You are on page 1of 2

Date 29-03-2023 Ref: WD/AMESL/23/05

To
Alif Marine & Engineering Services Ltd.
24 Halishahar H/E, Road-1, Block-H,
Halishahar, Chittagong

Work Completion Certificate


This is to certify that Alif Marine & Engineering Services Ltd. has successfully finished these jobs
described below between 20 Jan-2023 and 29 March-2023 and handed over the barge crane to Jamuna
Ship Breakers, As-salam Tower (10th floor), 57, Agrabad, Chattogram.

Sl.
Description of Item/Work Qty. Remarks
No.
Crane-mounted Barge design, Design approval & Certificate,
Fabrication, Crane Dismantling & Re-installation, Generator 01
installation & Painting
Assessment and preparation jobs done with resources to shift the
1 Satisfactory
crane from the vessel to the barge.
Crane-Barge Design done by a panel architect of the DG Shipping
(Govt.) and an approval certificate taken therefrom.

2 Design Approval Certificate No.: 02.00001513 (Dated 18-01-2023) Satisfactory


Length Over All (LOA): 47.60m;
Breadth: 12.80m;
Depth: 2.13m
Crane Shifting jobs from the vessel to the barge and fitting on barge
3 jobs done with available gears and supporting machines with safety Satisfactory
measure.
Crane machineries hydraulic pipe line found satisfactory as following:
-Hydraulic main pump to Hoisting motor line pipe
4 -Hydraulic main pump to luffing motor line pipe Satisfactory
-Hydraulic manifold to slewing motor line pipe
-Slewing brake line in and out line pipes
5 Hyd. line Main filter found satisfactory. Satisfactory
System Hyd. oil tank and gear boxes cleaned.
6 Satisfactory
Gear boxes replenished with gear oil.
7 Hyd. tank level float switch made free and functional. Satisfactory
8 Hydraulic line purging cocks dismantled, cleaned and fitted back Satisfactory
9 Hydraulic full system line flushed with oil and air. Satisfactory
10 System charged with hydraulic oil and purged properly. Satisfactory
Crane operating handles switching tension cables made free from the
11 Satisfactory
operator cabin.
Crane’s main electrical motor and cooling fan motor body, and
12 Satisfactory
cooling fan cleaned; insulation checked and found satisfactory.
Rope slag limit switch to solenoid line function checked and found
13 Satisfactory
satisfactory.
Crane operating all electrical panels assorted switches, breakers,
14 contractors, relay, fuses and line joint bars, cables cleaned and Satisfactory
checked, and found satisfactory.
Crane jib safe limit (upper and lower) and hoisting safe limit
15 Satisfactory
established, tested and found satisfactory.
Secured and established newly Main power cable from crane power
16 Satisfactory
panel to the Generator power panel.
17 Checked main power cable insulation, and found satisfactory. Satisfactory
Checked hydraulic System tank lower oil level safe trip, and found
18 Satisfactory
satisfactory.
19 Crane slewing made functional for 360 Degree rotations. Satisfactory
20 Crane machinery cabin cleaned and arranged lighting /bulb. Satisfactory
21 Crane wire rope installation job done newly with old existing one. Satisfactory
Existing Jib stand and crane Hook lashing eye strap installed on barge
22 Satisfactory
deck.
23 Generator service tank cleaned and reinstalled. Satisfactory
Crane frequently tried out with load for hoisting, luffing and slewing
(360deg) operation, found satisfactory without any abnormalities and
24 system oil leakage. It was done with attendance of the company
engineers and operators. The operators have been trained and
advised properly to handle the unit.
25 Required painting work done. Satisfactory

General Manager