You are on page 1of 17

CANT. CANT.

REQUER
SUM. E INST. ADOQUIN - M2 1000
REQUER CORTAD. ADOQ.
MATERIALES
CANT/
DESCRIPCION UND VALOR DESP VR. PARCIAL 10000 m2
REND
Adoquin de 12m m2 1 $ 50,000 2% $ 51,000
arena para sello m3 0.03 $ 33,000 5% $ 1,039.5

SUBTOTAL 52,039.50
HERRAMIENTAS/EQUIPOS
CANT/ DIAS TOTAL
DESCRIPCION UND REND VALOR VR. PARCIAL REND DIAS CALC RECUR REQ
cortadora de adoquin (pulidora + disco ) Dia 0.010 35,000.00 350.00 100 1 10 1

SUBTOTAL 350.00
TRANSPORTE
CANT/ HORAS DIAS TOTAL
DESCRIPCION UND VALOR VR. PARCIAL REND
REND X DIA CALC RECUR REQ
montacargas (transporte interno) Hora 0.020 35,000.00 700.00 100 8 6.25 2

SUBTOTAL 700.00
MANO DE OBRA
CANT/ HORAS DIAS TOTAL
DESCRIPCION UND VALOR PRESTAC VR. PARCIAL REND
REND X DIA CALC RECUR REQ
comision topografia (1top+2cad) HC 0.029 19,531.25 60% 892.86 70 8 8.9 2
cuadrilla( 1 oficial + 4 ayudantes) HH 0.533 48,750.00 60% 41,600.00 15 8 10.4 8

SUBTOTAL 42,492.86

TOTAL COSTO DIRECTO 95,582.36 DIAS ADOQUIN 11


CANT.
BASE ESTABILIZADA CON CEMENTO DE 1800 PSI - M3 REQUER 5500 M3
MATERIALES
CANT/
DESCRIPCION UND VALOR DESP VR. PARCIAL
REND
arena palmarito m3 1 32,500.00 35% 43,875.00
cemento gris Kg 120 352.94 5% 44,470.59
agua Lt 180 30.00 0% 5,400.00

SUBTOTAL 93,745.59
HERRAMIENTAS/EQUIPOS
CANT/ HORAS DIAS TOTAL
DESCRIPCION UND REND VALOR VR. PARCIAL REND X DIA CALC RECUR REQ
motoniveladora HR 0.050 120,000.00 6,000.00 60 8 3.8 3
retrocargador-pajarita HR 0.114 100,000.00 11,428.57 35 8 4.9 4
vibrocompactador HR 0.029 90,000.00 2,571.43 70 8 4.9 2
carrotanque HR 0.016 37,500.00 600.00 125 8 2.8 2

SUBTOTAL 20,600.00
TRANSPORTE
CANT/
DESCRIPCION UND VALOR VR. PARCIAL
REND

SUBTOTAL
MANO DE OBRA
DESCRIPCION UND CANT/ VALOR PRESTAC VR. PARCIAL REND HORAS DIAS TOTAL
REND X DIA CALC RECUR REQ
comision topografia (1top+2cad) HC 0.020 19,531.25 60% 625.00 100 8 3.1 2
ayudante HH 0.350 9,375.00 60% 5,250.00 20 8 4.9 7

SUBTOTAL 5,875.00

TOTAL COSTO DIRECTO 120,220.59 DIAS BASE 5


CANT.
SUB BASE TIPO INVIAS (PAVIMENTO) - M3 REQUER 3000 m3
MATERIALES
CANT/
DESCRIPCION UND VALOR DESP VR. PARCIAL
REND
arena palmito m3 0.5 32,500.00 35% 21,937.50
arena zahorra m3 0.5 17,500.00 35% 11,812.50
agua Lt 50.000 30.00 0% 1,500.00

SUBTOTAL 35,250.00
HERRAMIENTAS/EQUIPOS
CANT/ HORAS DIAS TOTAL
DESCRIPCION UND REND VALOR VR. PARCIAL REND X DIA CALC RECUR REQ
motoniveladora HR 0.075 120,000.00 9,000.00 40 8 3.1 3
vibrocompactador HR 0.03333 90,000.00 3,000.00 60 8 3.1 2
carrotanque HR 0.002 37,500.00 75.00 500 8 0.8 1

SUBTOTAL 12,075.00
TRANSPORTE
CANT/
DESCRIPCION UND REND VALOR VR. PARCIAL

SUBTOTAL
MANO DE OBRA
CANT/ HORAS DIAS TOTAL
DESCRIPCION UND VALOR PRESTAC VR. PARCIAL REND
REND X DIA CALC RECUR REQ
comision topografia (1top+2cad) HC 0.040 19,531.25 60% 1,250.00 50 8 3.75 2

SUBTOTAL 1,250.00

TOTAL COSTO DIRECTO 48,575.00 DIAS SUB-BASE 4

TOTAL DIAS 20
DESCAPOTE Y PREPARACION DEL TERRENO CON BULLDOZER - M2
HERRAMIENTAS/EQUIPOS
CANT/
DESCRIPCION UN VALOR VR. PARCIAL
REND
BULDOZZER HR 0.0016 $ 120,000 192.00
0.00
SUBTOTAL 192.00
MATERIALES

DESCRIPCION UN CANT/ VALOR DESP VR. PARCIAL


REND
0.00
SUBTOTAL 0.00
TRANSPORTE

DESCRIPCION UN CANT/ VALOR INCREM VR. PARCIAL


REND
0.00
SUBTOTAL 0.00
MANO DE OBRA
CANT/
DESCRIPCION UN VALOR PREST VR. PARCIAL
REND
Comision topo HC 0.0008 19,531.25 60% 25.00
0.00
SUBTOTAL 25.00
TOTAL COSTO DIRECTO 217.00
EXCAVACION A MAQUINA - M3
MATERIALES
CANT/
DESCRIPCION UN REND VALOR DESP VR. PARCIAL

0.00
SUBTOTAL 0.00
HERRAMIENTAS/EQUIPOS
CANT/
DESCRIPCION UN VALOR INCREM VR. PARCIAL
REND
RETROEXCAVAD HR 0.0066666667 180,000.00 1,200.00
0.00
SUBTOTAL 1,200.00
TRANSPORTE

DESCRIPCION UN CANT/ VALOR INCREM VR. PARCIAL


REND
0.00
SUBTOTAL 0.00
MANO DE OBRA

DESCRIPCION UN CANT/ VALOR PREST VR. PARCIAL


REND
Comision topo HC 0.0033333333 19,531.25 60% 104.17
0.00
SUBTOTAL 104.17
TOTAL COSTO DIRECTO 1,304.17
SUMINISTRO E INSTALACION DE GEOTEXTIL TEJIDO - M2
MATERIALES
CANT/
DESCRIPCION UN VALOR DESP VR. PARCIAL
REND
GEOTEXTIL TR 3 ROLLO 0.0016326531 7,350,000.00 8.730% 13,047.60
HILO DE COSTUR M 0.262 33.333 13.090% 9.88
0.00
0.00
0.00
SUBTOTAL 13,057.48
HERRAMIENTAS/EQUIPOS

DESCRIPCION UN CANT/ VALOR INCREM VR. PARCIAL


REND
MAQUINA DE CO DIA 0.01 20,000.00 200.00
SUBTOTAL 200.00
TRANSPORTE

DESCRIPCION UN CANT/ VALOR INCREM VR. PARCIAL


REND
0.00
SUBTOTAL 0.00
MANO DE OBRA
CANT/
DESCRIPCION UN VALOR PREST VR. PARCIAL
REND
CUADRILLA HC 0.002 48,750.00 60% 156.00
0.00
SUBTOTAL 156.00
TOTAL COSTO DIRECTO 13,413.48
MAT. GRANULAR TAM. MAX. 150mm

MATERIALES
CANT/
DESCRIPCION UN REND VALOR DESP VR. PARCIAL

0.00
0.00
0.00
0.00
0.00
SUBTOTAL 0.00
HERRAMIENTAS/EQUIPOS

DESCRIPCION UN CANT/ VALOR INCREM VR. PARCIAL


REND
0.00
0.00
0.00
0.00
0.00
SUBTOTAL 0.00
TRANSPORTE
CANT/
DESCRIPCION UN VALOR INCREM VR. PARCIAL
REND
0.00
0.00
0.00
0.00
0.00
SUBTOTAL 0.00
MANO DE OBRA

DESCRIPCION UN CANT/ VALOR PREST VR. PARCIAL


REND
0.00
0.00
0.00
0.00
0.00
SUBTOTAL 0.00
TOTAL COSTO DIRECTO 0.00
SOLADO 15MPa - M2
MATERIALES

DESCRIPCION UN CANT/ VALOR DESP VR. PARCIAL


REND
CONCRETO 2000 M3 0.1 181,632.00 5% 19,071.36
ANTISOL KG 0.3 3,500.00 5% 1,102.50
0.00
0.00
0.00
SUBTOTAL 20,173.86
HERRAMIENTAS/EQUIPOS
CANT/
DESCRIPCION UN VALOR INCREM VR. PARCIAL
REND
HERRAMIENTAS GL 1 500.00 500.00
0.00
0.00
0.00
0.00
SUBTOTAL 500.00
TRANSPORTE
CANT/
DESCRIPCION UN REND VALOR INCREM VR. PARCIAL

0.00
0.00
0.00
0.00
0.00
SUBTOTAL 0.00
MANO DE OBRA
CANT/
DESCRIPCION UN VALOR PREST VR. PARCIAL
REND
CUADRILLA DIA 0.0357142857 89,580.00 3,199.29
0.00
0.00
0.00
0.00
SUBTOTAL 3,199.29
TOTAL COSTO DIRECTO 23,873.15
SUM. E INST. ADOQUIN - M2
MATERIALES
CANT/
DESCRIPCION UND VALOR DESP VR. PARCIAL
REND
Adoquin de 12mm2 1 $ 50,000 2% $ 51,000
arena para sello m3 0.03 $ 33,000 5% $ 1,039.5

SUBTOTAL 52,039.50
HERRAMIENTAS/EQUIPOS

DESCRIPCION UND CANT/ VALOR INCREMENTO VR. PARCIAL


REND
cortadora de ado Dia 0.020 35,000.00 700.00

SUBTOTAL 700.00
TRANSPORTE

DESCRIPCION UND CANT/ VALOR INCREMENTO VR. PARCIAL


REND
montacargas (tr Hora 0.020 35,000.00 700.00

SUBTOTAL 700.00
MANO DE OBRA
CANT/
DESCRIPCION UND VALOR PRESTAC VR. PARCIAL
REND
comision topogr HC 0.029 19,531.25 60% 892.86
cuadrilla( 1 ofic HH 0.533 48,750.00 60% 41,600.00

SUBTOTAL 42,492.86

TOTAL COSTO DIRECTO 95,932.36

BASE ESTABILIZADA CON CEMENTO DE 1800 PSI - M3


MATERIALES
CANT/
DESCRIPCION UND REND VALOR DESP VR. PARCIAL

arena palmarito m3 1 32,500.00 35% 43,875.00


cemento gris Kg 120 352.94 5% 44,470.59
agua Lt 180 30.00 0% 5,400.00

SUBTOTAL 93,745.59
HERRAMIENTAS/EQUIPOS
CANT/
DESCRIPCION UND VALOR VR. PARCIAL
REND
motoniveladora HR 0.050 120,000.00 6,000.00
retrocargador-pa HR 0.114 100,000.00 11,428.57
vibrocompactad HR 0.029 90,000.00 2,571.43
carrotanque HR 0.016 37,500.00 600.00

SUBTOTAL 20,600.00
TRANSPORTE
CANT/
DESCRIPCION UND VALOR VR. PARCIAL
REND

SUBTOTAL
MANO DE OBRA

DESCRIPCION UND CANT/ VALOR PRESTAC VR. PARCIAL


REND
comision topogr HC 0.020 19,531.25 60% 625.00
ayudante HH 0.350 9,375.00 60% 5,250.00

SUBTOTAL 5,875.00

TOTAL COSTO DIRECTO 120,220.59

SUB BASE TIPO INVIAS (PAVIMENTO) - M3

HERRAMIENTAS/EQUIPOS

DESCRIPCION UND CANT/ VALOR VR. PARCIAL


REND
motoniveladora HR 0.075 120,000.00 9,000.00
vibrocompactad HR 0.0333333333 90,000.00 3,000.00
carrotanque HR 0.002 37,500.00 75.00

SUBTOTAL 12,075.00
TRANSPORTE
CANT/
DESCRIPCION UND REND VALOR VR. PARCIAL

SUBTOTAL
MANO DE OBRA
CANT/
DESCRIPCION UND REND VALOR PRESTAC VR. PARCIAL

comision topogr HC 0.040 19,531.25 60% 1,250.00


SUBTOTAL 1,250.00

TOTAL COSTO DIRECTO 48,575.00


CANT. REQUER 7500 M2

TOTAL RECUR
REND HORAS X DIA DIAS CALC
REQ
625 8 1.5 1

TOTAL RECUR
REND HORAS X DIA DIAS CALC
REQ
1250 8 0.8 1

CANT. REQUER 12500 M2

TOTAL RECUR
REND HORAS X DIA DIAS CALC
REQ
150 8 10.4 1

REND HORAS X DIA DIAS CALC TOTAL RECUR


REQ
300 8 5.2 1

DIAS 11
CANT. REQUER 5070 M2

REND DIA DIAS CALC TOTAL RECUR


REQ
500 1 2.0 5

TOTAL RECUR
REND HORAS X DIA DIAS CALC
REQ
500 8 1.3 1

DIAS 2
CANT. REQUER CANT. REQUER CORTAD. 1000
ADOQ.

10000 m2

REND DIAS DIAS CALC TOTAL RECUR


REQ
100 1 5 2

REND HORAS X DIA DIAS CALC TOTAL RECUR


REQ
100 8 6.25 2

TOTAL RECUR
REND HORAS X DIA DIAS CALC
REQ
70 8 8.9 2
15 8 10.4 8

DIAS ADOQUIN 11

CANT. REQUER 5500 M3

TOTAL RECUR
REND HORAS X DIA DIAS CALC
REQ
60 8 3.8 3
35 8 4.9 4
70 8 4.9 2
125 8 2.8 2

REND HORAS X DIA DIAS CALC TOTAL RECUR


REQ
100 8 3.1 2
20 8 4.9 7

DIAS BASE 5

CANT. REQUER 3000 m3

REND HORAS X DIA DIAS CALC TOTAL RECUR


REQ
40 8 3.1 3
60 8 3.1 2
500 8 0.8 1

TOTAL RECUR
REND HORAS X DIA DIAS CALC REQ
50 8 3.75 2
DIAS SUB-BASE 4

TOTAL DIAS 20
PRESUPUESTO
ITEM DESCRIPCIÓN UND
CANTIDAD VR. UNITARIO VR. PARCIAL
1 CONSTRUCCION EMISARIO TRAMO DE TIERRA
1.1 DESCAPOTE Y PREPARACION DEL TERRENO M2 7,500.00 $ 95,582.36 $ 716,867,679

1.2 EXCAVACION A MAQUINA CON RETROEXCAVADORA DE ORUGAS M3


EN TERRENO NATURAL DE AREAN 12,500.00 $ 120,220.59 $ 1,502,757,353

1.3 SUMINISTRO E INSTALACION DE GEOTEXTIL M2 5,070.00 $ 48,575.00 $ 246,275,250

1.4 SUMINISTRO E INSTALACION DE TUBERIA PRFV D=1,5 m ML 500.00

1.5 CIMENTACION CON TUBERIA M3 4,116.43

1.6 RELLENO CON MATERIAL SELECCIONADO M3 7,500.00

TOTAL COSTO DIRECTO $ 2,465,900,282


ADMINISTRACIÓN 2% % $ 59,988,504
UTILIDAD 10 % $ 246,590,028
IMPREVISTOS 0.93 % $ 23,000,000
TOTAL COSTOS ANTES DE IVA
IVA 19% $ 46,852,105

COSTO TOTAL $ 2,842,330,919

Cálculo Administración
COSTOS
Ingeniero Residente $ 5,000,000.00 mensual
Inspector HSEQ $ 3,000,000.00 mensual
Director de Obra $ 8,000,000.00 mensual
Campamento de obra $ 2,000,000.00 mensual
Gastos oficina central $ 5,000,000.00 mensual
Pólizas $ 36,988,504 1.5 % del C.D.

TOTAL
EN PORCENTAJE

calculo de imprevistos costo mensual


ingeniero residente $ 5,000,000
inspector HSEG $ 3,000,000 total= $ 23,000,000
Director de obra $ 8,000,000
campamento de obra $ 2,000,000
gastos oficina central $ 5,000,000
$ 50,000,000

$ 11,000,000

costo mes
$ 59,988,504.22