You are on page 1of 1

1.

Oxidation piping
a. Check iso matching with C2.
b. Check nozzle loads to confirm with original routing
c. Copy file & shift check valve to vertical

2. WGS pump suction line routing & other small lines need to model in C2
Request VD for missing iso
Nozzle load to be lower than existing report

3. Shell documentation

You might also like