NOIDA METRO RAIL CORPORATION LTD. No : RS/MW/GND/40
ROLLING STOCK DEPARTMENT Rev No: 00
PREVENTIVE MAINTENANCE RECORD DATE : Name of M&P: E.O.T CRANE SCHEDULE : Yearly
E.O.T CRANE Location: IBL ………
Note: This Checklist for ‘Monthly’ Service Checks should be applied Capacity_____ to the Time period scheduled, since the last Service. Downtime Man Hours Skill Requirements 4 Hrs 2 Mechanical & Electrical Work Preparation 1. Safety Switch off the power supply prior to any maintenance and put UNDER MAINTENANCE Board on the panel, also switch off the CB of respective crane. 2. Tools and Equipments Required (a) Scissor Lift (b) Torch (c) Spanners (d) Dust clothes (e) Sand papers (f) Safety Helmet (g) WD-40 (h) Grease. (i) Lubrication Oil Task Equipment Maintenance Actions OK / Remarks No NOT OK CRANE BRIDGE 1 Main Girder Check for any Mechanical Damage. Check for any weld seems for cracks.
2 Limit Check operation for cut off.
switches Unscrew and remove the limit switches and then clean all limit switches CONTROL SYSTEM 3 Emergency Check operation of emergency switch. switch 4 Hoist limit Check operation of limit switches. switches Unscrew and remove the limit switch and then clean limit switch. 5 Interlocking Check interlocking of main supply rotary switch with castle key. Check interlocking of pendant box lock with castle key. Check contactor & MCB for sparking, change if required.
Check working of all push buttons in pendant.
7 Check all overhead and platform lights are
Power working, supply Check all buzzer/alarm system is working.
Check for any damage of stationary cable,
DSL (Down Shop Lead) cable and pendant cable. Check UP/Down movement of hoist. 8 Operation Check cross movement of hoist. Check longitudinal movement of the crane. 9 Greasing Apply grease on wire ropes and rope drum. Check rope wire for any broken stand.
Check hook and hook safety latch for any
crack or damage. 10 Miscellaneo Air cleaning of crane bridge platform, cabin us etc.