S.N Name of worker Category of Labour Type of Work Rate Amount(NRS)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
Checked by:
Prepared by: Nawaraj gurung and Kushal Gurung Abiral K. Bhattarai
Site Engineer
MUSTER ROLL
Project Name: Emergency School Reconstruction Project
School Name: Shree gyanjyoti S.S, Hansapur, Gorkha
Month: Baisakh
Dates
S.N Name of worker Category of Labour Type of Work Rate Amount(NRS)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Checked by:
Prepared by: Nawaraj gurung and Kushal Gurung Abiral K. Bhattarai
Site Engineer
Government of Nepal
National Reconstruction Authority
Central Level Project Implementation Unit (Education)
District Level Project Implementation Unit (Education),Gorkha
Emergency School Reconstruction Project (ESRP), JICA Loan No. : NE-P11
Contract Bills
FINAL INTERIM PAYMENT CERTIFICATE
Period: 15th November 2018 to 10th August 2020
Name of School: Shree Gyanjyoti S. S. School Payment Voucher no:
Name of Contractor:Sharma-A.M Joint Venture Date of payment:
Contract Number:ESRP/MOE/CLPIU/074/075-GORKHA-15 Page no of measurement book:
Serial no. of previous payment bills: 7
Voucher no.of previous payment bills:
Date of order for commencement of work: 3rd October,2018
Date of work to be completed: 2nd February,2020
Date of completion of work:
Bill of Quantities Up to Date of work till now Previous Bill Currently Accomplished work
Pay
Item Description Unit Quantity As % completion Remarks
No. Rate Amount Quantity Amount Quantity Amount Quantity Amount
per Contract
GENERAL
1. MOBILIZATION AND DEMOBILIZATION
1 L.S. 1.00 500,000.00 500,000.00 1.00 500,000.00 1.00 500,000.00 0.00 - 100.00%
Mobilization of the construction by constructing
temporary
2. SITE OFFICE acomodation for labours and site staff with Per
ESTABLISHMENT
2 required 16.00 25,000.00 400,000.00 16.00 400,000.00 16.00 400,000.00 0.00 - 100.00%
Providingsuitable facilities andSite
and Maintaining keeping
Officetheofsame two in good Month
Rooms
hygenic
having condition
total Area for sq.m
20 entirefor project
the use completion
of Clienttime. and
3. PROJECT INFORMATION BOARD
3 Demolition including
Consultant of the same and cleaning
Table, the site afterfile nos. 1.00 10,000.00 10,000.00 1.00 10,000.00 1.00 10,000.00 0.00 - 100.00%
Providing and Fixing office of Project chair,
Information Lockable
board with
completion
cabinet, of the Items
Stationery construction
(Ink, activities
Paper, Pen, all complete.
Pencils etc.),
approved
4. SAFETY TextSIGN in BOARD
appropriate location including all
[Note: 50%
1 Computer payment shall
and 1 Printer as be
with made after completion of nos.
4 required
Providingfixing andaccessories
Fixing of Safety per all necessary
drawing
Signall
set up. all
complete.
Board with
1.00 10,000.00 10,000.00 1.00 10,000.00 1.00 10,000.00 0.00 - 100.00%
mobilization
complete asandperremaining instruction 50% of after completion
engineer. Theof
approved
5. BARRICADING
works Text
as per and WORKS
contract] Sinage including required fixing
5 Specification of computer shall not be less than (19.5" R.m 98.88 2,000.00 197,760.00 120.00 240,000.00 120.00 240,000.00 0.00 - 121.36%
accessories
Barricading as per
between drawing all complete.
led monitor with Core the i5, 7th School Academic
Generation, 500area gb Hdd, and
Construction
6.
8gbSAFETY
ddr 4 ram), area with
MATERIALS Printer 1.8 should
m SITE
& highfunction
CGI
SAFETY Sheet fixed of
at least to
6 Bamboo support frame all complete as per instruction of L.S. 1.00 100,000.00 100,000.00 1.00 100,000.00 1.00 100,000.00 0.00 - 100.00%
Providing
Printing, Scanningand Maintainingand Photocopy Construction
of A4Safetysize
Engineer.
Measures
documents. inProviding
Construction and Site with all
Maintaining proper
above Safetyitems
7. LAB TEST(WATER TEST)
7 measures to person and Lab work areacompletion
(Helmet, job 1.00 - 0.00 - 0.00 - 0.00 - 0.00%
on Rentaland
Testing Basis for entire
Providing project
Test Report forShoes,
time.
Quality First
of
Aid
Water Kit, Clothing,
in Water Stream Glove, Guard Rail
(Up and Down streem) located for edge
8. TEMPORARY TOILET
8 protection, Safety Net, Safety
near by Construction sitetoiletrope, Fall
before Protection etc.) nos. 2.00 150,000.00 300,000.00 2.00 300,000.00 2.00 300,000.00 0.00 - 100.00%
Construction of temporary with Starting
CGI Sheet and fixedafter
to
as required ofbyconstruction
completion the Contract work. Clause GCChas
This items
Test 24toand be
Bamboo
9. ROAD support
REPAIR frameAND andMAINTENANCE
all necesary including
9 Specification
done to mark division
the affect 1 "GENERAL
of construction REQUIREMENT
work in water Km. 38.00 50,000.00 1,900,000.00 38.00 1,900,000.00 38.00 1,900,000.00 0.00 - 100.00%
Septic pit, and
Providing Pipeline, Toilet Pan
Maintaining etc. for
the roads as entire
necessary project to
CLAUSE 8(C)".
stream. The number of Safety Materials
completion
avoid blockage timeby all complete asRockfall
Landslides per Instruction of
Personal Protecting Equipmentsand (PPE) shall befor regular
minimum -
Engineer.
transport Rate
of shall include
construction all Material
materials cost
andshall
site bewith fixing,
inspection
but not WORKS-
CIVIL limited toBUILDING
35 sets. Payment made in -
construction
during overall charges and demolition
construction period. Rate& shall
cleaningincludeof theall
1 Prorata
EARTH Basis
WORKS for entire duration of project. -
same after
Material cost completion
with demolition of thecharges,
construction activities
cleaning, fixing all &
SITE CLEARANCE
complete. charges of&the MOBILIZATION:
1.1 construction
Clearing and grubbing the
same after completion of the sq.m
site for construction by 598.98 100.00 59,898.00 634.56 63,456.10 710.50 71,050.00 -75.94 (7,593.90) 105.94%
construction activities all complete.
removing
EARTHWORK 150mmIN thick top soil including
EXCAVATION : bushes, small
1.2 trees, leveling of undulated ground, shorting and cu.m 342.79 400.00 137,116.00 320.88 128,351.35 413.06 165,223.10 -92.18 (36,871.75) 93.61%
Excavation in foundations in all type of soils for
stacking/storing
foundation, selected
trenches, top soilpits
footing, for etc.
reusetointhe landscaping
required
EARTH BACK
works, including
disposing FILLING
unsuitable materials: from
1.3 depth
Back filling dewatering
in foundation and bysides
manual or site,
of foundation
etc., all cu.m
mechanical with
201.25 300.00 60,375.00 234.34 70,300.76 214.80 64,440.00 19.54 5,860.76 116.44%
complete as
means etc.soil per
as per drawings,
specifications specifications and instructions
with all contractor’s own
approved
BOULDER
of the Engineer. obtained
SOLING : from the excavation at site and
machinery
1.4 stacked at and
site equipment's,
or brought providing
from crossing
outside in of track,
layer not cu.m 100.15 6,000.00 600,900.00 122.45 734,711.70 104.14 624,813.45 18.32 109,898.25 122.27%
Providing and laying uncoursed hand packed Dry Rubble
shoring, strutting,
exceeding 15 in timbering
cmfoundation,
thick (compacted andthickness)
buttressing with
Stone
SAND soling
FILLING : under floor plinth including
with out
appropriate
1.5 any
transportation materials
of soil, and all
spreadingsuch measures
in required necessary
line and to cu.m 7.40 6,000.00 44,400.00 7.07 42,395.40 0.00 - 7.07 42,395.40 95.49%
specialand
Providing dressing
filling of
sandstone including
in soak allfilling
pit.foundation
complete interstices
retain in position
level,suitable
sprinkling the
water, sides of the
ramming, compacting pitaswith
per
and
with
drawings, quarry
specifications waste or stone
and instruction chips or
of withquarry
the Engineer. sand,
including refilling
mechanical rammers, the excavated
testing, material watering,
watering, compacting using etc., all complete
appropriate as per
mechanical
ramming,specification
drawing, leveling the and site and disposing
instructions of the Engineer.off the
compaction means with all contractors materials,
surplus/unusable earth to outside the construction
handling, placing etc. all complete as per drawings,
premises, etc. all complete as per drawings,
specifications and instruction of the Engineer. The
specifications
Prepared by contractorand instructions ofChecked the Engineer.by Consultant, DSC Verified by (Engineer), DLPIU Recommended by DLPIU Chief Checked and forwarded by CLPIU DPD Approved by CLPIU, project Director
complete item including all lead & lift.
Bill of Quantities Up to Date of work till now Previous Bill Currently Accomplished work
Pay
Item Description Unit Quantity As % completion Remarks
No. Rate Amount Quantity Amount Quantity Amount Quantity Amount
per Contract
2. CONCRETE WORKS
2.1 2.1 P.C.C cu.m 17.00 14,000.00 238,000.00 17.67 247,429.00 16.19 226,660.00 1.48 20,769.00 103.96%
2.1.1 P.C.C (1:3:6)
Providing
2.1.2 P.C.Cand (1:2:4)laying WORKS machine mixed Plain Cement
2.1.2 Concrete of nominal mix 1:3:6 (1 cement : 3 sand : 6 cu.m 25.69 16,000.00 411,040.00 22.97 367,598.12 24.14 386,278.12 -1.17 (18,680.00) 89.43%
Providing and laying machine mixed Plain Cement
coarse
Concrete aggregate ) for leveling1:2:4course in foundations
: 2 sand and
2.2 P.C.C.ofFOR nominal R.C.C. mixWORKS (1 :cement : 4
2.2 under
coarsefloor of building,
aggregate etc. in all
) for leveling levelinwith
course broken stone
foundations and cu.m 381.20 20,000.00 7,624,000.00 390.87 7,817,350.42 404.41 8,088,251.96 -13.55 (270,901.54) 102.54%
Providing
aggregate and
ofof sizelaying in
not more position
than machine
25 with
mm brokenofmixed
approvedand
under
machine floor vibratedbuilding,cement etc. in all
concrete level of mix 1:1.5:3 stone
(1
2.3 SILICA
quality CEMENT
including ADMIXTURE
formwork
2.3 aggregate
cement:1.5of size not
sand: 3 coarse than wherever
more aggregate) 25 mm M20 of necessary,
approved
grade kg 3,812.00 300.00 1,143,600.00 3,908.68 1,172,602.56 4044.13 1,213,237.79 -135.45 (40,635.23) 102.54%
Providing
dewatering, and mixing
batching, Silica
mixing, Cement Admixture
transporting, of for
placing, in
quality including
reinforced cement formwork
concrete work wherever
using approved necessary,
cement
structural
compacting,
2.4 STEEL concrete
curing, at including
REINFORCEMENT the rate ofall2.50% lead by andweight of the
lift, placing,
etc. all
dewatering,
2.4 with 20 mm batching,
graded machinemixing,crushed transporting,
stone aggregate of Mt. 61.00 130,000.00 7,930,000.00 60.27 7,835,663.19 61.40 7,981,358.97 -1.12 (145,695.77) 98.81%
cement
complete for and
promoting workability, improving strength,
compacting,as
Providing
approved
perfixing
curing,
quality
drawings,
inincluding
various
specifications
in position
all lead and
locations
Fe lift,
500and the
etc.steel
all
achieving
instructions
reinforcement waterproofing
of of
the Engineer. properties, bleedingand heights
prevention,
2.5 FORMtransportation
complete
including asWORKSpervarious diameter
drawings,
of concrete
confirming
specifications
to site
toand
of
relevant
the
placing,
2.5 etc.
IS Silica
code in R.C.C. Cement Admixture
works shall
including shutteringbe the
straightening, product of
cutting, sq.m 2,547.51 800.00 2,038,008.00 2,561.56 2,049,244.48 2426.32 1,941,056.72 135.23 108,187.76 100.55%
Supplying
instructions
compaction, and
of the laying
Engineer. centering, of various
Silica
bending, Japan orfinished
binding superior
with 20
to required
andSWG meet line
shallannealed thewire and level,
requirements
for tying
pattern
3. BRICK
protection formworks
MASONRY
and curing, with 19/12
WORKS mm
etc. all complete thick water proof ply
as
the mentioned
reinforcement inbarsspecification
at props
each junctions of asmaterials
per drawings,
(binding and
wire
wood
3.1 3.1 BRICK& steelMASONRY adjustable forof all 1 kinds
4 c/sof) ONERCC
specifications
Workmanship,
shall
and
Division
notforbe foundations,
measured – 4:WORKS
the instructions
Concrete
separately)
(the
Works,
including
:Engineer,
allArticle
waste
but
2.4
and cu.m 114.50 20,000.00 2,290,000.00 - - 0.00 - 0.00 - 0.00%
works
SIDE
excluding FAIRFACE the cost ofcolumns, centering, shearshuttering,
walls, beams,
and
cut pieces,
slab, staircase,provisionlintel, forsill,
adequate
pergola, numbers of spacers,
including nails,
Providing
reinforcement,
CLEAR and SILICON
layingall first class WATER-REPELLANT
complete selected
as per factory pressed
drawings,
chairs, providing
propping scaffolding, and placing
staging, cement
supporting mortarand (1:1)bracing
cover
wire cut Fair
specifications
7.2.3 COATNG Faceinstructions
and
Providing brickand (machine
of the made
Applying Engineer.
Water brick) one or
Repellant sq.m 535.30 550.00 294,415.00 - - 0.00 - 0.00 - 0.00%
blocks
in proper to keep
lines the
and bars
level,in sealing
intended position
the joints at all heavy
with levels
more
Coating brick on thick
Exposed wall in
Brick cement
Surface mortar
using 1:4 (1
Siliconecement
Base :
all complete
duty brown self inas per
adhesive drawings,
tape, aligning specifications
toother
line and and
levels
4coarse
MC-Nisiwa sand) SH or ,superstructure
equivalent or and
superior specified
including
instructions
POINTING
including of the
WORK
Ties, PVC Engineer. IN (Authorized
Spacer, BRICKProviding lap length
MASONRY and
places
cleaning in all
brickheights
surface and using
level including
brick the costopenings/
of single
for the bar
8.1.1 Providing
cutouts/ length
and
pockets, exceeding
applying
applying at all metercleaning
10levels
De-shuttering in length
Pointing chemical,
chemical, shallDe-
Works be
in sq.m 535.30 400.00 214,120.00 - - 0.00 - 0.00 - 0.00%
or multi
single stage
orMortar self
multi-stage standing
scaffolding,scaffolding,
etc. soaking
allsand)
complete bricks,
measured
Cement
shuttering for
as
curing, raking joints,
the payment,
1:2
approved (1 by except
cement
the
provision :2 tofine
Engineer column).
for recesses,etc., on theasface
complete
openings,
per
at
manufacturer's
of brick masonry instruction,
wall3.1.,
including project
mixing specification and
all
BOQ levels
toothing Total
instruction
as of
etc.,
of
per drawing,
items
all
the complete
Engineer. 7.2.3
as per& 8.1.1:mortar,
specifications
drawing, laying in
andspecifications
instructions - - - 0.00 - 0.00 -
perfect
of
and the line, levelofand
Engineer.
instructions plumb
the7.2.3
Engineer. and finishing in regular and
Replaced items 3.1, and 8.1.1 with following
even surface ,all complete as per drawing , specification
items for 3-LaLiEACCr(F) and T(S)F - - - 0.00 - 0.00 -
and instruction of the Engineer.
Prepared by contractor Checked by Consultant, DSC Verified by (Engineer), DLPIU Recommended by DLPIU Chief Checked and forwarded by CLPIU DPD Approved by CLPIU, project Director
Bill of Quantities Up to Date of work till now Previous Bill Currently Accomplished work
Pay
Item Description Unit Quantity As % completion Remarks
No. Rate Amount Quantity Amount Quantity Amount Quantity Amount
per Contract
1 WATER SUPPLY INSTALLATION - - - - 0.00
a CPVC pipes SDR-11 - - - - 0.00
40 mm r.m 124.00 1,600.00 198,400.00 120.00 192,000.00 120.00 192,000.00 0.00 - 96.77%
25mm r.m 10.00 1,000.00 10,000.00 30.00 30,000.00 9.00 9,000.00 21.00 21,000.00 300.00%
20mm r.m 26.00 700.00 18,200.00 57.00 39,900.00 20.00 14,000.00 37.00 25,900.00 219.23%
15mm r.m 2.00 500.00 1,000.00 2.00 1,000.00 2.00 1,000.00 0.00 - 100.00%
c CPVC Ball Valve - - - - 0.00
40 mm nos. 3.00 2,000.00 6,000.00 6.00 12,000.00 6.00 12,000.00 0.00 - 200.00%
25 mm nos. 2.00 900.00 1,800.00 2.00 1,800.00 2.00 1,800.00 0.00 - 100.00%
20mm nos. 2.00 400.00 800.00 2.00 800.00 2.00 800.00 0.00 - 100.00%
d 40mm dia Gun Metal Check Valve nos. 1.00 4,500.00 4,500.00 1.00 4,500.00 1.00 4,500.00 0.00 - 100.00%
e Electrical Centrifugal Water Pump nos. 1.00 12,500.00 12,500.00 1.00 12,500.00 1.00 12,500.00 0.00 - 100.00%
f 1000 litres Capacity Water Storage Tank nos. 1.00 34,000.00 34,000.00 1.00 34,000.00 1.00 34,000.00 0.00 - 100.00%
2 Sewer, Rain and Waste Water Installation - - - - 0.00
110 mm r.m 42.00 1,400.00 58,800.00 72.00 100,800.00 40.00 56,000.00 32.00 44,800.00 171.43%
75mm r.m 46.00 1,200.00 55,200.00 40.00 48,000.00 40.00 48,000.00 0.00 - 86.96%
50mm r.m 20.00 250.00 5,000.00 33.00 8,250.00 15.00 3,750.00 18.00 4,500.00 165.00%
B School Blocks - - - - 0.00
1 Sanitary Installation - - - - 0.00
a Kitchen Sink of size 750*450*225mm set 5.00 30,000.00 150,000.00 5.00 150,000.00 5.00 150,000.00 0.00 - 100.00%
b Kitchen Sink of size 900*450*225mm set 1.00 35,000.00 35,000.00 1.00 35,000.00 1.00 35,000.00 0.00 - 100.00%
c PVC Multi Floor Trap no. 2.00 600.00 1,200.00 2.00 1,200.00 2.00 1,200.00 0.00 - 100.00%
2 Sanitary Installation - - - - 0.00
a Water Closet Set set 1.00 34,000.00 34,000.00 1.00 34,000.00 1.00 34,000.00 0.00 - 100.00%
b Orissa Pan set 2.00 3,100.00 6,200.00 2.00 6,200.00 2.00 6,200.00 0.00 - 100.00%
c Hand Wash Basin set 1.00 8,000.00 8,000.00 1.00 8,000.00 1.00 8,000.00 0.00 - 100.00%
d Ladies Urinal set 2.00 110,000.00 220,000.00 2.00 220,000.00 2.00 220,000.00 0.00 - 100.00%
e Self Closing Bib Cock nos. 6.00 4,000.00 24,000.00 6.00 24,000.00 6.00 24,000.00 0.00 - 100.00%
f CP Spreader in Urinal set 2.00 2,500.00 5,000.00 2.00 5,000.00 2.00 5,000.00 0.00 - 100.00%
g Toilet Paper Holder nos. 1.00 2,600.00 2,600.00 1.00 2,600.00 1.00 2,600.00 0.00 - 100.00%
h Commode Spray nos. 1.00 2,000.00 2,000.00 1.00 2,000.00 1.00 2,000.00 0.00 - 100.00%
i PVC Multi Floor Trap nos. 5.00 600.00 3,000.00 5.00 3,000.00 5.00 3,000.00 0.00 - 100.00%
j Waste Coupling and PVC Bottle Trap nos. 2.00 1,500.00 3,000.00 2.00 3,000.00 2.00 3,000.00 0.00 - 100.00%
k 40mm SS Grab Bar-Side nos. 1.00 4,500.00 4,500.00 1.00 4,500.00 1.00 4,500.00 0.00 - 100.00%
l 40mm SS Grab Bar-Rear nos. 1.00 4,500.00 4,500.00 1.00 4,500.00 1.00 4,500.00 0.00 - 100.00%
m CP Foldable Hinge nos. 2.00 5,500.00 11,000.00 2.00 11,000.00 2.00 11,000.00 0.00 - 100.00%
-
E CIVIL WORKS : SITE DEVELOPMENT -
1 EARTHWORKS -
1 SITE CLEARANCE AND MOBILIZATION Sq.m 249.65 1,000.00 249,650.00 128.21 128,210.90 128.21 128,210.90 0.00 - 51.36%
2 EARTHWORK IN EXCAVATION Cu.m 206.38 400.00 82,552.00 22.18 8,871.05 22.18 8,871.05 0.00 - 10.75%
3 BOULDER SOLING Cu.m 30.74 6,000.00 184,440.00 19.75 118,509.81 19.75 118,509.81 0.00 - 64.25%
6 P.C.C (1:2:4) Cu.m 15.27 16,000.00 244,320.00 9.62 153,853.08 9.62 153,853.08 0.00 - 62.97%
7 BRICKS MASONRY WORKS (1:4 c/s) Cu.m 0.22 18,000.00 3,960.00 0.20 3,643.20 0.20 3,643.20 0.00 - 92.00%
8 FLAG POLE nos. 2.00 25,000.00 50,000.00 2.00 50,000.00 2.00 50,000.00 0.00 - 100.00%
- - - - 0.00
CIVIL WORKS-RESERVIOR TANK - - - - 0.00
1.1 SITE CLEARANCE & MOBILIZATION:
1.1 sq.m 22.31 50.00 1,115.50 22.31 1,115.50 22.31 1,115.50 0.00 - 100.00%
Clearing and grubbing the site for construction by
removing 150mm thick
1.2 EARTHWORK IN top soil including :bushes, small
EXCAVATION
1.2 trees, leveling of undulated ground, shorting and cu.m 24.58 400.00 9,832.00 24.57 9,828.72 24.57 9,827.22 0.00 1.50 99.97%
Excavation in foundations in all type of soils for
stacking/storing
foundation, selected top soilpits
for etc.
reusetointhelandscaping
1.3 EARTHtrenches,
BACK FILLINGfooting, : required
works, including
1.3 depth disposing dewatering
unsuitable materials
bysides
manualfrom or site, etc., all cu.m
mechanical 4.02 300.00 1,206.00 4.01 1,202.85 4.01 1,202.85 0.00 - 99.74%
Back filling in foundation and of foundation with
complete as
means etc.soil per
as per drawings, specifications
specifications and instructions
with all contractor’s own
approved
1.4the
BOULDER obtained
SOLING from
: the excavation at site and
of
1.4 stacked Engineer.
machinery and equipment's, providing crossing of track,
at site or brought from outside
Providing and laying uncoursed hand packed Dry Rubble in layer not cu.m 2.08 6,000.00 12,480.00 2.08 12,462.00 2.08 12,462.00 0.00 - 99.86%
shoring, strutting,
exceeding 15 in timbering
cmfoundation,
thick (compacted andthickness)
buttressing with
Stone soling under floor plinth including
with out
appropriate
transportation materials
of soil,and all such
spreading measures
in required necessary
line and to
any special dressing of stone including filling interstices
retain in position the
level,suitable
sprinkling sidesramming,
of the foundation pit with
and
with quarrywater,
waste or stone chipscompacting
or quarry sand,
including
Prepared by
mechanical refilling
contractor rammers, the excavated
testing, material
Checked with
by watering,
Consultant,
as per DSC Verified by (Engineer), DLPIU Recommended by DLPIU Chief Checked and forwarded by CLPIU DPD Approved by CLPIU, project Director
watering, compacting using etc., all complete
appropriate mechanical
ramming,specification
drawing, leveling the and site and disposing
instructions off the
of the Engineer.
compaction means with all contractors materials,
surplus/unusable earth to outside the construction
handling, placing etc. all complete as per drawings,
premises, etc. all complete as per drawings,
specifications and instruction of the Engineer. The
Bill of Quantities Up to Date of work till now Previous Bill Currently Accomplished work
Pay
Item Description Unit Quantity As % completion Remarks
No. Rate Amount Quantity Amount Quantity Amount Quantity Amount
per Contract
2. CONCRETE WORKS
2.1.1 cu.m 0.78 14,000.00 10,920.00 0.78 10,904.25 0.78 10,904.25 0.00 - 99.86%
2.1 P.C.C
2.1.1
2.2 P.C.CFOR
P.C.C. (1:3:6) R.C.C. WORKS :
2.2 Providing and and laying
laying inmachine cu.m 7.42 20,000.00 148,400.00 7.41 148,295.00 7.41 148,295.00 0.00 - 99.93%
Providing positionmixedmachine Plain
mixedCement
and
Concrete
machine of nominal
vibrated mix 1:3:6
cement (1 cement
concrete of mix: 31:1.5:3
sand : (1 6
2.3 SILICA CEMENT ADMIXTURE
2.3 coarse aggregate
cement:1.5 sand: ) for leveling
3 coarse course in foundations and kg 74.20 300.00 22,260.00 74.15 22,244.25 74.15 22,244.25 0.00 - 99.93%
Providing and mixing Silicaaggregate) M20 grade
Cement Admixture of forin
under floorcement
reinforced of building, etc. work
concrete in all using
level with broken stone
structural
2.4 STEEL concrete at the rate
REINFORCEMENT of 2.50% approved
by weightcement
of the
2.4 aggregate
with 20 mm of graded
size not more crushed
machine than 25 stone
mm of approved
aggregate of Mt. 1.46 130,000.00 189,800.00 1.58 204,902.61 1.58 204,902.61 0.00 - 107.96%
cement for and
Providing promotingfixingworkability,
in position improving
Fe 500 strength,
steel
quality including
approved quality informwork various wherever
locations necessary,
achieving waterproofing
reinforcement properties,
of various mixing, bleedingand
diameter transporting,
confirming
heights
prevention,
to relevant
2.5 FORM
dewatering,
including WORKS
batching,
transportation of concrete to placing,
2.5 etc.
IS Silica
code Cementworks
in R.C.C. Admixture
including shall be site
the of
straightening,
placing,
product of sq.m 54.93 800.00 43,944.00 56.46 45,170.80 56.46 45,170.80 0.00 - 102.79%
Supplying
compacting,
compaction, and laying
curing, centering,
including all shuttering
lead and lift, of cutting,
various
etc. all
Silica
bending,Japan orfinished
binding superior
with 20
to required
and
SWG meet line
shallannealed thewireand level,
requirements
for tying
pattern
complete
protectionformworks
as per
and curing, with 19/12
drawings, mm thick water
specifications
etc. all complete proof
and ply
the - - 0.00
as
the mentioned
reinforcement inbarsspecification
at props of asmaterials
each junctions
per drawings,
(binding and
wire
F wood & steel
instructions
specifications
Furniture of andadjustable
the Engineer.
the instructions forof all
thekinds of RCC
Engineer, but lot 1.00 4,000,000.00 4,000,000.00 1.00 4,000,000.00 1.00 4,000,000.00 0.00 - 100.00%
shall
works notforbeWorks
Workmanship, Division
measured
foundations,
– 4: Concrete
separately) Works,
including allArticle
waste 2.4
and
excluding the cost ofcolumns, centering,
Total
shearshuttering,
walls, beams,
and 42,426,569.79 42,070,496.18 42,331,401.78 - 260,905.60
cut pieces,
slab, staircase,provision
lintel,forsill,
adequate numbers
pergola, of spacers,
including nails,
reinforcement, all complete as per drawings,
chairs, providing
propping scaffolding, and placing
staging,cement mortarand
supporting (1:1)bracing
cover
specifications and instructions of the Engineer.
blocks
in to keep
proper lines the andbars in sealing
level, intendedthe position
joints at all heavy
with levels
all complete as per drawings, specifications
duty brown self adhesive tape, aligning to line and levels and
instructions
including of the Engineer.
Ties, PVC Spacer, (Authorized
Providing lap length and
openings/
for the bar
cutouts/ length applying
pockets, exceedingDe-shuttering
10 meter in lengthchemical,shallDe-be
measured for
shuttering as the payment,
approved except
by the to column).
Engineer etc., complete at
all levels as per drawing, specifications and instructions
of the Engineer.
Prepared by contractor Checked by Consultant, DSC Verified by (Engineer), DLPIU Recommended by DLPIU Chief Checked and forwarded by CLPIU DPD Approved by CLPIU, project Director
Project Name : Emergency School Reconstruction Project (ESRP)
Building: Academic Block 3-LaLiEACCr(F), T(S)F
School Name : Shree Gyanjyoti Secondary School
Location : Hansapur-.3, Gorkha
Abstract of Cost - Civil Works
Pay Quantity
Quantity
Item Description of Works Unit Rate (NRs.) Qty Site Water Amount
in BOQ 3LaLiEACCr(F)-A T(S)F Total
No. Development Tank
GENERAL -
1 MOBILIZATION AND DEMOBILIZATION L.S. 1.00 500,000.00 1.00 500,000.00
2 SITE OFFICE ESTABLISHMENT Per Month 16.00 25,000.00 16.00 400,000.00
3 PROJECT INFORMATION BOARD nos. 1.00 10,000.00 1.00 10,000.00
4 SAFETY SIGN BOARD nos. 1.00 10,000.00 1.00 10,000.00
5 BARRICADING WORKS R.m 98.88 2,000.00 120.00 240,000.00
6 SAFETY MATERIALS & SITE SAFETY L.S. 1.00 100,000.00 1.00 100,000.00
7 LAB TEST(WATER TEST) job 1.00 0.00 -
8 TEMPORARY TOILET nos. 2.00 150,000.00 2.00 300,000.00
9 ROAD REPAIR AND MAINTENANCE. Km. 38.00 50,000.00 38.00 1,900,000.00
0.00 -
CIVIL WORKS- BUILDING 0.00 -
1 EARTH WORKS 0.00 -
1.1 SITE CLEARANCE & MOBILIZATION: sq.m 598.98 100.00 550.65 83.91 634.56 63,456.10
1.2 EARTHWORK IN EXCAVATION : cu.m 342.79 400.00 249.69 71.19 320.88 128,351.35
1.3 EARTH BACK FILLING : cu.m 201.25 300.00 171.13 63.21 234.34 70,300.76
1.4 BOULDER SOLING : cu.m 100.15 6,000.00 107.98 14.48 122.45 734,711.70
1.5 SAND FILLING : cu.m 7.40 6,000.00 4.91 2.16 7.07 42,395.40
2. CONCRETE WORKS
2.1 2.1 P.C.C cu.m 17.00 14,000.00 15.19 2.49 17.67
2.1.1 P.C.C (1:3:6) 247,429.00
2.1.2 P.C.C (1:2:4) WORKS cu.m 25.69 16,000.00 22.41 0.56 22.97 367,598.12
2.2 P.C.C. FOR R.C.C. WORKS : cu.m 381.20 20,000.00 374.40 16.46 390.87 7,817,350.42
2.3 SILICA CEMENT ADMIXTURE kg 3,812.00 300.00 3744.04 164.63 3,908.68 1,172,602.56
2.4 STEEL REINFORCEMENT Mt. 61.00 130,000.00 58.15 2.13 60.27 7,835,663.19
2.5 FORM WORKS sq.m 2,547.51 800.00 2433.42 128.13 2,561.56 2,049,244.48
3. BRICK MASONRY WORKS
3.1 3.1 BRICK MASONRY WORKS ( 1 : 4 c/s ) ONE SIDE cu.m 114.50 20,000.00 0.00
-
7.2.3 FAIRFACE
CLEAR SILICON WATER-REPELLANT COATNG sq.m 535.30 550.00 0.00 -
8.1.1 POINTING WORK IN BRICK MASONRY sq.m 535.30 400.00 0.00 -
Breadth Height
S. No. Description No. Length (m) Quantity Unit Remarks
(m) (m)
1 EARTH WORKS
1.1 Site Clearance
Building 1 34.50 15.50 534.75
Soak Pit 1 15.90 Area 15.90
Total 550.65 sq.m
Ramp
For Slope 1 1.30 0.52 Area 0.67
Wall Along Grid B 1 0.50 0.45 0.45 0.10
Wall Parallel to Ramp 1 6.80 0.45 0.41 1.25
Total 249.69 cu.m
2 CONCRETE WORKS
2.1 P.C.C.
2.1.1 P.C.C.(1:3:6) Works
Footing
Isolated F1 2 2.50 2.50 0.10 1.25
Isolated F2 4 3.00 3.00 0.10 3.60
Combined CF1 3 1.80 5.00 0.10 2.70
Combined CF2 1 3.00 5.00 0.10 1.50
Combined CF3 2 2.80 5.00 0.10 2.80
Ramp
Sloped 1 1.30 0.51 Area 0.66
Wall Top 1 1.33 0.25 0.05 0.02
1 6.80 0.13 0.05 0.04
Lab/ECD/Store/Pantry 4 5.70 6.70 0.08 11.46
Corridor 4 5.70 2.20 0.08 3.76
1 4.20 2.20 0.08 0.69
Below Staircase 1 4.20 6.70 0.08 2.11
Total 22.41 cu.m
B Beam
Foundation beam (300x400)
Along Grid A & F 2 3.50 0.30 0.40 0.84
Along Grid B 1 3.30 0.30 0.40 0.40
Grid C & D 2 3.55 0.30 0.40 0.85
Along Grid E 1 3.25 0.30 0.40 0.39
Along Grid 1 1 12.50 0.30 0.40 1.50
Along Grid 2,3 2 15.10 0.30 0.40 3.62
Secondary beam
Along grid 1a 2 10.9 0.25 0.3 1.64
Along grid 1b 1 4.2 0.25 0.3 0.32
Along grid A1,B1,D1 & E1 4 8.9 0.25 0.3 2.67
Edge Beam(125x525)
Grid B,C 1 7.90 0.13 0.3 0.30
Secondary beam
Along grid 1a 2 10.9 0.25 0.3 1.64
Along grid 1b 1 4.2 0.25 0.3 0.32
Along grid A1,B1,D1 & E1 4 8.9 0.25 0.3 2.67
Secondary beam
Along grid 1a 2 10.9 0.25 0.3 1.64
Along grid 1b 1 4.2 0.25 0.3 0.32
Along grid A1,B1,D1 & E1 4 8.9 0.25 0.3 2.67
Beam(Roof level)
Main beam
Along grid 1,2 & 3 3 4 0.3 0.4 1.44
Along grid C & D 2 8.5 0.3 0.4 2.04
Secondary beam
Along grid 1a 1 4.2 0.25 0.3 0.32
C Column
Ground floor plan
D Slab
First floor level (+3.00m Lvl) 1 305.15 Area 0.13 38.14
Deduction
Column deduction -18 0.50 0.50 0.13 -0.56
Void deduction -1 4.78 4.20 0.13 -2.61
Projections
At Back 2 11.50 0.70 0.13 2.01
At Front 1 6.20 1.00 0.13 0.78
E Staircase
Ground floor level
Bottom 1 2.07 2.00 0.20 0.83
Landing 1 2.20 2.00 0.20 0.88
1 2.00 2.10 0.20 0.84
Waist Slab 1 6.75 2.00 0.20 2.70
Steps 20 0.03 Area 2.00 1.20
Landing Beam 1 4.00 0.25 0.38 0.38
G Lintel Bands
Ground floor level
Short Span
Along grid A,C,D,E,F 5 6.50 0.23 0.08 0.56
Between B,C 1 4.70 0.125 0.08 0.04
1 2.05 0.23 0.08 0.04
Long Span
Along grid 1 1 22.20 0.23 0.08 0.38
Along grid 2 1 21.68 0.23 0.08 0.37
H Soak Pit
RCC slab 1 2.27 Area 0.15 0.34
I Pedestal
Base Block 14 0.50 0.25 0.25 0.44
J Parapet Wall
Top Floor 2.00 36.53 0.35 0.10 2.56
1.00 7.50 0.35 0.10 0.26
Roof Level 1.00 33.00 0.35 0.10 1.16
K Bench
Bench Top Slab 2 2.40 0.50 0.08 0.18
L Slab for In-built Furniture
Furniture Slab for Lab 4 1.80 0.90 0.10 0.65
Sink slab type-1 1 9.43 0.50 0.10 0.47
Sink slab type-2 1 5.75 0.50 0.10 0.29
Sink slab type-3 1 3.60 0.90 0.10 0.32
Furniture slab in preparation room 1 6.75 0.60 0.10 0.41
Sink Deduction
Sink slab type-1 -2 0.70 0.35 0.10 -0.05
Sink slab type-2 -2 0.70 0.35 0.10 -0.05
2.5 Formworks
Formworks for RCC
A Foundation
Isolated footing
Isolated F1 2 10.00 0.25 5.00
Isolated F2 4 12.00 0.25 12.00
Combined footing
Combined CF1 3 13.60 0.60 24.48
Combined CF2 1 16.00 0.60 9.60
Combined CF3 2 15.60 0.60 18.72
B Beam
Foundation beam (300x400)
Along Grid A & F 2 3.50 0.80 5.60
Along Grid B 1 3.30 0.80 2.64
Grid C & D 2 3.55 0.80 5.68
Along Grid E 1 3.25 0.80 2.60
Along Grid 1 1 12.50 0.80 10.00
Along Grid 2,3 2 15.10 0.80 24.16
Along Grid 1 1 26.00 0.80 20.80
Along Grid 2,3 2 26.00 0.80 41.60
Secondary beam(250x425)
Grid 1a 4 5.45 0.85 18.53
Grid 1b 1 4.20 0.70 2.94
Grid A1,B1,D1,E1 4 8.90 0.85 30.26
Edge Beam(125x525)
Grid B,C 1 7.90 1.05 8.30
Secondary beam(250x425)
Grid 1a 4 5.45 0.85 18.53
Grid 1b 1 4.20 0.70 2.94
Grid A1,B1,D1,E1 4 8.90 0.85 30.26
Secondary beam(250x425)
Grid 1a 1 4.20 0.85 3.57
Landing beam 3 0.85 4.00 10.20
C Column
Ground floor plan
Total columns(500x500) 18 2.00 2.88 103.50
D Slab
First floor level (+3.00m Lvl) 1 28.80 9.80 282.24
Cantilever slab back side 2 11.75 0.70 16.45
Cantilever slab front side 1 6.15 1.00 6.15
Deduction
Void deduction -1 4.75 4.20 -19.95
Main beam(300x500)
Along grid 1,2,3 -3 26.00 0.30 -23.40
Along Grid A,B,E,F -4 8.50 0.30 -10.20
Along Grid C,D -2 9.25 0.30 -5.55
Secondary beam(250x425)
Grid 1a -4 5.45 0.25 -5.45
Edge Beam(125x525)
Grid B,C -1 7.90 0.13 -0.99
Main beam(300x525)
Along grid 1,2,3 -3 26.00 0.30 -23.40
Along Grid A,B,E,F -4 8.50 0.30 -10.20
Along Grid C,D -2 8.50 0.30 -5.10
Secondary beam(250x425)
Grid 1a -4 5.45 0.25 -5.45
Grid 1b -1 4.20 0.25 -1.05
Grid A1,B1,D1,E1 -4 8.90 0.25 -8.90
Main beam(300x525)
Along grid 1,2,3 -3 26.00 0.30 -23.40
Along Grid A,B,E,F -4 8.50 0.30 -10.20
Along Grid C,D -2 8.50 0.30 -5.10
Secondary beam(250x425)
Grid 1a -4 5.45 0.25 -5.45
Grid 1b -1 4.20 0.25 -1.05
Grid A1,B1,D1,E1 -4 8.90 0.25 -8.90
Secondary beam(250x425)
Grid 1a -1 4.20 0.25 -1.05
E Staircase
Ground floor level
Bottom 1 2.07 0.20 0.41
Waist Slab 1 6.75 2.00 13.50
Side 1 6.75 0.20 1.35
Landing 1 2.20 1.65 3.64
1 2.00 2.15 4.29
Side 1 3.80 0.15 0.57
Riser 20 2.00 0.15 6.00
Landing Beam 1 4.00 0.86 3.44
G Lintel Bands
Ground floor level
Along grid A,C,D,E,F 5.00 6.50 0.15 4.88
Along grid 1 1.00 22.20 0.15 3.33
Along grid 2 1.00 21.68 0.15 3.25
Between B,C 1.00 4.70 0.15 0.71
1.00 2.05 0.15 0.31
First floor level
Along grid A,C,D,E,F 5.00 6.50 0.15 4.88
Along grid 1 1.00 22.20 0.15 3.33
Along grid 2 1.00 21.75 0.15 3.26
Between B,C 1.00 5.03 0.15 0.75
1.00 1.73 0.15 0.26
Second floor level
Along grid A,B,C,D,E,F 6.00 6.50 0.15 5.85
Along grid 1 1.00 22.20 0.15 3.33
Along grid 2 1.00 21.60 0.15 3.24
Between Principal/Admin 1.00 1.50 0.15 0.23
1.00 4.25 0.15 0.64
I Pedestal
Base Block 14 1.25 0.25 4.38
J Parapet Wall
Top Floor 2.00 36.53 0.25 18.27
1.00 7.50 0.25 1.88
Roof Level 1.00 33.00 0.25 8.25
K Bench
Bench Top Slab 2 5.80 Perimeter 0.075 0.87
Bottom 2 5.80 0.60 6.96
Deduction -4 0.13 0.50 -0.25
L Slab For In-built Furniture
Furniture Slab for Lab 4 1.80 0.90 6.48
4 5.40 0.10 2.16
Sink slab type-1 1 9.43 0.50 4.71
1 10.43 0.10 1.04
2 2.10 0.10 0.42
Sink deduction -2 0.70 0.35 -0.49
Sink slab type-2 1 5.75 0.50 2.88
1 6.75 0.10 0.68
2 2.10 0.10 0.42
Sink Deduction -2 0.70 0.35 -0.49
Sink slab type-3 1 3.60 0.90 3.24
1 9.00 0.10 0.90
1 2.10 0.10 0.21
Sink deduction -1 0.70 0.35 -0.25
Furniture slab in preparation room 1 6.75 0.60 4.05
1 6.75 0.10 0.68
M Soak Pit
RCC slab 1.00 1.13 Area 1.13
Parapet Wall
Top Floor 2.00 36.53 0.23 0.80 13.44
1.00 7.50 0.23 1.40 2.42
Roof Level 1.00 33.00 0.23 0.90 6.83
Outside
Steps 1 28.58 0.60 0.15 2.57
1 28.58 0.30 0.15 1.29
Ramp
Wall Along -B 1 1.33 0.25 Area 0.33
1 6.91 0.17 Area 1.19
5 FLOORING WORKS
5.1 Hardened Cement Concrete Flooring (40mm) With Neat Cement Punning
Ground floor plan
Laboratory 1.00 9.43 6.75 63.62
Store 1.00 2.23 6.75 15.02
Class Room/Store,Pantry 2.00 5.75 6.75 77.63
Corridor 1.00 28.80 2.37 68.26
1.00 4.20 2.37 9.95
Staircase Below 1.00 6.625 4.2 27.83
Staircase
Staircase Tread 18.00 0.30 2.00 10.80
Riser 20.00 0.15 2.00 6.00
Staircase landing 1.00 2.00 2.20 4.40
1.00 2.13 2.00 4.25
Roof plan
Roof Floor Slab 1.00 5.50 10.50 57.75
Total 1206.32 sq.m
7 PLASTER WORKS
7.1 Internal Cement Plaster
7.1.1 Internal Plaster on Wall (1:6)
Ground Floor
Laboratory 1 32.75 2.88 94.16
Store 1 17.95 2.88 51.61
Store/Pantry/ECD 2 25.35 2.88 145.76
Deductions
W1 -18 1.10 1.13 -11.14
V1 -18 1.10 0.53 -5.20
W3 -1 1.50 0.37 -0.28
D1 -6 1.10 2.44 -8.04
D3 -2 1.00 2.10 -2.10
D4 -2 1.00 1.55 -1.55
Column Plaster
Ground Floor
Along grid 1
Grid 1A,1F 2.00 1.25 3.00 7.50
Grid 1B,1C,1D,1E 4.00 0.75 3.00 9.00
Along grid 3
Grid 3A,3B,3C,3D,3E,3F 6.00 1.50 2.48 22.28
6.00 0.50 3.00 9.00
First Floor
Along grid 1
Grid 1A,1F 2.00 1.25 3.00 7.50
Grid 1B,1C,1D,1E 4.00 0.75 3.00 9.00
Along grid 3
Grid 3A,3B,3C,3D,3E,3F 6.00 1.50 2.48 22.28
6.00 0.50 3.00 9.00
Second Floor
Along grid 1
Grid 1A,1F 2.00 1.25 3.00 7.50
Grid 1B,1C,1D,1E 4.00 0.75 3.00 9.00
Along grid 3
Grid 3A,3B,3C,3D,3E,3F 6.00 1.50 2.48 22.28
6.00 0.50 3.00 9.00
Parapet Wall
Top Floor 2 35.90 0.80 57.44
1 7.50 1.40 10.50
Roof 1 32.00 0.90 28.80
On Outer walls
Ground floor level
Along grid A,F/1-2 2 6.50 2.48 32.18
Along grid 1 4 5.55 2.48 54.95
1 4.00 2.10 8.38
Along grid 2 4 5.55 2.48 54.95
First floor level
Along grid A,F/1-2 2 6.50 2.48 32.18
Along grid 1 4 5.55 2.48 54.95
1 4.00 2.10 8.38
Along grid 2 4 5.55 2.48 54.95
Second floor level
Along grid A,F/1-2 2 6.50 2.48 32.18
Along grid 1 4 5.55 2.48 54.95
1 4.00 2.10 8.38
Along grid 2 4 5.55 2.48 54.95
Top floor level
Along grid C,D/1-3 2 8.50 2.10 35.70
Along grid 1 1 4.00 2.10 8.40
Along grid 3 1 4.00 2.10 8.40
8 MISCELLANOUS
8.4 Railing
Total
Staircase Railing length Kg/m
Length
Horizontal ISNB 40M 1 22.818 22.82 3.56 81.23
Horizontal ISNB 40M (Top Floor) 1 2.125 2.13 3.56 7.57
Vertical 38mm Square Pipe 6 0.92 5.52 2.82 15.57
Vertical 38mm Square Pipe 20 0.95 19.00 2.82 53.58
Horizontal 25mm Square Pipe 4 22.818 91.27 0.85 77.58
Horizontal 25mm Square Pipe (Top Floor) 4 2.125 8.50 0.85 7.23
Balcony Railing
First Floor
Horizontal ISNB 40M 1 30.2 30.20 3.56 107.51
Horizontal ISNB 32M 2 30.2 60.40 3.10 187.24
Vertical ISNB 32M 23 1.14 26.22 3.10 81.28
Inclined ISNB 32M 23 0.134 3.08 3.10 9.55
Vertical 25mm Square Pipe 208 0.82 170.56 0.85 144.98
Second Floor
Horizontal ISNB 40M 1 30.2 30.20 3.56 107.51
Horizontal ISNB 32M 2 30.2 60.40 3.10 187.24
Vertical ISNB 32M 23 1.14 26.22 3.10 81.28
Inclined ISNB 32M 23 0.134 3.08 3.10 9.55
Vertical 25mm Square Pipe 208 0.82 170.56 0.85 144.98
Parapet Wall
ISNB 40M(Horizontal Bars) 2 36.53 73.06 3.56 260.09
Pedestal
ISNB 40M Pedestal Bars 14 1.54 21.57 3.56 76.80
14 1.20 16.80 3.56 59.81
28 0.40 11.20 3.56 39.87
Base plate 185 0.00009375 0.02 7850 136.15
12 mm dia. Anchor Bolt, Nut 740 0.13 96.20
Total 2,424.07 k.g
2 Column
2.1 Grid 1 (A ,B,E &F) 4
Main Bar 16 6 3.59 86.11 1.59 136.92 16mm
16 6 6.59 158.11 1.59 251.40 6.18 3.18 16mm
0.10 0.1
0.31 0.31
2.2 Grid 1 ( C ) 1
Main Bar 20 4 4.07 16.27 2.47 40.19
16 2 3.59 7.18 1.59 11.41 20mm 16mm
16 6 6.59 39.53 1.59 62.85 16mm 6.18
3.42 3.18
2.3 Grid 1 ( D ) 1
Main Bar 20 6 4.07 24.42 2.47 60.32
20 6 7.07 42.41 2.47 104.75 20mm 20mm
6.42 3.42
0.12 0.12
0.12 0.12
0.53 0.53
2.6 Grid 3 (A,B,C,D,E & F) 6
Main Bar 20 6 4.07 146.52 2.47 361.90
20 6 7.26 261.23 2.47 645.23 20mm 20mm
3.42 6.42
0.12 0.12
0.53 0.53
2.7 Stirrups 18
For 18 columns 8 12 1.84 397.44 0.40 158.98 0.08
8 24 1.28 552.96 0.40 221.18 0.42 0.14 0.08
0.42
0.42
3 For Lower Tie Beam
3.1 Grid 1,2 & 3 3 8.73
Top Bar 16 2 10.04 60.24 1.59 95.78 0.96
0.35
End bar from both
direction
16 2 11.46 68.76 1.59 109.33 11.46
8.73
16 2 10.04 60.24 1.59 95.78 0.96
0.35
2.94
Middle bar 16 1 4.25 12.75 1.59 20.27 0.96
0.35
0.25
8.61
20 2 10.24 61.41 2.47 151.68 1.2
0.425
2.94
Middle bar 16 1 4.33 12.98 1.59 20.63 0.96
0.425
16 1 12.00 36.00 1.59 57.24 12
2.94
16 1 4.33 12.98 1.59 20.63 0.96
0.425
Bottom Bar
End bar from both 20 2 11.65 69.90 2.47 172.65
0.94
direction 9.51 1.2
0.66
16 1 11.37 34.11 1.59 54.23 0.96 9.75
0.25 0.25
5 Column ( Up To 1st Floor Level)
5.1 Grid 1 (A ,B,E & F) 4
0.96
5.2 Grid 1 ( C ) 1
Main Bar 20 4 7.20 28.80 2.47 71.14
16 2 6.96 13.92 1.59 22.13 20mm 16mm
0.12 0.96
5.3 Grid 1 ( D ) 1
Main Bar 20 6 7.20 43.20 2.47 106.70
6 20mm
2.47
1.2
1.20 0.96
1.2
1.20
5.7 Stirrups 18
For 18 columns 8 31 1.84 1026.72 0.40 410.69 0.08
8 62 1.28 1428.48 0.40 571.39 0.42 0.14 0.08
1.59 0.42
0.42
6 For Staircase
(Plinth level to 1st floor level)
1.703
Main Bar (top bar) 1 16 21 8.23 172.81 1.59 274.77 0.3
3.354
2.472
0.4
2.042 1.03
0.2
1
Extra Bar 1 16 21 2.00 42.00 1.59 66.78
1
1.853
Landing bottom bar 1 16 21 3.00 63.06 1.59 100.27 1 0.15
1.2
Landing Extra bar 1 16 21 2.20 46.20 1.59 73.46 1
1
2.147 0.15
1
Extra Bar 1 16 21 2.20 46.20 1.59 73.46 1.2
1.82
Bottom bar( Slab level) 1 16 21 3.02 63.42 1.59 100.84 0.2 1
4.92
6.1 Landing Beam 1 20 3 5.62 16.86 2.47 41.64 0.35 0.35
4.46 1.5
1.29
6 25 2 6.75 81.00 3.86 312.66 5.46
7.2 Grid 1
0.94
Bottom Bar (end bar) 1 20 2 5.65 11.30 2.47 27.91 1.2
3.51
0.94
20 2 9.85 19.70 2.47 48.66
1.2 7.71
Top Bar (End Bar) 16 2 10.35 20.70 1.59 32.91 8.73 0.96
0.66
0.96 8.73
16 2 10.35 20.70 1.59 32.91
0.66
2.94 0.96
Middle Bar 16 1 4.56 4.56 1.59 7.25
0.66
16 1 12.00 12.00 1.59 19.08 12
0.96
16 1 12.00 12.00 1.59 19.08 11.04
0.66
16 1 4.56 4.56 1.59 7.25 2.94
0.96
0.94
3.5
3 25 4 3.80 45.60 3.86 176.02 0.15 0.15
0.35
2 16 1 4.98 9.95 1.59 15.82
4.625
top bar (end bar) 2 16 2 4.06 16.22 1.59 25.79
2.645 0.96
0.45
4.75
top bar 1 12 3 5.65 16.95 0.89 15.09 0.45 0.45
250
7.9 Stirriups( For Main Beam) 1 10 1125 1.65 1856.25 0.62 1150.88 0.10
0.425
0.25
7.10 For Secondry Beam 1 8 540 1.31 707.40 0.40 282.96
0.8
0.375
0.2
between 2 & 3
along x axis 1 8 6 4.20 25.20 0.40 10.08 4.2
along y axis 1 8 18 2.20 39.60 0.40 15.84 2.2
9 Bands
Ground Floor
9.1 Sill Bands 0.75 0.75
Grid 1 4 10 2 7.15 57.20 0.62 35.464 0.075 5.5 0.075
1 10 2 4.50 9.00 0.62 5.58 4.5
0.75 0.75
1 10 2 5.65 11.30 0.62 7.006 0.075 4 0.075
0.7
0.95 0.95
Distribution Bar 1 8 63 0.82 51.66 0.40 20.66 0.06 0.7 0.06
Type3
Main Bar 1 8 5 6.82 34.10 0.40 13.64 0.06 6.7 0.06
Type 4
Main Bar 1 8 5 0.45 2.25 0.40 0.90 0.06 0.45 0.06
Type 5
Main Bar 1 8 5 0.86 4.30 0.40 1.72 0.06 0.74 0.06
0.96
10.2 Grid 1 ( C ) 1
Main Bar 20 4 7.20 28.80 2.47 71.14
16 2 6.96 13.92 1.59 22.13 20mm 16mm
0.12 0.96
10.3 Grid 1 ( D ) 1
Main Bar 20 6 7.20 43.20 2.47 106.70
6 20mm
2.47
1.2
1.20 0.96
1.2
1.20
10.7 Stirrups 18
For 18 columns 8 31 1.84 1026.72 0.40 410.69 0.08
8 62 1.28 1428.48 0.40 571.39 0.42 0.14 0.08
1.59 0.42
0.42
11 For Staircase
(1st Floor level to 2nd Floor Level)
1.703
Main Bar (top bar) 1 16 21 8.23 172.81 1.59 274.77 0.3
3.354
2.472
0.4
2.042 1.03
0.2
1
Extra Bar 1 16 21 2.00 42.00 1.59 66.78
1
1.853
Landing bottom bar 1 16 21 3.00 63.06 1.59 100.27 1 0.15
1.2
Landing Extra bar 1 16 21 2.20 46.20 1.59 73.46 1
1
2.147 0.15
1
Extra Bar 1 16 21 2.20 46.20 1.59 73.46 1.2
1.82
Bottom bar( Slab level) 1 16 21 3.02 63.42 1.59 100.84 0.2 1
0.2
12 Main Beam(Second Floor Level)
12.1 Grid A,B,C,D,E & F
Bottom bar (End Bar) 6 25 2 7.25 87.00 2.47 214.89 1.29
4.46 1.5
1.29
6 25 2 6.75 81.00 3.86 312.66 5.46
12.2 Grid 1
0.94
Bottom Bar (end bar) 1 20 2 5.65 11.30 2.47 27.91 1.2
3.51
0.94
20 2 9.85 19.70 2.47 48.66
1.2 7.71
Top Bar (End Bar) 16 2 10.35 20.70 1.59 32.91 8.73 0.96
0.66
0.96 8.73
16 2 10.35 20.70 1.59 32.91
0.66
2.94 0.96
Middle Bar 16 1 4.56 4.56 1.59 7.25
0.66
16 1 12.00 12.00 1.59 19.08 12
0.96
16 1 12.00 12.00 1.59 19.08 11.04
0.66
16 1 4.56 4.56 1.59 7.25 2.94
0.96
0.94
3.5
3 25 4 3.80 45.60 3.86 176.02 0.15 0.15
0.35
2 16 1 4.98 9.95 1.59 15.82
4.625
top bar (end bar) 2 16 2 4.06 16.22 1.59 25.79
2.645 0.96
0.45
4.75
top bar 1 12 3 5.65 16.95 0.89 15.09 0.45 0.45
250
12.8 Stirrups( For Main Beam) 1 10 1125 1.65 1856.25 0.62 1150.88 0.10
0.425
0.25
12.9 Stirrups ( For Secondry Beam) 1 8 540 1.31 707.40 0.40 282.96
0.8
0.375
0.2
0.375
Infront of stair case
Straight bar 1 8 15 4.92 73.80 0.40 29.52 4.92
Distribution bars
Between Grid 1 &1a
along x-axis 1 8 96 2.72 261.12 0.40 104.45 2.72
along y- axis 1 8 80 3.20 256.00 0.40 102.40 3.2
between 2 & 3
along x axis 1 8 6 4.20 25.20 0.40 10.08 4.2
along y axis 1 8 18 2.20 39.60 0.40 15.84 2.2
Negative Bars
along Grid 1 2 8 35 2.05 143.50 0.40 57.40 2.05
along grid 1a 2 8 35 2.35 164.50 0.40 65.80 2.35
along grid 1b 1 8 7 1.08 7.56 0.40 3.02 1.08
along grid 2 (except infront of
stair case) 2 8 35 2.10 147.00 0.40 58.80 2.1
along grid 2 in front of
staircase 1 8 14 1.38 19.32 0.40 7.73 1.38
along grid a1 1 8 28 2.05 57.40 0.40 22.96 2.05
along grid b 1 8 28 2.10 58.80 0.40 23.52 2.1
along b1 1 8 28 2.05 57.40 0.40 22.96 2.05
along grid c&d 2 8 9 2.55 45.90 0.40 18.36 2.55
along grid d1 1 8 28 2.05 57.40 0.40 22.96 2.05
along grid e 1 8 28 2.10 58.80 0.40 23.52 2.1
along grid e1 1 8 28 2.05 57.40 0.40 22.96 2.05
0.96
0.96
14.3 Grid 1 ( D ) 1
Main Bar 20 2 6.21 12.41 2.47 30.66
16 4 5.97 23.87 1.59 37.95 6 20mm 16mm
5.00625 5.00625
1.2 0.96
0.96
1.2 0.96
1.20 0.96
14.7 Stirrups 18
For 18 columns 8 31 1.84 1026.72 0.40 410.69 0.08
8 62 1.28 1428.48 0.40 571.39 0.42 0.14 0.08
0.42
0.42
14.8 Band (Second Floor)
Sill Bands 0.75 0.75
Grid 1 4 10 2 7.15 57.20 0.62 35.464 0.075 5.5 0.075
1 10 2 4.50 9.00 0.62 5.58 4.5
0.75 0.75
1 10 2 5.65 11.30 0.62 7.006 0.075 4 0.075
15 For Staircase
(2nd Floor to Top Foor)
1.703
Main Bar (top bar) 1 16 21 8.23 172.81 1.59 274.77 0.3
3.354
2.472
0.4
2.042 1.03
0.2
1
Extra Bar 1 16 21 2.00 42.00 1.59 66.78
1
1.853
Landing bottom bar 1 16 21 3.00 63.06 1.59 100.27 1 0.15
1.2
Landing Extra bar 1 16 21 2.20 46.20 1.59 73.46 1
1
2.147 0.15
1
Extra Bar 1 16 21 2.20 46.20 1.59 73.46 1.2
1.82
Bottom bar( Slab level) 1 16 21 3.02 63.42 1.59 100.84 0.2 1
4.92
15.1 Landing Beam 1 20 3 5.62 16.86 2.47 41.64 0.35 0.35
0.2
16 Main Beam (Top Floor Level))
16.1 Grid A,B,E & F
Bottom bar (mid bar) 4 20 2 10.87 86.96 2.47 214.79 0.475 0.475
9.92
0.475
0.475
End Bar 4 25 2 10.87 86.96 3.86 335.67 9.92
0.94 0.94
Bottom Bar along C & D 2 20 2 11.80 47.20 2.47 116.58 0.92
16.4 Grid 1
0.475
Bottom Bar (end bar) 1 20 2 3.39 6.77 2.47 16.72 1.2
1.71
0.475
20 2 9.39 18.77 2.47 46.36
1.2 7.71
Top Bar (End Bar) 16 2 10.35 20.70 1.59 32.91 8.73 0.96
0.66
0.96 8.73
16 2 10.35 20.70 1.59 32.91
0.66
2.94 0.96
Middle Bar 16 1 4.56 4.56 1.59 7.25
0.66
16 1 12.00 12.00 1.59 19.08 12
0.96
16 1 12.00 12.00 1.59 19.08 11.04
0.66
16 1 4.56 4.56 1.59 7.25 2.94
0.96
16.5 Extra Bar Along Grid 1 1 25 4 3.65 14.60 3.86 56.36 0.15
1.29
4
1 25 4 4.30 17.20 3.86 66.39 0.15 0.15
3.5
0.475
20 4 9.39 75.08 2.47 185.45
1.2 7.71
0.94
1.2
Top Bar (end Bar) 20 4 10.75 43.00 2.47 106.21 8.61
0.94
3.5
2 20 4 3.80 30.40 2.47 75.09 0.15 0.15
4.75
top bar 1 12 3 5.65 16.95 0.89 15.09 0.45 0.45
16.10 Bent up Bar (hunch bar) 1 16 36 3.02 108.72 1.59 172.86 0.96 0.96
0.425 0.425
0.25
16.11 Stirriups( For Main Beam) 1 10 1125 1.65 1856.25 0.62 1150.88 0.10
0.425
0.25
16.12 For Secondry Beam 1 8 540 1.31 707.40 0.40 282.96
0.8
0.375
0.2
7.215
2 12 4 8.41 67.28 0.89 59.88
1.64
7.195
2 12 4 9.09 72.68 0.89 64.69 1.89
6.325
2 12 4 7.97 63.72 0.89 56.71
1.64
10.15
Infront of Grid A & F 2 12 4 10.15 81.20 0.89 72.27
6.64
2 12 2 8.17 32.68 0.89 29.09 0.89
7.28
16.14 Stirriups( beam 250*150 ) 1 8 546 0.76 414.96 0.40 165.98 0.0 0.1
8
0.2
0.525 0.95
cranked bar 1 8 36 4.04 145.26 0.40 58.10 0.08 0.08
2.4
2 1.5 1.5
cranked bar 1 8 24 11.01 264.24 0.40 105.70 0.08 0.08 0.08 0.08 0.08
1.5 1.5
0.08 0.08 0.95
1.5
0.95 1.875 1.875
1 8 24 11.38 273.12 0.40 109.25 0.08 0.08 0.08 2.25 0.08
1.5
0.08 0.08 0.95
1.5
0.95 1.5 1.5
1 8 24 11.01 264.24 0.40 105.70 0.08 0.08 0.08 1.5 0.08
1.5 2
0.08 1.5 0.08 0.08
between 2 & 3
along x axis 1 8 8 4.20 33.60 0.40 13.44 4.2
along y axis 1 8 18 2.20 39.60 0.40 15.84 2.2
Top near grid A & F (in bottom) 2 10 5 12.00 120.00 0.62 74.40 12
Top near grid A & F (on top) 2 10 4 12.00 96.00 0.62 59.52 12
Top infront of grid 3 (in bottom) 2 10 5 11.98 119.80 0.62 74.28 11.98
Top infront of grid 3 (on top) 2 10 4 11.98 95.84 0.62 59.42 11.98
Top infront of staircase (in bottom) 1 10 6 8.24 49.44 0.62 30.65 8.24
1 10 5 8.24 41.20 0.62 25.54 8.24
7.215
2 10 2 8.41 33.64 0.62 20.86
1.64
7.195
2 10 2 9.09 36.34 0.62 22.53 1.89
6.325
2 10 2 7.97 31.86 0.62 19.75
1.64
10.15
Infront of Grid A & F 2 10 2 10.15 40.60 0.62 25.17
6.64
0.96
18.2 Grid 1 ( D ) 1
Main Bar 20 2 3.20 6.40 2.47 15.81
16 4 2.96 11.84 1.59 18.83 20mm 16mm
2 2
1.2 0.96
1.2 0.96
18.4 Stirrups 6
For 6 columns 8 26 1.84 287.04 0.40 114.82 0.08
8 52 1.28 399.36 0.40 159.74 0.42 0.14 0.08
0.42
0.42
18.5 Band under wall (Grid C&D) 2 10 2 6.50 26.00 0.62 16.12 6.5
1 10 2 4.50 9.00 0.62 5.58 4.5
0.06 0.06
1 8 30 0.30 9.00 0.40 3.60 0.18
Stirrups 2 8 44 0.30 13.20 0.40 5.28 0.06 0.06
19 Slab Beam 0.18
19.1 Grid C & D
Bottom bar 2 20 2 10.87 43.48 2.47 107.40 0.475 0.475
9.92
0.475
0.475
2 16 1 10.87 21.74 1.59 34.57 9.92
4.92
Top Bar
Top bar along grid 1a 1 16 3 5.65 16.95 1.59 26.95 0.35 4.75 0.45
19.4 Stirriups( For Main Beam) 1 10 180 1.65 297.00 0.62 184.14 0.10
0.425
0.25
19.5 For Secondry Beam 1 8 35 1.31 45.85 0.40 18.34
0.8
0.375
0.2
2.105 2.105
Cranked bar 1 8 28 6.48 181.44 0.40 72.58 0.08 0.08 0.08 0.08
1.95
Site
S. No. Description G.F F.F S.F TF Quantity Unit Remarks
Development
A. Common Installation
1.1 Stand Alone 40 A DP MCB with Enclosure 1 1.00 nos.
2 CABLES & WIRES
2 Nos 10 Sq.mm + 1 No 6 Sq.mm mutistranded
2.1 53.00 r.m
copper conductor wires
2 Concrete Works
2.1 PCC
2.1.1 P.C.C.(1:3:6) Works
For Footing 1
P.C.C. for isolated footing(F1) 6 1.00 1.00 0.10 0.60
Septic Tank
1 5.50 2.25 0.08 0.99
Sewer Manhole
Bottom 1 1.00 Area 0.10 0.10
Waste water Chamber 0.00
Bottom 2 1.00 1.00 0.10 0.20
Total 2.49 Cu.m
Beam
Foundation Beam
Along grid 1 1 4.70 0.25 0.30 0.35
Along grid 2 1 4.70 0.25 0.30 0.35
Along grid 3 1 4.70 0.25 0.30 0.35
Along grid A 1 5.40 0.25 0.30 0.41
Along grid B/(1,2) 1 3.20 0.25 0.30 0.24
Tie Beam
Along grid 1 1 4.70 0.25 0.30 0.35
Along grid 2 1 4.70 0.25 0.30 0.35
Along grid 3 1 4.70 0.25 0.30 0.35
Along grid A 1 5.40 0.25 0.30 0.41
Column
Column up to plinth level 6 0.30 0.30 1.00 0.54
Column from plinth to top 6 0.30 0.30 3.00 1.62
Slab
Slab of first floor 1 4.75 2.25 0.15 1.60
Lintel Bands
For first floor
Along grid 1 1 4.70 0.125 0.25 0.15
Along grid 2 1 4.70 0.125 0.25 0.15
Along grid 3 1 4.70 0.125 0.25 0.15
Along grid A 1 5.40 0.125 0.25 0.17
Along grid B 1 3.20 0.125 0.25 0.10
Along the partition wall 1 3.25 0.125 0.25 0.10
For the partition wall 1 2.77 0.125 0.13 0.04
Sill Bands
For first floor
Along grid 1 1 4.70 0.075 0.43 0.15
Along grid 2 1 4.70 0.075 0.43 0.15
Along grid 3 1 4.70 0.075 0.43 0.15
Along grid A 1 5.40 0.075 0.43 0.17
Along grid B 1 3.20 0.075 0.43 0.10
Along the partition wall 1 3.25 0.075 0.25 0.06
For the partition wall 1 2.77 0.075 0.13 0.03
Deduction 0.00
D1 -1 1.00 0.075 0.43 -0.03
D2 -1 0.90 0.075 0.43 -0.03
Soak Pit
RCC slab 1 1.13 Area 0.12 0.14
Sewer Manhole
Top Cover 1 1.00 1.00 0.10 0.10
Waste Water Chamber
Top Cover 2 1.00 1.00 0.10 0.20
Total 16.46 Cu.m
2.5 Formworks
Foundation
Isolated footing (F1) 6 4.00 0.20 4.80
Beam
Foundation Beam
Along grid 1 1 4.70 0.50 2.35
Along grid 2 1 4.70 0.50 2.35
Along grid 3 1 4.70 0.50 2.35
Along grid A 1 5.40 0.50 2.70
Along grid B/(1,2) 1 3.20 0.50 1.60
Tie Beam
Along grid 1 1 4.70 0.60 2.82
Along grid 2 1 4.70 0.60 2.82
Along grid 3 1 4.70 0.60 2.82
Along grid A 1 5.40 0.60 3.24
Along grid B/(2,3) 1 2.20 1.18 2.60
Column
Column up to plinth level 6 1.00 1.20 7.20
Column from plinth to top 6 3.00 1.20 21.60
Slab
Along corridor 1 4.75 2.25 10.69
Lintel Bands
Along grid 1 2 4.70 0.125 1.18
Along grid 2 2 4.70 0.125 1.18
Along grid 3 2 4.70 0.125 1.18
Along grid A 2 5.40 0.125 1.35
Along grid B 2 3.20 0.125 0.80
Along partition walls 1 2.77 0.125 0.35
Sewer Manhole
Top Cover 1 0.60 Area 0.60
3 Brick Works
3.2 Full Brick (230 mm) Works (1:4c/s)
Brick Works under Plinth beam
Along grid 1 1 4.70 0.23 0.45 0.49
Along grid 2 1 4.70 0.23 0.45 0.49
Between Grid 2 and 3 1 4.50 0.23 0.68 0.70
Along grid 3 1 4.70 0.23 0.45 0.49
Along grid A 1 5.40 0.23 0.45 0.56
Along grid B 1 3.20 0.23 0.45 0.33
5 FLOORING WORKS
5.1 Cement Concrete Flooring (40mm) With Neat Cement Punning
Toilets ( Female) 1
At corridor 1 5.30 1.20 6.36
At Ramp 1 5.60 1.20 6.72
Along the terrace 1 4.75 2.25 10.69
step 1 0.30 1.20 0.36
Inside the room 1 3.23 2.00 6.45
1 3.23 2.50 8.06
At Doors 1 1.90 0.25 0.48
Along the water trough 1 3.45 0.7 2.42
Total 41.53 sq.m
7 PLASTER/PAINTING WORKS
7.1 Internal Plaster
7.1.1 Internal Plaster on Wall (1:6)
Toilets ( Female) 1
Along grid A & B 2 3.20 1.80 11.52
Along A 1 2.20 3.00 6.60
Along grid 1 1 4.70 1.80 8.46
Along grid 2 1 2.55 1.80 4.59
On partition wall 2 3.25 1.80 11.70
Long wall 1 1.63 1.80 2.93
1 1.88 1.80 3.38
Short wall 2 0.43 1.80 1.53
Deduction
8 MISCELLANOUS
8.2 Cement Board
For Partition
2.00 1.69 Area 3.37
Total 3.38 sq.m
900
a. Along Y-axis 100 12 150 6 7 1100 46.2 0.889 41.07
100
900
b. Along X-axis 100 12 150 6 7 1100 46.2 0.889 41.07
100
B. Column-MAIN BAR
465
4251
a. Longitudinal bar upto full height 12 - 6 8 5160 247.68 0.889 220.16
100 344
STIRRUPS FOR COLUMN SIZE 300 x 300 upto Plinth Height-
220
80
1
160 6
80 0
c Stirrups 8 100 6 11 800 52.8 0.395 20.86
1
6 160
0
C Column (300*300)
220
80
a Stirrups for Column upto floor Height 220 8 125 6 25 1040 156 0.395 61.63
1
160 6
80 0
b " 8 125 6 25 800 120 0.395 47.41
1
6 160
0
D BEAM
1 Foundation Beam (250*250)
5000
a Along Grid-1,2 & 3- Top Bar 720 720 12 3 3 6440 57.96 0.889 51.52
b Along Grid--1,2 & 3-Bottom Bar 720 12 3 3 6440 57.96 0.889 51.52
5000 720
6000
c Along Grid-A & B-Top Bar 720 12 3 3 7440 66.96 0.889 59.52
720
200
80
e Stirrups Along Grid 1, 2 & 3 8 150 3 34 960 97.92 0.395 38.69
200
200
80
f Stirrups Along A & B 8 150 2 40 960 76.8 0.395 30.35
200
5000
a. Along Grid-1 -Top Bar 960 16 1 2 6920 13.84 1.580 21.88
960
5000
b 720 12 1 1 6440 6.44 0.889 5.73
720
5000
c Along Grid-1 -Bottom Bar 960 16 1 2 6920 13.84 1.580 21.88
960
5000
d 720 12 1 1 6440 6.44 0.889 5.73
720
e Along Grid-2 & 3-Top Bar 960 16 2 2 6920 27.68 1.580 43.75
5000 960
g Along Grid-2 & 3-Bottom Bar 960 16 2 2 6920 27.68 1.580 43.75
5000 960
6000
i Along Grid-A & B-Top Bar 12 2 3 7440 44.64 0.889 39.68
720 720
j Along Grid-A & B-Bottom Bar 720 12 2 4 7440 59.52 0.889 52.91
6000 720
200
80
200
80
3 FLOOR BEAM
LONGITUDINAL BARS
Along Grid 1,2&3
5200
a Top Bars 870 16 3 2 6940 41.64 1.580 65.81
870
5200
b Top Bars 12 3 1 6380 19.14 0.889 17.02
590 590
6200
e Top Bars 12 2 3 7380 44.28 0.889 39.36
590 590
STIRRUPS
200
8
0
g Stirrups for Beam Size 250*400 350 8 125 1 93 1260 117.18 0.395 46.30
200
80
h Stirrups for Beam Size 250*450 400 8 125 1 124 1360 168.64 0.395 66.63
E SLAB
850 850
a Main Bars Short Span 100 10 150 1 33 4600 151.8 0.617 93.71
100 2700
1475 1475
b Main Bars Long Span 100 10 150 1 16 8350 133.6 0.617 82.47
5200 100
220
80
1
160 6
80 0
b Stirrups 8 125 6 21 800 100.8 0.395 39.83
1
6 160
0
G SOAKPIT
d=1850+Ld
d=1450+Ld
c Main Bar Along both Direction 8 200 1 2 1650 3.3 0.395 1.31
1650
h Top Bar Along Radial Direction 8 200 1 8 425 3.4 0.395 1.35
425
H SEPTIC TANK
200
6
a Stirrups for Concealed Beam 5 8 150 1 13 670 8.71 0.395 3.45
70
1850
b 10Ø Longitudional Bar for CB-Top Bar 10 1 2 1970 3.94 0.617 2.44
60
60
c 10Ø Longitudional Bar for CB-Bottom Bar 10 1 2 1970 3.94 0.617 2.44
60 1850
60
Bed RCC Bars
d Bottom Mesh Bar-Along Length Wise 8 200 1 12 5550 66.6 0.395 26.32
50 5450
50
e Bottom Mesh Bar-Along WIdth Wise 8 200 1 28 2300 64.4 0.395 25.45
50 2200 50
f Septic Tank Slab Cover
1215 1475
j 8Ø Bottom bar along Length wise 8 1 9 7650 68.85 0.395 27.20
60 4840 60
1215
k 8 1 4 3780 15.12 0.395 5.98
60 2445 60
1
n Top Bars-Along Width Wise 0 8 1 8 620 4.96 0.395 1.96
0 520
I SILL BAND
Longitudinal Bars
3400 75
800
800
a Grid 1/A-B ,Grid 3/A-B 75 10 2 2 6350 25.4 0.617 15.68
75 600 600
1175 75
1700
b Grid 2/A-B 10 1 2 2950 5.9 0.617 3.65
75
2650 75
425
425
c Grid A/1-2, B/1-2 10 2 2 4950 19.8 0.617 12.23
75
75 600 600
2150 75
175
175
d Grid A/2-3 10 1 2 3850 7.7 0.617 4.76
75
75 600 600
e Partition Wall between Grid A & Grid B 10 1 2 3600 7.2 0.617 4.45
3600
Ties
65 65
i Grid 1/A-B ,Grid 3/A-B 8 150 2 33 320 21.12 0.395 8.35
190
65 65
j Grid 2/A-B 8 150 1 20 320 6.4 0.395 2.53
190
65 65
k Grid A/1-2, B/1-2 8 150 2 23 320 14.72 0.395 5.82
190
65 65
l Grid A/2-3 8 150 1 16 320 5.12 0.395 2.03
190
65 65
m Partition Wall between Grid A & Grid B 8 150 1 23 320 7.36 0.395 2.91
190
50 50
n Partition Wall between Incinerator Holes 8 150 1 9 170 1.53 0.395 0.61
70
50 50
o Partition Wall between along D3 8 150 1 7 170 1.19 0.395 0.48
70
50 50
p Partion Wall for Urinal 8 150 1 5 170 0.85 0.395 0.34
70
J Lintel Band
Longitudinal Bars
3400 75
800
800
3400 75
800
800
2650 75
425
425
2150 75
175
175
e Partition Wall between Grid A & Grid B 10 1 2 3700 7.4 0.617 4.57
3600
65 65
i Grid 1/A-B ,Grid 3/A-B 8 150 2 33 320 21.12 0.395 8.35
190
65 65
j Grid 2/A-B 8 150 1 33 320 10.56 0.395 4.18
190
65 65
k Grid A/1-2, B/1-2 8 150 2 23 320 14.72 0.395 5.82
190
65 65
l Grid A/2-3 8 150 1 16 320 5.12 0.395 2.03
190
65 65
m Partition Wall between Grid A & Grid B 8 150 1 23 320 7.36 0.395 2.91
190
50 50
n Partition Wall between Incinerator Holes 8 150 1 10 170 1.7 0.395 0.68
70
50 50
o Partition Wall between along D3 8 150 1 21 170 3.57 0.395 1.42
70
50 50
p Partion Wall for Urinal 8 150 1 5 170 0.85 0.395 0.34
70
M INCINERATOR
a 630*505 Grill Mesh
Toilet
S. No. Description Quantity Unit Remarks
Block
A. Common Installation
1.2 Stand Alone 6 A DP MCB with Enclosure 1 1.00 nos.
B School Blocks
1 DISTRIBUTION BOARDS nos.
1.4 Stand Alone 6 A DP MCB with Enclosure 1.00 1.00 nos.
3.1 One Way Light Point 6.00 6.00 pts.
6 Sweep Ceiling/Exhaust Fans/ Wall Fan
6.1 225mm dia M/D Exhaust Fan 2 2.00 no.
7 Light Fixtures/Luminaires & Accessories
7.5 7W LED Wall Light 1.00 1.00 no.
7.6 9W LED Surface Mounted Cylindrical type 1.00 1.00 no.
7.7 6W LED Recessed Mounted Circular type 3.00 3.00 no.
7.8 7W LED T5 Slim Mirror Light 1.00 1.00 no.
Length Breadth
S.No Description No. Height (m) Qty. Unit Remarks
(m) (m)
1 Site Clearance
Concrete Pavement
Infront of Bldg 1.00 6.70 1.50 10.05
1.00 13.20 2.50 33.00
Side of Bldg 1.00 5.60 1.60 8.96
Infront of Toilet 1.00 6.40 1.20 7.68
Gate to Bldg 1.00 1.07 3.87 4.14
1.00 11.60 5.55 64.38
Total 128.21 sq.m
2 Earth Work Excavation
Concrete Pavement
Infront of Bldg 1.00 6.70 1.50 0.15 1.51
1.00 13.20 2.50 0.15 4.95
Side of Bldg 1.00 5.60 1.60 0.15 1.34
Infront of Toilet 1.00 6.40 1.20 0.15 1.15
Gate to Bldg 1.00 1.07 3.87 0.15 0.62
1.00 11.60 5.55 0.15 9.66
Around Gate Column 1 12.70 Area 0.15 1.91
Excavation For Flag Pole
Flag Pole 2 0.60 0.60 1.00 0.72
2 1.10 0.50 0.15 0.17
2 1.60 0.25 0.15 0.12
1 0.60 0.40 0.15 0.04
Total 22.18 cu.m
3 Boulder Soling
Concrete Pavement
Infront of Bldg 1.00 6.70 1.50 0.15 1.51
1.00 13.20 2.50 0.15 4.95
Side of Bldg 1.00 5.60 1.60 0.15 1.34
Infront of Toilet 1.00 6.40 1.20 0.15 1.15
Gate to Bldg 1.00 1.07 3.87 0.15 0.62
1.00 11.60 5.55 0.15 9.66
Soling For Gate Column
Column 2 0.90 0.90 0.20 0.32
Stone Soling for Flag Pole 1 0.70 0.80 0.35 0.20
Total 19.75 cu.m
5 P.C.C.(1:2:4) Works
Concrete Pavement
Infront of Bldg 1.00 6.70 1.50 0.08 0.75
1.00 13.20 2.50 0.08 2.48
Side of Bldg 1.00 5.60 1.60 0.08 0.67
Infront of Toilet 1.00 6.40 1.20 0.08 0.58
Gate to Bldg 1.00 1.07 3.87 0.08 0.31
1.00 11.60 5.55 0.08 4.83
Total 9.62 cu.m
6 Full Brick (230 mm) Works (1:4c/s)
Flag Pole Base 2 0.80 0.23 0.55 0.20
Total 0.20 cu.m
7 Flag Pole
75 Dia GI Pipe 2.00 1 2.00
Total 2.00 nos
2 Concrete Works
2.1 PCC
2.1.1 PCC Work (1:3:6)
Below Water Tank 1 3.35 3.1 0.075 0.78
Total 0.78 Cu.m.
1.915 1.915
3.02
1.915 1.915
3.29
1.884 1.884
0.05
0.49 0.49
1.884 1.884
0.05
0.49 0.49
0.592
0.592 0.6 0.6
D. Horizontal Bars(outer 4
0.3 0.3
1 Shorter Span 10 21 3.62 304.08 0.62 188.53
3.02 3.02
0.3 0.3
3.27 3.27
0.3 0.3
E. Base Slab bar 4
1 Shorter Span 10 35 3.14 439.6 0.62 272.55 3.045
0.05 0.05