Elevator Periodic Service and Maintenance Work report Check List For the
Month of January 2020 (Preheater Elevator)
Building: Dangote Cement (Ethiopia) Plant Elevator Contract No: - 45NS0703
Yes NO
Checked N/A
1. Fan of the controller working?
2. Check relays fuses, holders, etc.
5. REM systems
6. Governor ropes clean no lubricant added
8. Checked RBI
11. Check guide shoes or rollers
12. Brake lining wear or condition
13. Car and CW Guide rail lubricated
14. Car door contact condition
15. Check tensions of Belts?
16. Hoist way door interlocks condition, adjustment,
17. Check Traveling cables, condition, and attachment
20. Button & key switches free from sticking and plugging
21. Check Indicator & signal lamps
22. Checked Earth quick sensor
Remark: - Preheater elevator was out of ordered due to landing door lock
problem at 7th floor. Accordingly, having adjusting the landing door lock
mechanisms then the elevator became operational.
Preheater elevator was out of ordered due to landing door lock problem at 7 th floor
preheater elevator needs preventive service work .