You are on page 1of 3

National Institutional Ranking Framework

Ministry of Human Resource Development


Government of India
Submitted Institute Data for NIRF'2020'
Institute Name: Thapar Institute of Engineering & Technology [IR-E-I-1480]

Sanctioned (Approved) Intake


Academic Year 2018-19 2017-18 2016-17 2015-16 2014-15 2013-14

UG [4 Years Program(s)] 1865 1625 1480 1270 - -

PG [2 Year Program(s)] 390 390 - - - -

PG-Integrated 90 75 90 90 0 -

Total Actual Student Strength (Program(s) Offered by Your Institution)


(All programs No. of Male No. of Female Total Students Within State Outside State Outside Economically Socially No. of students No. of students No. of students No. of students
of all years) Students Students (Including male (Including male Country Backward Challenged receiving full receiving full receiving full who are not
& female) & female) (Including male (Including male (SC+ST+OBC tuition fee tuition fee tuition fee receiving full
& female) & female) Including male reimbursement reimbursement reimbursement tuition fee
& female) from the State from Institution from the Private reimbursement
and Central Funds Bodies
Government

UG [4 Years 5106 1190 6296 2910 3318 68 570 379 7 334 2 606
Program(s)]

PG [2 Year 232 172 404 155 249 0 75 21 0 25 0 71


Program(s)]

PG-Integrated 161 42 203 46 157 0 92 2 0 3 0 91

Placement & Higher Studies

UG [4 Years Program(s)]: Placement & higher studies for previous 3 years


Academic Year No. of first year No. of first year Academic Year No. of students Academic Year No. of students No. of students Median salary of No. of students
students intake in the students admitted in admitted through graduating in placed placed selected for Higher
year the year Lateral entry minimum stipulated graduates(Amount in Studies
time Rs.)

2013-14 945 853 2014-15 116 2016-17 939 760 600000(Six Lakhs) 88

2014-15 1230 1206 2015-16 103 2017-18 1234 811 620000(Six Lakhs 14
Twenty Thousand)

2015-16 1270 1274 2016-17 120 2018-19 1270 1040 630000(Six Lakhs 63
Thirty Thousand)

PG [2 Years Program(s)]: Placement & higher studies for previous 3 years


Academic Year No. of first year No. of first year Academic Year No. of students graduating in minimum No. of students Median salary of No. of students
students intake in the students admitted in stipulated time placed placed selected for Higher
year the year graduates(Amount in Studies
Rs.)

2015-16 620 359 2016-17 349 146 440000(Four Lakhs 90


Forty Thousand)

2016-17 390 295 2017-18 285 125 600000(Six Lakhs) 41


2017-18 390 247 2018-19 244 95 800000(Eight Lakhs) 130

PG-Integrated [5 Years Program(s)]: Placement & higher studies for previous 3 years
Academic Year No. of first year No. of first year Academic Year No. of students graduating in minimum No. of students Median salary of No. of students
students intake in the students admitted in stipulated time placed placed selected for Higher
year the year graduates(Amount in Studies
Rs.)

2012-13 30 30 2016-17 29 12 579000(Five Lakh 1


Seventy Nine)

2013-14 0 0 2017-18 0 0 0(Zero) 0

2014-15 0 0 2018-19 0 0 0(Zero) 0

Ph.D Student Details


Ph.D (Student pursuing doctoral program till 2018-19)

Total Students

Full Time 472

Part Time 303

No. of Ph.D students graduated (including Integrated Ph.D)

2018-19 2017-18 2016-17

Full Time 35 28 39

Part Time 42 45 65

Financial Resources: Utilised Amount for the Capital expenditure for previous 3 years
Financial Year 2018-19 2017-18 2016-17

Utilised Amount Utilised Amount Utilised Amount

Annual Capital Expenditure on Academic Activities and Resources (excluding expenditure on buildings)

Library 12914000 (One Crore Twenty Nine Lakhs Forteen thousand) 4247000 (Forty Two Lakh Forty Seven Thousand) 16500000 (One Crore Sixty Five Lakh )

New Equipment for Laboratories 21258000 (Two crore Twelve lakh Fifty Eight Thousand) 69318000 (Six Crore Ninty Three Lakh Eighteen Thousand) 125279000 (Twelve Crore Fifty Two Lakh Seventy Nine
Thousand)

Engineering Workshops 31651000 (Three Crore Sixteen Lakh Fifty One Thousand) 9196000 (Ninty One Lakh Ninty Six Thousand) 18685000 (One Crore Eighty Six Lakh Eighty Five Thousand)

Other expenditure on creation of Capital Assets (excluding 224323000 (TWENTY TWO CRORE FORTY THREE LAKH 40273000 (Four Crore Two Lakh Seventy Three Thousand) 238877000 (Twenty Three Crore Eighty Eight Lakh Seventy
expenditure on Land and Building) TWENTY THREE THOUSAND ) Seven Thousand)

Financial Resources: Utilised Amount for the Operational expenditure for previous 3 years
Financial Year 2018-19 2017-18 2016-17

Utilised Amount Utilised Amount Utilised Amount

Annual Operational Expenditure

Salaries (Teaching and Non Teaching staff) 1232133000 (Twelve Crore Thirty Two Lakh ) 973844000 (Nine Seven Crore Thirty Eight Lakh Forty Four 736774000 (Seventy Three Crore Sixty Seven Lakh Seventy
Thousand) Four Thousand)
Maintenance of Academic Infrastructure or consumables, 722522280 (SEVENTY TWO CRORE TWENTY FIVE LAKH 468269000 (Forty Six Crore Eighty Two Lakh Sixty Nine 373198000 (Thirty Seven Crore Thirty One Lakh Ninty Eight
other running expenditures etc.(excluding maintenance of TWENTY TWO THOUSAND TWO HUNDRED AND EIGHTY Thousand) Thousand)
hostels and allied services) ONLY )

Seminars/Conferences/Workshops 75749000 (Seven Crore Fifty Seven Lakh Forty Nine 39528000 (Three Crore Ninty Five Lakh Twenty Eight 4438000 (Forty Four Lakh Thirty Eight Thousand)
Thousand) Thousand)

PCS Facilities: Facilities of physically challenged students


1. Do your institution buildings have Lifts/Ramps? Yes, more than 80% of the buildings

2. Do your institution have provision for walking aids, includingwheelchairs and transportation from one building to another for Yes
handicapped students?

3. Do your institution buildings have specially designed toilets for handicapped students? Yes, more than 80% of the buildings

You might also like