Burgur palace DEA problem

Efficiency optimization
U1 V1 V2
Constraint 1 100 -2 -200
Constraint 2 100 -4 -150
Constraint 3 100 -4 -100
Constraint 4 100 -6 -100
Constraint 5 100 -8 -80
Constraint 6 100 -10 -50
Constraint 7 2 200
Profit per bag 100 0

Model
Decision variables
U1 V1 V2
Efficiency parameter 0.01 0.166667 0.003333

Maximize total profit 1

Constraints
Constraint 1 0 <= 0
Constraint 2 -0.166667 <= 0
Constraint 3 0 <= 0
Constraint 4 -0.333333 <= 0
Constraint 5 -0.6 <= 0
Constraint 6 -0.833333 <= 0
Constraint 7 1= 1
Microsoft Excel 16.0 Answer Report
Worksheet: [Burger Palace S1.xlsx]Sheet2
Report Created: 29-11-2020 05:17:43 PM
Result: Solver found a solution. All Constraints and optimality conditions are satisfied.
Solver Engine
Engine: Simplex LP
Solution Time: 0.016 Seconds.
Iterations: 4 Subproblems: 0
Solver Options
Max Time Unlimited, Iterations Unlimited, Precision 0.000001, Use Automatic Scaling
Max Subproblems Unlimited, Max Integer Sols Unlimited, Integer Tolerance 1%, Assume NonNegative

Objective Cell (Max)


Cell Name Original Value Final Value
$B$20 Maximize total profit U1 1 1

Variable Cells
Cell Name Original Value Final Value Integer
$B$18 Efficiency parameter U1 0.01 0.01 Contin
$C$18 Efficiency parameter V1 0.1666666667 0.16666666667 Contin
$D$18 Efficiency parameter V2 0.0033333333 0.00333333333 Contin

Constraints
Cell Name Cell Value Formula Status Slack
$B$24 Constraint 1 U1 0 $B$24<=$D$24 Binding 0
$B$25 Constraint 2 U1 -0.166666667 $B$25<=$D$25 Not Binding 0.166666667
$B$26 Constraint 3 U1 1.110223E-16 $B$26<=$D$26 Binding 0
$B$27 Constraint 4 U1 -0.333333333 $B$27<=$D$27 Not Binding 0.333333333
$B$28 Constraint 5 U1 -0.6 $B$28<=$D$28 Not Binding 0.6
$B$29 Constraint 6 U1 -0.833333333 $B$29<=$D$29 Not Binding 0.833333333
$B$30 Constraint 7 U1 1 $B$30=$D$30 Binding 0
$B$18 Efficiency parameter U1 0.01 $B$18>=0 Not Binding 0.01
$C$18 Efficiency parameter V1 0.1666666667 $C$18>=0 Not Binding 0.166666667
$D$18 Efficiency parameter V2 0.0033333333 $D$18>=0 Not Binding 0.003333333
Microsoft Excel 16.0 Sensitivity Report
Worksheet: [Burger Palace S1.xlsx]Sheet2
Report Created: 29-11-2020 05:17:43 PM

Variable Cells
Final Reduced Objective Allowable Allowable
Cell Name Value Cost Coefficient Increase Decrease
$B$18 Efficiency parameter U1 0.01 0 100 1E+030 100
$C$18 Efficiency parameter V1 0.1666666667 0 0 0 3
$D$18 Efficiency parameter V2 0.0033333333 0 0 300 0

Constraints
Final Shadow Constraint Allowable Allowable
Cell Name Value Price R.H. Side Increase Decrease
$B$24 Constraint 1 U1 0 1 0 1 0.384615385
$B$25 Constraint 2 U1 -0.166666667 0 0 1E+030 0.166666667
$B$26 Constraint 3 U1 1.110223E-16 0 0 0.2 1
$B$27 Constraint 4 U1 -0.333333333 0 0 1E+030 0.333333333
$B$28 Constraint 5 U1 -0.6 0 0 1E+030 0.6
$B$29 Constraint 6 U1 -0.833333333 0 0 1E+030 0.833333333
$B$30 Constraint 7 U1 1 1 1 1E+030 1
Microsoft Excel 16.0 Limits Report
Worksheet: [Burger Palace S1.xlsx]Sheet2
Report Created: 29-11-2020 05:17:44 PM

Objective
Cell Name Value
$B$20 Maximize total profit U1 1

Variable Lower Objective Upper Objective


Cell Name Value Limit Result Limit Result
$B$18 Efficiency parameter U1 0.01 0 0 0.01 1
$C$18 Efficiency parameter V1 0.166666667 0.166666667 1 0.166666667 1
$D$18 Efficiency parameter V2 0.003333333 0.003333333 1 0.003333333 1
Burgur palace DEA problem

Efficiency optimization
U1 V1 V2
Constraint 1 100 -2 -200
Constraint 2 100 -4 -150
Constraint 3 100 -4 -100
Constraint 4 100 -6 -100
Constraint 5 100 -8 -80
Constraint 6 100 -10 -50
Constraint 7 2 200
Profit per bag 100 0

Model
Decision variables
U1 V1 V2
Efficiency parameter 0.01 0.166667 0.003333

Maximize total profit 1

Constraints
Constraint 1 0 <= 0
Constraint 2 -0.166667 <= 0
Constraint 3 0 <= 0
Constraint 4 -0.333333 <= 0
Constraint 5 -0.6 <= 0
Constraint 6 -0.833333 <= 0
Constraint 7 1= 1