This document is a mobile crane pre-use inspection checklist used by Ain Tsila Development Project. It lists 36 items that are inspected on a daily basis, including checks of the engine, hydraulic and air systems, fuel levels, brakes, lights, tires, leaks, safety equipment, and controls to ensure the crane is safe for operation. The checklist is signed by the inspector and includes the inspection dates and responsible contractor.
This document is a mobile crane pre-use inspection checklist used by Ain Tsila Development Project. It lists 36 items that are inspected on a daily basis, including checks of the engine, hydraulic and air systems, fuel levels, brakes, lights, tires, leaks, safety equipment, and controls to ensure the crane is safe for operation. The checklist is signed by the inspector and includes the inspection dates and responsible contractor.
This document is a mobile crane pre-use inspection checklist used by Ain Tsila Development Project. It lists 36 items that are inspected on a daily basis, including checks of the engine, hydraulic and air systems, fuel levels, brakes, lights, tires, leaks, safety equipment, and controls to ensure the crane is safe for operation. The checklist is signed by the inspector and includes the inspection dates and responsible contractor.
A-CNT-CON-000-00282 MOBILE CRANE PRE-USE INSPECTION CHECKLIST
Sl ITEMS SAT SUN MON TUE WED THU FRI COMMENTS
1 Engine oil level is acceptable 2 Hydraulic fluid level id acceptable 3 There is no leakage from hydraulic system 4 There is no leakage from air system 5 Fuel tank is in good condition 6 There is enough fuel in the fuel tank 7 Brakes are in good condition without any leakage 8 Park brakes are in good condition 9 Front and rear lights are in good condition and functioning properly 10 Tyres/wheels are in condition with proper inflation 11 There is no leakage from underneath the crane 12 Steps and handholds are in good condition and clean 13 Rollover protective structures are in good condition 14 Windshield wipers and washers are in good condition 15 Washer bottle is full Doors are in good condition without any broken glass and opening 16 properly
17 Exhaust emission is acceptable 18 Engine guarding is in place 19 Boom is in good condition 20 Wire rope is in good condition without kinks, dirt, excess lube 21 Wire rope is spooled correctly 22 Reeving is correct 23 Wedge sockets and wire rope clips are in good condition 24 Block is in good condition 25 Ball and hook are free to swivel and rotate 26 Outriggers and rams are operational and without any leaks 27 Outrigger mats are available and in good condition 28 Correct counterweight is available for the load to be listed AIN TSILA DEVELOPMENT PROJECT A-CNT-CON-000-00282 MOBILE CRANE PRE-USE INSPECTION CHECKLIST
Sl ITEMS SAT SUN MON TUE WED THU FRI COMMENTS
29 Main hoist control is functioning properly 30 Auxiliary hoist control is functioning properly 31 Anti2block is in place and functioning properly 32 Swing brake is functioning properly 33 Safe Working Load (SWL) is clearly marked on the crane 34 Current color coding is visible on the crane and lifting accessories Lifting accessories (slings, web slings, chains, u-bolts, spreader beams, 35 etc.) are in good condition with clear SWL marking
36 Tag lines having sufficient length are available CAB 1 Fire extinguisher is in place 2 Load chart is legible and visible to operator 3 Load moment indicator is operational Indicators (drum rotation, boom length and boom angle) are functioning 4 properly
Horn, amber flashing beacon and reversing alarm are in good working 5 condition
6 Seat and seat belt are in good condition
7 Pedals are in good condition 8 Mirrors and windows are in good condition Operator instruction, in a language that can be fully understood by the 9 operator, is available
10 Copy of the 3rd Party Certificate is available
Inspected by: From Date : To Date :
Signature : Responsible Contractor: Note: Use (/) if it is OK, put (X) if not OK and put NA if Not Applicable