
8 1 47.00 1.31 61.57 0.40 24.32
0.375
0.2
Grid A1 & D1
16mm dia bar
0.08
8 2 67.00 1.31 175.54 0.40 69.34
0.375
0.2
Grid B1
16mm dia bar
0.08
8 1 56.00 1.31 73.36 0.40 28.98
0.375
0.2
11 Landing Beam
First Floor
20 mm dia bar
0.08
8 1 36.00 1.22 43.92 0.40 17.35
0.33
0.2
12 Edge Beam
First Floor
12 mm dia bar
0.08
8 1 115.00 1.31 150.65 0.40 59.51
0.475
0.1
First Floor
Grid 1-1,2-2,3-3
20mm through bar( bottom 2)
20 3 2.00 27.25 1.20 2.00 163.50 2.47 403.68
1.4 27.4 1.4
0.10
10 3 177.00 1.65 876.15 0.62 540.59
0.475
0.25
Grid AABB,CC,DD,EE
25mm through bar( bottom 2)
25 5 2.00 11.55 115.50 3.86 445.60
1.75 8.05 1.75
20MM ( 5 no.)
1.4 1.4
8.05 20 5 5.00 10.85 271.25 2.47 669.72
0.10
0.475
Secondary Beam
Ground Floor
Grid 1a
From A-C 16mm dia bar
0.5 13.26 0.5 16 1 7.00 14.26 0.96 1.00 99.82 1.58 157.72
0.08
8 1 94.00 1.31 123.14 0.40 48.64
0.375
0.2
0.08
8 1 47.00 1.31 61.57 0.40 24.32
0.375
0.2
0.08
8 3 67.00 1.31 263.31 0.40 104.01
0.375
0.2
Landing Beam
First Floor
20 mm dia bar
0.08
8 1 36.00 1.22 43.92 0.40 17.35
0.33
0.2
Second Floor
Grid 1-1,2-2,3-3
20mm through bar( bottom 2)
20 3 2.00 27.25 1.20 2.00 163.50 2.47 403.68
1.4 27.4 1.4
0.10
10 3 177.00 1.65 876.15 0.62 540.59
0.475
0.25
Grid AABB,CC,DD,EE
25mm through bar( bottom 2)
25 5 2.00 11.55 115.50 3.86 445.60
1.75 8.05 1.75
20MM ( 5 no.)
1.4 1.4
8.05 20 5 5.00 10.85 271.25 2.47 669.72
0.10
10 5 67.00 1.65 552.75 0.62 341.05
0.475
0.25
Secondary Beam
Ground Floor
Grid 1a
From A-C 16mm dia bar
0.5 13.26 0.5 16 1 7.00 14.26 0.96 1.00 99.82 1.58 157.72
0.08
8 1 94.00 1.31 123.14 0.40 48.64
0.375
0.2
0.08
8 1 47.00 1.31 61.57 0.40 24.32
0.375
0.2
0.08
Landing Beam
First Floor
20 mm dia bar
0.08
8 1 36.00 1.22 43.92 0.40 17.35
0.33
0.2
Main Beam
Top Floor
Grid 1-1,2-2,3-3
20mm through bar( top 2)
20 3 2.00 6.80 40.80 2.47 100.74
1.4 4 1.4
0.10
10 3 36.00 1.65 178.20 0.62 109.95
0.475
0.25
Grid CC,DD
20mm through bar( top 2)
20 2 2.00 10.85 43.40 2.47 107.16
1.4 8.05 1.4
16MM ( 5 no.)
1.12 1.12
8.05
16 2 5.00 11.24 112.40 1.58 177.59
1.12 8.05 1.12
0.10
10 2 67.00 1.65 221.10 0.62 136.42
0.475
0.25
Secondary Beam
Grid 1b
16 mm dia bar
0.08
8 1 36.00 1.31 47.16 0.40 18.63
0.375
0.2
13 Stair case
1.3
0.1
16mm through bar @ bottom
2.422
0.1
16mm through bar @ bottom
16 3 19.00 3.60 205.03 1.58 323.95
2.422 1.2
0.1
16mm through bar
1.15 16 3 19.00 2.38 135.38 1.58 213.89
1.2 0.1
10mm distribution @ bottom
1.95 10 3 35.69 1.95 208.81 0.62 128.83
14 Slab
Ground Floor
From A-C & 1-3
x-axis
12.88
8 1 53.67 13.78 0.48 1.00 739.26 0.40 292.01
0.45 0.45
0.45 0.45
Y-axis
14.83
8 1 33.67 9.88 332.46 0.40 131.32
0.525 0.525
0.525 0.525
Y-axis
8 1 15.00 9.48 142.13 0.40 56.14
8 1 27.00 10.55 284.85 0.40 112.52
From D-E & 1-3
x-axis
7.35
8 1 52.00 7.25 377.00 0.40 148.92
0.525 0.525
0.525 0.525
Y-axis
0.525 0.525
Top bar
X-axis 8 1 36.00 6.25 225.00 0.40 88.88
0.525 0.525
Y-axis
0.525 0.525
Top bar
X-axis
8 1 20.23 5.46 110.47 0.40 43.64
Y-axis
8 1 31.00 3.43 106.18 0.40 41.94
Extra Bar
Along A1 B1 & D1 8 3 12.67 2.05 77.90 0.40 30.77
2.05
Along B
2.1 8 1 12.67 2.10 26.60 0.40 10.51
Along 1a
2.35 8 1 31.33 2.05 64.23 0.40 25.37
Along 2
1.975
8 1 31.33 1.95 61.10 0.40 24.14
8 1 5.83 1.98 11.52 0.40 4.55
Along 3
2.05 8 1 44.00 2.05 90.20 0.40 35.63
Along 1
1.875 8 1 31.33 1.88 58.75 0.40 23.21
Along C & D
2.55
Slab
First Floor
From A-C & 1-3
x-axis
14.83
8 1 53.67 13.73 0.48 1.00 736.84 0.40 291.05
0.525 0.525
0.525 0.525
Y-axis
14.83
8 1 73.67 9.88 727.46 0.40 287.35
0.525 0.525
0.525 0.525
Top bar
X-axis 8 1 36.00 12.73 0.48 1.00 458.28 0.40 181.02
Y-axis
8 1 41.00 9.45 387.45 0.40 153.04
0.525 0.525
Y-axis
0.525 0.525
Top bar
X-axis 8 1 36.00 6.25 225.00 0.40 88.88
0.525 0.525
Y-axis
0.525 0.525
Top bar
X-axis
8 1 13.67 5.46 74.62 0.40 29.48
Extra Bar
Along A1 B1 & D1 8 3 12.67 2.05 77.90 0.40 30.77
2.05
Along B
2.1 8 1 12.67 2.10 26.60 0.40 10.51
Along 1a
2.05 8 1 31.33 2.05 64.23 0.40 25.37
Along 2
1.95
8 1 31.33 1.95 61.10 0.40 24.14
8 1 5.83 1.98 11.52 0.40 4.55
Along 1
1.875 8 1 31.33 1.88 58.75 0.40 23.21
Along C & D
2.55
8 2 8.67 2.55 44.20 0.40 17.46
Slab
Second Floor
From A-C & 1-3
x-axis
15.905
8 1 66.33 14.31 0.48 1.00 948.90 0.40 374.82
0.525
0.525 0.525
Y-axis
11.8
8 1 27.67 10.80 298.80 0.40 118.03
0.525 0.525
0.525 0.525
Top bar
X-axis 8 1 30.00 13.86 415.65 0.40 164.18
Y-axis 8 1 19.00 10.80 205.20 0.40 81.05
8 1 31.00 11.28 349.68 0.40 138.12
0.525 0.525
Y-axis
11.8 8 1 27.67 10.80 298.80 0.40 118.03
0.525 0.525
8 1 11.00 12.78 0.48 1.00 140.58 0.40 55.53
0.525
0.525 0.525
Y-axis
11.8
8 1 13.83 5.15 71.24 0.40 28.14
0.525 0.525
0.525 0.525
Top bar
X-axis 8 1 17.17 5.96 102.31 0.40 40.41
Y-axis 8 1 19.00 5.15 97.85 0.40 38.65
Extra Bar
Along A1 B1 & D1 8 3 13.42 2.05 82.51 0.40 32.59
2.05
Along B
2.1 8 1 13.42 2.10 28.18 0.40 11.13
Along 1a
2.05 8 1 53.33 2.05 109.33 0.40 43.19
Along 2
2.1
8 1 31.33 1.95 61.10 0.40 24.14
8 1 5.83 1.98 11.52 0.40 4.55
Along 3
2.125 8 2 14.17 2.13 60.21 0.40 23.78
8 1 12.17 2.63 31.94 0.40 12.62
Along C & D
2.7
8 2 8.67 2.55 44.20 0.40 17.46
Along A & E
2.125 8 2 13.42 2.13 57.02 0.40 22.52
Along 1
2.45 8 1 31.33 2.28 71.28 0.40 28.16
Slab
top floor level
From A-C & 1-3
0.525
0.525 0.525
Y-axis
11.8
8 1 40.33 10.50 423.50 0.40 167.28
0.525 0.525
0.525 0.525
Top bar
X-axis 8 1 40.67 6.20 252.13 0.40 99.59
Y-axis 8 1 29.33 9.90 290.40 0.40 114.71
Extra Bar
Along 2
1.95
8 1 5.83 1.95 11.38 0.40 4.49
Along 1 &3
2.05
8 2 4.33 2.05 17.77 0.40 7.02
Along C & D
2.5
8 2 9.67 2.50 48.33 0.40 19.09
Grid 2
10 1 2.00 10.05 20.10 0.62 12.40
8 1 68.00 0.34 23.12 0.40 9.13
Grid A,B,C,D,E 0.00 0.00 0.00
10 5 2.00 5.55 55.50 0.62 34.24
8 1 38.00 0.34 12.92 0.40 5.10
0.00 0.00 0.00
First Floor 0.00 0.00 0.00
Grid 1 10 1 2.00 16.65 33.30 0.62 20.55
Grid 2
10 1 2.00 10.05 20.10 0.62 12.40
8 1 68.00 0.34 23.12 0.40 9.13
Grid A,B,C,D,E 0.00 0.00 0.00
10 5 2.00 5.55 55.50 0.62 34.24
8 1 38.00 0.34 12.92 0.40 5.10
Second Floor
Grid 1 10 1 2.00 16.65 33.30 0.62 20.55
8 1 112.00 0.34 38.08 0.40 15.04
Grid 2
10 1 2.00 10.05 20.10 0.62 12.40
8 1 68.00 0.34 23.12 0.40 9.13
Grid A,B,C,D,E 0.00 0.00 0.00
10 5 2.00 5.55 55.50 0.62 34.24
8 1 38.00 0.34 12.92 0.40 5.10
Grid 2
10 1 2.00 10.05 20.10 0.62 12.40
8 1 68.00 0.34 23.12 0.40 9.13
Grid A,B,C,D,E
10 5 2.00 5.55 55.50 0.62 34.24
8 1 38.00 0.34 12.92 0.40 5.10
Top floor
Grid 1-3 10 2 2.00 4.00 16.00 0.62 9.87
8 2 27.67 0.34 18.81 0.40 7.43
2 Concrete Works
2.1 PCC
2.1.1 PCC work (1:3:6)
For Footing
F1 9 1.00 1.00 0.10 0.90
For Lower Tie Beam
Grid 1 and Grid 3 2 9.40 0.45 0.05 0.42
Grid 2 2 4.70 0.35 0.05 0.16
Between grid 2 and 3 2 4.45 0.45 0.05 0.20
Along grid A-12,B-12 & C-12 3 3.20 0.45 0.05 0.22
Along grid A-23 & C-23 2 2.20 0.35 0.05 0.08
Along grid B-23 1 2.20 0.45 0.05 0.05
Septic Tank 1 0.83 1.45 0.08 0.09
Sewer Manhole (Rectangular)
Bottom 4 1.00 1.00 0.10 0.40
PCC Benching 4 0.07 Area 1.00 0.30
Total 2.82 cum
3 BrickWorks
3.2 Brick Masonary Works (1:4 c/s)
Below Plinth tie beam
Grid 1,2,3 3 9.40 0.35 0.40 3.95
9.40 0.10 0.55 1.55
Grid A-12, B-12 & C-12 3 3.20 0.35 0.40 1.34
3.20 0.10 0.55 0.53
Grid B-23 1 2.20 0.35 0.40 0.31
2.20 0.10 0.55 0.12
Along the ramp 2 4.70 0.35 0.68 2.22
5 FLOORING WORKS
5.1 Hard Concrete Flooring (40mm) With Neat Cement
Punning
Toilet Floors 2 4.75 3.25 30.88
Corridor Floors 2 4.75 1.27 12.07
Outside Staircase 2 1.20 1.05 2.52
Ramp
Slanted Portion 1 5.45 1.03 5.59
Horizontal Portion 1 1.20 1.03 1.23
Drain 1 11.45 1.48 16.95
Along the terrace 2 4.75 2.25 21.38
Water Trough 2 0.60 3.75 4.50
6 ROOFING/TERRACING WORKS
6.1 Metal Works
Truss 1 999.81
Total 999.81 kgs
8 Miscellaneous
8.2 Cement Board Wall
For Partition
Gabel wall 2 1.17 Area 2.34
Total 2.34 sq.m
16mm dia rod Anchor bolt 24 0.45 10.800 r.m. 1.58 17.07
16mm dia nut nut 24 24.000 no. 0.03 0.75
10mm thick plate Top chord cleat 30 0.2 0.09 0.01 0.005 cu.m. 7,850.00 42.39
10mm thick plate Purlin Cleat 60 0.2 0.09 0.01 0.011 cu.m. 7,850.00 84.78
10mm dia nut bolt (50mm) nut bolt 60 60.000 no. 0.05 2.91
10mm thick plate Runner plate 16 0.175 0.07 0.01 0.002 cu.m. 7,850.00 15.39
10mm thick plate Runner box 32 0.175 0.07 0.01 0.004 cu.m. 7,850.00 30.77
10mm thick plate 32 0.08 0.07 0.01 0.002 cu.m. 7,850.00 14.07
16mm dia nut bolt (50mm) Runner box 32 32.000 no. 0.13 4.30
0.9
1 F1 Footing: Main bars 12 150 0.888 7 1.06 6.59
0.08
0.9
Distribution bars 12 150 0.888 7 1.06 6.59
0.08
0.22 0.08
100 &
Stirrups 8 0.395 30 1.04 12.32 110.92 Total height
150
0.22 for Stirrups= 3.25
0.15 0.08 & Ht. for 150 1.65
100 & spacing=
8 0.395 30 0.76 9.01 81.05
150
0.15
0.08 3 Nos. in
U shaped Stirrups & ties (total) 8 each 0.395 9 1.20 4.27 38.39
0.22
member
for One Column = 61.93
for Nine Columns = 557.40
3 Foundation Beams, 250*250
0.15 0.08
100 &
Stirrups (for 250*250) 8 0.395 203 0.76 61.04 61.04 5 Stretches
150
0.15
0.15 0.08
8 150 0.395 32 0.76 9.71 9.71 1 Stretch (Section 2)
0.15
0.15 0.08
100 &
Stirrups (for 250*250) 8 0.395 48 0.76 14.41 14.41
150
0.15
0.15 0.08
100 &
Stirrups (for 250*250) 8 0.395 28 0.76 8.46 16.91
150
0.15
0.40 0.08
100 &
Stirrups (for 250*501) 8 0.395 20 1.26 9.87 19.74
150
0.15
0.25 0.08
100 &
Stirrups (for 250*300) 8 0.395 203 1.06 85.14 85.14 5 Stretches
150
0.20
0.25 0.08
8 150 0.395 32 1.06 13.54 13.54 1 Stretch (Section 2)
0.20
Approved By:
Submitted By: Checked By: DLPIU Engineer
Sharma-AM J/V Consultant SE
Main Bars (Short side beam); Along
0.6 6.0+0.3-2(0.06) 12 0.888 6 7.38 39.32 39.32 1 beam
Grid B-B
0.25 0.08
100 &
Stirrups (for 250*300) 8 0.395 48 1.06 20.10 20.10
150
0.20
0.25 0.08
100 &
Stirrups (for 250*300) 8 0.395 28 1.06 11.79 23.59
150
0.20
Main Beams:
5 Long Beams: 250*450
10.0+0.3-2(0.06)
0.4+0.48 16 1.580 2 12.90 40.76 122.29 1 Lap
0.88
Top Bars 10.0+0.3-2(0.06) 16 1.580 3 12.90 61.15 183.44 1 Lap
0.40 0.08
100 &
Stirrups (for 250*450) 8 0.395 244 1.36 131.08 131.08 6 Stretches
150
0.20
Short side beams:
6.0+0.3-2(0.06)
Bottom Bars 0.4+0.2 12 0.888 4 7.38 26.21 78.64 3 beams
0.6
Top Bars 6.0+0.3-2(0.062) 12 0.888 3 7.38 19.66 58.98
0.40 0.08
Stirrups (for 250*450) 8 100 0.395 23 1.36 12.36 37.07
0.20
0.35 0.08
100 &
Stirrups (for 250*400) 8 0.395 28 1.26 14.02 42.06
150
0.20
0.86
6 SLAB: Short Span 0.11 2.71 10 150 0.617 65 4.65 186.49 186.49 65
1.48
Long Span 10.21 10 300 0.617 9 13.95 77.46 77.46 1 Lapping 9
0.09
1.48
1 Lapping, & Cranked
10.21 10 300 0.617 9 14.17 78.69 78.69
0.09 over middle beam
3.25
Top Extra (Negative) Bar 8 300 0.395 9 3.25 11.55 11.55
10.21
Distribution Bar, Long Span 8 150 0.395 10 10.21 41.40 41.40
2.71
Distribution Bar, Short Span 8 150 0.395 41 2.71 43.53 43.53
Approved By:
Submitted By: Checked By: DLPIU Engineer
Sharma-AM J/V Consultant SE
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Toilet Block,Tc(S)
School Name : Shree Dharmawati SS
Location : Choprak,Gorkha
Reinforcement of Septic and Soak pit tank
Total Total
S. No Item Description Dia Lot No length m wt/m Remarks
length Quantity
1 Septic tank
Beam
Long span
short span
4400
200
slab
Along Y axis
Total
S. No. Description Tc(S) Unit Remarks
Quantity
A. Common Installation
1.2 Stand Alone 6 A DP MCB with Enclosure 2 2.00 nos.
B School Blocks
1 DISTRIBUTION BOARDS
1.5 6A DP MCB with Enclosure 2.00 2.00 nos.
3 General Service Light Point Wiring
3.1 One Way Light Point 11 11.00 pts.
3.3 Ceiling and Exhaust Fan Point 4 4.00 pts.
6 Sweep Ceiling/ Exhaust Fan/Wall Fan
6.2 225mm dia M/D exhaust Fan 4 4.00 nos.
7 Light Fixtures/Luminaires & Accessories
7.6 LED Wall Light 2 2.00 nos.
7.7 9 W LED Surface Mounted Cylindrical type 2 2.00 nos.
7.8 6 W LED Recessed Circular type 6 6.00 nos.
7.9 7 W LED T5 Slim Mirror Light 2 2.00 nos.
Length Breadth
S.No Description No. Height (m) Qty. Unit Remarks
(m) (m)
1 Site Clearance
Column 2 0.90 0.90 1.62
Concrete Pavement
Infront of 3-9C(SF) 1 17.00 3.30 56.10
1 7.00 2.50 17.50
Side of 3-9C(SF) 1 6.50 2.00 13.00
Infront of 3LaLiEACCr(F)-A 1 20.00 3.20 64.00
1 6.70 1.50 10.05
Infront of Toilet 1 11.00 1.50 16.50
Side of Toilet 1 7.40 1.70 12.58
1 7.50 4.50 33.75
In Betn Toilet and 3LaLiEACCr(F)-A 1 4.30 5.50 23.65
In Betn Two Bldgs 1 4.20 6.50 27.30
At Gate 1 15.00 4.00 60.00
Retaining wall
For 2.5m height 1.00 56.00 2.20 123.20
1.00 18.50 2.20 40.70
Total 499.95 sq.m
4 Boulder Soling
Concrete Pavement
Infront of 3-9C(SF) 1 17.00 3.30 0.15 8.42
1 7.00 2.50 0.15 2.63
Side of 3-9C(SF) 1 6.50 2.00 0.15 1.95
Infront of 3LaLiEACCr(F)-A 1 20.00 3.20 0.15 9.60
1 6.70 1.50 0.15 1.51
Infront of Toilet 1 11.00 1.50 0.15 2.48
Side of Toilet 1 7.40 1.70 0.15 1.89
1 7.50 4.50 0.15 5.06
In Betn Toilet and 3LaLiEACCr(F)-A 1 4.30 5.50 0.15 3.55
In Betn Two Bldgs 1 4.20 6.50 0.15 4.10
At Gate 1 15.00 4.00 0.15 9.00
B Column
Gate Column 2 0.30 0.30 2.95 0.53
Top RCC Coping 2 0.59 0.59 0.05 0.03
2 0.175 0.05 0.02
Total 0.99 cu.m
8 Steel Reinforcement
For gate 1 106.90 106.9
Total 106.90 Kg
0.11 Tons
10 Formworks
A Entrance Gate-Foundation 2 3.60 0.35 2.52
Gate Column 2 1.20 3.15 7.56
Flag Pole Steps 2 0.25 0.80 0.4
Flag Pole Masonry Top Surface 1 1.70 0.50 0.85
Total 11.33 sq.m
17 External Plaster
Column Inside face 4 0.54 1.64 3.54
Column Outside face 2 1.2 0.20 0.48
4 0.54 1.70 3.67
Deduct -2 0.3 1.40 -0.84
Top Coping 2 2.36 0.05 0.24
4 0.59 0.30 0.71
Total 7.80 sq.m
19 Flag Pole
75 Dia GI Pipe 2.00 1 2.00
Total 2.00 nos
22 Geotextile
Retaining wall
For 2.5m high 1 56.00 2.00 112.00
1 18.50 2.00 37.00
Total 149.00 Sq.m
Size Spacing c/c Structure Rebar Length/pc. Total Weight Per Total Weight
SN Description Shape Remarks
(mm) (mm) Nos Nos (mm) Length (m) Meter (Kg) (Kg)
1 Entrance Gate-Column
75 75
a 900*900 Foundation Mesh 850 10 150 2 12 1000 24 0.62 14.82
220
8 mm dia at 150 c/c for column
c 7
220 8 150 2 26 1030 53.56 0.40 21.16
stirrups-Outer 5
1
7
7 3
8 mm dia at 150 c/c for column 5
d 8 150 2 26 842 43.784 0.40 17.3
stirrups-Outer
1.915 1.915
3.02
1.915 1.915
3.29
1.884 1.884
0.05
0.49 0.49
1.884 1.884
0.05
0.49 0.49
0.592
0.592 0.6 0.6
D. Horizontal Bars(outer 4
0.3 0.3
1 Shorter Span 10 20 3.62 289.6 0.62 179.552
3.02 3.02
0.3 0.3
3.27 3.27
0.3 0.3
E. Base Slab bar 4
1 Shorter Span 10 32 3.14 401.92 0.62 249.19 3.045
0.05 0.05