AIN TSILA DEVELOPMENT PROJECT

A-CNT-CON-000-00282

NIGHT SHIFT WORK INSPECTION CHECKLIST

Item Yes No N/A


Construction Check Sheet Remarks Action by
No. Tick apt box
Permit to Work shall be raised in advance prior to
1.1
commence the job.
1.2 PTW is signed and revalidated for the specific day?
1.3 JSA for nightshift work shall be made available.
Separate TBT for Nightshift work as per JSA to be
1.4
discussed before commencing the job.
Supervisor and HSE shall be made available at all
1.5
times during work?
Sufficient lightning is provided with a minimum of 80
1.6
lux for People and equipment working area?
Is safe and clear access provided for people,
1.7
equipment and ambulance in-case of emergency?
Are there protection / guards to stop people and
1.8
materials falling in?
Adequate work zone segregation with barriers and
1.9
signage in place before work commence?
Available competent banks man using light baton
1.10
instead of flag?
Is there an adequate supply of water?
1.11
Monitoring of heat stress index.
Provided personnel to do the housekeeping prior to
1.12
leave the working area?

NOTES:

INSPECTED BY:
Name Designation Badge No. Date Signature Area Inspected
P. Authority
Performer