尼日利亚 Ogunjinni-Owulade Irawo 公路软土路基处理说明

Treatment instructions for Soft soil foundation of Ogunjinni-owulade


Irawo Road, Nigeria
根据现场钻探结果,沼泽地段软土厚度约 25m 左右。为满足工后沉降
和承载力要求,沼泽地段地基采用水泥搅拌桩加固,桩长 8m,桩间距
1.3m,梅花形布置。水泥搅拌桩措施代表横断面如下:
According to the results of Field borehole exploration, the thickness of
the soft soil in the marsh area is about 25m. In order to meet the
requirements of post-construction settlement and bearing capacity, the
foundation of the marsh area is reinforced with cement mixing piles, the pile
length is 8m, the pile spacing is 1.3m, and Arrange in the shape of the plum
blossom. The representative cross section of cement mixing pile measures is
as follows: