REQUER
SUM. E INST. ADOQUIN - M2 1000
REQUER CORTAD. ADOQ.
MATERIALES
CANT/
DESCRIPCION UND VALOR DESP VR. PARCIAL 10000 m2
REND
Adoquin de 12m m2 1 $ 50,000 2% $ 51,000
arena para sello m3 0.03 $ 33,000 5% $ 1,039.5
SUBTOTAL 52,039.50
HERRAMIENTAS/EQUIPOS
CANT/ DIAS TOTAL
DESCRIPCION UND REND VALOR VR. PARCIAL REND DIAS CALC RECUR REQ
cortadora de adoquin (pulidora + disco ) Dia 0.010 35,000.00 350.00 100 1 10 1
SUBTOTAL 350.00
TRANSPORTE
CANT/ HORAS DIAS TOTAL
DESCRIPCION UND VALOR VR. PARCIAL REND
REND X DIA CALC RECUR REQ
montacargas (transporte interno) Hora 0.020 35,000.00 700.00 100 8 6.25 2
SUBTOTAL 700.00
MANO DE OBRA
CANT/ HORAS DIAS TOTAL
DESCRIPCION UND VALOR PRESTAC VR. PARCIAL REND
REND X DIA CALC RECUR REQ
comision topografia (1top+2cad) HC 0.029 19,531.25 60% 892.86 70 8 8.9 2
cuadrilla( 1 oficial + 4 ayudantes) HH 0.533 48,750.00 60% 41,600.00 15 8 10.4 8
SUBTOTAL 42,492.86
SUBTOTAL 93,745.59
HERRAMIENTAS/EQUIPOS
CANT/ HORAS DIAS TOTAL
DESCRIPCION UND REND VALOR VR. PARCIAL REND X DIA CALC RECUR REQ
motoniveladora HR 0.050 120,000.00 6,000.00 60 8 3.8 3
retrocargador-pajarita HR 0.114 100,000.00 11,428.57 35 8 4.9 4
vibrocompactador HR 0.029 90,000.00 2,571.43 70 8 4.9 2
carrotanque HR 0.016 37,500.00 600.00 125 8 2.8 2
SUBTOTAL 20,600.00
TRANSPORTE
CANT/
DESCRIPCION UND VALOR VR. PARCIAL
REND
SUBTOTAL
MANO DE OBRA
DESCRIPCION UND CANT/ VALOR PRESTAC VR. PARCIAL REND HORAS DIAS TOTAL
REND X DIA CALC RECUR REQ
comision topografia (1top+2cad) HC 0.020 19,531.25 60% 625.00 100 8 3.1 2
ayudante HH 0.350 9,375.00 60% 5,250.00 20 8 4.9 7
SUBTOTAL 5,875.00
SUBTOTAL 35,250.00
HERRAMIENTAS/EQUIPOS
CANT/ HORAS DIAS TOTAL
DESCRIPCION UND REND VALOR VR. PARCIAL REND X DIA CALC RECUR REQ
motoniveladora HR 0.075 120,000.00 9,000.00 40 8 3.1 3
vibrocompactador HR 0.03333 90,000.00 3,000.00 60 8 3.1 2
carrotanque HR 0.002 37,500.00 75.00 500 8 0.8 1
SUBTOTAL 12,075.00
TRANSPORTE
CANT/
DESCRIPCION UND REND VALOR VR. PARCIAL
SUBTOTAL
MANO DE OBRA
CANT/ HORAS DIAS TOTAL
DESCRIPCION UND VALOR PRESTAC VR. PARCIAL REND
REND X DIA CALC RECUR REQ
comision topografia (1top+2cad) HC 0.040 19,531.25 60% 1,250.00 50 8 3.75 2
SUBTOTAL 1,250.00
TOTAL DIAS 20
DESCAPOTE Y PREPARACION DEL TERRENO CON BULLDOZER - M2
HERRAMIENTAS/EQUIPOS
CANT/
DESCRIPCION UN VALOR VR. PARCIAL
REND
BULDOZZER HR 0.0016 $ 120,000 192.00
0.00
SUBTOTAL 192.00
MATERIALES
0.00
SUBTOTAL 0.00
HERRAMIENTAS/EQUIPOS
CANT/
DESCRIPCION UN VALOR INCREM VR. PARCIAL
REND
RETROEXCAVAD HR 0.0066666667 180,000.00 1,200.00
0.00
SUBTOTAL 1,200.00
TRANSPORTE
MATERIALES
CANT/
DESCRIPCION UN REND VALOR DESP VR. PARCIAL
0.00
0.00
0.00
0.00
0.00
SUBTOTAL 0.00
HERRAMIENTAS/EQUIPOS
0.00
0.00
0.00
0.00
0.00
SUBTOTAL 0.00
MANO DE OBRA
CANT/
DESCRIPCION UN VALOR PREST VR. PARCIAL
REND
CUADRILLA DIA 0.0357142857 89,580.00 3,199.29
0.00
0.00
0.00
0.00
SUBTOTAL 3,199.29
TOTAL COSTO DIRECTO 23,873.15
SUM. E INST. ADOQUIN - M2
MATERIALES
CANT/
DESCRIPCION UND VALOR DESP VR. PARCIAL
REND
Adoquin de 12mm2 1 $ 50,000 2% $ 51,000
arena para sello m3 0.03 $ 33,000 5% $ 1,039.5
SUBTOTAL 52,039.50
HERRAMIENTAS/EQUIPOS
SUBTOTAL 700.00
TRANSPORTE
SUBTOTAL 700.00
MANO DE OBRA
CANT/
DESCRIPCION UND VALOR PRESTAC VR. PARCIAL
REND
comision topogr HC 0.029 19,531.25 60% 892.86
cuadrilla( 1 ofic HH 0.533 48,750.00 60% 41,600.00
SUBTOTAL 42,492.86
SUBTOTAL 93,745.59
HERRAMIENTAS/EQUIPOS
CANT/
DESCRIPCION UND VALOR VR. PARCIAL
REND
motoniveladora HR 0.050 120,000.00 6,000.00
retrocargador-pa HR 0.114 100,000.00 11,428.57
vibrocompactad HR 0.029 90,000.00 2,571.43
carrotanque HR 0.016 37,500.00 600.00
SUBTOTAL 20,600.00
TRANSPORTE
CANT/
DESCRIPCION UND VALOR VR. PARCIAL
REND
SUBTOTAL
MANO DE OBRA
SUBTOTAL 5,875.00
HERRAMIENTAS/EQUIPOS
SUBTOTAL 12,075.00
TRANSPORTE
CANT/
DESCRIPCION UND REND VALOR VR. PARCIAL
SUBTOTAL
MANO DE OBRA
CANT/
DESCRIPCION UND REND VALOR PRESTAC VR. PARCIAL
TOTAL RECUR
REND HORAS X DIA DIAS CALC
REQ
625 8 1.5 1
TOTAL RECUR
REND HORAS X DIA DIAS CALC
REQ
1250 8 0.8 1
TOTAL RECUR
REND HORAS X DIA DIAS CALC
REQ
150 8 10.4 1
DIAS 11
CANT. REQUER 5070 M2
TOTAL RECUR
REND HORAS X DIA DIAS CALC
REQ
500 8 1.3 1
DIAS 2
CANT. REQUER CANT. REQUER CORTAD. 1000
ADOQ.
10000 m2
TOTAL RECUR
REND HORAS X DIA DIAS CALC
REQ
70 8 8.9 2
15 8 10.4 8
DIAS ADOQUIN 11
TOTAL RECUR
REND HORAS X DIA DIAS CALC
REQ
60 8 3.8 3
35 8 4.9 4
70 8 4.9 2
125 8 2.8 2
DIAS BASE 5
TOTAL RECUR
REND HORAS X DIA DIAS CALC REQ
50 8 3.75 2
DIAS SUB-BASE 4
TOTAL DIAS 20
PRESUPUESTO
ITEM DESCRIPCIÓN UND
CANTIDAD VR. UNITARIO VR. PARCIAL
1 CONSTRUCCION EMISARIO TRAMO DE TIERRA
1.1 DESCAPOTE Y PREPARACION DEL TERRENO M2 7,500.00 $ 95,582.36 $ 716,867,679
Cálculo Administración
COSTOS
Ingeniero Residente $ 5,000,000.00 mensual
Inspector HSEQ $ 3,000,000.00 mensual
Director de Obra $ 8,000,000.00 mensual
Campamento de obra $ 2,000,000.00 mensual
Gastos oficina central $ 5,000,000.00 mensual
Pólizas $ 36,988,504 1.5 % del C.D.
TOTAL
EN PORCENTAJE
$ 11,000,000
costo mes
$ 59,988,504.22